HomeMy WebLinkAbout2660277 - F.I. Request Letter 25/08/2026 Uisce Éireann C/O Ryan Hanley Ltd 1 Galway Business Park Dangan Galway H91 A3EF Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60277 - permission to apply for a 10-year planning permission for development at the site, which covers an area of approx. 0.36 hectares and includes: the existing 98 Avenue Wastewater Pumping Station site within Barry McGuigan Park; lands located approx. 110 metres north of the existing 98 Avenue Wastewater Pumping Station site; part of 98 Avenue (R183 Regional Road); and part of an adjacent unnamed road The development will consist of: 1.Alterations to the existing 98 Avenue Wastewater Pumping Station site within Barry McGuigan Park, comprising: a) Demolition and removal of existing valve chamber, control kiosks, and fencing.b) Repurposing of the existing Wastewater Pumping Station wet well chamber into an overflow chamber with associated interconnecting pipework and manholes.c) Reinstatement works for soft landscaping, including return of the existing Wastewater Pumping Station and control kiosks footprints to parkland, and all associated above and below ground ancillary works including site works and temporary working areas. 2.Construction of a new Wastewater Pumping Station site within lands located approx. 110 metres north of the existing 98 Avenue Wastewater Pumping Station site, comprising: a)Partial demolition of the existing brick site boundary wall.b)Below ground construction of wet well, valve chamber, air valve chamber, flowmeter chamber, and emergency storage tank with 6 hours storage capacity, and interconnecting pipework and manholes.c) Above ground construction of a vent stack, control kiosk, welfare kiosk, ESB meter cabinet, and gantry crane.d)Construction of a new site access, to incorporate a security palisade gate and full site perimeter fencing and protection bollards for setback from road verge.e)Construction of the internal site access and turning area.f) Proposed hard and soft landscaping works to include screen planting.g)All associated ancillary works including site works and temporary working areas.3.Below ground construction of approx. 176m of wastewater gravity and approx. 157m of wastewater rising main and all associated above and below ground ancillary works, including carriageway reinstatement, within part of 98 Avenue (R183 Regional Road) and within part of an unnamed adjacent road to connect the proposed new 98 Avenue Wastewater Pumping Station to the existing Clones wastewater network. at 98 Avenue, Largy, Clones, Co. Monaghan. _______________________________________________________ Dear Sir/Madam, With reference to the above application, I am to inform you that the information submitted is not adequate to enable a decision to be made. In accordance with the provisions of Article 33 of the Planning and Development Regulations 2001 (as amended) you are hereby requested to submit further information as set out on the attached page. Article 33(3) states that “where a requirement under sub-article (1) or sub-article (2) (Clarification) is not complied with within the period of 6 months from the date of the requirement for further information, or such additional period, not exceeding 3 months, as may be agreed by the Planning Authority, the planning application shall be declared to be withdrawn”. It should be noted that you will be required to give notice in an approved newspaper under article 35(1)(a) and erect a site notice in accordance with Article 35 (1)(b) of the Planning and Development Regulations 2001 (as amended) if the further information received is considered to contain significant additional data. Please Note: 4 copies of Additional Information to be submitted. In the case of Significantly Different Information, 6 copies of additional information to be submitted. Yours faithfully, __________________________ ADMINISTRATIVE OFFICER pp 26/60277 Uisce Éireann 98 Avenue, Largy, Clones, Co. Monaghan ADDITIONAL INFORMATION 1. The Applicant has submitted a Site Layout Plan showing a new vehicular access onto the Local Tertiary Road (cul-de-sac), however no information with regard to visibility splays have been included. It is noted that onto a Cul-de-sac road, visibility splays of 35m x 2.4m x 1.05m are required in accordance with Section 15.23 of Monaghan County Development Plan 2025-2031. In this regard, the applicant is requested to submit: a) A revised Site Layout Plan (1:500 scale) indicating how a clear and unobstructed visibility splay of 35m can be achieved at the proposed entry/exit point onto the cul- de-sac in a southerly direction. i. The required visibility splays should be provided from a point in the centre of the entrance, 2.4 metres from the road edge at a height of 1.05 metre to 2.0 metres above ground level. Sight distances to be measures to the nearest road edge in both directions. The submitted revised site layout plan should demonstrate all necessary site work, including the extent of the front boundary hedge and trees which would be required to be removed/trimmed, re-grading of side banks etc to achieve the required sight distances. ii. Where the sight distances are not achievable within the applicant’s ownership, the applicant should submit Legal Agreements with adjoining landowners giving their consent to allow re-locating of obstruction impeding on the visibility splays, removal of their hedgerow and hedges trimmed regularly to provide the required sight distance. The Legal Agreement and accompanying Maps shall be signed by the landowner, the applicant and witnessed by a Solicitor in accordance with exact wording of Appendix 13 of Monaghan County Development Plan 2025-2031. 2. The proposed development is considered insufficient in terms of the environmental information provided. In this regard, the applicant is requested to: a) Submit a fully completed water protection checklist. b) Confirm if stormwater overflow emission point TPEFF2400D0206SW004 will be decommissioned or retained as part of the proposed development. c) Provide details of any proposed overflow to waters associated with the replacement pump station to include the discharge location and discharge route to nearby surface waters. Details shall be sufficient to demonstrate that the proposed development will not negatively impact on the receiving watercourse. d) Provide details of future monitoring to be carried out on any storm overflow emission point to waters. e) Submit a revised site layout plan clearly showing i. The route of any proposed overflow to adjacent waters ii. The location of any proposed overflow and the hydrological connection to receiving waters. iii. The receiving waters. The planner dealing with this application is Catherine Toner