HomeMy WebLinkAbout2660301 - Chief Executives OrderMONAGHAN COUNTY COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No: P875-26
Reference Number: 26/60301
Name of Applicant: Mary McKenna
Address: Patrick Ruxton
Corgreagh
Shercock
County Monaghan
A81 PW32
Nature of Application: Permission to remove thatch and dormer windows to existing roof of
single storey dwelling house and replace with slate, elevational
changes, existing entrance and sewerage connection and all
associated site works
Location of Development: Mullaghmore West
Ballinode
Co Monaghan
ORDER:
I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended)
and the Planning and Development Regulations 2001 (as amended) to grant permission for the above
development in accordance with documents submitted, subject to the 7 condition(s) set out in the
Schedule attached hereto.
I further decide that PERMISSION be granted subject to the same conditions on the expiration of the
period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no
appeal before An Coimisiun Pleanala.
Adrian Hughes
SENIOR PLANNER
26.c��• 2�
Date
26/60301 Mary McKenna Mullaghmore West, Ballinode, Co Monaghan.
1.
a) Prior to the commencement of development the applicant shall submit to the Planning Authority,
for agreement in writing, a site -specific Construction and Demolition Resource Management Plan.
b) The submitted plan shall have regard to EPA publication 'Best Practice Guidelines for the
preparation of Resource and Waste Management Plans for construction and demolition projects'
(2021).
c) The development shall be carried out in accordance with the details agreed under (a) above.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
2.
a) Prior to the commencement of development, the applicant shall submit the following to the
Planning Authority for agreement in writing;
i) a revised site layout plan, scale 1:500, demonstrating;
• all surface/storm water drainage systems (outlined in blue).
• the directional flow of all surface water pipelines.
• all associated discharge points and outfalls.
• all foul water drainage systems (outlined in red).
ii) a fully completed Water Protection Plan checklist.
b) The development shall be completed, maintained and managed in accordance with the details
agreed under (a) above.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
3.
a) Any construction and demolition waste or excess soil generated during the construction phase
which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste
Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted
facility in accordance with the requirements of the Waste Management Act 1996 as amended using
authorised waste collectors authorised to collect the type of material for disposal/recovery at
authorised treatment facilities.
b) b) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be
collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the
Waste Management Act 1996 as amended.
c) The applicant shall ensure completely separate foul and surface water drainage systems are in place.
d) The applicant shall ensure that adequate measures and precautions are in place for the construction
phase to ensure there is no discharge of polluting matter/sediment laden waters discharging from
the site to any watercourse. These measures shall take account of the guidance produced by Inland
Fisheries Ireland entitled 'Requirements for the Protection of Fisheries Habitat during Construction
and Development Works at River Sites'.
e) Monaghan County Council and Inland Fisheries Ireland (IFI) shall be informed immediately of an
accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may
threaten the quality of any watercourse or groundwater body.
f) Any fuels, oils, greases, hazardous liquid wastes, and hydraulic fluids within the site area shall be
stored on site, away from any watercourses in a bunded, leak -proof, and lockable storage area. Note
that bunds are to be designed to contain 110% of the capacity of the largest storage container
located within the bund. There shall be no overflow drain facility from any bunds on site and all
filling and off -take points shall be located within a bun
g) Material storage, fuel handling, parking areas and other yard activities shall be managed in a manner
which prevents the discharge of polluting matter to ground or surface water.
Reason: In the interests of public health and environmental protection
a) Surface water from the site shall not drain onto the public road or otherwise interfere with the
existing public road drainage system.
b) The discharge of surface water from the public road onto the site through road surface drainage
and road subsoil drainage shall remain unimpeded.
Reason: In the interests of traffic safety and to ensure a satisfactory standard of development.
5.
Any existing mature trees and hedgerow defining the site boundaries and within the site shall be
permanently retained in this development, unless otherwise agreed in writing.
Reason: In the interests of visual amenity.
6.
Development within the site in respect of water and sewerage services shall be to the standards as
required by Uisce Eireann.
Reason: In the interests of orderly development, public health and securing a satisfactory standard
of development.
The development shall be carried out in accordance with plans and documentation submitted to the
Planning Authority on the 16th July 2026, except as may otherwise be required in order to comply with
the above conditions.
Reason: To ensure a satisfactory standard of development.
Adrian Hughes
Senior Planner
Date