HomeMy WebLinkAbout2560410 - Appeal NotificationOur Case Number: PL -501960 -MN -26
Planning Authority Reference Number: 2560410
Planning Department
Monaghan County Council
Council Offices
No.1 Dublin Street
Monaghan
Co. Monaghan
Date: 27 August 2026
An
Coimisiun
Pleanala
MON. CO. CO.
PLANNING SECTION
28 AUG 2026
Re: Retention of internal alterations to approved plans under 20/155 including conversion
of attic of for the provision of 9. bedrooms, alterations to layout of ground and first
floor, repurposing of ground floor meeting room to kitchen and laundry facilities and
all associated site works.
Treacys Hotel, Losset Kingscourt Road, Carrickmacross, Co. Monaghan.
Dear Sir/Madam,
Enclosed is a copy of an appeal under the Planning and Development Act, 2000, (as
amended).
1. The planning authority is required to forward specified documents to the Commission under
the provisions of section 128 and section 37(1)(b) of the Planning and Development Act,
2000, (as amended). You are requested to submit these pilot digital planning application
documents to An Coimisiun Pleanala electronically. The documents are to be uploaded
on our digital portal as agreed with the training from the LGMA.
Please upload, within a period of 2 weeks beginning on the date of this letter, the following
documents:-
(i) a copy of the planning application made to the planning authority and a copy of any
drawings, maps (including ordnance survey number) particulars, evidence, a copy of any
environmental impact statement, other written study or further information received or obtained
by your authority in accordance with regulations under the Acts. If practicable, the original of
any drawing with coloured markings should be provided or a coloured copy,
(ii) a copy of any technical or other reports prepared by or for the planning authority in relation
to the application,
(iii) a certified copy of the relevant Manager's Order giving the decision of the planning authority,
(iv) a copy of the notification of decision given to the applicant,
Tell Tel (01) 858 8100
GlaoAitiuil LoCall 1890 275 175
Facs Fax (01) 872 2684 64 Sraid Maoilbhride 64 Marlborough Street
Laithrean Greasain Website www.pleanala.ie Baile Atha Cliath 1 Dublin 1
Riomhphost Email communications@pleanala.ie D01 V902 D01 V902
(v) particulars of the applicant's interest in the land or structure, as supplied to the planning
authority,
(vi) a copy of the published notice and a copy of the text of the site notice erected on the land or
structure.
(vii) a copy of requests (if any) to the applicant for further information relating to the application
under appeal together with copies of reply and documents (if any) submitted in response to
such requests,
(viii) a copy of any written submissions or observations concerning the proposed development
made to the planning authority,
(ix) a copy of any notices to prescribed bodies/other authorities and any responses to same,
(x) a copy of any exemption application/certificate within Part V of the 2000 Act, (as amended),
applies,
(xi) a copy of the minutes of any pre -planning meetings,
(xii) One electronic copy of any Environmental Impact Assessment Report received by
the Planning Authority as per Article 97(1) of the Planning and Development Regulations,
2001, (as amended).
2. To ensure that the Commission has a full and complete set of the material specified above
and that it may proceed with full consideration of the appeal, please certify that the planning
authority holds no further material relevant to the case coming within the above list of items by
signing the certification on page 3 of this letter and returning the letter to the Commission.
3. In addition to the documents mentioned above, please supply the following:- Particulars
and relevant documents relating to previous decisions affecting the same site or relating to
applications for similar development in near proximity. "History" documents should include;
a) Certified Manager's Order,
b) the site location, site layout maps, all plans and
c) particulars and all internal reports.
Copies of I -plan sheets are not adequate.
Where your records show that a decision was appealed to the Commission, it would be helpful
if you would indicate the Commission's reference.
Submissions or observations by the planning authority.
4. As a party to the appeal you may, under section 129 of the 2000 Act, (as amended), make
submissions or observations in writing to the Commission in relation to the appeal within a
period of 4 weeks beginning on the date of this letter.
Please note any submission/observation you wish to make to the Commission CANNOT
be uploaded to Sharefile. These submissions can be made in writing to the Commission
or can be emailed to appeals@pleanala.ie within the required timeframe.
Any submissions or observations received by the Commission outside of that period shall not
be considered, and where none have been validly received, the Commission may determine the
appeal without further notice to you.
Contingency Submission
5. If the decision of your authority was to refuse permission, you should consider whether
the authority wishes to make a contingency submission to the Commission as regards
appropriate conditions which, in its view, should be attached to a grant of permission should the
Commission decide to make such a grant. In particular, your authority may wish to comment
on appropriate conditions which might be attached to a permission in accordance with
section 48 and/or 49 of the 2000 Planning Act, (as amended), (Development / Supplementary
Development Contributions) including any special condition which might be appropriate under
section 48(2)(c) of the Act.
Any such contingency submission, in circumstances which your authority decided to refuse
permission, would be without prejudice to your authority's main submission in support of its
decision.
Please quote the above appeal reference number in any further correspondence.
If you have any queries in the meantime, please contact the undersigned officer of the
Commission at appeals@pleanala.ie.
I hereby certify that the planning authority has complied with section 128 and section 37(1)(b) of
the 2000 Act, (as amended), and that all material relevant to (PL -501960 -MN -26) the request at
1 on page 1 of this letter has been forwarded.
Signed:
Print:(
Date:
Yours faithfully,
Verity Taylor
Administrative Assistant
Digital BP07 Enclosures
Make a Planning Appeal
Direct URL: https://forms.gov.ie/en/68e6334b054d8f2739f8ad5b
Response ID
Date cuhmitted
Check if you can appeal to An Coimisit n Pleanala
1. What type of appeal are you making?
2. Select the statement that applies to you
3. During the appeal we will post/email information and items to the
appellant or to the appellant's agent. For this appeal, who should we write
to?
4. Throughout the appeal process, we may issue correspondence to the
appellant/agent as selected above by email, Please confirm that you are
satisfied to receive correspondence by email
AN COM SIUNPLEANALA
LDG-
2 4 AUG 20261
6a8c4af5e8854447 b5792iie _ _L
A Type:
M: „ice
24/08/2026
Dy.
First -party appeal (I lodged the original application to the planning
authority)
I am an agent acting on behalf of the appellant
The agent acting on behalf of the appellant or prescribed body
Yes
Appeal type
"This section will determine the type of appeal you wish to make and calculate the fee involved. If you qualify for the reduced fee, only that amount will
be charged."
5. Is your appeal solely under Section 48 and/or Section 49 of the No
Planning and Development Acts?
6. Are you appealing against a non -financial condition that has been No
attached to a permission by the planning authority?
7. Does your appeal include retention? Yes
8. Does your appeal relate to commercial development? Yes
9. Does your appeal or application include an Environmental Impact No
Assessment Report (EIAR) or Natura Impact Statement (NIS)?
10. Do you wish to request an oral hearing? No
11. Please confirm the following fee details are correct: Yes
Appellant/company details
"This section is for details of the person/company who is making the appeal. If you are an agent submitting an appeal on behalf of a person/company,
please include their details on this page. You can submit your agent details on the next page if applicable
12. Appellant's full name/Company name Leah Unicorn Ltd
13. Is the appellant/company's address In the Republic of Ireland? Yes
14. Address Treacys Hotel,
Losset,
Kingscourt Road,
Carrickmacross,
Co. Monaghan
Ireland
15. Phone number +353429662660
16. Is there more than one appellant associated with this appeal? No
"Please be advised that An Coimisiun Pleanala will only correspond with one appellant throughout the appeal process. If you wish to include further
appellants on the appeal you may do so in your grounds to appeal document.
If the appeal is a third party appeal, you must ensure that you have a planning authority submission acknowledgement letter for each appellant listed. This
must be uploaded with your appeal documents."
Agent's details
17. Agent's full name/Company name
18. Is your address in the Republic of Ireland?
19. Address
20. Phone number
Ian Doyle Planning Consultant
Yes
WOODLEIGH
CORNWALL
KILLURIN
WEXFORD
Y21F795
Ireland
+353868576040
Details about the proposed development
**This section asks for details about the planning authority decision you wish to appeal**
----------
21. Planning authority Monaghan County Council
22. Planning authority register reference number 25/60410
23. Address of proposed development Treacys Hotel,
Losset,
Kingscourt Road,
Carrickmacross,
Co. Monaghan
Ireland
Grounds for appeal
24. Attachment describing the grounds of your appeal (planning reasons First_Party_Appeal.pdf - Virus scan flagged the file as clean
and arguments)
**You can also attach further supporting materials on the next page**
Supporting material
If you wish you can include supporting materials with your appeal. Supporting materials include photographs, plans, surveys, drawings, technical guidance
documents and so on.
Please note An Coimisiun Pleanala will receive a complete copy of documents/drawings/maps that were submitted at planning authority stage. When
submitting supporting material, please only include new documents. (This does not apply to third party appeals where we will always require a copy of your
planning authority submission acknowledgement letter.)
If you have added attachments, submitting the form may take a few moments. Thanks for your patience
IAN DOYLE I PLANNING CONSULTANT
Monaghan County Council Planning Ref. 25/60410
Applicant: Leah Unicorn Ltd.
The Secretary,
An Coimisiun Pleanala
64 Marlborough Street
Dublin 1
D01 V902
Ireland
24/08/2024
Re: First Party Appeal against Monaghan County Council Planning Ref.
25/60410
Fee applicable: A7 Commercial. Retention no EIAR or NIS: €4500
"Retention of internal alterations to previous approved plans under 20/155 including the
following: 1. Conversion of attic of 528.41sq.m. floor area for the provision of 9 no.
bedrooms, associated stairs and lift core. 2. Alterations to previously approved layout of
ground floor in relation to 11 no. bedrooms, storage and staircase locations. 3. Alterations to
previously approved layout on first floor in relation to bedroom, storage and staircase
locations. 4. Repurposing of existing ground floor meeting room (62.00sq.m.) to additional
kitchen and laundry facilities. 5. All associated site development work Significant further
information received relates to submitted, Bus timetable, site layout plan, Certificate of
compliance and Environmental Protection Checklist at Treacy's Hotel, Losset, Kingscourt
Road, Carrickmacross, Co. Monaghan."
A Chara,
This Appeal Statement has been prepared by Ian Doyle, Planning Consultant (Woodleigh,
Cornwall, Killurin, Enniscorthy, Co. Wexford) on behalf of Leah Unicorn Ltd. (Treacys Hotel,
Losset, Kingscourt Road, Carrickmacross, Co. Monaghan) in support of an appeal against the
decision of Monaghan County Council to refuse retention permission under Planning Ref.
25/60410 in respect of internal alterations to the existing accommodation building at Treacys
Hotel, Losset, Kingscourt Road, Carrickmacross, Co. Monaghan.
The application seeks retention permission for the following works:
• Conversion of existing attic floor space to provide 9 no. additional bedrooms together
with associated circulation space and lift core.
• Alterations to the previously approved ground floor layout in respect of bedroom,
storage and staircase arrangements.
• Alterations to the previously approved first floor layout in respect of bedroom, storage
and staircase arrangements.
• Repurposing of an existing ground floor meeting room to provide additional kitchen
and laundry facilities.
IAN DOYLE I PLANNING CONSULTANT
All associated site development works.
The retained development is entirely internal in nature and does not involve any extension to
the footprint, height or alterations to the external appearance of the building.
OVERVIEW OF GROUNDS OF APPEAL
This appeal concerns the proper planning assessment of the structural alterations
described above which are proposed to be retained and which include the provision for
nine additional bedrooms. However, contrary of the approach of the planning authority,
the application falls to be assessed in light of the fact that the principle of the use of the
subject premises as an accommodation centre has long been established since the
parent permission was granted under reg. ref. 97/552.
This Appeal Statement will demonstrate that the Planning Authority did not correctly
assess the application that was before it. The first party appellant submits that the
development sought to be retained should have been assessed on its own planning
merits in the context of the permissions already granted for the premises.
As will be demonstrated below, the retention of the structural alterations, including the
addition of nine bedrooms, will not give rise to unacceptable planning impacts and the
decision to refuse permission should therefore be set aside. The planning authority did not
assess the application on this basis but instead treated the application as if it was a de novo
application for an accommodation centre for protected persons and relied on policies under
its development plan which were not relevant to the actual application before it. This was a
fundamentally flawed approach.
The planning authority treated the proposed development as if it involved the
development of an integrated living centre or accommodation centre falling within the
scope of its policy under WSP 1 and Section 15.10.8 of the Monaghan County
Development Plan 2025-2031, notwithstanding the fact that the principle of the use of
the building on the site for residential accommodation had already been established
under the parent permission 97/552. That permission continues to endure for the benefit
of the land, as will be discussed in more detail below.
The planning authority has effectively sought to revisit the issue of the suitability of the
location for an accommodation centre, despite the fact that such a use has long been
established on the site. The use of the premises either as a hotel or as an
accommodation centre for protected persons both fall within the scope of the permitted
use granted under the parent permission 97/552.
The applicant has separately referred a question to the planning authority under section 5 of
the Planning and Development Act 2000 ('the 2000 Act') to determine whether the change of
use of the premises from use as a hotel to use as an accommodation centre for protected
persons enjoys the benefit of an exemption under Class 14(j)), Second Schedule, Part 1, of the
Planning and Development Regulations 2001, as amended ('the 2001 Regulations'). While
seeking to have the exempted status clarified in the context of the separate procedure under
'rJ
IAN DOYLE I PLANNING CONSULTANT
section 5, the applicant nonetheless relies on the permission granted under reg. ref. 97/552
as supporting the authorised status of the current use for the accommodation of protected
persons.
In that context, the use of the premises as a hotel did not result in any abandonment of
the more general residential accommodation use permitted under reg. ref. 97/552; both
hotel use and use as an accommodation centre fall within the scope of this permission.
The reference under planning permission 17/155 to the existing hotel use at the date of
that application is consistent with the continuation of the permitted use of the premises
for residential accommodation as per the parent permission under reg. ref. 97/552. It is
clear from the grant of permission under reg. ref.17/155 that the planning authority
accepted that use as a hotel was permissible within the scope of the parent permission
reg. ref. 97/552.
PLANNING HISTORY
The subject property has been the subject of a number of planning permissions over an
extended period. The relevant planning history is summarised below.
Planning Permission Ref. 97/552
Planning Permission Ref. 97/552 granted permission for the retention of development
described as:
"Retain 35 no. bedrooms incl. facility for disabled people, new restaurant, the roofing and
complete refurbishment of the already existing night club known as the Oasis Night Club."
This permission established the provision of overnight accommodation within the building
together with associated ancillary facilities, including dining facilities. In effect, this permission
allowed the premises to provide the same facilities as would be provided in a hotel, though
not described as such.
Planning Permission Ref. 17/155
Planning Permission Ref. 17/155 subsequently granted permission for works described as:
"Works to an existing hotel..." including the change of use of part of the ground floor,
additional bedrooms, extensions, alterations to the existing building, revised access
arrangements, car parking, landscaping and associated site development works.
Planning Permission Ref. 20/155
Planning Permission Ref. 20/155 subsequently authorised further alterations and
extensions to the premises, including additional bedroom accommodation and
3
IAN DOYLE I PLANNING CONSULTANT
associated ancillary development. In that context, the permission formed part of the
continuing development of the premises for overnight accommodation, with the
authorised works directed principally towards additional bedroom accommodation and
associated facilities. It did not purport to grant a new underlying use of the premises or
to confine the accommodation use established by the earlier planning history to a
different operational format.
The present application does not seek to revisit or alter the development authorised under
Planning Permission Ref. 20/155. Rather, it seeks retention permission for identified internal
alterations carried out during the implementation of that permission, including the provision
of 9 additional bedrooms and associated internal reconfiguration.
Section 5 Declaration
Separately, the appellant submitted a request for a declaration under Section 5 of the
Planning and Development Act 2000 (as amended) (Ref. EX25/102) seeking a determination
regarding the planning status of the current occupation of the premises.
That declaration remains undetermined and is the subject of a separate statutory process.
The applicant intends to pursue the section 5 referral following the determination of this
application.
Current Appeal
The present appeal arises from Monaghan County Council's refusal of Planning Ref. 25/60410,
which seeks retention permission for internal alterations carried out within the existing
building.
The retained development is confined to physical works within the building and does not
involve any extension to the building envelope or external alterations.
SCOPE OF THE APPEAL
Before addressing the Grounds of Appeal in detail, it is important to clearly define the scope
of the application that was before the Planning Authority and, consequently, the scope of the
present appeal.
The subject application seeks retention permission for identified internal alterations carried
out within an existing accommodation building. Those works comprise the conversion of attic
floor space to provide 9 additional bedrooms together with associated circulation space and
lift core, alterations to previously approved internal layouts at ground and first floor level, the
repurposing of an existing meeting room to provide additional kitchen and laundry facilities,
together with all associated site development works.
M
IAN DOYLE I PLANNING CONSULTANT
The application does not seek permission for a new building, an extension to the existing
building, or any alteration to the external appearance of the development. Equally, the
application does not seek permission for a new accommodation facility or the establishment
of a new land use.
The Planning Authority had separately received a request for a declaration under Section 5 of
the Planning and Development Act 2000 (as amended) (Ref. EX25/102), on particular, as to
whether the current use of the premises for the accommodation of persons seeking
international protection fell within the scope of the exemption under Class 14(j)), Second
Schedule, Part 1, of the 2001 Regulations. That statutory process remained live and
undetermined throughout the assessment of the present application.
The present appeal does not invite An Coimisiun Pleanala to determine the outstanding
Section 5 Declaration, nor does it seek to pre-empt or prejudice that separate statutory
process. The purpose of this appeal is confined to determining whether the Planning
Authority correctly assessed the planning application that was before it, namely an
application for retention of identified physical works within an existing accommodation
building.
It is accepted that the development proposed to be retained, including the addition of nine
bedrooms, must be considered as an extension or expansion of the existing use of the
premises as a whole (albeit a relatively modest one) but the planning authority is incorrect in
concluding that "the proposal now seeks to continue protected persons accommodation." The
applicant is entitled to continue to rely on the parent permission under reg. ref. 97/552 for
the permitted use of the premises for residential accommodation and the continuation of the
use for the accommodation of protected persons is not the subject of the present application
nor does the retention sought in this case seek to authorise the use of the premises for the
accommodation of protected persons.
Accordingly, the principal issue for determination in this appeal is whether the retention of
the structural alterations and their use is acceptable having regard to the proper planning and
sustainable development of the area and/or whether it would give rise to adverse planning
impacts such as would merit a refusal of planning permission. It is the appellant's submission
that the Planning Authority departed from that question by addressing matters that extended
beyond the scope of the application before it.
CONSIDERATION OF PLANNING AUTHORITY'S REASONS FOR
REFUSAL AND GROUNDS OF APPEAL
Four principal grounds of appeal are set out below, to be considered against the background
context set out above.
Appeal Ground 1- The planning authority incorrectly concluded that planning
permission was granted for the use of the premises as a hotel only, as a
5
IAN DOYLE I PLANNING CONSULTANT
consequence of which it further erred in concluding that the accommodation
use would be inconsistent with a use as a hotel.
Refusal Reason No. 1 states as follows:
1. The established and permitted use of the premises is as a hotel. Information received by the
Planning Authority on the 16/06/2026 confirms that the premises is currently being used to
accommodate persons seeking international protection and is not operating as a hotel.
The planning status of this accommodation use has not been formally established. Whilst a
Section 5 Declaration request has been submitted in respect of the use, that process remains
ongoing and no determination has been made.
Accordingly, to permit the retention of the development as proposed, to serve the
accommodation use currently occurring on -site, would be contrary to the established and
permitted hotel use granted under previous planning permissions.
To permit the development as proposed would therefore be contrary and sustainable
development of the area.
In Refusal Reason No. 1, the planning authority states that the "established and permitted use
of the premises is as a hotel". However, as can be seen from the planning history and as
explained further below, no permission was ever applied for or granted for hotel use, per se.
As already discussed, above permission was obtained under the parent permission 97/552 for
residential accommodation, without confining the use to any particular operational format.
That permission continues to enure for the benefit of the land. Section 39(1) of the 2000 Act
provides as follows
39.—(1) Where permission to develop land or for the retention of development is
granted under this Part, then, except as may be otherwise provided by the permission,
the grant of permission shall enure for the benefit of the land and of all persons for
the time being interested therein.
[Emphasis added]
Reason no. 1 is incorrect in referring to "to the established and permitted hotel use granted
under previous planning permissions". The planning authority does not identify the
permissions to which it is referring. In fact, permission was never sought or granted for hotel
use. The parent permission 97/552 was for general use for residential accommodation and
was not specific to hotel use.
Furthermore, while planning permission 17/155 refers to the existing hotel use at the date of
that application, permission was not sought for hotel use under that application. The existing
use of the premises as a hotel at that time was authorised by and was consistent with the
parent permission under reg. ref. no. 97/552, which was for general use for residential
accommodation. Similarly, the current use of the premises for persons seeking international
A
IAN DOYLE I PLANNING CONSULTANT
protection is not in any way inconsistent with the continuation of the permitted use of the
premises for residential accommodation as per the parent permission under reg. ref. 97/552.
The planning authority reference the fact that the first party appellant expressed an intention
in the context of the application under reg. ref. 20/155 to revert to hotel use. That intention
remained as an intention and never became a term or condition of the permission. On that
basis, the expression of intent could not be regarded as binding on the appellant as if it were
an enforceable term of the application. The Supreme Court (Clarke J delivering judgment) in
Lanigan v Barry [20161 1 IR 656, has made a clear distinction between expressions of general
intent and the terms of a permission; the latter are enforceable, the former are not.
The planning authority did not give proper consideration to the planning history of the subject
premises and the broad residential accommodation use in respect of which the parent
permission was granted and has incorrectly concluded that planning permission was granted
for a hotel, per se. While the use of the premises as a hotel was clearly accepted by the
planning authority as being an authorised use under planning permission 17/155, it is
inaccurate to suggest that the use of the premises was confined to hotel use by the parent
permission reg. ref. 97/552 or planning permission 17/155.
The planning authority concluded in its assessment of the current application that the
retained development "serves the accommodation use currently occurring on site" and
that, because the planning status of that use had not been formally established, it would
be premature to grant retention permission for the works the subject of this application.
However, the section 5 referral relates to the question as to whether an exemption is
available under Class 14(j). The first party appellant relies on the parent permission and
subsequent permissions as authorising a general use for residential accommodation
purposes as permitted by the parent permission under reg. ref. 97/552. The making of an
application for retention permission does not give rise to an estoppel (as per the Supreme
Court decision in William P Keeling Ltd. v Fingal County Council [2005] 2 IR 108) and,
in the same way, a section 5 referral does not amount to an admission that planning
permission is required for the activity the subject of the referral. In that regard, the first
party appellant reiterates that it relies on the parent permission as establishing the
principle of a general use for residential accommodation on the premises. The current
application is for internal and structural alterations to the premises and does not seek
any change of use from the permitted use.
The application before the Commission therefore involves structural works and a relatively
minor expansion of that use, including the addition of nine bedrooms. This is the development
the retention of which should have been assessed by the planning authority and which now
falls to be assessed by the Commission, rather than the acceptability of use of the overall
premises for residential accommodation, as this use has already been established as a matter
of principle under the parent permission.
The planning authority is incorrect in referring, in reason no. 1, to "the established and
permitted hotel use granted under previous planning permissions" and relying on that as
a basis for refusal. Instead, the planning authority should have had regard to the
established and permitted use of the premises for residential accommodation on foot of
7
IAN DOYLE I PLANNING CONSULTANT
the parent permission. The correct approach, therefore, was for the planning authority to
consider whether the proposed retention of the structural alterations to the premises,
including the provision of nine additional bedrooms would give rise to adverse planning
impacts. It is respectfully submitted that this is the approach which the Commission
should now take in assessing this application.
The planning authority did not identify any adverse planning impacts which would be
caused by the discrete development which is the subject of the current application, as
distinct from the use of the overall premises which was already an established and
permitted use.
The planning impacts of the development sought to be retained are assessed separately
under Appeal Ground 4 below.
The Relationship Between the Present Appeal and the Pending Section 5 Declaration
The application before the Planning Authority sought retention permission for identified
physical works carried out within an existing accommodation building. Those works comprise
internal alterations, the provision of 9 additional bedrooms within the existing building
envelope, revisions to internal layouts and the repurposing of an existing meeting room to
provide kitchen and laundry facilities.
The current application does not seek permission for a new building, a new accommodation
facility, or any determination as to whether the use of the premises as a whole enjoyed the
benefit of the specific exemption under Class 14(j), Second Schedule, Part 1 of the Planning
and Development Regulations 2001 ('Class 14(j)') , which question remains, the subject of a
separate referral process under Section 5 of the Planning and Development Act 2000 (as
amended).
While seeking to have the exempted status clarified in the context of the separate procedure
under section 5, the applicant nonetheless relies in the context of the current application and
appeal on the permission 97/552 as supporting the authorised status of the current use for
the accommodation of protected persons. In that context, the use of the premises as a hotel
did not result in any abandonment of the general residential accommodation use permitted
under reg. ref. 97/552. Both hotel use and use as an accommodation centre fall within the
scope of the parent permission.
The outcome of the present application will determine whether the first party appellant will
be permitted to retain the unauthorised structural works. Until that decision has been made,
there is no practical benefit in the first party appellant proceeding with the section 5 referral
but it proposes to do so once the Commission has made its decision.
The applicant's intention remains the return of the premises, in the medium term, to a
standard hotel operation when the current urgent requirement for the accommodation
of persons seeking international protection no longer arises.
l:3
IAN DOYLE I PLANNING CONSULTANT
In the meantime, the accommodation provided in the context of the current application
will remain bedroom -based accommodation as initially permitted under Reg. ref. 97/552
with shared facilities and common areas. The retained works do not alter the overall
operational characteristics of the building and do not give rise to any additional material
planning impacts beyond those associated with the authorised accommodation use of
the premises.
Appeal Ground 2 - The planning authority erred in concluding that the
development proposed to be retained would be contrary to Policy WSP
1 and section 15.10.8 of the Monaghan County Development Plan 2025-
2031. Both Reasons no. 2 and no. 3 rely on this erroneous conclusion.
Refusal Reason No. 2 states:
"2. Having regard to the current use of the premises as accommodation for protected persons,
the scale of accommodation provided, the rural location of the site, its separation from
Carrickmacross and other settlement centres, the limited accessibility of services and facilities,
and the reliance upon organised transport arrangements, the Planning Authority is of the
opinion that the retention of the additional bedroom accommodation and associated
alterations represents an unsustainable form of development in this rural location.
The proposed development has not been demonstrated to comply with Policy WSP 1 and
Section 15.10.8 of the Monaghan County Development Plan 2025-2031, which require such
accommodation to be located within a serviced and sustainable setting.
The Planning Authority further notes that the Core Strategy seeks to promote sustainable and
balanced development through the settlement hierarchy, with population and development
growth directed towards settlements with appropriate infrastructure, services and facilities.
The applicant has failed to satisfactorily demonstrate that the proposed development is
consistent with this approach.
The proposed development would therefore be contrary to Policy WSP 1 and Section 15.10.8,
the settlement hierarchy, Core Strategy and Housing Strategy of the Monaghan County
Development Plan 2025-2031 and contrary to the proper planning and sustainable
development of the area."
In response to both the second and third reasons for refusal, we submit, that the planning
authority misapplied Policy WSP1 and Section 15.10.8 of the Monaghan County
Development Plan 2025-2031. The planning authority treated the proposed
development as if it involved the development of an integrated living centre or
accommodation centre falling within the scope of its policy under WSP 1 and Section
15.10.8 of the Development Plan, notwithstanding the fact that these policies relate to
the establishment of new integrated living or accommodation centres. However, in the
present case, such a use had already been established under the parent permission
97/552.
E
IAN DOYLE I PLANNING CONSULTANT
Planning Authority's Assessment
The Planning Authority concluded that the proposal failed to comply with Policy WSP1 and
Section 15.10.8 of the Monaghan County Development Plan 2025-2031 on the basis that the
development would support continued accommodation for persons seeking international
protection in an unsustainable rural location, contrary to the Core Strategy and Housing
Strategy of the Development Plan.
Misapplication of Development Plan Policy
Section 15.10.8 and Policy WSP1 are concerned with ensuring that proposals for serviced and
sustainable neighbourhoods, integrated living centres and accommodation centres are
appropriately served by infrastructure, transport, community facilities and essential services.
The policy requires the Planning Authority to assess whether adequate capacity exists to
support the proposed development having regard to the range of available services and the
integration of future residents within the local community.
The first party appellant does not dispute the importance of these policy objectives. However,
the Planning Authority's assessment fails to distinguish between the purpose of the policy
and the nature of the application before it.
The present application does not seek permission for a new accommodation centre, the
establishment of a new residential community or the development of a new serviced
neighbourhood. Rather, it seeks retention permission for internal alterations carried out
within an existing accommodation building.
Notwithstanding this distinction, the first party appellant responded comprehensively to the
Further Information request by providing detailed information regarding transport
arrangements, access to services, wastewater treatment capacity, fire safety certification,
accessibility, management arrangements and the operational context of the premises. A
dedicated transport timetable was submitted demonstrating regular connectivity with
Carrickmacross, updated engineering certification confirmed that the wastewater treatment
system has a design capacity of 290 Population Equivalent (PE), and supporting Building
Control documentation confirmed that Fire Safety and Disability Access Certificates had been
granted for the relevant works.
Despite this information, the Planning Authority's decision does not identify which
specific requirements of Policy WSP1 or Section 15.10.8 are relevant to the subject
matter of the retention application, which does not seek to establish a new use.
Furthermore, the planning authority does not explain why the extensive technical
information submitted in response to the request for Further Information failed to
demonstrate that the retained development could be appropriately served by existing
infrastructure and services. Instead, the decision reaches a conclusion of non-compliance with
Policy WSP1 or Section 15.10.8 without engaging with the detailed technical evidence placed
before it.
10
IAN DOYLE I PLANNING CONSULTANT
The retained development comprises physical accommodation infrastructure within an
existing accommodation building. The works include additional bedrooms, circulation space,
a lift core, alterations to internal layouts and the provision of ancillary kitchen and laundry
facilities.
These works are not unique to any particular operational model. They are physical elements
of an accommodation building and are capable of serving overnight accommodation
irrespective of the category of occupants lawfully accommodated within the premises.
From a planning perspective, the retained works perform the same physical function whether
the building operates as a hotel, guest accommodation or accommodation for persons
seeking international protection. The works do not alter the external appearance of the
building, its relationship with surrounding lands, its servicing characteristics or the
environmental demands placed upon the site.
The first party appellant submits that the Planning Authority misapplied Policy WSP1 and
Section 15.10.8 by applying those provisions to the current occupation of the premises rather
than assessing the planning merits of the physical works proposed to be retained and their
associated use. As this fundamental error underpins both the second and third reasons for
refusal, these reasons cannot be allowed to stand.
Moreover, the planning merits of the retained physical works should be assessed by reference
to their physical characteristics and their impacts on the proper planning and sustainable
development of the area, rather than by reference to the identity or category of persons
accommodated within the building.
Appeal Ground 3 - Failure of Planning Authority to Engage with the Submitted
Evidence
During the assessment of the application, the Planning Authority issued an extensive Further
Information request seeking clarification on matters including transport, wastewater
treatment, fire safety, accessibility, servicing, accommodation standards and the operational
characteristics of the premises.
The appellant responded comprehensively to each request and submitted additional
technical reports, engineering certification, transport information, Building Control
documentation and supporting planning information.
Notwithstanding the information submitted, the Planning Authority concluded that the
proposal had failed to satisfactorily demonstrate compliance with the relevant provisions of
the Development Plan and that insufficient information had been provided to establish the
acceptability of the development.
The Further Information response addressed each of the matters identified by the Planning
Authority.
11
IAN DOYLE I PLANNING CONSULTANT
In particular, the appellant submitted:
• updated engineering certification confirming that the wastewater treatment system
approved under Planning Permission Ref. 20/155 had been installed in accordance
with the approved design, was operational and possessed sufficient capacity to
accommodate a loading of 290 Population Equivalent (PE);
• confirmation that Fire Safety and Disability Access Certificates had been granted
together with Building Control documentation confirming the relevant certification
process had been completed for the works in question;
• a transport timetable demonstrating regular connectivity between the premises and
Carrickmacross together with supporting information regarding access to services and
facilities;
• detailed information regarding management arrangements, servicing,
accommodation standards and the regulatory framework applicable to the operation
of the premises.
While the Planning Authority was not obliged to agree with the conclusions reached by the
appellant or its consultants, it was required to assess the information submitted and explain
why it considered that information insufficient.
Neither the refusal decision nor the accompanying Planner's Report identifies any substantive
deficiency within the technical documentation submitted. Instead, the decision reaches
broad conclusions that the proposal has failed to demonstrate compliance without explaining
why the evidence provided was considered to be inadequate or why the professional opinions
submitted should not be accepted.
The appellant respectfully submits that the Planning Authority failed to properly engage with
the technical evidence that it specifically requested during the Further Information process.
In the absence of any reasoned assessment identifying deficiencies within that evidence, the
conclusions reached in Refusal Reasons No. 2 and No. 3 cannot be sustained.
Appeal Ground 4— The Retained Development is Acceptable Having Regard
to the Proper Planning and Sustainable Development of the Area
Relevant Refusal Reasons: Refusal Reasons No. 2 and No. 3
Planning Assessment
The development sought to be retained comprises internal alterations to the
existing accommodation building, including the provision of 9 no. additional
bedrooms within the existing building envelope together with associated
circulation space, lift core, internal reconfiguration and ancillary kitchen and
laundry facilities.
12
IAN DOYLE I PLANNING CONSULTANT
In assessing the planning merits of the development sought to be retained,
regard must be had to the nature and scale of the works and to any additional
planning impacts arising from them over and above those associated with the
established accommodation use of the premises.
The additional 9 no. bedrooms represent a relatively modest increase in
accommodation within premises where the principle of substantial overnight
accommodation has already been established. The relevant planning question
is therefore whether the additional bedrooms and associated internal
alterations give rise to any identifiable adverse planning impact.
In quantitative terms, the premises currently contains 50 no. bedrooms, with
the development sought to be retained providing a further 9 no. bedrooms,
resulting in a total of 59 no. bedrooms. The additional accommodation
therefore represents an increase of 18% in bedroom numbers. Viewed in the
context of the scale of the established accommodation use, this is a relatively
modest expansion, accommodated entirely within the existing building
envelope. The appropriate planning assessment is therefore directed towards
the incremental effects arising from those additional 9 no. bedrooms, rather
than reconsidering the planning impacts associated with the established 50 -
bedroom accommodation use as a whole.
Traffic and Access
The retained development does not involve any alteration to the existing
vehicular access or the established circulation arrangements serving the
premises. The additional 9 no. bedrooms represent a limited increase relative
to the existing 50 -bedroom accommodation capacity and do not materially
alter the nature or intensity of the established accommodation use.
The Further Information response provided details of the transport
arrangements serving the premises, including a timetable demonstrating
regular connectivity between the site and Carrickmacross. This information
demonstrated that the premises is not dependent solely upon private -car
access and that arrangements are in place to facilitate access to the town and
its services.
Having regard to the limited scale of the additional accommodation, the
established access arrangements and the transport information submitted,
there is no basis to conclude that the additional 9 no. bedrooms would
generate a material traffic or road -safety impact or increase car dependency
to any material extent.
Residential and Visual Amenity
The retained development is entirely contained within the existing building
envelope. It does not increase the footprint or height of the building, alter its
13
IAN DOYLE I PLANNING CONSULTANT
external appearance or materially change its physical relationship with
adjoining lands.
Accordingly, the development gives rise to no additional overlooking,
overshadowing, overbearing impact or visual intrusion. Nor does it materially
alter the relationship between the existing premises and neighbouring
properties. The additional bedrooms and associated internal alterations
therefore do not result in any material interference with the residential or
visual amenities of the area.
Wastewater and Environmental Protection
The potential increase in loading arising from the additional accommodation
was specifically addressed during the Further Information process.
Updated engineering certification was submitted confirming that the
wastewater treatment system approved under Planning Permission Ref.
20/155 had been installed in accordance with the approved design, was
operational and possessed sufficient capacity to accommodate a loading of
290 Population Equivalent (PE).
The relevant issue is therefore not simply whether the development increases
occupancy, but whether the wastewater infrastructure serving the premises
has sufficient capacity to accommodate that increase. The engineering
evidence submitted confirms that it does.
The additional 9 no. bedrooms can be accommodated within the
demonstrated design capacity of the wastewater treatment system and,
consequently, no material wastewater, environmental health or other adverse
environmental impact arises from the retained development and its impact on
water services.
Fire Safety and Accessibility
The Further Information response confirmed that Fire Safety and Disability
Access Certificates have been granted in respect of the relevant works and
supporting Building Control documentation was submitted to the Planning
Authority.
The internal alterations have therefore been subject to the relevant statutory
certification processes in respect of fire safety and accessibility. There is no
identified planning consideration under either heading which would warrant
refusal of retention permission.
14
IAN DOYLE I PLANNING CONSULTANT
Scale, Character and Nature of the Development
The development does not extend the building footprint, increase its height or
alter its external form or appearance. The 9 no. additional bedrooms are
accommodated within existing attic floor space and the remaining works
comprise internal reconfiguration and ancillary accommodation facilities.
The development therefore does not introduce a new form of development
onto the site. The bedrooms, circulation space, lift core, kitchen and laundry
facilities are all functionally consistent with the established accommodation
use of the premises.
The increase from 50 no. to 59 no. bedrooms must also be considered in that
context. While it represents an expansion of the established use, it does not
materially alter the overall scale, character or physical form of the premises.
Access to Services and Carrickmacross
The Planning Authority placed particular emphasis on the rural location of the
premises, its separation from Carrickmacross and reliance upon organised
transport arrangements in Refusal Reason No. 2.
However, those considerations principally relate to the established
accommodation use of the premises as a whole. The development now before
the Commission does not establish that accommodation use at this location; it
provides 9 no. additional bedrooms within premises containing an existing 50
no. bedrooms.
Furthermore, the applicant responded to the Planning Authority's concerns by
submitting details of the transport arrangements and a timetable
demonstrating regular connectivity with Carrickmacross,
Accordingly, while the accessibility of the premises is a relevant consideration
in assessing the incremental expansion proposed, the provision of an
additional 9 no. bedrooms does not materially alter the established
relationship between the premises and Carrickmacross or create a new
dependency upon services or transport arrangements that did not previously
exist.
Overall Planning Assessment
Having regard to the foregoing, the development sought to be retained:
• represents an increase from 50 no. to 59 no. bedrooms, equivalent to
an 18% increase in bedroom accommodation within an established
accommodation premises;
15
IAN DOYLE I PLANNING CONSULTANT
• is accommodated entirely within the existing building envelope and
does not increase the footprint, height or external scale of the
development;
• does not materially alter the existing access or circulation
arrangements and does not give rise to an identified traffic or road -
safety impact;
• does not result in overlooking, overshadowing, visual intrusion or any
other material interference with adjoining residential or visual
amenity;
• can be accommodated within the demonstrated capacity of the
existing wastewater treatment system;
• has been subject to the relevant Fire Safety and Disability Access
certification processes; and
• does not materially alter the established relationship between the
premises and Carrickmacross or the existing arrangements for
accessing services and facilities.
The appellant therefore submits that the additional 9 no. bedrooms and
associated internal alterations do not give rise to any material adverse
planning impact.
Basis for Grant of Retention Permission
Having regard to:
(a) the planning history of the site and the established principle of substantial
overnight residential accommodation at the premises;
(b) the nature and scale of the development sought to be retained, comprising
internal alterations and 9 no. additional bedrooms within the existing building
envelope;
(c) the fact that the additional bedrooms represent an increase from 50 no. to
59 no. bedrooms and therefore a relatively modest expansion of the
established accommodation use;
(d) the absence of any increase in the footprint, height or external scale of the
existing building;
(e) the established access arrangements and transport information submitted
demonstrating connectivity with Carrickmacross;
(f) the demonstrated capacity of the wastewater treatment system to
accommodate the development;
16
IAN DOYLE I PLANNING CONSULTANT
(g) the Fire Safety and Disability Access certification applicable to the relevant
works; and
(h) the absence of any material adverse effect on traffic safety, environmental
protection, public health, residential amenity or the visual amenities of the
area,
it is submitted that the development sought to be retained is acceptable
having regard to the proper planning and sustainable development of the area
and that retention permission should be granted.
CONCLUSION
The appellant respectfully submits that the decision of Monaghan County Council cannot be
sustained for the reasons set out in this Appeal Statement.
The appeal has demonstrated that the Planning Authority did not assess the planning
application that was before it. In particular, the planning authority erred in concluding
that the only permitted use of the premises was as a hotel, notwithstanding the fact that
the principle of the use of the subject premises for residential accommodation was
established when the parent permission was granted under reg. ref. 97/552
Rather, the assessment proceeded on the basis of the acceptability in principle of a
residential accommodation use at this location. The planning authority wrongly took the
view that the planning status of the premises was uncertain because the question as to
whether the premises could avail of the exemption under Class 14(j), which is the subject
of a separate statutory declaration process under Section 5 of the Planning and
Development Act 2000 (as amended), has not yet been determined. However, the first
party appellant is entitled to rely on the parent permission and subsequent permissions
as authorising a general accommodation use which is not confined to hotel use.
In doing so, the Planning Authority failed to distinguish between the structural alterations
which it is sought to retain and the use of the premises as a whole. That distinction is
fundamental to the proper assessment of the application and materially influenced the
conclusions reached in both the Planner's Report and the decision to refuse permission.
The appeal has further demonstrated that the Planning Authority misapplied the relevant
provisions of the Monaghan County Development Plan 2025-2031 by assessing the
application against policy objectives directed towards the establishment and operation of
accommodation centres, rather than the planning merits of the retained physical works
before it.
Notwithstanding the above, the appellant provided comprehensive technical information in
response to the Further Information request addressing transport, wastewater treatment,
Building Control certification, servicing and operational matters. Neither the refusal decision
17
IAN DOYLE I PLANNING CONSULTANT
nor the Planner's Report identifies any substantive deficiency in that information or explains
why the evidence submitted was insufficient to address the matters raised by the Planning
Authority.
Having regard to the nature of the retained development, the absence of any identified
adverse physical planning impacts and the information submitted throughout the application
process, the appellant submits that the retained development is acceptable having regard to
the proper planning and sustainable development of the area.
This Appeal Statement has demonstrated that the refusal of Planning Ref. 25/60410 arose
from an assessment that extended beyond the scope of the application before the Planning
Authority. The retained development comprises internal physical works within an existing
accommodation building and should have been assessed on its own planning merits.
For the reasons set out in this Appeal Statement, the appellant respectfully requests that An
Coimisiun Pleanala allow the appeal, set aside the decision of Monaghan County Council and
grant retention permission for the development the subject of Planning Ref. 25/60410.
I trust the above is in order. If you require further discussions with regards to the above,
please do not hesitate to contact me.
Kind Regards
Ian Doyle,
Planning Consultant
BA (HONS) Town & Country Planning. BTP
18