HomeMy WebLinkAbout2560419 - Chief Executives OrderMONAGHAN COUNTY COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No:
P864-26
Reference Number:
25/60419
Name of Applicant:
Raymond Prunty
Address:
Owen Cunningham
Thornford Lodge
Broomfield
Castleblayney
A75HE16
Nature of Application: Permission to separate section of existing two storey detached
dwellinghouse and extend same to form 2 No. two storey semi-
detached units comprising: 1) Renovation to existing dwellinghouse
to form a 4 bedroom two storey dwellinghouse. 2) Extension to
separated section to form a new 3 bedroom two storey dwellinghouse
and all associated site development works, Significant further
Information received relates to the retention of existing ancillary
domestic storage shed and revised drawings and Shadow report
Location of Development
ORDER:
31 Knockcarrick
Mullaghduff (DED: Carrikaslane)
Co. Monaghan
I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended)
and the Planning and Development Regulations 2001 (as amended) to grant permission for the above
development in accordance with documents submitted, subject to the 8 condition(s) set out in the
Schedule attached hereto.
I further decide that PERMISSION and RETENTION be granted subject to the same conditions on the
expiration of the period for the taking of an appeal to An Coimisiun Pleanala against this decision if
there is then no appeal before An Coimisiun Pleanala.
Adrian Hughes
SENIOR PLANNER
Date
25/60419 Raymond Prunty 31 Knockcarrick, Mullaghduff (DED: Carrikaslane), Co. Monaghan.
a) The developer shall pay to Monaghan County Council a sum of €1940 in accordance with the
General Development Contribution Scheme 2021-2026 made by the Council under Section 48 of
the Planning and Development Act 2000 (as amended), towards expenditure incurred or proposed
to be incurred by the Council in the provision of community, recreation and amenity public
infrastructure and facilities in the area.
b) The sum attached to this condition shall be revised from the date of the grant of planning
permission to the value pertaining at the time of payment in accordance with the Wholesale Price
Index for Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in full, or until
Monaghan County Council has agreed in writing to a schedule of phased payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the expenditure
incurred or proposed to be incurred by the Council in the provision of community, recreation and
amenity infrastructure and facilities in the area.
2.
a) All construction and demolition activity shall be restricted to the hours 08:00 to 18:00 Monday to
Friday, unless otherwise agreed in writing with the Planning Authority.
b) No work shall take place on Saturdays, Sundays, bank holidays or public holidays.
Reason: In the interest of residential amenity and to ensure that the development is carried out in
an orderly manner.
a) Prior to the commencement of development, details of measures to be employed during the
construction phase to minimise disturbance to adjoining residential properties shall be submitted
to and agreed in writing with the Planning Authority. The submitted details shall include:
I. Arrangements for construction parking.
ii. Storage of materials.
iii. Dust suppression measures.
iv. confirmation of hours of construction activity, in line with Condition 2.
v. Procedures for keeping the adjoining public road free from mud and debris.
b) Development shall be carried out in accordance with the to -be -agreed details.
Reason: In the interest of residential amenity and to ensure that the development is carried out in
an orderly and planned manner.
4.
a) Prior to the commencement of development, a Construction and Demolition Waste Management
Plan shall be submitted to and agreed in writing with the Planning Authority. The plan shall
provide details regarding:
I. The segregation, storage and recovery/recycling of construction and demolition waste.
ii. The disposal of surplus excavated materials.
iii. Measures to prevent pollution arising from construction activities.
iv. The name and contact details of the person responsible for implementation of the plan.
b) Development shall be carried out in accordance with the to -be -agreed details.
Reason: To ensure that the development is carried out in an orderly and planned manner.
Development within the site in respect of water and sewerage services shall be to standards as
required by Irish Water. All surface water from the development shall be disposed of in accordance
with the submitted drainage proposals. All foul effluent shall be discharged to the public foul sewer
network in accordance with the details submitted.
Reason: In the interests of orderly development, public health and securing a satisfactory standard
of development.
The existing shed/garage structure shall be retained and used solely for purposes incidental to the
enjoyment of the associated dwelling and not for any industrial, business, commercial or habitable
residential purposes.
Reason: In the interests of proper planning and sustainable development.
7.
All existing and proposed boundary treatments shall be retained and completed in accordance with
the submitted plans. Any damaged boundary treatments shall be repaired or replaced prior to
occupation of the new dwelling.
Reason: In the interests of residential and visual amenity.
8.
The development shall be carried out strictly in accordance with the plans and documents submitted
on the 17/10/2025 as amended on the 30/07/2026, except as may otherwise be required in order to
comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.
Adrian Hughes
Senior Planner
Date