LANDSCAPE MANAGEMENT AND
MAINTENANCE SCHEDULE
Drum Anaerobic Digester
June 2026 RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
2
1. LANDSCAPE MANAGEMENT & MAINTENANCE SCHEDULE
1.1. PLANT MATERIAL
All plant material shall be good quality nursery stock, free from fungal, bacterial or viral infection, aphids, red spider
or other insect pests and any physical damage. Planting shall be in accordance with BS4428: 1989 Code of practice
for general landscape operations (excluding hard surfaces).
All plants shall have been nursery grown in accordance with good practice and shall be supplied through the normal
channels of the wholesale nursery trade. They shall have the habit of growth that is normal for the species. Country
of origin must be shown in all cases for species grown from seed.
1.2. PLANT SPECIES
It is imperative to use native Irish species in so far as possible as they are adapted to Irish conditions and therefore
more likely to thrive compared to imported stock. Selected species should also represent woodland and hedgerows
in the surrounding environs although non-native species are not to be used, unless otherwise agreed with the
Planning Authority. All plants supplied shall be exactly true to name as shown in the plant schedules. Varieties
with variegated and/or coloured leaves will not be accepted, and any plant found to be of this type upon leafing-
out shall be replaced by the contractor. Bundles of plants shall be marked in conformity with BS3936: Part 1: 1965
and BS3936: part 4: 1966. The nursery supplier shall replace any plants which, on leafing out, are found not to
conform to the labels.
Hedgerow Planting (including additional planting to fill gaps in existing hedgerows):
The composition of hedgerow will consist of three layers; Primary Structure (60%), Secondary Structure (30%) and
Shrub Species Structure (10%).
• The primary structure of proposed hedgerows will comprise of 60% of total stock and is to consist of
Crataegus monogyna (Hawthorn). It is important that Hawthorn saplings are of native Irish stock, as
imported stock is not known to be as vigorous or thorny.
• Secondary structure to consist of a mix of Prunus spinosa (Blackthorn) and Ilex aquifolium (Holly).
Secondary structure will make up 30% of the overall hedgerow stock with species such as Ilex included to
produce a year round screening effect.
• Remainder of hedgerows (10%) to comprise of a mix of the following species: Viburnum opulus (Guelder
rose), Corylus avellana (Hazel), Rosa canina (Dog rose), Euonymus europaeus (Spindle) or in certain cases
native willow shrubs (Salix cinerea, Salix aurita, Salix caprea).
Native Perennial Wildflower Mix (1519 sqm)
It is proposed to plant a mix of native perennial wildflowers within the site in drifts of 3, 5 and 7 plants at a density
of 4 plants per m2. The mix is to include:
• Lotus corniculatus
• Trifolium pratense
• Succisa pratensis RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
3
• Knautia arvensis
• Galium verum
• Centaurea nigra
• Leucanthemum vulgrae
• Linum perenne
1.3. PROTECTION
PROPOSED PLANTING
The interval between the lifting of stock at the heeling -in area and planting on site is to be kept to an absolute
minimum. Plants shall be protected from drying out and from damage in transport. All stock awaiting planting on
site shall be stored in a sheltered place protected from the wind and frost and from drying out. Except when
heeled-in, all plants shall be protected in polythene at all times until planted into their final position on site.
The level of protection needed depends on whether the adjoining lands will be used for grazing during the periods
of planting establishment. Rabbit-proof guards and/or rabbit proof fencing shall be provided to all newly planted
hedgerow species where applicable.
DAMAGE
On completion of planting any broken branches shall be pruned and any areas of damaged bark neatly pared back
to sound tissue.
WATERING / FERTILISERS
All trees and shrubs shall be soaked in water for one hour prior to planting. Fertilisers shall conform to BS 5581:
1981. In the case of granular fertiliser being added to plantings, it must be mixed through and incorporated into
the base of the planting hole and covered over in order to avoid roots of plants coming in direct conta ct. Approved
slow release fertiliser granules are to be incorporated into backfill material at manufacturers specified rates.
Fertilisers shall be supplied in sealed bags or containers bearing the manufacturers name, the net weight and
analysis.
1.4. PLANTING METHODS
STAKING
Younger hedgerow plants should not require staking, however, in such cases where advanced nursery stock is
needed, staking may be required.
Standard Trees
Round stakes shall be of peeled larch, pine or Douglas fir, preserved with a water -borne copper chrome arsenic
composition in accordance with I.S. 131. Stakes shall be round, minimum 1.6m long, 75mm in diameter. Set stakes
vertically in the pit, to the western side of the tree station, and drive before planting. Drive stake with a wooden
maul or cast-iron headed drive. Sledgehammer should not be used. Set stakes vertically in the pit and drive before
planting. Drive stake with a drive- all, wooden maul or cast-iron headed mell.
Tree Ties RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
4
For standard trees, tree ties shall be of rubber, PVC or proprietary fabric laminate composition and shall be strong
and durable enough to hold the tree securely in all weather conditions for a period of three years. They shall be
flexible enough to allow proper tightening of the tie. Ties shall be min. 25mm wide for 120cm height trees and
min. 38mm for larger sizes. They shall be fitted with a simple collar spacer to prevent chafing. Two ties per tree
shall be applied to standard trees. Ties shall be nailed to the stake with one galvanised nail.
TREE PLANTING
Trees shall be planted at the same depth as in the nursery, indicated by the soil mark on the stem of the tree. They
shall be planted in the centre of the planting pit and planted upright. Stones or other rubbish over 75mm shall be
removed. Supply and drive the stake 800mm into the ground for standard trees . Backfill planting hole with
excavated topsoil, and remove all stones and debris, firming plant into position. Upon completion of planting, all
pits hall be raked over lightly to leave an even surface and neat appearance. All stones greater than 25mm diameter
to be removed. Provision should be made for the watering of root-balled trees in the first year following planting.
Small Trees/Large Shrubs
Excavate tree pits to 750mm x 750mm x 750mm deep. Farmyard manure 800mm deep and 100g of fertiliser shall
be applied to each tree pit prior to planting. Farmyard manure shall consist of predominantly of faecal matter and
shall be free of loose, dry straw and undigested hay. It shall be free of surplus liquid effluent. Install tree support
system as per above. Fill planting hole with topsoil, and remove all stones and debris, firming plant into
Native woodland planting:
• Proposed woodland planting to consist of feathered whips (of various sizes) and advanced nursery stock
planted.
• Trees should be planted at varying distances between 1.5m x 1.5m to 3m x 3m. Shrubs to be planted
between 900mm and 1500mm.
• The location and density of tree planting to be determined by the landscape architect prior to the ordering
of advanced nursery stock.
• All whips within the low canopy and understory and fringe to be a minimum height of 90 -120cm and the
other shrub species within the understory and edge to be a minimum height of 40 -60cm.
Table 1.2 Woodland Planting Schedule (10256 sqm)
Botanical name Common name Size %
High Canopy (Dominants)
Quercus robur
Quercus petraea
Pinus sylvestris
Pendunculate Oak
Sessile Oak
Scots Pine
Standard Tree, 12-14cm g, B
Standard Tree, 12-14cm g, B
Standard Tree, 250-300cm, RB
<20%
Low Canopy (Sub-dominants);
Alnus glutinosa
Betula pubescens
Prunus avium
Alder
Downy Birch
Wild Cherry
90-120cm
90-120cm
90-120cm
20-25%
Understory and fringe (higher shrubs);
Prunus padus
Corylus avellana
Ilex aquifolium
Crataegus monogyna
Bird Cherry
Hazel
Holly
Hawthorn
60-90cm
60-90cm
60-90cm
60-90cm
20-40% RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
5
Salix caprea
Salix purpurea
Goats Willow
Purple Willow
60-90cm
60-90cm
Understory and edge (lower shrubs);
Prunus spinosa
Rosa-canina
Euonymus europaeus
Salix aurita
Rubus fruticosus
Blackthorn
Dog-rose
Spindle
Eared Willow
Bramble
40-60cm
40-60cm
40-60cm
40-60cm
40-60cm
15-25%
WHIP PLANTING 40-60CM, 80-100CM, 100-120CM
Remove vegetation by hand and create notch to depth as necessary to fully contain the length of the plant root
system using standard steel spade, place plant in notch, spreading roots to ensure the roots are not constricted in
the planting notch. (Notch should be made at right angles to line of hedge). Using the ball of the foot, press the
edges of the notch together taking care not to scrape the bark of the plant. Ensure that the root collar finishes
level with the ground and that the plant finishes upright.
Planting should not take place during prolonged wet periods, periods of frost or periods of drought. The principal
hedgerow planting types are detailed below.
Newly Planted Sections of Hedgerow:
• New sections of hedgerow to consist of feathered whips (of various sizes) and advanced nur sery stock
(standard trees) in tripple staggered rows, at a spacing 600mm apart with a gap of 600mm between rows.
• 1/3rd of the primary structure to consist of advanced nursery stock (standard trees) and to be evenly
distributed to create an instant screening effect upon planting.
• All other native species will be planted as whips, with the primary and secondary structure to be a
minimum height of 80-100cm and the other shrub species to be a minimum height of 40-60cm.
• With regard to type 3 hedgerows, all of the primary structure, secondary structure and shrub species are
to be provided as whips.
Table 1.1 Hedgerow planting schedule (432 LINEAR METERS OF NEW HEDGEROW )
Botanical name Common name Size %
Primary structure;
Crateagus monogyna Hawthorn 90-120cm (30%) / 8-
10cm girth 3m br
standard trees
60%
Secondary structure;
Prunus spinosa Blackthorn 90-120cm 15%
Ilex aquifolium Holly 90-120cm 15%
Shrub species structure
Viburnum opulus Guelder rose 60-90cm 2.5%
Corylus avellana Hazel 60-90cm 2.5%
Rosa canina Dog-rose 60-90cm 2.5%
Euonymus europaeus Spindle 60-90cm 2.5% RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
6
CONTAINER GROWN SHRUBS, GRASSES, PERENNIALS P9 /20-30 / 30-40CM
Excavate planting hole to a dept of 500mm x 500mm x 500mm deep; the base to be broken to a depth
of 50mm and glazed sides roughened. Apply farmyard manure to base of hole to a depth of 150mm and
30g of fertilizer per planting pit. Backfill planting hole with excavated topsoil, and remove all stones and
debris, firming plant into position.
CONTAINER GROWN SHRUBS, GRASSES, PERENNIALS , 40-60cm
Excavate planting hole to a dept of 500mm x 500mm x 500mm deep; the base to be broken to a depth
of 50mm and glazed sides roughened. Apply farmyard manure to base of hole to a depth of 150mm and
50g of fertilizer per planting pit. Backfill planting hole with excavated topsoil, and remove all stones and
debris, firming plant into position.
FIELD MARGINS/GRASS SEEDING
Field margins to be planted and/or managed in accordance with the BRIDE project EIP techniques. A mix
of cereal and wildflower plants (native species of local provenance) to provide food and cover for
Yellowhammer and other bird species. Mix to be finalised in conjunction with the project ecologist. A
minimum width of 2m from the base of the hedgerow is recommended. It will be important to flail these
margins every year during the period of September 15th to February 28th. A full management regime in
accordance with best practice will be adhered to, ensuring that the species will thrive through natural
regeneration. Field margin management techniques and wildflowers have been shown to increase
biodiversity on rural sites, with numbers of pollinators clearly benefiting from these food sources and
an increased presence of other animals in these margins being evident as well when compared to
improved grassland margins managed more intensely.
1.5. MANAGEMENT AND MAINTENANCE
HEDGEROWS
Immediate aftercare of newly planted hedgerows is essential for them to become established.
• In the first growing year it is important to control the development of competing vegetation and
weeds along the base of the hedgerow. This will help the overall establishment of the lower
branches of the plants, giving a more favourable dense basal layer to the hedgerow. Manual
weeding is preferable as chemical herbicides can damage young hedgerow plants. Mulching
immediately after planting will also help to suppress any weeds. Noxious weeds (Dock, Thistle,
Ragwort) shall not be allowed to flower and all such weeds shall be killed or removed at each
maintenance visit.
• Within the first summer season any dead or dying stock is to be counted, tagged and replaced
during the following planting season. Occasional plant failure is not of particular concern as this can
lead to more ‘natural’ looking hedgerows.
RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
7
• Hawthorn can be trimmed back to encourage new growth at its base. This will ensure and dense,
bushy plant habit in the long term.
• Once established new sections of hedgerow should be trimmed on a 2-3 year rotation to encourage
flowering pollinators and fruiting for birds. This will encourage faster hedgerow growth, which will
ensure a natural, bushy form. When trimming hedgerows it is important to use reciprocating bar
cutters that slice through branches leaving a neater cut. This gives the plants a better chance of
healing without infection. Hedgerow trimming and maintenance should only take place between
the 1st of September and the last day of February to avoid harming nesting birds.
• Existing sections of hedgerow should also be trimmed on a 2 -3 year rotation to encourage gradual
consolidation to a minimum height of 4m and to promote dense and bushy habit. Trees and
hedgerows are not to be cut during nesting and breeding season between the 1st March and the
31st August, in order to protect nesting birds.
• If gaps become apparent in the hedgerows over time, long-term management solutions (20-30 year
intervals) such as laying or coppicing may be needed and will help to retain the hedgerows
biodiversity, density and structure.
• Once weed growth is not highly prevalent within the wild grass seeding area, they will only need to
be trimmed back on an annual basis, usually in late August. Noxious weeds to be controlled with
spot treatments of appropriate herbicides.
FIELD MARGINS/GRASS SEEDING
Field Margins to be managed in line with the Bride Project techniques as set out below.
• It will be important to flail this margin every year (Sept. 15th to Feb.28th) to cut back the vegetation
and prevent the hedgerow from encroaching onto the field margin. Cutting the ground vegetation
will allow light down to ground level and thus encourage wild flowers to germinate the following
year.
• Allowing livestock to access it (Sept, 15th to Feb. 28th) will also be beneficial. However, this may
not be practical.
• It is very important when spreading fertiliser, to shut off the disc on the hedgerow side to prevent
fertiliser from reaching the field margin – wild flowers will not thrive in nutrient-rich soil and
wasting fertiliser in this area is costly to the farmer.
• Apart from improving biodiversity, perhaps a more important reason to increase the field margin
width is to reduce the need for chemical control of vegetation by allowing a hedge cutter to control
vegetation near an electric fence. RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
8
GENERAL PLANTING AFTERCARE
Planting shall be tended for 36 months from the date of completion of all Works.
Weeding
Throughout the aftercare period keep all shrub planting areas weed free. For tree planting keep an area
of 1 m. in diameter around each planting station in a weed free condition. This may be achieved by the
use of an approved herbicide or by regular cultivation. A minimum of 3 visits for weed control will be
required during the growing season. All injurious weeds, will be removed from the remainder of each
transplant tree or shrub plot. The growth of herbaceous material between the weed free planting
stations should be controlled by strimming twice per year.
Stakes, Trees, Shrubs and Ties
All stakes, trees and shrubs shall be maintained in firm positions within the ground and with all ties
securely fixed and adjusted to allow for the increase in stem girth.
Replacements
Plants that fail to thrive, are removed, uprooted or destroyed or die during the aftercare period will be
replaced with equivalent plants as soon as possible during the following planting season. Replacements
shall be of the same size and species as that originally specified unless otherwise agreed with the
Planning Authority. Defects shall be made good by the end of the planting season of the year in which
the defect is identified.
• Shrub areas – all dead stock shall be replaced at the end of each growing season to obtain 100%
stocking
• Cell grown/root trainers and transplant planting – throughout the aftercare period, all dead
stock shall be replaced at the end of each growing season to obtain 90% stock providing that
failures are evenly distributed throughout both planting areas and species
• Standard trees – throughout the aftercare period all dead and diseased stock shall be replaced
at the end of each growing season.
RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
9
MAINENANCE SCHEDULE
Tasks WINTER SPRING SUMMER AUTUMN
General Tasks;
Landscape Architect inspection
Replacing failed plants
Refirming
Pest and disease control
Check Plant supports
General pruning
Tasks for Whips/Transplants;
Weed control
Slow release fertiliser
Tasks for Trees;
Weed control
Slow release fertiliser
Tasks for field margin/wildgrass seeding areas;
Flail/Mow
Weed control
MONITORING
A qualified Landscape Architect should monitor the site on an annual basis for the duration of the 3 yr Maintenance
and Management Schedule and make adjustments to the Management and Maintenance Strategy where required.
RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
10
APPENDIX A- INDICATIVE COST SCHEDULE PLANTING
Description Size Unit Cost
(€)
Quantity Subtotal (€)
1.Woodland Planting – 10,256 sqm
High Canopy Trees (<15% approx. 1,020 plants
Species
Quercus robur Std 12–
14cm
girth, B&B
95 340 32,300
Quercus petraea Std 12–
14cm
girth, B&B
95 340 32,300
Pinus sylvestris 250–
300cm,
rootballed
65 340 22,100
Low Canopy Trees (20% approx. 1,360 plants)
Species
Alnus glutinosa 90-120cm
whip
3.5 455 1,593
Betula pubescens 90-120cm
whip
3.25 455 1,479
Prunus avium 90-120cm
whip
4.5 450 2,025
Understory- Higher Shrubs (approx. 2,380
plants)
Species
Prunus padus 60–90cm 3.5
Corylus avellana 60–90cm 3.75
Ilex aquifolium 60–90cm 4.5
Crataegus monogyna 60–90cm 2.9
Salix caprea
60–90cm
2.75
Salix purpurea
60–90cm
2.75
Average cost used: €3.35
Understory- Lower Shrubs (approx. 2,040
plants)
Prunus spinosa 40-60cm 2.8
Rosa canina 40-60cm 2.9
Euonymus europaeus 40-60cm 3.25
Salix aurita 40-60cm 2.75
Rubus fruticosus 40-60cm 2.25
Woodland Planting Subtotal: €105,480 RECEIVED: 28/08/2026
Management and Maintenance Schedule - Drum Anaerobic Digester
11
2.Native Wildflower Meadow-1,519 sqm
Item
Native perennial seed mix 420/ kg 2.3 kg 966
Ground preparation 3.50/ sqm 1519 5,317
Sowing (labour & equipment 1.75/ kg 1519 2,658
Wildflower Meadow Subtotal: €8,940
3. Hedgerow Planting
New hedgerow: 432 linear meters
Bolstered Hedgerow: 503 linear meters
Species
Crataegus monogyna (Hawthorn) 90-120cm/8-
10cm
advanced
8.5 3366 28,611
Prunus spinosa (Blackthorn) 90-120cm 3.25 842 2,737
Ilex aquifolium (Holly) 90-120cm 5 842 4,210
Shrub species 60-90cm 3.75 560 2,100
Hedgerow Planting Subtotal: €37,660
4. Labour and Installation Costs
Rate Cost (€)
Item
Woodland planting (6800 PLANTS @ €2.80) 19,040
Tree stakes, ties guards 14,500
Hedgerow planting labour 7200
Wildflower establishment Included
Installation Subtotal: €40,740
5.Maintenance (3 Years)
Item
Tree and shrub replacement (10%) 14,200
Weed control (woodland and hedgerow) €0.85/sqm/yr 26,100
Meadow cut and lift (1-2 cuts/yr) 6,500
Maintenance Subtotal: €46,800
Grand Total Summary (VAT Excluded) Cost
Woodland Planting €105,480
Wildflower Meadow €8,940
Hedgerows €37,660
Installation €40,740
Maintenance (3 years) €46,800
TOTAL PROJECT COST: €239,620 RECEIVED: 28/08/2026