Loading...
HomeMy WebLinkAbout2660021 - F.I. Received Doc. - Infiltration Rate at Drumbear Infiltration Rate at Drumbear, Co. Monaghan. Client: HSE RECEIVED: 25/08/2026 Trial Pit No. 1 Trial Pit Local Landmarks RECEIVED: 25/08/2026 Dimensions of Trial Pit 1.5 m long x 0.7 m wide x 1.4 m deep RECEIVED: 25/08/2026 Infiltration Rate Calculation Graph – Depth of Water vs Time in Trial Pit Depth of water during test = 75% - 25% empty = (0.89 – 0.30) = 0.59 m Vp = Length x Width x (75% empty – 25% empty) Vp= 1.5 x 0.7 x (0.89 – 0.30) = 0.6248 m3 Ap50 = ((Length + Width) x 2) (75% empty – 25% empty) + (Length x Width) Ap50 = ((1.5 + 0.7) x 2) (0.89 – 0.30) + (1.5 x 0.7) = 3.6680 m2 Infiltration rate = Vp / (Ap50 x 75% - 25% empty time x 60) = 0.6248 / (3.6680 x 4300 x 60) = 6.60 x10-7 m/s Soil Infiltration Test 1: Conducted on-site, yielding an infiltration rate of 6.602 x10-7 m/s 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 (Day 0)9.52 10.55 12.05 16.53 (Day 1)10.06 16.39 (Day 2)10.42 16.09 (Day 3)12.04 17.46 (Day 4) 11.35 Plot of Water Depth (m) V Time Time taken to drop from 75% to 25% full depth = 4300 minutes RECEIVED: 25/08/2026 Trial Pit No. 2 Trial Pit Local Landmarks RECEIVED: 25/08/2026 Dimensions of Trial Pit 1.45 m long x 0.75 m wide x 1.5 m deep RECEIVED: 25/08/2026 Infiltration Rate Calculation Graph – Depth of Water vs Time in Trial Pit Depth of water during test = 75% - 25% empty = (0.99 – 0.33) = 0.66 m Vp = Length x Width x (75% empty – 25% empty) Vp= 1.45 x 0.75 x (0.99 – 0.33) = 0.7178 m3 Ap50 = ((Length + Width) x 2) (75% empty – 25% empty) + (Length x Width) Ap50 = ((1.45 + 0.75) x 2) (0.99 – 0.33) + (1.45 x 0.75) = 3.9915 m2 Infiltration rate = Vp / (Ap50 x 75% - 25% empty time x 60) = 0.7178/ (3.9915 x 1050 x 60) = 2.85 x10-6 m/s Soil Infiltration Test 2: Conducted on-site, yielding an infiltration rate of 2.854 x10-6 m/s 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 9.54 10.55 12.05 16.43 (Day 1)12.39 Plot of Water Depth (m) V Time Time taken to drop from 75% to 25% full depth = 1050 minutes RECEIVED: 25/08/2026 Trial Pit No. 3 Trial Pit Local Landmarks RECEIVED: 25/08/2026 Dimensions of Trial Pit 1.4 m long x 0.65 m wide x 1.6 m deep RECEIVED: 25/08/2026 Infiltration Rate Calculation Graph – Depth of Water vs Time in Trial Pit Depth of water during test = 75% - 25% empty = (0.95 – 0.32) = 0.63 m Vp = Length x Width x (75% empty – 25% empty) Vp= 1.4 x 0.65 x (0.95 – 0.32) = 0.5733 m3 Ap50 = ((Length + Width) x 2) (75% empty – 25% empty) + (Length x Width) Ap50 = ((1.4 + 0.65) x 2) (0.95 – 0.32) + (1.4 x 0.65) = 3.4930 m2 Infiltration rate = Vp / (Ap50 x 75% - 25% empty time x 60) = 0.5733 / (3.4930 x 430 x 60) = 6.36 x10-6 m/s Soil Infiltration Test 3: Conducted on-site, yielding an infiltration rate of 6.362 x10-6 m/s 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 10.03 10.56 12.05 16.40 17.47 19.25 20.35 Plot of Water Depth (m) V Time Time taken to drop from 75% to 25% full depth = 430 minutes RECEIVED: 25/08/2026 RECEIVED: 25/08/2026