Loading...
HomeMy WebLinkAbout2660135 - Chief Executives OrderMONAGHAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: P867-26 Reference Number: 26/60135 Name of Applicant: The Board of Management St Louis Secondary School Address: Sebana Moynagh KSNPM M11 Business Campus Innovation House, Gorey, Co. Wexford Y25A8H2 Nature of Application: Permission for a development which will consist of the installation of a new predominantly two -storey school building, with a third -storey circulation core at 2nd floor level, and a new pedestrian access bridge from the existing carpark level to the 2nd floor level of the proposed new school building. The proposed development (1010m2) includes 2 no. Mainstream Classrooms, 1 no. Science Lab & Prep Area, 2 no. Art Rooms; and all associated site and ancillary works The above proposed development consists of works within the curtilage of protected structures including: Convent of Saint Louis School Building (Reg No: 41310083); Convent of Saint Louis School Building (Reg No: 41310084); Convent of Saint Louis Church/Chapel (Reg No: 41310085); Saint Louis Convent National School (Reg No: 41310064); Convent of Saint Louis Stables (Reg No: 41310065); Saint Louis Convent/Nunnery (Reg No. 41310066); Convent of Saint Louis Gates/Railings/Boundary Walls (Reg No: 41310067); School House (Reg No: 41310072). There are also two recorded monuments within the curtilage of the proposed site: Fortified House and Bawn: Drummond Otra (Reg No. MO031-034) Location of Development:St Louis Secondary School Carrickmacross Co Monaghan ORDER: I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001 (as amended) to grant permission for the above development in accordance with documents submitted, subject to the 5 condition(s) set out in the Schedule attached hereto. I further decide that PERMISSION be granted subject to the same conditions on the expiration of the period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no appeal before An Coimisiun Pleanala. Adrian Hughes SENIOR PLANNER Date 26/60135 The Board of Management St Louis Secondary School, St Louis Secondary School, Carrickmacross, Co Monaghan. 1. Prior to the commencement of development, a Construction and Traffic Management Plan (CTMP) shall be submitted to and agreed in writing with the Planning Authority. The CTMP shall provide details of construction traffic management, contractor parking, delivery arrangements, wheel washing, road cleaning, noise control and measures to prevent pollution during construction. The development shall be carried out in accordance with the agreed CTMP. Reason: To ensure that the development is carried out in an orderly and planned manner. All construction and/or demolition activity shall be restricted to the hours 08:00 to 18:00 Monday to Friday and the hours 09:00 to 13:00 on Saturdays, unless otherwise agreed in writing with the Planning Authority. No works shall take place on Sundays, bank holidays or public holidays. Reason: To ensure that the development is carried out in an orderly and planned manner. 3. Development within the site in respect of water services shall be to standards as required by Uisce Eireann. Reason: In the interests of orderly development, public health and securing a satisfactory standard of development. 4. a) All surface water arising from the development shall be disposed of in accordance with the details submitted. b) The developer shall ensure that adequate measures are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any watercourse or drains. c) Any construction and demolition waste shall be appropriately recovered/disposed of by a registered, qualified waste contractor in accordance with the Waste Management Act 1996 (as amended) and shall suitably incorporate any hazardous waste, including asbestos. public health. Reason: In the interests of environmental protection, public health and the orderly development of the area. The development shall be carried out strictly in accordance with the plans and documents submitted on the 14/04/2026 as amended on the 04/08/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of proper planning and sustainable development. Adrian Hughes Senior Planner Date