HomeMy WebLinkAbout2660018 - F.I. Received Doc. - EIAR Appendix 10.1 NRA/TII Rating Criteria
AUGUST 2026
VOLUME III
APPENDICES TO
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
APPENDIX 10.1
NRA/TII RATING CRITERIA:
HYDROLOGICAL &
HYDROGEOLOGICAL
Stream BioEnergy Ireland Limited
RECEIVED: 28/08/2026
Anaerobic Digester-Monaghan / 247501.0350
AWN Consulting Ltd 1
APPENDIX 10.1
NRA/TII Criteria for Rating the Magnitude and Significance of Impacts at EIA Stage National Roads
Authority.
(NRA/TII, 2009).
RECEIVED: 28/08/2026
Anaerobic Digester-Monaghan / 247501.0350
AWN Consulting Ltd 2
Table 1 Criteria for Rating Site Attributes – Estimation of Importance of Hydrological
Attributes (NRA)
Importance Criteria Typical Examples
Extremely
High
Attribute has a high quality
or value on an international
scale
River, wetland or surface water body
ecosystem protected by EU legislation e.g.
’European sites’ designated under the
Habitats Regulations or ‘Salmonid waters’
designated pursuant to the European
Communities (Quality of Salmonid Waters)
Regulations, 1988.
Very High
Attribute has a high quality
or value on a regional or
national scale
River, wetland or surface water body
ecosystem protected by national legislation
– NHA status.
Regionally important potable water source
supplying >2500 homes.
Quality Class A (Biotic Index Q4, Q5).
Flood plain protecting more than 50
residential or commercial properties from
flooding.
Nationally important amenity site for wide
range of leisure activities.
High Attribute has a high quality
or value on a local scale
Salmon fishery.
Locally important potable water source
supplying >1000 homes.
Quality Class B (Biotic Index Q3-4).
Flood plain protecting between 5 and 50
residential or commercial properties from
flooding.
Locally important amenity site for wide range
of leisure activities.
Medium
Attribute has a medium
quality or value on a local
scale
Coarse fishery.
Local potable water source supplying >50
homes.
Quality Class C (Biotic Index Q3, Q2- 3).
Flood plain protecting between 1 and 5
residential or commercial properties from
flooding. RECEIVED: 28/08/2026
Anaerobic Digester-Monaghan / 247501.0350
AWN Consulting Ltd 3
Importance Criteria Typical Examples
Low Attribute has a low quality
or value on a local scale
Locally important amenity site for small range
of leisure activities.
Local potable water source supplying <50
homes Quality Class D (Biotic Index Q2, Q1).
Flood plain protecting 1 residential or
commercial property from flooding.
Amenity site used by small numbers of local
people.
Table 2 Criteria for Rating Site Attributes – Estimation of Magnitude of Impact on
Hydrological Attribute (NRA)
Magnitude of
Impact Criteria Typical Examples
Large
Adverse
Results in loss of
attribute
Loss or extensive change to a waterbody or water
dependent habitat.
Increase in predicted peak flood level
>100mm.
Extensive loss of fishery.
Calculated risk of serious pollution incident
>2% annually.
Extensive reduction in amenity value.
Moderate
Adverse
Results in impact on
integrity of attribute
or loss of part of
attribute
Increase in predicted peak flood level
>50mm.
Partial loss of fishery.
Calculated risk of serious pollution incident
>1% annually.
Partial reduction in amenity value.
Small
Adverse
Results in minor
impact on integrity of
attribute or loss of
small part of attribute
Increase in predicted peak flood level
>10mm.
Minor loss of fishery.
Calculated risk of serious pollution incident
>0.5% annually. RECEIVED: 28/08/2026
Anaerobic Digester-Monaghan / 247501.0350
AWN Consulting Ltd 4
Magnitude of
Impact Criteria Typical Examples
Slight reduction in amenity value.
Negligible
Results in an impact
on attribute but of
insufficient magnitude
to affect either use or
integrity
Negligible change in predicted peak flood level.
Calculated risk of serious pollution incident
<0.5% annually.
Minor
Beneficial
Results in minor
improvement of
attribute quality
Reduction in predicted peak flood level
>10mm.
Calculated reduction in pollution risk of 50% or more
where existing risk is <1% annually.
Moderate
Beneficial
Results in moderate
improvement of
attribute quality
Reduction in predicted peak flood level
>50mm.
Calculated reduction in pollution risk of 50% or more
where existing risk is >1% annually.
Major
Beneficial
Results in major
improvement of
attribute quality
Reduction in predicted peak flood level >100mm
Table 3 Criteria for rating Site Attributes - Estimation of Importance of Hydrogeology
Attributes (NRA)
Magnitude of
Impact Criteria Typical Examples
Extremely High Attribute has a high quality or value
on an international scale
Groundwater supports river, wetland or surface
water body ecosystem protected by EU
legislation e.g. SAC or SPA status
Very High Attribute has a high quality or value
on a regional or national scale
Regionally Important Aquifer with multiple well
fields
Groundwater supports river, wetland or surface
water body ecosystem protected by national
legislation – NHA status
Regionally important potable water source
supplying >2500 homes RECEIVED: 28/08/2026
Anaerobic Digester-Monaghan / 247501.0350
AWN Consulting Ltd 5
Magnitude of
Impact Criteria Typical Examples
Inner source protection area for
High Attribute has a high quality or value
on a local scale
Regionally Important Aquifer Groundwater
provides large proportion of baseflow to local
rivers
Locally important potable water source
supplying >1000 homes
Outer source protection area for regionally
important water source
Inner source protection area for locally
important water source
Medium Attribute has a medium quality or
value on a local scale
Locally Important Aquifer
Potable water source supplying >50 homes
Outer source protection area for locally
important water source
Low Attribute has a low quality or value
on a local scale
Poor Bedrock Aquifer
Potable water source supplying <50 homes
Source: Box 4.3: ‘Guidelines on Procedures for Assessment and Treatment of Geology, Hydrology
and Hydrogeology for National Road Schemes’ by the National Roads Authority (NRA, 2009)
RECEIVED: 28/08/2026
Anaerobic Digester-Monaghan / 247501.0350
AWN Consulting Ltd 6
Table 4 Criteria for Rating Impact Significance at EIS Stage – Estimation of Magnitude of
Impact on Hydrogeology Attribute (NRA)
Magnitude of
Impact Criteria Typical Examples
Large Adverse
Results in loss of attribute and
/or quality and integrity of
attribute
Removal of large proportion of aquifer.
Changes to aquifer or unsaturated zone
resulting in extensive change to existing
water supply springs and wells, river
baseflow or ecosystems.
Potential high risk of pollution to groundwater
from routine run- off. 1
Calculated risk of serious pollution incident
>2% annually. 2
Moderate
Adverse
Results in impact on integrity
of attribute or loss of part of
attribute
Removal of moderate proportion of aquifer.
Changes to aquifer or unsaturated zone
resulting in moderate change to existing
water supply springs and wells, river
baseflow or ecosystems.
Potential medium risk of pollution to
groundwater from routine run-off. 1
Calculated risk of serious pollution incident
>1% annually. 2
Small Adverse
Results in minor impact on
integrity of attribute or loss of
small part of attribute
Removal of small proportion of aquifer.
Changes to aquifer or unsaturated zone
resulting in minor change to water supply
springs and wells, river baseflow or
ecosystems.
Potential low risk of pollution to groundwater
from routine run- off. 1
Calculated risk of serious pollution incident
>0.5% annually. 2
Negligible
Results in an impact on
attribute but of insufficient
magnitude to affect either use
or integrity
Calculated risk of serious pollution incident
<0.5% annually. 2
1 refer to Annex 1, Method C, Annex 1 of HA216/06
2 refer to Appendix B3 / Annex 1, Method D, Annex 1 of HA216/06
Source: Box 5.3: ‘Guidelines on Procedures for Assessment and Treatment of Geology, Hydrology
and Hydrogeology for National Road Schemes’ by the National Roads Authority (NRA, 2009) RECEIVED: 28/08/2026
Anaerobic Digester-Monaghan / 247501.0350
AWN Consulting Ltd 7
Table 5 Rating of Significant Environmental Impacts at EIA Stage (NRA)
Importance of
Attribute
Magnitude of Importance
Negligible Small Adverse Moderate Adverse Large Adverse
Extremely High Imperceptible Significant Profound Profound
Very High Imperceptible Significant/moderate Profound/Significant Profound
High Imperceptible Moderate/Slight Significant/moderate Profound/Significant
Medium Imperceptible Slight Moderate Significant
Low Imperceptible Imperceptible Slight Slight/Moderate
Source: Box 5.4: ‘Guidelines on Procedures for Assessment and Treatment of Geology, Hydrology
and Hydrogeology for National Road Schemes’ by the National Roads Authority (NRA, 2009)
RECEIVED: 28/08/2026
AUGUST 2026
VOLUME III
APPENDICES TO
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
APPENDIX 10.2
FLOOD RISK ASSESSMENT
Stream BioEnergy Ireland Limited
RECEIVED: 28/08/2026
SSESSMENT awn CONSULTING A
Chapter 6 Appendix 6.2 – Flood Risk Assessment
AWN Consulting Ltd, The Tecpro Building, IDA Business & Technology Park, Clonshaugh, Dublin 17, D17 XD90
FRA Renewable Biogas Plant,
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd
TABLE OF CONTENTS
1. FLOOD RISK ASSESSMENT 1-3
1.1 Introduction ......................................................................................................... 1-3
1.1.1 Renewable Biogas Plant Site ............................................................................... 1-3
1.1.2 Linear Gas Grid Connection ................................................................................. 1-3
1.1.3 Planning Context ................................................................................................ 1-4
1.1.4 Purpose of a Site Specific Flood Risk Assessment .................................................. 1-4
1.1.5 The Planning System and Flood Risk Management Guidelines ................................. 1-4
1.2 Experience of Authors .......................................................................................... 1-8
1.3 Methodology ........................................................................................................ 1-9
1.4 Climate change .................................................................................................. 1-11
2. BASELINE CONDITIONS 2-13
2.1.1 Receiving environment ..................................................................................... 2-13
3. DEVELOPMENT CHARACTERISTICS 3-17
3.1.1 Renewable Biogas Plant Site ............................................................................. 3-17
4. STAGE 1- FLOOD RISK IDENTIFICATION 4-19
4.1.1 Historical Flooding Records ............................................................................... 4-19
4.1.2 Fluvial Flooding ................................................................................................ 4-20
4.1.3 Pluvial Flooding ................................................................................................ 4-22
4.1.4 Groundwater Flooding ...................................................................................... 4-23
4.1.5 Other Sources of Flooding ................................................................................. 4-23
4.1.6 Overview of Flood Risk Identification.................................................................. 4-23
4.1.7 Flood Mitigation Measures ................................................................................. 4-23
4.1.8 Residual Risk ................................................................................................... 4-24
5. CONCLUSIONS 5-25
6. REFERENCES 6-26
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd i
LIST OF TABLES
Table 1-1. Classification of vulnerability of different types of developments. 1-10
Table 1-2: Matrix of vulnerability versus flood zone to illustrate appropriate development and
that required to meet the Justification Test. 1-11
Table 1-3. Allowances in Flood Parameters for the Mid‐Range and High‐End Future Scenarios for
Fluvial and Tidal Sources 1-11
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd ii
LIST OF FIGURES
Figure 1-1. Site Location Map 1-4
Figure 1-2. Flood Zones. 1-6
Figure 2-1. Regional Hydrological environment 2-13
Figure 2-2. Local Hydrological Environment 2-14
Figure 2-3. Designated Sites and Hydrological Connections 2-15
Figure 4-1. Historic Flood Events 4-20
Figure 4-2. CFRAM River Flood Probability (OPW, 2025) 4-21
Figure 4-3.Strategic Flood Risk Assessment Monaghan County 4-22
Figure 4-4. Extract from CFRAM MRFS and HEFS Pluvial Flooding Map for the Site Area (CFRAM,
2025). 4-24
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-3
1. FLOOD RISK ASSESSMENT
1.1 Introduction
AWN Consulting Ltd (AWN) has been appointed by Stream Bioenergy to undertake a Flood Risk
Assessment (“FRA”) to support an application for permission for a Renewable Biogas Plant at
Maghernakelly, Drum, County Monaghan. The flood risk assessment is carried out for the Renewable
Biogas site as described below.
The proposed development will utilise Anaerobic Digestion (AD) technology to generate renewable energy
in the form of biomethane from organic waste materials. AD is a sustainable form of renewable energy
production through a naturally occurring process in which micro-organisms break down biodegradable
material in the absence of oxygen in an enclosed system to produce renewable biogas.
Biogas generated by the proposed development will be upgraded to biomethane and exported to the gas
grid network to replace fossil fuel derived natural gas. This will be directly injected into the gas grid which
will be delivered by Gas Networks Ireland under a separate consenting process.
1.1.1 Renewable Biogas Plant Site
The site of the Proposed Development is located in Maghernakelly, Drum, Co. Monaghan, covering a total
area of approximately 6.2 hectares. It is c.4km north of Cootehill and 17.5km southwest of Monaghan
town. The site is comprised of two fields which are divided by a hedgerow. It is bounded to the north by
L2280 Drumcall Road, to the east by the R189 regional road, and to the west by Maghernakelly Road. To
the south, the site adjoins New Park Farm and an existing residential property. The site is undulating with
substantial elevation from approximately 109mOD in the southern section to around 93mOD at the
northern boundary.
1.1.2 Linear Gas Grid Connection
A gas transmission pipeline will provide a physical connection between the Renewable Biogas Plant and
the existing national gas network in Dromore West, Co. Monaghan. While the development of the gas grid
is not part of the planning application, as Gas Networks Ireland will deliver it, it is included in the EIAR for
assessment purposes, as it forms part of the overall project for the EIA Directive. The works comprise the
laying of an underground pipeline over approximately 3.5 km within the public road corridor.
As the construction is a shallow trench in a roadway there is minimal potential for impact on receiving
waterways. There are 3no. water crossing associated with the installation of the pipeline. However, it is
proposed that horizontal directional drilling methodology will be implemented at all water crossing. Hence
eliminating any interaction with the stream. The design will be required to ensure the contractor manages
collection and disposal of water during open trench cuts and soil disposal in an environmentally responsible
manner. During operation there is no potential for impact on receiving waterways.
This site-specific FRA assesses flood risk in relation to the Renewable Biogas Plant site. The hydrological
and hydrogeological effects associated with construction and operation of the Linear Gas Grid Connection
are assessed in Chapter 10 of the EIAR. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-4
Figure 1-1. Site Location Map
1.1.3 Planning Context
The following planning policy documents are relevant to the assessment of the proposed development:
► The National Planning Guidelines published by the OPW and the Department of the Environment,
Heritage and Local Government in November 2009 entitled ‘The Planning System and Flood Risk
Management Guidelines for Planning Authorities’
► Monaghan County Development Plan 2025-2031;
► National Development Plan 2018-2027.
1.1.4 Purpose of a Site Specific Flood Risk Assessment
In line with the Guidelines, a Site Specific Flood Risk Assessment (SSFRA) should be undertaken for a scale
of individual site planning applications. The purpose of this FRA is to assess all types of flood risk for a
new development. A FRA identifies the sources of flood risk, the effects of climate change on this, the
impact of the development, the effectiveness of flood mitigation and management measures and the
residual risks that remain after those measures are put in place.
1.1.5 The Planning System and Flood Risk Management Guidelines
This assessment was undertaken in accordance with the Department of the Environment, Heritage and
Local Government (DoEHLG) Flood Risk Management Guidelines for Planning Authorities published by the
OPW in 2009 (hereafter referred to as the FRM Guidelines) in order to introduce comprehensive RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-5
mechanisms for the incorporation of flood risk identification, assessment and management into the
planning process.
For carrying out a Site-specific Flood Risk Assessment (SSFRA), the OPW Guidelines recommend using
Source-Path-Receptor (S-P-R) concept model to identify where the flood originates from, what the
floodwaters path is and the areas in which assets and people might be affected by such flooding (Section
2.18 of the OPW Guidelines, 2009). Figure 2 below shows a schematic representation of S -P-R model.
Figure 2: Schematic Representation of S-P-R model.
A Flood Risk Assessment (FRA) is undertaken over several stages with the need for progression to a more
detailed stage dependent on the outcomes of the former stage.
As per the Flood Risk Management (FRM) Guidelines a tiered approach has been taken. This usually begins
with a Stage 1 Assessment which aims to quantify the risk posed to the development and to the
surrounding environment by this development. The main aim of this FRA is to determine the risk of flooding
to the site, and the impact development will have on the floodplain, developments off site, upstream and
downstream levels and any mitigation measures necessary.
This hierarchy of assessment ensures that flood risk is taken into account at all levels of the planning
system but also that the right level of detail is considered. This avoids the need for detailed and costly
assessments prior to making strategic decisions.
In terms of the Flood Risk Assessment and Management Study the scope of this work incorporates three
stages:
► Stage 1: Flood Risk Identification - to identify whether there may be any flooding or plan issues related
to a plan area or proposed development site that may warrant further investigation.
► Stage 2: Initial Flood Risk Assessment - to confirm sources of flooding that may affect a plan area or
proposed development site, to appraise the adequacy of existing information and to determine what
surveys and modelling approach is appropriate to match the spatial resolution required and complexity
of the flood risk issues. The extent of the risk of flooding should be assessed which may involve
preparing indicative flood zone maps. Where existing river or coastal models exist, these should be
used broadly to assess the extent of the risk of flooding and potential impact of a development on
flooding elsewhere and of the scope of possible mitigation measures; and,
► Stage 3: Detailed Flood Risk Assessment - to assess flood risk issues in sufficient detail and to provide
a quantitative appraisal of potential flood risk to a proposed or existing development, of its potential
impact on flood risk elsewhere and of the effectiveness of any proposed mitigation measures. This will
typically involve use of an existing or construction of a hydraulic model of the river or coastal cell across
a wide enough area to appreciate the catchment wide impacts and hydrological processes involved. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-6
As described in the FRM guidelines flood risk is a combination of the likelihood of flooding and the potential
consequences arising. This is normally expressed in terms of the following relationship:
Flood risk = Probability of flooding x Consequences of flooding
The likelihood of flooding is normally expressed as the percentage probability based on the average
frequency measured or extrapolated from records over a large number of years. A 1% probability indicates
the flood level that is expected to be reached on average once in 100 years, i.e. it has a 1% chance of
occurring in any one year. Therefore:
► 100-year flood = 1% Annual Exceedance Probability (AEP).
► 1000-year flood = 0.1% AEP.
In the FRM Guidelines, the likelihood of a flood occurring is established through the identification of Flood
Zones which indicate a high, moderate, or low risk of flooding from fluvial or tidal sources as shown in
Figure 1-2, as defined as follows:
► Flood Zone A - Where the probability of flooding is highest (greater than 1% AEP or 1 in 100 for river
flooding and 0.5% AEP or 1 in 200 for coastal flooding) and where a wide range of receptors would be
vulnerable.
► Flood Zone B - Where the probability of flooding is moderate (between 0.1% AEP or 1 in 1000 and 1%
AEP or 1 in 100 for river flooding and between 0.1% AEP or 1 in 1000 year and 0.5% AEP or 1 in 200
for coastal flooding); and
► Flood Zone C - Where the probability of flooding is low (less than 0.1% AEP or 1 in 1000 for both river
and coastal flooding).
The Flood Zones shown on Figure 1-2 are for illustrative purposes to demonstrate typical demarcation of
flood risk areas. They bear no connection to project and should not be used to determine the risk of
flooding at the proposed development site.
Figure 1-2. Flood Zones.
According to the OPW Guidelines, the planning implication of each of the zones mentioned above are: RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-7
► Zone A - High probability of flooding. Most types of development would be considered inappropriate in
this zone.
► Zone B - Moderate probability of flooding. Highly vulnerable development, such as hospitals, residential
care homes, Garda, fire and ambulance stations, dwelling houses and primary strategic transport and
utilities infrastructure, would generally be considered inappropriate in this zone
► Zone C - Low probability of flooding. Development in this zone is appropriate from a flood risk
perspective (subject to assessment of flood hazard from sources other than rivers and the coast) but
would need to meet the normal range of other proper planning and sustainable development
considerations.
Potential impacts of the proposed development were considered within the study area. This is defined as
the area within the proposed development site boundary (i.e. the proposed development site), and the
wider hydrological setting of the area (refer to Table 1-1 and 1-2 below). A sequential plan approach was
undertaken for this risk assessment under guidance from the local planning authorities (2009). Specifically,
a sequential approach is first and foremost directed towards land that is at low risk of flooding. The
underpinning philosophy of the sequential approach is highlighted in the illustration below. It should be
noted that the above guidance is applicable in the layout and design of the specific subject site at the
development management stage.
Based on the CFRAM (Catchment Flood Risk Assessment and Management) PRFA (Preliminary Flood Risk
Assessment) and Monaghan County Development Plan 2025-2031, the subject site resides in Flood Zone
C (refer to Section 4 below). This report contains the first stage of the flood risk assessment.
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-8
1.2 Experience of Authors
Rashaqat Ali Siddiqui (BSc, MSc, MIT). Ali is a hydrogeologist with over 7 years’ experience in water
resource management and impact assessment. He has a Masters in Hydrogeology and is a former
Education Secretary of the Irish chapter for the Association of Hydrogeologists (IAH). Ali’s specialist area
of expertise is water resource management, Site investigation and monitoring, Contaminated land
Assessment, hydrological assessment, site specific flood risk assessment and environmental impact
assessment.
Marcelo Allende (BSc, BEng) is a Principal Environmental Consultant (Hydrologist) at AWN with over 20
years of experience water resources technical studies, conceptual and numerical modelling and
environmental consultancy. Marcelo holds a degree in Water Resource Civil Engineering (BEng, Hons) from
the University of Chile and a Bachelor of Science in Engineering (BSc, Hons). He has worked on a wide of
range of projects including multi-aspect environmental investigations, geo-environmental impact
assessments, surface and groundwater resource management, hydrological and hydrogeological
conceptual and numerical modelling, strategic and site specific flood risk assessments (Stage 1, 2 and 3),
Due Diligence reporting, baselines studies, soils, surface water and groundwater monitoring and field
sampling programmes on a variety of brownfield and greenfield sites throughout Ireland as well as
overseas in Chile, Argentina, Peru and Panama. He also has detailed knowledge of environmental
guidance, legislation, regulations & standards and expertise in GIS (expert level) and MATTE studies at
COMAH establishments. He is currently a member of the International Association of Hydrogeologists (IAH,
Irish Group) and a member of Engineers Ireland (MIEI. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-9
1.3 Methodology
This assessment follows the FRM Guidelines; the methodology involves researching the following data
sources:
► Base maps – Ordnance Survey of Ireland;
► Flood Hazard Maps and flooding information for Ireland, www.floodinfo.ie Office of Public Works
(OPW);
► Geological Survey of Ireland (GSI) maps on superficial deposits;
► EPA hydrology maps;
► National River Basin Management Plan 2018-2021;
► Water Action Plan 2024
► Monaghan County Development Plan 2025-2031;
► Geological Survey of Ireland (GSI) maps on superficial deposits (current and historical);
► Circular PL2/2014 Flooding Guidelines;
► The National Development Plan 2018 – 2027.
The proposed development and its component parts have been assessed against the FRM Guidelines
Classification of Vulnerability. It is considered that the proposed development would reside within the
warehousing, commercial, industrial and waste treatment categories; as such it is classified as ‘Less
Vulnerable Development’ (see Table 1-1 below).
According to the FRM Guidance, a Less Vulnerable Development requires a Justification test for Flood Zone
A and is appropriate for Flood Zones B and C (see Table 1-2 below). RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-10
Table 1-1. Classification of vulnerability of different types of developments.
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-11
Table 1-2: Matrix of vulnerability versus flood zone to illustrate appropriate development
and that required to meet the Justification Test.
1.4 Climate change
Flood risk is anticipated to increase as a result of climate change. Projected impacts for Ireland include:
► Sea level rise of between 18cm and 59cm this century;
► More intense storms and rainfall events;
► Increased likelihood and magnitude of river and coastal flooding; and
► Increased storm surges.
With respect to this assessment and the development area, only changes in the intensity of rainfall events
and the magnitude of river flooding are of direct relevance.
In all developments, climate change should be considered when assessing flood risk and in particular
residual flood risk. Consideration of climate change is particularly important where flood alleviation
measures are proposed, as the design standard of the proposal may reduce significantly in future years
due to increased rainfall, river flows and sea levels.
The Guidelines recommend that a precautionary approach to climate change is adopted due to the level
of uncertainty involved in the potential effects. A significant amount of research into climate change has
been undertaken on both a national and international front, and updates are ongoing.
Based on these two scenarios the OPW recommended allowances for climate change are given in Table
1-3 below. These climate change allowances are particularly important at the development management
stage of planning and will ensure that proposed development is designed and constructed to take into
account best current knowledge.
Table 1-3. Allowances in Flood Parameters for the Mid‐Range and High‐End Future Scenarios for Fluvial
and Tidal Sources
Parameter MRFS HEFS
Extreme Rainfall
Depths +20% +30%
Peak Flood Flows +20% +30%
Mean Sea Level Rise +500 mm +1,000 mm RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 1-12
Parameter MRFS HEFS
Land Movement -0.5 mm/year 1 -0.5 mm/year 1
Urbanisation
No General Allowance – Review
on
a Case by Case Basis
No General Allowance – Review
on
a Case by Case Basis
Forestation -1/6 Tp 2
-1/3 Tp 2
+10% SPR 3
Note 1: Applicable to the southern part of the country only (Dublin – Galway and south of
this)
Note 2: Reduction in the time to peak (Tp) to allow for potential accelerated runoff that
may arise as a result of drainage of afforested land
Note 3: Add 10% to the Standard Percentage Runoff (SPR) rate: This allows for temporary
increased runoff rates that may arise following felling of forestry.
For most development, including residential, nursing homes, shops and offices, the medium -range future
scenario (20% increase in flows) is an appropriate consideration. This should be applied in all areas that
are at risk of flooding (i.e. within Flood Zone A and B) and will be considered for sites which are in Flood
Zone C but are adjacent to Flood Zone A or B. This is because land which is currently not at risk may
become vulnerable to flooding when climate change is taken into account.
Where the risk associated with inundation of a development is low and the design life of the development
is short (typically less than 30 years) the allowance provided for climate change may be less than the 20%
/ 0.5m level.
In general, climate change will be accounted for by the setting of finished floor levels to a height which
includes an allowance for climate change. However, climate change may also reveal additional flow paths
which need to be protected or give rise to flows which exceed culvert capacity or overtop defences. These
outcomes will need to be specifically investigated for each site, and an appropriate response provided. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 2-13
2. BASELINE CONDITIONS
2.1.1 Receiving environment
2.1.1.1 Hydrological features
The Renewable Biogas site is located within the Erne WFD Catchment (Catchment ID: 36) and the
Dromore_sc_20 WFD sub-catchment (Dromore_070 WFD River Sub Basin; EPA, 2026).
The project site is located within the Dromore_sc_20 WFD sub -catchment (Dromore 60 WFD River Sub
Basin; EPA, 2025). According to the EPA online mapping (EPA, 2026) there are no watercourses that
traverse the site grounds. The nearest waterbody Coolkill Lough Stream (EPA Code: IE_NW_36D020700)
is located approximately 350 metres east from the Renewable Biogas site (395m from the point of
discharge) which discharges to Coolkill Lough c.300 east.
The Rockcorry Stream (EPA Code: IE_NW_36D020700) originates from Coolkill Lough and flows in a north
westerly direction before passing through Drumgole Lough (EPA Code: IE_NW_36_415). It then continues
in a southerly direction before ultimately discharging into the Dromore River (EPA Code:
IE_NW_36D020900), approximately 3 km from the proposed development site. According to EPA mapping
no watercourses traverse the proposed development site, refer to figure 2-1 for regional hydrological
environment.
Figure 2-1. Regional Hydrological environment
A site walkover was carried out on 1st October 2024 by AWN to establish site conditions of the Renewable
Biogas site. During the walkover it was identified that the Renewable Biogas site elevation substantially RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 2-14
decreases from south to north. Two field drains were noted along the western and eastern boundary
flowing in a northernly direction and discharging into an existing drain on the northern boundary of the
site parallel to L2280. The drain was observed to have very low volume with areas of dry drain, making it
difficult to confirm flow direction. However, based on the local topography and on site observations it was
determined that the drainage ditch discharges via a culvert under the R189 into another drainag e ditch,
which is hydrologically connected to the Coolkill Lough Stream (EPA Code: IE_NW_36D020700), located
approximately 350 metres east of the renewable biogas site/395m from the point of discharge.
Figure 2-2. Local Hydrological Environment
According to EPA (2025), Coolkill Lough stream has a WFD status (2019-2024) of ‘Poor’ and a WFD risk
score of ‘At Risk’ of Not achieving Good Status by 2027 and DROMORE_070 waterbody (EPA Code:
IE_NW_36D020900) is currently classified a by the EPA as having ‘Poor’ WFD water quality status (2019-
2024 period) and is WFD risk score of ‘At Risk’ of Not achieving Good Status by 2027. This ‘Poor’ status
assigned is due to its poor biological (invertebrate) status or potential.
According to NPWS (2024), the designated sites in closest proximity of the proposed development site are
as follows:
➢ the Kilroosky Lough Cluster SAC (Site Code 001786), located c. 12km northeast (linear distance).
➢ Dromore Lakes pNHA (Site Code 000001), located c.2km south (linear distance). RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 2-15
However, the site has no hydrological pathway/connection to the Kilroosky Lough Cluster SAC or the
Dromore lakes pNHA.
Other designated sites which have hydrological connectivity to the proposed site are as follows:
➢ The Drumgole Lough pNHA ((Site Code 001601), located c. 930m north (linear distance) and c.9km
(hydrological distance).
➢ The Lough Oughter and Associated Loughs SAC (Site Code: 000007), located c.14km west (linear
distance) and c. 38km (hydrological distance).
Refer to Figure 2-3 below for the location of Drumgole Lough pNHA ((Site Code 001601) Dromore Lakes
pNHA (Site Code 000001 the Kilroosky Lough Cluster SAC (Site Code 001786) and The Lough Oughter and
Associated Loughs SAC (Site Code: 000007).
As Stated above, the site does have an indirect hydrological connection to the Drumgole pNHA and Lough
Oughter and Associated Loughs. However, the connection is a long hydrological pathway allowing
significant time for settlement and dilution and as such there is no potential for change in water quality of
this receiving habitat.
Figure 2-3. Designated Sites and Hydrological Connections
2.1.1.2 Existing site geology and hydrogeology
Based on a review of GSI online mapping, the proposed development including the Renewable Biogas site
is underlain by tills derived from Paleozoic Sandstones and Shales which are of low permeability. There
are no recorded bedrock outcrops within the site boundary (GSI, 2025). RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 2-16
The proposed development is underlain by Red Island formation which comprises of Greywacke,
microconglomerate & argillite.
The landslide susceptibility classification within the site boundary ranges from ‘Low’ to ‘Moderate’ (GSI,
2025).
The proposed development lies within the Rockcorry-Cootehill Ribbed Moraines geological heritage site.
These moraines form part of the largest field of ribbed moraines found anywhere in the world (which also
includes the Scotshouse-Redhills cross cutting ribbed moraines). The entire field includes over 3,000
features and this subset, covering an area of 18 by 10 kilometres, contains approximately 160 individual
features. It includes the largest individual ribbed moraines found anywhere in the world and therefore one
of the most important geological terrains in Ireland.
According to GSI (2025), the bedrock aquifer underlying the proposed development site including the
Renewable Biogas site is a classified as Poor Aquifer (PI), i.e. Bedrock which is Generally Unproductive
except for Local Zones. The potential for vertical or horizontal migration within this type of aquifer is poor
as fractures will be disconnected. As such the aquifer is not a significant pathway for off-site migration.
No karst features have been identified with a 20km radius of the proposed development (GSI 2025).
According to GSI regional mapping, the groundwater vulnerability rating is classified as ‘Low’ for the
proposed development site (GSI, 2025).
The groundwater body in the region of the site (Cavan GWB) is classified under the WFD Status 2019-
2024 (EPA, 2025) as having ‘Good Status’. The WFD Risk Score is ‘Not at Risk’ of not achieving good status
by 2027. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 3-17
3. DEVELOPMENT CHARACTERISTICS
3.1.1 Renewable Biogas Plant Site
The development consists of the construction and operation of a Renewable Biogas Plant and associated
infrastructure. The principal elements of the plant comprise a main process building where the feedstock
for the anaerobic digestion (AD) process is received. An odour control system with a dispersion stack will
treat the air from the building. The feedstock passes to the AD tanks located within a bunded tank farm.
There is a combined heat and power (CHP) building where the electricity for the plant’s energy needs will
be generated from the biogas produced in the AD process. A Biogas Upgrade and Treatment Plant will be
installed to produce biomethane (a renewable natural gas) that will be exported via a Gas Grid Entry Unity
to the national gas grid. A CO2 Liquefaction plant will be installed to capture the carbon dioxide in the
biogas, turning it into liquid CO₂. A Dryer Building is proposed, where the digestate will be dried, and a
Pellet Hall will be constructed, where the digestate pellets will be stored prior to removal from the site for
use as a natural fertiliser product. Ancillary elements include a gas dome, tanks to store incoming liquid
feedstock, freshwater, firewater, and fuel, a backup gas flare, a backup generator, a plant building, and
a control building. A new site entrance, weighbridges, wheel washes, parking facilities, and all ancillary
development works and services also form part of the development.
A high-level process flow follows.
3.1.1.1 Surface Water Drainage Strategy
The drainage strategy for the proposed development consists of a number of surface water drainage
networks that collect run-off from the proposed building and plant roofs, and external hardstanding areas,
provides appropriate levels of attenuation, with an objective to reuse within the process the maximum
amount of surface water generated from the operational extents of the site as possible. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 3-18
Run-off will enter the drainage network via gullies, rainwater downpipes, or linear drains and travel through
a network of pipes to underground attenuation tanks. The tanks will attenuate flows up to and including
the 100-year plus 30% climate change allowance and discharge surface water to the downstream network
at a restricted flowrate.
A water treatment system comprising of SDS Aquaswirl Vortex Pollutant Separation System Chambers and
SDS AquaFilter Surface Water Filtration Units will be installed on the inlet pipework to the attenuation
tanks, to reduce the overall amount of total suspended solids and other potential compounds within the
surface water run-off. Any harvested surface water used in the plant process or discharged from the site
will have undergone treatment via these units.
As noted above, the proposed development will be utilising rainwater within the AD process as part of
daily operations. This will significantly reduce the volume of water that would potentially be discharged
from the site. As a result, it shall provide betterment over existing greenfield run-off rates that would
typically be generated from the site. It is noted that the proposed development site does include large
permeable areas that are typically associated with landscaping (i.e. earthworks berm). In general, any
run-off from these areas shall follow the existing drainage regime, directed to and utilising existing
drainage ditches that shall remain along the boundary of the site, with flow directed to the existing
discharge point on the north-east site boundary.
As a worst-case scenario, should onsite water re-use be halted, the proposed development will discharge
water at a rate equivalent to the greenfield run-off currently experienced with attenuation being provided.
The maximum design discharge flow from the site will be 83.5l/s, the calculated greenfield runoff rate for
the site for a 1-in-100-year event.
If run-off does leave the site, it will discharge into an existing culvert which sends flows to a ditch located
on the opposite side of the R189 to the site, on the north-east site boundary. This is subject to gaining
the necessary discharge consent/approvals. This ditch conveys water to the nearest watercourse (Coolkill
Lough Stream) to the east of the site.
3.1.1.2 Foul Water
Foul water flows generated from the proposed development will be directed to a private foul water
treatment plant via a network of pipes and manholes.
Effluent will discharge to a Foul Water Pumping Station. Occasional removal of solids (c.0.5 tonnes /
annum) from the treatment plant off-site to an appropriate facility will be required (likely the McBreen
facility c.20km southwest of the site in Lismagratty, Cootehil Road, Cavan).
The Foul Water Pumping Station will pump to be used on site as part of the AD process. As such, there
will be no trade effluent (waste waters) or domestic type wastewater discharging from the proposed
development.
The Foul Water Pumping Station will be sized to provide 24 hours of storage for the foul flows generated
by the site as a contingency should there be a pump or power failure. It will also afford some flexibility to
the plant operator with respect to sending the treated water to the AD process
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 4-19
4. STAGE 1- FLOOD RISK IDENTIFICATION
In broad terms, the potential sources of flooding at the site can be categorised as:
► Fluvial (River) Flooding: The main risk of fluvial flooding is from the local hydrological environment.
Fluvial or river flooding occurs when the capacity of a watercourse is exceeded or the channel is blocked
or restricted, and excess water spills out from the channel onto adjacent low-lying area.
► Tidal/Coastal Flooding: There is no potential for tidal/coastal flooding based on the location of the site.
► Pluvial Flooding: Pluvial flooding occurs when the capacity of the local drainage network is exceeded
during periods of intense rainfall. At these times, water can collect at low points in the topography and
cause flooding.
► Groundwater Flooding: Groundwater Flooding can occur during lengthy periods of heavy rainfall,
typically during late winter/early spring when the groundwater table is already high. If the groundwater
level rises above ground level, it can pond at local low points and cause periods of flooding.
Groundwater flood is usually associated with areas of high karstification i.e. the west of Ireland.
Each of these potential sources of flooding are considered in this FRA.
4.1.1 Historical Flooding Records
According to the OPW records, there are no previous flood events recorded within the proposed
development site. However, a recurring flooding event area has been identified as ‘Drumgole Lough’,
located c. 970 m north of the subject site as shown in Figure 4-1. As this recurring flooding area is local,
it is not considered to represent a flood risk for the subject site.
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 4-20
Figure 4-1. Historic Flood Events
4.1.2 Fluvial Flooding
4.1.2.1.1 CFRAM Preliminary Flood Risk Assessment (PFRA)
The EU Floods Directive (2007/60/EC) required Member States to undertake a national preliminary flood
risk assessment by 2011 to identify areas where significant flood risk exists or might be considered likely
to occur. Members States were also required to prepare catchment-based Flood Risk Management Plans
by 2018 that will set out flood risk management objectives, actions and measures. The OPW in co-
operation with various Local Authorities produced a number of PFRAs which aimed to map out current and
possible future flood risk areas and develop risk assessment plans. These have been used to form the
Draft Flood Risk Management Plans aimed at identifying possible structural and non-structural measures
to improve the flood risk.
As part of the CFRAM programme provisional flood maps had been produced by the OPW which have been
used in this assessment. The PFRA flood maps do not indicate flooding risk throughout the proposed
development site as shown in Figure 4-2.
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 4-21
Figure 4-2. CFRAM River Flood Probability (OPW, 2025)
4.1.2.1.2 Strategic Flood Risk Assessment (SFRA) – Monaghan County Development Plan
A Strategic Flood Risk Assessment (SFRA) for the Monaghan County Development Plan 2025-2031 was
developed by McCloy Consulting and published in March 2025 Flood Risk Maps have been produced as
part of this assessment based on desk and field studies including predictive and historical indicators of
flood risk, documented Council knowledge of lands, etc.
A Flood Risk Assessment mapping was developed by the Monaghan County Council, and an extract is
shown in Figure 4-3 below. The site boundary is indicated with a red outline in the northwest corner of
the map. This shows the proposed development site was outside any defined flood risk zone (source:
https://monaghan.ie/wp-content/uploads/2024/10/Appendix-19-SFRA-Appendix-A.pdf).
RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 4-22
Figure 4-3.Strategic Flood Risk Assessment Monaghan County
From reviewing Figure 4-1 to 4-3 (above), it is shown that the proposed development site is within Flood
Zone C i.e. the probability of flooding is low (less than 0.1% AEP or in 1 in 1000 year) for Fluvial flooding.
The proposed development may be categorised as “Appropriate” as per the FRA Guidel ines (OPW, 2009)
as the development is “Less Vulnerable Development”
As indicated in Table 1-1 above, the OPW Guidelines state that ‘Less Vulnerable Developments’ are deemed
‘appropriate’ within Flood Zone C, therefore a Justification Test for Development Management is not
required in this case.
4.1.3 Pluvial Flooding
Flooding of land from surface water runoff is usually caused by intense rainfall that may only last a few
hours. The resulting water follows along natural valley lines, creating flow paths along roads and through
and around developments and ponding in low spots, which often coincide with fluvial floodplains. Any
areas at risk from fluvial flooding will almost certainly be at risk from surface water flooding.
Surface water discharge from all areas will be collected and directed to an attenuation/rainwater harvesting
system. Collected rainwater will be stored on site and reused in the AD process. All captured surface water
within the site will pass through a sequence of Aqua Swirl Vortex and Aqua Filter Unit at least once prior
to use in the AD process or discharge from site.
Attenuation will be provided on site for flows up to and including the 100-year plus 30% climate change
allowance and discharge surface water to the downstream network is managed with a restricted flowrate. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 4-23
As a worst-case scenario, should onsite water re-use be halted, the proposal development will discharge
water at a rate equivalent to the greenfield run-off currently experienced with attenuation being provided.
The maximum design discharge flow from the site will be 83.5l/s which is the calculated greenfield runoff
rate for the site for a 1-in-100-year event. This will ensure that any discharges from site will not cause
any flooding in the receiving watercourses.
4.1.4 Groundwater Flooding
Groundwater flooding can be due to high water tables and increased recharge following extended periods
of wet weather and usually associated with the karst areas of the west of Ireland. According to the OPW
and GSI records, there have been no reported instances of groundwater flooding in the area of study. An
analysis of datasets available online through GSI Mapping was undertaken to determine the potential for
groundwater flooding. Groundwater flooding is most common in Karst areas. The GSI Groundwater Data
Viewer shows no indication of any Karst features in the area. This indicates that the proposed site has a
low risk from groundwater flooding.
4.1.5 Other Sources of Flooding
There are no reservoirs, canals or other significant artificial sources in the vicinity of the development site.
As such flooding from this source is not considered a risk to the site and therefore is not discussed further
within this FRA.
4.1.6 Overview of Flood Risk Identification
The OPW Historical records show that there is no evidence of flooding at the site. The desktop review
shows the proposed development site is not at risk from coastal, pluvial, fluvial or groundwater flooding.
Therefore, the proposed development is located within Flood Zone C. Based on the 2009 Guidelines, it is
concluded that this type of development (proposed Renewable Biogas Plant) is appropriate for this flood
zonation.
Therefore, based on the nature of the development and the results presented above, it is considered that
it is not necessary to proceed to Stages 2 and 3.
4.1.7 Flood Mitigation Measures
Surface water discharge from all areas will be collected and directed to an attenuation/rainwater harvesting
system. Collected rainwater and storm water will be utilised in the wheel washing and AD processes.
Excess surface water will be attenuated in underground tanks via silt traps and oil interceptors prior to
discharge from the site to an approved location at greenfield runoff rates.
The network will be designed to cater for a 1 in 100-year event with a 30% addition to account for climate
change.
Surface water runoff from hardstanding areas, the tank farm and buildings will be collected via a network
of pipes. Surface water captured in bunded areas, such as the tank farm, will be assessed for potential
contaminants prior to discharge to the drainage system. If unsuitable to be discharged to the drainage
system this water will be pumped from a sump in the bund, to ensure there is no inadvertent discharge
to the surface water drainage system.
All surface water which is discharged to the attenuation/rainwater harvesting system shall pass through
Aqua Swirl Vortex and Aqua Filter units, to improve the quality of the runoff from the proposed
development.
The attenuation/rainwater harvesting system has a dual purpose of: RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 4-24
► reducing the peak quantity of discharge from the site by attenuating the volume and restricting the
flow and;
► providing permanent storage for reuse of collected rainwater in the operation of the proposed facility.
The management of surface water for the proposed development has been designed to comply with the
policies of the Monaghan County Council Development Plan (refer to Engineering Services Report,
McAdam, 2025). The overall objective is to minimise stormwater runoff and to collect and treat this
minimised amount of runoff as close to the source as possible.
4.1.8 Residual Risk
According to the 2009 Guidelines, the residual risk remains after all risk avoidance, substitution and
mitigation measures have been implemented, on the basis that such measures only reduce risk, not
eliminate it.
The residual risk associated to climate change is considered to be low, based on CFRAM Mid-Range and
High-End future models (refer to Section 1.5 above). Figure 4-4 below show that the site is located within
Flood Zone C for both cases.
Figure 4-4. Extract from CFRAM MRFS and HEFS Pluvial Flooding Map for the Site Area (CFRAM, 2025).
In addition, the development includes drainage and attenuation strategy that have been designed with an
allowance 30% increase in flows as suggested per 2009 Guidelines. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 5-25
5. CONCLUSIONS
This Stage 1 Flood Risk Assessment has been undertaken in accordance with the FRM guidelines. The
main aim of this FRA is to determine the risk of flooding to the site and the impact the development will
have on the floodplain; upstream and downstream levels and any mitigation measures necessary. The
OPW CFRAM online mapping and associated Maps were used to consider the risk of flooding to the
proposed site. Based on the nature of the development and the results presented above, it is considered
that it is not necessary to proceed to Stages 2 and 3.
The review of the available data on fluvial, pluvial and groundwater flooding shows that the proposed
development site has no historical flood hazard identified in the vicinity; the entire site falls within Flood
Zone C and no further justification test is required. No residual risk is foreseen as the development is
located outside any flooding zones associated with future scenarios (MRFS and HEFS). The development
includes a drainage and attenuation strategy that have been designed with an allowance 30% increase in
flows as suggested per 2009 Guidelines.
Based on this information the proposed development complies with the appropriate policy guidelines for
the area which include the Monaghan County Development Plan 2025-2031.
Overall, it is concluded that this proposed development, and the surrounding area is not at risk from
flooding since the proposed development is located in Flood Zone C. The type of development is classed
as a ‘Less Vulnerable Development’. This type of development is deemed appropriate for this flood
zonation. RECEIVED: 28/08/2026
FRA Renewable Biogas Plant, / 257501.0350EIAR
AWN Consulting Ltd 6-26
6. REFERENCES
► The Planning System and Flood Risk Management Guidelines for Planning Authorities, DoEHLG, 2009.
► Base maps, Ordnance Survey Ireland.
► Flood Hazard Maps and flooding information for Ireland, www.floodinfo.ie
► GSI Bedrock Geology, Subsoils, Aquifers, Groundwater vulnerability online mapping, www.gsi.ie
► Monaghan County Council Development Plan 2025-2031 (https://monaghan.ie/planning/wp-
content/uploads/sites/4/2024/09/Written-Statement-Draft-Monaghan-County-Development-Plan-
2025-2031.pdf )
► The National Development Plan 2018 – 2027
► Monaghan AD Plant, Engineering Services Report. McAdam, October 2025.
RECEIVED: 28/08/2026
AUGUST 2026
VOLUME III
APPENDICES TO
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
APPENDIX 10.3
WATER FRAMEWORK DIRECTIVE
ASSESSMENT
Stream BioEnergy Ireland Limited
RECEIVED: 28/08/2026
Appendix 10.3
Water Framework Directive (WFD) Screening Assessment for
Monaghan Renewable Biogas Plant
AWN Consulting Ltd, The Tecpro Building, IDA Business & Technology Park, Clonshaugh, Dublin 17, D17 XD90
Monaghan Renewable
Biogas Plant RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd
TABLE OF CONTENTS
1 WATER FRAMEWORK DIRECTIVE SCREENING ASSESSMENT 4
1.1 Introduction ............................................................................................................. 4
1.2 Site Setting and History ........................................................................................... 4
1.2.1 Renewable Biogas Plant Site .................................................................................. 4
1.2.2 Linear Gas Grid Connection .................................................................................... 4
1.2.3 Site History........................................................................................................... 5
1.3 Experience of Authors .............................................................................................. 5
1.4 Legislation and Guidance ......................................................................................... 5
1.5 Methodology ............................................................................................................ 6
1.5.1 WFD Risk Status ................................................................................................... 6
1.5.2 WFD Water Body Status ........................................................................................ 7
1.5.3 Methodology for Determination of No Deterioration Assessment ................................ 7
1.5.4 Assessment against Future Status Objectives ........................................................... 9
1.6 Sources of Information ............................................................................................ 9
2 DESCRIPTION OF EXISTING HYDROLOGICAL AND HYDROGEOLOGICAL ENVIRONMENT
11
2.1 Hydrology .............................................................................................................. 11
2.1.1 Regional Hydrological Environment ....................................................................... 11
2.1.2 Local Hydrological Environment ............................................................................ 12
2.1.3 Designated Sites ................................................................................................. 13
2.1.4 Bathing Waters and Recreational Waterbodies ....................................................... 14
2.1.5 Water Supplies ................................................................................................... 15
3 HYDROGEOLOGY 16
3.1.1 Groundwater Bodies ............................................................................................ 16
3.1.2 Groundwater Quality ........................................................................................... 16
3.1.3 Source Protection Areas ....................................................................................... 17
3.1.4 Aquifer Classification & Vulnerability ..................................................................... 17
4 WATER BODY IDENTIFICATION & STATUS 20
4.1 The DROMORE_070 WFD River Waterbody ............................................................ 21
4.2 The DROMORE_080 WFD River Waterbody ............................................................ 21
4.3 The Drumgole WFD Lake Waterbody ...................................................................... 22
4.4 The Cavan Groundwater Body (GWB) .................................................................... 22
5 DESCRIPTION OF THE PROJECT 24
5.1 Construction Phase ................................................................................................ 25
5.2 Operational Phase .................................................................................................. 25
6 ASSESSMENT OF SOURCE-PATHWAY-RECEPTOR (SPR) MODEL 27
6.1 Assessment of Potential Sources of Impact ........................................................... 27
7 NO DETERIORATION ASSESSMENT 7-28
7.1 HYDROLOGICAL ENVIRONMENT ........................................................................ 7-28
7.2 HYDROGEOLOGICAL ENVIRONMENT ................................................................. 7-28
7.3 ASSESSMENT IN TERMS OF FUTURE GOOD STATUS ........................................... 7-29
8 CONCLUSIONS 8-31
APPENDIX A. 8-32 RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd i
APPENDIX B. 8-34
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd ii
LIST OF TABLES
Table 1-1 Surface Water Assessment Matrix 7
Table 1-2 Groundwater Assessment Matrix 8
Table 4-1 WFD Waterbodies Located Within the Study Area 20
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd iii
LIST OF FIGURES
Figure 2-1. Regional Hydrological environment 11
Figure 2-2. Drainage Ditches and Flow Directions (McAdam, 2025) 13
Figure 2-3. Designated Sites and Hydrological Connections 14
Figure 3-1. WFD Groundwater Bodies 16
Figure 3-2. Aquifer Classification 18
Figure 3-3. Groundwater Vulnerability Rating 19
Figure 4-1. Surface Water Quality for Dromore_070 WFD Surface Waterbody 21
Figure 4-2. Surface Water Quality for Dromore_080 WFD Surface Waterbody 22
Figure 4-3. Surface Water Quality for Drumgole WFD Surface Waterbody 22
Figure 4-4.Groundwater Quality for Cavan Groundwater Body 23
Figure 5-1. Proposed Layout (McAdam, 2025) 24
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 4
1 WATER FRAMEWORK DIRECTIVE SCREENING ASSESSMENT
1.1 Introduction
AWN Consulting Limited (AWN) has prepared this Water Framework Directive (WFD) Assessment
to support the competent authority in determining whether the Proposed Project has the potential
to cause deterioration in the status of any relevant surface water or groundwater body,
deterioration of any relevant WFD quality element, or prevent the achievement of the applicable
WFD environmental objectives.
The Proposed Development for which planning permission is sought comprises the Renewable
Biogas Plant at Maghernakelly, Drum, Co. Monaghan. The Linear Gas Grid Connection will be
delivered separately by Gas Networks Ireland under the applicable statutory consenting process;
however, it forms part of the overall Proposed Project for the purposes of EIA and is considered
in this assessment where relevant to WFD receptors and pathways.
The objective of the assessment is to address the following:
• Does this development cause deterioration of a water body from its current status or potential
for reaching “Good” status?
• Does this development impact on any water dependent protected areas, priority species,
habitats etc.?
• Does this development support the achievement of water body objectives and programme of
measures?
The surface water assessment and groundwater assessment both examine potential effects of the
proposed development, which includes the construction and operation of the proposed
development.
1.2 Site Setting and History
1.2.1 Renewable Biogas Plant Site
The site of the Proposed Development is located in Maghernakelly, Drum, Co. Monaghan, covering
a total area of approximately 6.2 hectares. It is c.4km north of Cootehill and 17.5km southwest of
Monaghan town. The site is comprised of two fields which are divided by tree lined hedgerows. It
is bounded to the north by L2280 Drumcal Road, to the east by the R189 regional road, and to
the west by Maghernakelly Road. To the south, the site adjoins New Park Farm and an existing
residential property. The site is undulating with substantial elevation from approximately 109mOD
in the southern section to around 93mOD at the northern boundary.
1.2.2 Linear Gas Grid Connection
A gas transmission pipeline will provide a physical connection between the Renewable Biogas Plant
and the existing national gas network in Dromore West. Co. Monaghan. While the development of
the gas grid is not part of the planning application, as Gas Networks Ireland will deliver it, it is
included in the EIAR for assessment purposes, as it forms part of the overall project for the EIA
Directive. The works comprise the laying of an underground pipeline over approximately 3.5 km
within the public road corridor.
As the construction is a shallow trench in a roadway there is minimal potential for impact on
receiving waterways. The design will be required to ensure the contractor manages collection and
disposal of water during open trench cuts and soil disposal in an environmentally responsible
manner. There are 3no. of water crossings on Crosslea 36 Stream along the pipeline route. It is
proposed recommended that directional drilling (trenchless drilling) methodology will be RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 5
implemented along these water crossings. So, no potential for any significant surface water or
groundwater disturbance. During operational Phase, there is no potential for impact on receiving
waterways.
1.2.3 Site History
The Renewable Biogas Plant site is presently undeveloped and is predominantly in pastoral
agricultural use. Historical Ordnance Survey mapping indicates that the site has remained largely
agricultural and has not been occupied by significant built development. The southern boundary
adjoins New Park Farm and an existing residential property. Existing drainage features and the
hydrological setting of the site are described in Section 2.1.2.
1.3 Experience of Authors
Rashaqat Ali Siddiqui (BSc, Msc, MIT). Ali is a hydrogeologist with over 7 years’ experience in water
resource management and impact assessment. He has a Masters in Hydrogeology and is a former
Education Secretary of the Irish chapter for the Association of Hydrogeologists (IAH). Ali’s specialist
area of expertise is water resource management, Site investigation and monitoring, Contaminated
land Assessment, hydrological assessment, Water Framework Directive Assessment and
environmental impact assessment.
Teri Hayes (BSc MSc PGeol EurGeol, Dip Planning & Environmental Law) is a Director and
Hydrogeologist with AWN Consulting with 30 years of experience in water resource management,
environmental assessment and environmental licensing. Teri is a former President of The
International Association of Hydrogeologists (IAH, Irish Group) and is a professional member of
the Institute of Geologists of Ireland (IGI) and European Federation of Geologists (EurGeol). She
has qualified as a competent person for contaminated land assessment as required by the IGI and
EPA. Her project experience includes managing Environmental Impact Statements, Environmental
Licences and environmental reports for Industry, Infrastructure and residential developments. Teri
has written and provided technical review and training on environmental programmes for both the
public and private sector and has considerable experience in public presentations, stakeholder
liaison and acting as a legal witness.
1.4 Legislation and Guidance
The Water Framework Directive (WFD) 2000/60/EC aims to protect and enhance the quality of the
water environment (both surface water and groundwater) across all European Union member
states. The WFD was transposed into Irish law by the European Communities (Water Policy)
regulations 2003 (S.I. No 722 of 2003). The WFD requires that EU Member States achieve at least
“Good” status for all water bodies by the year of 2027 at the latest. Additionally, where Member
States assign “High” status objectives to water bodies, the “High” status must be achieved or
maintained by 2027.
The concept of ‘deterioration of the status’ of a body of surface water in Article 4(1)(a)(i) of
Directive 2000/60 must be interpreted as meaning that there is deterioration as soon as the status
of at least one of the quality elements, within the meaning of Annex V to the directive, falls by one
class, even if that fall does not result in a fall in classification of the body of the surface water as
a whole. However, if the quality element concerned, within the meaning of that annex, is already
in the lowest class, any deterioration of that element constitutes a ‘deterioration of the status’ of
a body of surface water, within the meaning of Article 4(1)(a)(i).
The primary aim of the RBMP is that water bodies identified as being ‘At Risk’ of not achieving
their WFD environmental objectives need to have targeted measures implemented to achieve
objectives under this Plan. The EPA determines the significant pressures that are placing the water RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 6
body at risk of meeting its status objective. This determination focuses the programme of Measures
for the relevant subcatchment(s).
As part of its role, the EPA and other stakeholders such as local authorities must consider whether
proposals for new developments (other than where exemptions apply Article 4.4 - 4.7 of the WFD)
have the potential to:
➢ Cause a deterioration of a water body from its current status or potential; and/ or
➢ Prevent future attainment of good status or potential where not already achieved.
As a result, new developments that have the potential to impact on current or predicted WFD
status are required to assess their compliance against the WFD objectives of the potentially
affected water bodies.
The WFD is implemented through River Basin Management Plans (RBMPs) in six year cycles. We
are currently in WFD third cycle 2022-2027 i.e. Water Action Plan 2024 - A River Basin Management
Plan for Ireland, (Department of Housing Local Government & Heritage, Sept 2024).
1.5 Methodology
This WFD assessment was based on a desktop review of the Environmental Protection Agency
(EPA) dataset which was obtained from the portal www.catchments.ie (accessed May 2025).
The water bodies identified for this assessment are related to the vicinity of the proposed
construction area and its direct or indirect hydrological or hydrogeological connection. From the
aforementioned source of information, the WFD Status classification and Risk score was obtained
for the identified water bodies.
Besides the status classification of water bodies, the WFD also requires that ‘designated sites’ meet
their environmental requirements and conservation objectives. Designated sites are Natura 2000
sites (Special Areas of Conservation, SACs, with water-dependent habitats, and Special Protection
Areas for species listed in the EU Habitats Directive); drinking water protected areas; bathing
waters; shellfish waters; salmonid waters; and nutrient sensitive waters. Environmental
requirements and conservation objectives for designated sites are stipulated in existing regulations
or are being developed by the relevant public bodies (e.g., National Parks and Wildlife Service for
SACs).
1.5.1 WFD Risk Status
The WFD Risk score is the risk for each waterbody of failing to meet their WFD objectives by 2027.
The risk of not meeting WFD objectives has been determined by assessment of monitoring data,
data on the pressures and data on the measures that have been implemented. Waterbodies that
are At Risk are prioritised for implementation of measures. This assessment was completed in
2020 by the EPA Catchments Unit in conjunction with other public bodies and was primarily based
on monitoring data up the end of 2018.
The three risk categories are:
➢ Waterbodies that are ‘At Risk’ of not meeting their Water Framework Directive objectives. For
these waterbodies an evidence-based process was undertaken to identify the significant
pressures; once a pressure is designated as ‘significant’, measures and accompanying
resources are needed to mitigate the impact(s) from this pressure. These ‘At Risk’ waterbodies
require not only implementation of the existing measures described in the various regulations,
e.g., the Good Agricultural Practices Regulations, but also in many instances more targeted
supplementary measures. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 7
➢ Waterbodies that are categorised as ‘Review’ either because additional information is needed
to determine their status before resources and more targeted measures are initiated or the
measures have been undertaken, e.g., a wastewater treatment plant upgrade, but the
outcome hasn’t yet been measured/monitored.
➢ Waterbodies that are ‘Not at Risk’ and therefore are meeting their Water Framework Directive
objectives. These require maintenance of existing measures to protect the satisfactory status
of the water bodies.
1.5.2 WFD Water Body Status
Surface water body status is classified on the basis of chemical and ecological status or potential.
This system is summarised in Appendix A Table 1 and Table 2. Under the WFD, surface water
body and groundwater body status is classified on the basis of quantitative and chemical status.
This system is summarised in Appendix B.
1.5.3 Methodology for Determination of No Deterioration Assessment
Projects that have the potential to impact on current or predicted WFD status are required to
assess their compliance against the objectives defined for potentially affected water bodies.
1.5.3.1 Surface Water No Deterioration Assessment
Table 1.1 below presents the matrix used to assess the effect of the Project on surface water
status or potential class. It ranges from a major beneficial effect (i.e., a positive change in overall
WFD status) through no effect to deterioration in overall status class. The colour coding used in
Table 2.1 is applied to the No Deterioration Assessment’ spreadsheet provided in Appendix A of
this report.
Table 1-1 Surface Water Assessment Matrix
Effect Description/ Criteria Outcome
Major
Beneficial
Impacts that taken on their own or in combination with
others have the potential to lead to the improvement in
the ecological status or potential of a WFD quality
element for the entire waterbody
Increase in status of one or more
WFD element giving rise to a
predicted rise in status class for
that waterbody.
Minor/
localised
beneficial
Impacts when taken on their own or in combination
with others have the potential to lead to a minor
localised or temporary improvement that does not
affect the overall WFD status of the waterbody or any
quality elements
Localised improvement, no
change in status of WFD element
No Impact No measurable change to any quality elements. No change
Localised /
temporary
adverse effect
Impacts when taken on their own or in combination
with others have the potential to lead to a minor
localised or temporary deterioration that does not
affect the overall WFD status of the waterbody or any
quality elements. Consideration will be given to habitat
creation measures.
Localised deterioration, no
change in status of WFD element
when balanced against mitigation
measures embedded in the
project. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 8
Adverse effect
on class of
WFD element
Impacts when taken on their own or in combination
with others have the potential to lead to the
deterioration in the WFD status class of one or more
biological quality elements, but not in the overall status
of the waterbody. Consideration will be given to habitat
creation measures.
Decrease in status of WFD
element when balanced against
positive measures embedded in
the project.
Adverse effect
on overall WFD
class of
waterbody
Impacts when taken on their own or in combination
with others have the potential to lead to the
deterioration in the ecological status or potential of a
WFD quality element, which then lead to a
deterioration of status/potential of waterbody.
Decrease in status of overall WFD
waterbody status when balanced
against positive measures
embedded in the project.
1.5.3.2 Groundwater No Deterioration Assessment
Table 1.2 below presents the matrix used to assess the effect of the Project on groundwater status
class. It ranges from a beneficial effect but no change in status to deterioration in overall status
class. The colour coding used in Table 2.2 is applied to the final ‘No Deterioration Assessment’
spreadsheet in Appendix A of this report.
Table 1-2 Groundwater Assessment Matrix
Magnitude of
Impact of the
Project on WFD
Element
Effect on WFD Element within the assessment
boundary
Effect on Status of WFD
element at the Groundwater
Body Scale
Impacts lead to
beneficial effect
Combined impacts have the potential to have a
beneficial effect on the WFD element.
Improvement but no change to
status of WFD element
No measurable
change to
groundwater levels or
quality.
No measurable change to WFD elements. No change and no deterioration
in status of WFD element
Impacts when taken
on their own have the
potential to lead to a
minor localised or
temporary effect
Combined impacts have the potential to lead to a
minor localised or temporary adverse effect on the
WFD element.
Combined impacts have the
potential to lead to a minor
localised or temporary effect on
the WFD element. No change to
status of WFD element and no
significant deterioration at
groundwater body scale.
Impacts when taken
on their own have the
potential to lead to a
widespread or
prolonged effect.
Combined impacts have the potential to have an
adverse effect on the WFD element.
Combined impacts have the
potential to have an adverse
effect on the WFD element,
resulting in significant
deterioration but no change in
status class at groundwater
body scale. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 9
Magnitude of
Impact of the
Project on WFD
Element
Effect on WFD Element within the assessment
boundary
Effect on Status of WFD
element at the Groundwater
Body Scale
Impacts when taken
on their own have the
potential to lead to a
significant effect.
Combined impacts in combination with others
have the potential to have a significant adverse
effect on the WFD element.
Combined impacts in
combination with others have
the potential to have an adverse
effect on the WFD element AND
change its status at the
groundwater body scale
1.5.4 Assessment against Future Status Objectives
River Basin Management Plans are used to outline water body pressures and the actions that are
required to address them. The future status objective assessment considers the ecological
potential of a surface water body and the mitigation measures that defined the ecological potential.
Assessments are based on the project (including mitigation measures) risks (construction and
operation) with regard to the objectives for achieving good status as set out in the 3rd Cycle RBMP
2022-2027 i.e. Water Action Plan 2024. The assessment considers whether the Project has the
potential to prevent the implementation or impact the effectiveness of the defined measures in
these plans.
1.6 Sources of Information
Desk-based hydrological and hydrogeological information in the vicinity of the site was obtained
through accessing databases and other archives where available. Data was sourced from the
following:
• Geological Survey of Ireland- online mapping (GSI, 2025).
• GSI - Geological Heritage Sites & Sites of Special Scientific Interest.
• Ordnance Survey of Ireland (OSI).
• Teagasc subsoil database.
• Catchments.ie
• National Parks and Wildlife services (NPWS, 2025).
• Environmental Protection Agency (EPA) – website mapping and database information. Envision
water quality monitoring data for watercourses in the area.
• Water Action Plan 2024 - A River Basin Management Plan for Ireland, (Department of Housing
Local Government & Heritage, Sept 2024).
• The Planning System and Flood Risk Management, Guidelines for Planning Authorities
(Department of the Environment, Heritage and Local Government (DoEHLG) and the Office of
Public Works (OPW).
• Office of Public Works (OPW) flood mapping data (www.floodmaps.ie)
• ‘Control of Water Pollution from Construction Sites, Guidance for Consultants and Contractors’
(CIRIA 532, 2001).
Site specific data was derived from the following sources:
• Monaghan AD Plant-Engineering Services Report (McAdam, 2025)
Relevant legislation and guidance is as follows:
• European Communities 920030, Common Implementation Strategy for the Water Framework
Directives (2000/60/EC) Guidance Document No.2.
• EPA (May 2015), An approach to characterisation as part of the Water Framework Directive V2
revised. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 10
• EPA (2010) Methodology for Establishing Groundwater Threshold Values, the Assessment of
Chemical and Quantitative Status for Groundwater and Groundwater Trends.
• Common Implementation Strategy (CIS) (2017) Guidance Document No. 36 'Exemptions to the
environmental objectives according to Article 4(7) provides comprehensive guidance on the
application of Article 4(7).
• Joint Assistance to Support Projects in European Regions (JASPERS) (2018) Water Framework
Directive Project assessment checklist tool.
• UKTAG (2012) Groundwater Chemical Classification for the Water Framework Directive. Paper
11b(i).
• UK Technical Advisory Group on the Water Framework Directive.
• UKTAG (2012) Groundwater Quantitative Classification for the Water Framework Directive.
Paper 11b(ii), UK Technical Advisory Group on the Water Framework Directive.
• Control of Water Pollution from Construction Sites, Guidance for Consultants and Contractors’
(CIRIA 532, 2001).
This WFD assessment was based on desktop review of the Environmental Protection agency (EPA)
and Local Authority Waters Programme water quality records which were obtained from the portal
www.catchments.ie (accessed November 2025). From the aforementioned source of information,
the WFD Status classification and Risk score was obtained for the identified water bodies.
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 11
2 DESCRIPTION OF EXISTING HYDROLOGICAL AND
HYDROGEOLOGICAL ENVIRONMENT
2.1 Hydrology
2.1.1 Regional Hydrological Environment
The Renewable Biogas site is located within the Erne WFD Catchment (Catchment ID: 36) and the
Dromore_sc_20 WFD sub-catchment (Dromore_070 WFD River Sub Basin; EPA, 2026). The Erne
catchment is divided into 28 Sub-Catchments with 129 river waterbodies, 132 lake waterbodies,
five transitional waterbodies, 39 groundwater bodies and no coastal waterbodies.
The project development including the Renewable Biogas site is located within the Dromore_sc_20
WFD sub-catchment (Dromore 60 WFD River Sub Basin; EPA, 2026). According to the EPA online
mapping (EPA, 2025) there are no watercourses that traverse the site grounds. The nearest
waterbody is Coolkill Lough Stream (EPA Code: IE_NW_36D020700) is located approximately 350
metres east from the Renewable Biogas site/395m from the point of discharge.
Coolkill Lough Stream discharges into Coolkill Lough c.300 meters east. The Rockcorry Stream
(EPA Code: IE_NW_36D020700) originates from Coolkill Lough and flows in a north westerly
direction before passing through Drumgole Lough (EPA Code: IE_NW_36_415). It then continues
in a southerly direction before ultimately discharging into the Dromore River (EPA Code:
IE_NW_36D020900), approximately 3 km from the proposed development site.
Figure 2-1. Regional Hydrological environment
The nearest active surface waterbody EPA monitoring station is ‘Br.W. of Clementstown’
(StationCode: RS36D020700) located in the DROMORE_070 waterbody adjacent to Cootehill town
c. 3.5km birds eye distance of the proposed development site. The most recent water quality RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 12
status recorded by the EPA (2022) at this monitoring station (EPA Code: RS36D020700) is
classified as Q3 Poor, which denotes moderately polluted waterbody. This Value is based primarily
on the relative proportions of pollution sensitive to tolerant macroinvertebrates (the young stages
of insects primarily but also snails, worms, shrimps etc.) resident at a river site.
According to EPA (2026), Coolkill Lough stream has a WFD status (2019-2024) of ‘Poor’ and a
WFD risk score of ‘At Risk’ of Not achieving Good Status by 2027 and DROMORE_070 waterbody
(EPA Code: IE_NW_36D020900) is currently classified a by the EPA as having ‘Poor’ WFD water
quality status (2019-2024 period) and is WFD risk score of ‘At Risk’ of Not achieving Good Status
by 2027. This ‘Poor’ status assigned to the is due to its poor biological (invertebrate) status or
potential.
Drumgole Lough (WFD Code: IE_NW_36_415) is assigned a WFD status (2019-2024) of ‘Poor’
and a WFD risk score is under review.
The Coolkill Lough and Rockcorry Streams are located within the WFD surface waterbody
‘DROMORE_070’ (WFD Code: IE_NW_36D020700). The Dromore River is located within the
‘DROMORE_080’ WFD surface waterbody.
2.1.2 Local Hydrological Environment
A site walkover was carried out on 1st October 2024 by AWN to establish site conditions of the
Renewable Biogas site. During the walkover it was identified that the Renewable Biogas site
elevation substantially decreases from south to north. Two field drains were noted along the
western and eastern boundary flowing in a northernly direction and discharging into an existing
drain on the northern boundary of the site parallel to L2280. The drain was observed to have very
low volume with areas of dry drain, making it difficult to confirm flow direction. However, based
on the local topography and on site observations it was determined that the drainage ditch
discharges via a culvert under the R189 into another drainage ditch, which is hydrologically
connected to the Coolkill Lough Stream (EPA Code: IE_NW_36D020700), located approximately
350 metres east of the renewable biogas site/395m from the point of discharge. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 13
Figure 2-2. Drainage Ditches and Flow Directions (McAdam, 2025)
A review of the Geological Survey Ireland (GSI) online mapping tool and historical mapping
resources indicates that there are no recorded historical features or structures within the local
environment of the proposed development site. This suggests that the area has no identified
historical or archaeological significance based on available mapping data.
2.1.3 Designated Sites
The NPWS (2026) on-line database have been reviewed to determine the location of areas of
conservation within the Proposed Development site, and there are no Special Protected Areas
(SPA) established under the EU Birds Directive (79/409/EEC), or Special Areas of Conserv ation
(SAC) established under the Habitats Directive within the boundary of the Proposed Development
site. Furthermore, there are no Natural Heritage Areas (NHA), or proposed Natural Heritage Areas
(pNHA) established under the Wildlife Acts, 1976 and 2000 (as amended) within the boundary of
the Proposed Development site.
The designated sites in closest proximity of the site are as follows:
➢ the Kilroosky Lough Cluster SAC (Site Code 001786), located c. 12km northeast (linear
distance).
➢ Dromore Lakes pNHA (Site Code 000001), located c.2km south (linear distance).
However, the site has no hydrological pathway/connection to the Kilroosky Lough Cluster SAC or
the Dromore lakes pNHA. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 14
Other designated sites which have hydrological connectivity to the proposed site are as follows:
➢ The Drumgole Lough pNHA ((Site Code 001601), located c. 930m north (linear distance) and
c.9km (hydrological distance).
➢ The Lough Oughter and Associated Loughs SAC (Site Code: 000007), located c.14km west
(linear distance) and c. 38km (hydrological distance).
The site does have an indirect hydrological connection to the Drumgole pNHA and Lough Oughter
and Associated Loughs. However, the connection is a long hydrological pathway allowing
significant time for settlement and dilution and as such there is no potential for change in water
quality of this receiving habitat.
Refer to Figure 2-3 below for the location of Drumgole Lough pNHA ((Site Code 001601) Dromore
Lakes pNHA (Site Code 000001 the Kilroosky Lough Cluster SAC (Site Code 001786), Lough
Oughter and Associated Loughs SAC (Site Code: 000007) and the hydrological connectivity in the
context of the site. Further assessment is provided in the EIAR Biodiversity chapter.
Figure 2-3. Designated Sites and Hydrological Connections
2.1.4 Bathing Waters and Recreational Waterbodies
The local environment also includes areas of natural resources that relate to populations and
human health that may be impacted by the Proposed Development, this includes economic
resources, recreational and bathing waters, and drinking water resources.
A review of Environmental Sensitivity Mapping online maps that includes the Register of Protected
Areas (RPA) under the Water Framework Directive (WFD) has shown that there are no Recreational
Waters, Bathing Waterbodies, within the proposed development or located within a 20km radius
of the proposed development. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 15
2.1.5 Water Supplies
A review of the Environmental Protection Agency's (EPA) online mapping, which includes the
Register of Protected Areas (RPA) established under the Water Framework Directive (WFD) does
not show any Surface Water Drinking RPAs in the vicinity of the site. There is one known reported
abstraction from surface water in the vicinity of the proposed development (Monaghan County
Council, 2025). The area is supplied by Drumgole group water scheme which abstract water from
Annaghmakerig Lough located c.1.9km north of the proposed development. However, no
hydrological connection is identified between the site and the lough.
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 16
3 HYDROGEOLOGY
3.1.1 Groundwater Bodies
The GSI (2026) National Bedrock Aquifer Map classifies that the proposed development site
including the Renewable Biogas site and as being located within one groundwater body (GWB) i.e.
Cavan groundwater body (GWB) (European Code: IE_NW_G_061) as presented in Figure 3-1.
The key characteristics of the ‘Cavan’ groundwater body (GWB) have been identified by the GSI
as follows:
The Cavan Groundwater Body (GWB) is underlain predominantly by low transmissivity bedrock,
with the northern section where the proposed site is located comprised mainly of Ordovician
metasedimentary rocks. These rocks have experienced significant structural deformation, resulting
in numerous faults aligned southwest to northeast and additional intersecting perpendicular faults.
The area is mainly covered by glacial till (~71%), with smaller extents of peat (~9%) and rock
outcrop or shallow subsoil (~10%). Groundwater recharge primarily occurs via rainfall infiltration
through thin or permeable subsoils and exposed rock outcrops. However, recharge is often limited
in areas where thick, low-permeability subsoils such as till and peat dominate, leading to reduced
aquifer infiltration.
Groundwater flow paths in the Cavan GWB are typically short ranging between 30 and 300
metres—with groundwater discharging quickly to nearby streams, springs, and lakes. These short
flow paths reflect the limited storage and permeability of the aquifer. Groundwater flow direction
is mainly governed by surface topography, with a general trend towards the north and east.
Figure 3-1. WFD Groundwater Bodies
3.1.2 Groundwater Quality
The Water Framework Directive (WFD) 2000/60/EC was adopted in 2000 as a single piece of
legislation covering rivers, lakes, groundwater, transitional (estuarine) and coastal waters. In RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 17
addition to protecting said waters, its objectives include the attainment of ‘Good Status’ in water
bodies that are of lesser status at present and retaining ‘Good Status’ or better where such status
exists at present. ‘Good Status’ was to be achieved in all waters by 2015, as well as maintaining
‘high status’ where the status already exists. The EPA co-ordinates the activities of the River Basin
Districts, local authorities and state agencies in implementing the directive, and operates a
groundwater quality monitoring programme undertaking surveys and studies across the Republic
of Ireland.
Presently, the groundwater body in the region of the site (Cavan GWB - European Code:
IE_NW_G_061) for which the site is located entirely within, has a WFD status of “Good” (WFD
Period: 2016-2021) and a WFD risk score (3rd Cycle) of “Not at Risk” of not achieving good status.
The objective is to protect the “Good status” and “not at risk” score by recognising that the quality
of the groundwater could be at risk in the future due to point and diffuse sources of pollution.
3.1.3 Source Protection Areas
There are no recorded Public Supply Source Protection Area or Group Scheme Preliminary Source
Protection Areas in the vicinity of the site. The nearest Public Supply Source Protection Area is
Clones Scotshouse PWS (IE_GSI_SPA_90) located c. 10km west of the site. The nearest
groundwater Group Scheme Preliminary Source Protection Area is Templeport (IE_GSI_ZOC_161)
located c. 35.3km west of the site. Groundwater flow paths in the Cavan GWB are typically short—
ranging between 30 and 300 metres—with groundwater discharging quickly to nearby streams,
springs, and lakes. Based on the flow proximity of the proposed development site to the PWS, the
flow paths within the aquifer and the fact none of the river transverses these source protection
areas. There is no hydrogeological connection between the site and the PWS.
3.1.4 Aquifer Classification & Vulnerability
The GSI has devised a system for classifying the bedrock aquifers in Ireland. The aquifer
classification for bedrock depends on a number of parameters including, the area extent of the
aquifer (km2), well yield (m3/d), specific capacity (m3/d/m) and groundwater throughput (mm3/d).
There are three main classifications: regionally important, locally important and poor aquifers.
Where an aquifer has been classified as regionally important, it is further subdivided according to
the main groundwater flow regime within it. This sub-division includes regionally important fissured
aquifers (Rf) and regionally important karstified aquifers (Rk). Locally important aquifers are sub-
divided into those that are generally moderately productive (Lm) and those that are generally
moderately productive only in local zones (Ll). Similarly, poor aquifers are classed as either
generally unproductive except for local zones (Pl) or generally unproductive (Pu).
According to GSI (2025), the bedrock aquifer underlying the site is classified as a Poor Aquifer
(PI), i.e. Bedrock which is Generally Unproductive except for Local Zones as presented in Figure
3-2. The potential for vertical or horizontal migration within this type of aquifer is poor as fractures
will be disconnected. As such the aquifer is not a significant pathway for off-site migration. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 18
Figure 3-2. Aquifer Classification
Aquifer vulnerability is a term used to represent the intrinsic geological and hydrological
characteristics that determine the ease with which groundwater may be contaminated generally
by human activities. According to GSI regional mapping, the groundwater vulnerability rating is
classified as ‘Low’ for the proposed development. Aquifer vulnerability classifications are primarily
based on the permeability and thickness of subsoils.
According to GSI regional mapping, the groundwater vulnerability rating is classified as ‘Low’ for
the site, refer to Figure 3-3. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 19
Figure 3-3. Groundwater Vulnerability Rating
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 20
4 WATER BODY IDENTIFICATION & STATUS
This section presents the water bodies identified for assessment, reasoning and water body status.
The overall Project site lies entirely within Erne WFD Catchment (Catchment ID: 36) and River Sub
Basin Dromore_sc_20. The Erne catchment is divided into 28 Sub-Catchments with 129 river
waterbodies, 132 lake waterbodies, five transitional waterbodies, 39 groundwater bodies and no
coastal waterbodies.
The Project site is located within the Dromore_sc_20 WFD sub-catchment (Dromore 60 WFD River
Sub Basin; EPA, 2025).
This WFD Screening has identified 3 no. WFD surface waterbodies and 1 no. groundwater bodies
which need to be considered. The Coolkill Lough Stream, Rockcorry Stream, the Drumgole lough,
the Dromore River and the underlying Cavan groundwater body (GWB). As stated in section 2.1.1,
The Coolkill Lough and Rockcorry Streams are located within the WFD surface waterbody
‘DROMORE_070’ (WFD Code: IE_NW_36D020700). The Dromore River is located within the
‘DROMORE_080’ WFD surface waterbody. Drumgole lough (WFD Code: IE_NW_36_415) is
assessed as its own waterbody via modelling.
There is an existing ‘indirect’ hydrological connection/pathway through the site drainage which
discharges to the Coolkill Lough Stream which eventually outfalls to the Dromore River. There is
also an existing ‘indirect’ hydrogeological connection/pathway through lateral migration via
groundwater within the underlying subsoils/top of weathered bedrock and/or Poor Aquifer (PI) to
the surrounding hydrological environment i.e. the Coolkill Lough and Rockcorry Stream. The site
has an indirect connection to the Natura 2000 site Lough Oughter and Associated Loughs SAC
(Site Code: 000007) located 14km west via Dromore river.
The surface and groundwater bodies are listed in Table 4-1 below. For each waterbody, the most
recent WFD status (Period: 2019-2024), risk score and location in relation to the site are provided
(EPA, 2025).
Table 4-1 WFD Waterbodies Located Within the Study Area
Type WFD
Classification
WFD Name/ID WFD Status
(2016-2021)
WFD Risk
Score
Location
Surface
Water
River
Waterbody
DROMORE_070
(European Code: IE:
IE_NW_36D020700)
‘Poor’ ‘At Risk’ Downstream of Site
River
Waterbody
DROMORE_080
(European Code:
IE_NW_36D020900)
‘High’ ‘Not at Risk’ Downstream of Site
Lake Water
Body
Drumgole (European
Code:
IE_NW_36_415)
‘Poor’ ‘Review’ Downstream of Site
Groundwater Groundwater
Body
Cavan GWB
(European Code:
IE_NW_G_061)
‘Good’ ‘Not at Risk’ Underlying site
Sections 4.1, 4.2 and 4.3 below summarise the surface water quality of the DROMORE_070,
DROMORE_080 and Drumgole Lough WFD surface waterbodies, respectively. Sections 4.4
summarise the groundwater quality of the underlying Poor Aquifer –(PI) i.e. Cavan groundwater
body (GWB). RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 21
4.1 The DROMORE_070 WFD River Waterbody
The Dromore_070 (European Code: IE_NW_36D020700) for which the Coolkill Lough and
Rockcorry Streams are located within has a most recent WFD surface water status (WFD Period:
2019-2024) of ‘Poor’ and its current WFD risk score (3rd risk cycle) is ‘At Risk’ of not achieving
good status by 2027. The most recent Sub-Catchment Assessment carried out by the EPA in
January 2019 on the Dromore_SC_020 Sub-Catchment states the main pressure identified on the
Dromore_070 WFD surface waterbody from agriculture and urban wastewater, likely attributing to
the poor ecological and biological status or potential. Monitoring of the concentrations of Ammonia
Total (as N) by the EPA has shown an upward trend, and Ortho-Phosphate (as P) have shown a
downward trend.
The most recent catchment report (HA 36 Erne Catchment Report) carried out by the EPA in May
2025 on the Erne Catchment states that significant pressures on the Dromore_070 WFD surface
waterbody includes agriculture and urban wastewater.
Figure 4-1. Surface Water Quality for Dromore_070 WFD Surface Waterbody
4.2 The DROMORE_080 WFD River Waterbody
The Dromore_080 (European Code: IE_NW_36D020900) for which the Dromore River is located
within has a most recent WFD surface water status (WFD Period: 2019-2024) of ‘High’ and its
current WFD risk score (3rd risk cycle) is ‘Not at risk’ of not achieving good status by 2027. The
most recent catchment report (HA 36 Erne Catchment Report) carried out by the EPA in May 2025
on the Erne Catchment does not state any significant pressures on the Dromore_080 WFD surface
waterbody. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 22
Figure 4-2. Surface Water Quality for Dromore_080 WFD Surface Waterbody
4.3 The Drumgole WFD Lake Waterbody
The Drumgole (European Code: IE_NW_36_415) has a most recent WFD surface water status
(WFD Period: 2019-2024) of ‘Poor’ and its current WFD risk score (3rd risk cycle) is under Review.
The most recent Sub-Catchment Assessment carried out by the EPA in January 2019 on the
Dromore_SC_020 Sub-Catchment states the main pressure identified on the Drumgole WFD
surface waterbody from agriculture.
Figure 4-3. Surface Water Quality for Drumgole WFD Surface Waterbody
4.4 The Cavan Groundwater Body (GWB)
As stated in Section 3.1.1 above, the Cavan groundwater body (GWB) (European Code:
IE_NW_G_061) underlays the entire site. The site is located within a ‘Poor Aquifer- (PI), this is an
aquifer which is incapable of supplying regionally important supplies (e.g., large public water
supplies). Based on the most recent data published by the EPA, the Cavan GWB has a WFD status
of ‘Good’ (WFD Period: 2019-2024) and a WFD risk score (3rd Cycle) of ‘Not at Risk’ of not achieving
good status, meaning it has achieved its objectives end the overall status is considered good. This”
Good’” status is related to the overall groundwater status i.e. quantitative groundwater status and
chemical groundwater status.
The most recent catchment report (HA 36 Erne Catchment Report) carried out by the EPA in May
2025 on the Erne Catchment does not state any pressures on the Cavan groundwater body (GWB)
(European Code: IE_NW_G_061).
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 23
Figure 4-4.Groundwater Quality for Cavan Groundwater Body
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 24
5 DESCRIPTION OF THE PROJECT
The purpose of this section is to provide an overview of the key relevant details of the construction
and operational phases of the Project. The information presented in this section is informed by the
project design, but it is not a complete description of the Project. Please refer to chapter 2 for a
complete description of the Proposed Development.
The Proposed Project comprises two elements. The Proposed Development for which planning
permission is sought is the Renewable Biogas Plant at Maghernakelly, Drum, Co. Monaghan,
occupying approximately 6.2 ha. The second element is the approximately 3.5 km Linear Gas Grid
Connection between the Renewable Biogas Plant and the existing national gas network at Dromore
West. The Linear Gas Grid Connection will be delivered separately by Gas Networks Ireland under
the applicable statutory consenting process but forms part of the overall Proposed Project for the
purposes of EIA and this WFD assessment.
Figure 5-1. Proposed Development Layout (McAdam, 2025)
The works can be summarised in the following two sections:
• Construction Phase
• Operational Phase RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 25
5.1 Construction Phase
During construction of the development, the potential of impact on water body status is associated
with the following sources:
➢ Accidental release of suspended solids (muddy water with increased turbidity (measure of
the degree to which the water loses its transparency due to the presence of suspended
particulates) – arising from excavation and ground disturbance;
➢ Accidental release of alkaline water from cement/concrete (increase turbidity and pH) works;
➢ Accidental release of hydrocarbons and other construction chemicals (ecotoxic) – accidental
spillages from construction plant or onsite storage; and
➢ Accidental release of wastewater (nutrient and microbial rich) – arising from accidental
discharge from on-site toilets and washrooms. Construction phase sewerage will be
contained in a tank and taken by tanker off site for disposal to McBreen Environmental
facility (WFP-CN-21-0003-01), Lismagratty, Cootehill Road, or similar licensed facility nearby.
➢ Removal of any encountered contaminated soil during gas grid connection installation.
These are temporary short-lived events which could impact on status without mitigation measures
being in place. The most likely impact would be to surface water body status as the groundwater
bodies are naturally protected by overlying clays at this site. There is no long term dewatering or
water abstractions required during construction so no likely impact on groundwater quantitative
status.
5.2 Operational Phase
During operation of the development, the potential impact on water body status is associated
with the following activities
➢ Accidental release of suspended solids (muddy water with increased turbidity (measure of
the degree to which the water loses its transparency due to the presence of suspended
particulates) – arising storm water runoff;
➢ Accidental release of hydrocarbons and other chemicals (ecotoxic) – accidental spillages
from operational plant or onsite storage; and
➢ Groundwater Abstraction of a maximum of 45m3/day during dry periods.
The operation of the Biogas plant will be undertaken in compliance with an EPA IED Licence which
will include conditions to protect receiving waters e.g monitoring of any bulk chemical storage,
management of any accidental emissions to ground and monitoring programmes.
The proposed surface water management strategy is to collect and utilise the majority of the water
within the AD process. All captured water will be treated via SDS Aquaswirl Vortex Pollutant
Separation System Chambers and SDS AquaFilter Surface Water Filtration Units which will be
installed on the inlet pipework to the attenuation tanks, to reduce the overall amount of total
suspended solids, heavy metals, and hydrocarbons within the surface water run-off. Any excess
water which will be discharged off site will have undergone this treatment.
Attenuation will be provided on site for flows up to and including the 100-year plus 30% climate
change allowance and discharge surface water to the downstream network is managed with a
restricted flowrate.
As a worst-case scenario, should onsite water re-use be halted, the proposed development will
discharge water at a rate equivalent to the greenfield run-off currently experienced with
attenuation being provided. The maximum design discharge flow from the site will be 83.5l/s which
is the calculated greenfield runoff rate for the site for a 1-in-100-year event. It is noted that the
proposed development site does include large permeable areas that are typically associated with
landscaping (i.e. earthworks berm). In general, any run-off from these areas shall follow the RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 26
existing drainage regime, directed to and utilising existing drainage ditches that shall remain along
the boundary of the site, with flow directed to the existing discharge point on the north-east site
boundary.
Foul water flows generated from the proposed development will be directed to a private foul water
treatment plant via a network of pipes and manholes. The plant will treat the foul water and
discharge the treated water to a Foul Water Pumping Station. Occasional removal of solids from
the treatment plant off-site to McBreen Environmental facility or similar licensed facility.
The Foul Water Pumping Station will pump the treated effluent to be used on site as part of the
AD process. As such, there will be no trade effluent (waste waters) or domestic type wastewater
discharging from the proposed development.
As the AD plant will utilise poultry and animal manures – this will lead likely lead to a reduction in
the impact of agricultural runoff to receiving water in Co. Monaghan. Currently as noted the water
body status of the surface water body is Poor and agriculture is noted as a significant Pressure.
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 27
6 ASSESSMENT OF SOURCE-PATHWAY-RECEPTOR (SPR)
MODEL
A conceptual site model is developed based on a good understanding of the hydrological and
hydrogeological environment, plausible sources of impact and knowledge of receptor
requirements. This in turn allows possible Source Pathway Receptor (S-P-R) linkages to be
identified. If no S-P-R linkages are identified, then there is no risk to identified receptors.
6.1 Assessment of Potential Sources of Impact
This section presents the information related to the current waterbody status identified in the
development area. The Proposed Development site lies within the Dromore WFD sub-catchment
(Dromore_SC_020 WFD River Sub Basin EPA, 2025). The Groundwater Body (GWB) underlying
the site is the Cavan Groundwater Body (EU Ground Waterbody Code: IE_NW_G_061).
This WFD Screening has identified three (3) no. WFD surface waterbodies and one (1) no. WFD
groundwater bodies of relevance due to the close proximity and connection of these waterbodies
during the construction and operation of the Proposed Development. Table 1 and 2 in appendix A
provides the impacts and includes the robust mitigation and design measures which will be
incorporated into the Proposed Development throughout the construction and operational phases.
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 7-28
7 NO DETERIORATION ASSESSMENT
7.1 HYDROLOGICAL ENVIRONMENT
As discussed in section 6 of this report, the Proposed Development has an indirect hydrological connection
to the Coolkill Lough Stream (Dromore_070 river waterbody) located approximately 350 metres east of
the Proposed Development Site or 395m from the point of discharge. There is a risk of surface water
entering the Coolkill Lough Stream through the proposed drainage network which ultimately discharges to
the Rockcorry Stream, the Dromore River and then to the Lough Oughter and Associated Loughs 14km
west of the site.
There are mitigation and design measures which will be implemented during the construction phase to
protect the hydrological and hydrogeological environment. There is a potential of accidental discharges
during the construction phase, however these are temporary short-lived events that will not impact on the
water status of waterbodies long-term and as such will not impact on trends in water quality and overall
status assessment.
Construction of the Renewable Biogas Plant will be undertaken in accordance with the CEMP and Soil and
Surface Water Management Plan, including measures for sediment control, management of excavation
water, refuelling, concrete works and accidental spills.
The Linear Gas Grid Connection will be delivered separately by Gas Networks Ireland. The pollution-
prevention, excavation-water, sediment-control and watercourse-crossing measures identified in this
assessment in respect of those works are therefore presented as recommendations for implementation by
GNI through its applicable construction and environmental management procedures.
There are no changes to the overall hydrological and hydrogeological regime as a result of the Proposed
Development. There are no proposed diversions of any drainage ditches or waterbodies as part of the
Proposed Development.
The implementation of the design and mitigation measures outlined in this document, CEMP and the
surface water management plan will ensure, there is no perceptible impact on the water quality of the
Coolkill Lough stream, Rockcorry Stream Drumgole Lough and the Dromore River i.e. no change to the
WFD status or elements in terms of the hydrological environment.
Taking account of these measures, construction activities are not predicted to cause deterioration in the
status of any WFD quality element or deterioration in the overall status of the identified surface
waterbodies.
7.2 HYDROGEOLOGICAL ENVIRONMENT
As discussed in section 6 of this report, all areas associated with enabling works and operational phase
have an indirect connection with the ‘Cavan’ groundwater body (GWB) (European Code: IE_NW_G_061)
and is described as a ‘Poor Aquifer – (PI)’.
No long-term dewatering will be required during groundworks. Local sustainable groundwater abstraction
will be undertaken during drought periods. As such, no changes in water quality or levels are expected
unless there are local alterations to the groundwater regime at the site. There is no potential for changes
in water quality or levels unless the groundwater regime at the site undergoes local changes.
There are no planned discharges to groundwater during the operational phase. However, there is a
proposed groundwater abstraction onsite which will be designed sustainably so there is no potential for
over abstraction. The project design includes hard standing areas across the site. However, these areas
will have a minimal impact on infiltration capacities due to the extent and size of the Cavan GWB in relation
to the proposed site.
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 7-29
There is limited potential of accidental discharges during the construction phase. However, should these
occur they are temporary short-lived events that will not impact on the water status of the underlying
bedrock aquifer long-term and as such will not impact on trends in water quality and overall status
assessment. The project-specific mitigation measures will be implemented to ensure the protection of the
hydrogeological environment during construction which will ensure that there will be no negative impact
on the quantitative or qualitative of the underlying Poor Aquifer (Cavan GWB).
In terms of the operational phase, the risk to the aquifer is considered to be low since there are no
proposed discharges to ground and all bulk oil for backup generator and operational site vehicles will be
stored in fully bunded areas with 110% capacity. All other chemicals are stored within the AD building. All
generators will be double bunded meaning the fuel tanks will sit inside another fuel tank in the event of a
spill, emergency spill procedures and spill mats will be in place in the event of an accidental spill or leak.
The proposed hard standing area across the Renewable Biogas site will also provide protection as no
permeable surfaces are proposed within the process areas.
All foul water produced during the operation phase will be treated on site as stated above. The solids from
the foul water will be separated and disposed off site at McBreen Environmental facility (or similar) and all
the liquid will be introduced back into the AD process. There are no proposed wastewater discharges
during the operation phase.
There is a proposed groundwater abstraction well on site to a maximum of 45m3/day during dry periods.
However, given the demand and the catchment size of Cavan GWB and proposed dual pumping to storage
system, there is no risk associated with over abstraction which can impact the WFD quantitative status of
the GWB.
The implementation of the mitigation measures outlined in this document, CEMP and the surface water
management plan will ensure, there is no perceptible impact on the water quality of the Cavan GWB i.e.
no change to the WFD status or elements in terms of the hydrogeological environment.
On that basis, the abstraction is not predicted to cause a measurable adverse change in groundwater
levels at groundwater-body scale or deterioration in the quantitative status of the Cavan GWB.
7.3 ASSESSMENT IN TERMS OF FUTURE GOOD STATUS
The Dromore_070 (European Code: IE_NW_36D020700) for which the Coolkill lough Stream and Rockcorry
streams are located within has a most recent WFD surface water status (WFD Period: 2019-2024) of ‘Poor’
and its current WFD risk score (3rd risk cycle) is under ‘At Risk’ of not achieving good status by 2027. The
most recent Sub-Catchment Assessment carried out by the EPA in January 2019 on the Dromore_SC_020
Sub-Catchment states the main pressure identified on the Dromore_070 WFD surface waterbody is from
agriculture, likely attributing to the poor ecological and biological status or potential. Monitoring of the
concentrations of Ammonia Total (as N) by the EPA has shown an upward trend, and Ortho -Phosphate
(as P) have shown a downward trend.
The Dromore_080 (European Code: IE_NW_36D020900) for which the Dromore river is located within has
a most recent WFD surface water status (WFD Period: 2019-2024) of ‘High’ and its current WFD risk score
(3rd risk cycle) is ‘Not at risk’ of not achieving good status by 2027. The most recent Sub-Catchment
Assessment carried out by the EPA in December 2018 on the Dromore_SC_020 Sub-Catchment states is
passed all Ecological Status or potential.
The Cavan groundwater body (GWB) (European Code: IE_NW_G_061) underlays the entire portion of the
and is described as a ‘Poor Aquifer – (PI)’. This is a generally unproductive except for Local Zones. Based
on the most recent data published by the EPA, the Cavan GWB has a WFD status of ‘Good’ (WFD Period:
2019-2024) and a WFD risk score (3rd Cycle) of ‘Not at Risk’ of not achieving good status. The objective
is to protect the “Good status” and “not at risk” score by recognising that the quality of the groundwater
could be at risk in the future due to point and diffuse sources of pollution. This ‘Good’” status is related to
the overall groundwater status i.e. quantitative groundwater status and chemical groundwater status. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 7-30
At present there are no local targeted measures within the catchments to maintain or achieve
improvements to the status of the water bodies. However, the following are some pressures associated
with waterbody catchments:
• Management of pollution from agricultural activities.
• Management of pollution from urban environments.
No dewatering or discharge to ground is required during operation. There is a proposed groundwater
abstraction well on site to a maximum of 45m3/day during dry periods. However, given the demand and
the catchment size of Cavan GWB. There is no risk associated with over abstraction which can impact the
WFD quantitative status of the GWB. As such there will be no change to the existing status as a result of
the proposed event.
Based on the above information it is not considered that any aspects of the proposed event will prevent
the WFD objectives from being achieved or to meet the requirements and/or objectives in the third RBMP
2022-2027 (River Basin Management Plan) and Water Action Plan 2024 - A River Basin Management Plan
for Ireland.
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 8-31
8 CONCLUSIONS
Appendix A contains the background information and the WFD classification elements for surface water
and groundwater body status. The colour coded system referred to in Appendix A – Table 1 and Table 2
are used to give a visual impression of the surface water and groundwater assessment, respectively
Appendix B presents the methodology for the surface water and groundwater assessments.
The WFD assessment indicates that, based on the current understanding of the Project, there is no
potential for adverse or minor temporary/ long-term or localised effects on the Coolkill lough stream,
Rockcorry stream, Drumgole Lough and Dromore River. Therefore, it has been assessed that the proposed
development will not cause any deterioration or change in water body status or prevent attainment, or
potential to achieve, future good status or to meet the requirements and/or objectives in the third RBMP
2022-2027 (River Basin Management Plan) and Water Action Plan 2024 - A River Basin Management Plan
for Ireland.
The WFD assessment indicates that there is no potential for adverse or minor temporary or localised
effects on the Cavan groundwater body (GWB). Therefore, it has been assessed that it is unlikely that the
proposed site will cause any deterioration or change on its water body status or prevent attainment, or
potential to achieve the WFD objectives or to meet the requirements and/or objectives in the third RBMP
2022-2027 (River Basin Management Plan) and Water Action Plan 2024 - A River Basin Management Plan
for Ireland.
Accordingly, no WFD deterioration or impediment to the achievement of WFD objectives is predicted as a
result of the Proposed Project.
No further assessment of WFD is recommended given that no significant deterioration or change in water
body status is expected based on the current understanding of the Project during construction and
operation. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 8-32
APPENDIX A.
RECEIVED: 28/08/2026
Surface WaterScheme ElementsPhase (Construction/ Operation)Construction ConstructionOperationOperationIdentified Quantitative ImpactsIncreased run-off and sediment loadingPollution due to accidential discharges or spillages during the construction phaseIncrease in HardstandingAccidental Leaks and DischargesMacrophytes and phytobenthos - combinedNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusMacroinvertebratesNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusFishNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusTotal AmmoniaNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusTotal NitrogenNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusOrtho-PhosphateNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusQuantity and dynamics of river flowNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusConnection to GroundwaterNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusRiver continuityNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusRiver depth and width variation bedNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusStructure and substrate of river bedNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusStructure of riparian zoneNo measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrological environment with no deterioration to the WFD StatusPhysio-Chemical StatusRisk screening of potential to cause deterioration of current WFD statusHydromorphological ElementsPredicted change to status elements (green = none, amber = possibly, red = likely)Predicted change to status elements (green = none, amber = possibly, red = likely)Predicted change to status elements (green = none, amber = possibly, red = likely)Proposed Development Overall Impact with mitgation measuresWFD StatusMitigation MeasuresConstruction: The project-specific CEMP includes robust mitigation measures to protect the hydrological environment. The CEMP sets out requirements and standards which must be met during the construction stage and includes relevant mitigation measures outlined in the EIA Report and any subsequent conditions provided in planning for water protection. These include management of soils, re-fuelling machinery and chemical handling and control of water during the construction phase.Operation: The proposed development is designed to ensure the protection of the hydrological environment. In order to limit the surface water discharge from the site, greenfield rates are applied and to ensure improvement in the overall surface water quality before ultimate discharge the principles of Sustainable Drainage Systems, (SuDS) are implemented throughout the site. Majority of the surface water will be reused on site. Any discharge which will occur from site is through a water treatment system. Site will acquire an EPA IED Licence and monitoring of all containment measures will be undertaken as part of an EPA licence. The licence includes conditions to protect water quality discharge to ensure no impact on water body status.DROMORE_070 (European Code: IE: IE_NW_36D020700)DROMORE_080 (European Code: IE_NW_36D020900)Drumgole (European Code: IE_NW_36_415)RECEIVED: 28/08/2026
GroundwaterScheme ElementsPhase (Construction/ Operation)Construction Construction Operation Operation Identified Quantitative ImpactsIncreased run-off and sediment loadingPollution due to accidential discharges or spillages during the construction phaseIncrease in HardstandingAccidental Leaks and DischargesSaline or other intrusions.To identify groundwater bodies where the intrusion of poor quality water as a result of groundwater abstraction is leading to sustained upward trends in pollutant concentrations or significant impact on one or more groundwater abstractions.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusSurface water.To assess the impact of groundwater abstractions on the ecological status of surface water bodies.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusGroundwater Dependent TerrestrialEcosystems (GWDTE's)To assess the impact of groundwater abstractions on the condition of GWDTE'S.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusWater balanceTo identify groundwater bodies where abstractions exceed the available resource.Not Applicable (No dewatering anticipated)Not Applicable (No dewatering anticipated)No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusSaline or other intrusions.To identify groundwater bodies where the intrusion of poor quality water as a result of groundwater abstraction is leading to sustained upward trends in pollutant concentrations or significant impact on one or more groundwater abstractions.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusSurface water.To assess the impact of groundwater abstractions on the ecological status of surface water bodies.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusGroundwater Dependent TerrestrialEcosystems (GWDTE's)To assess the impact of nutrient concentrations in groundwater (primarily phosphates) on GWDTE's.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusDrinking Water Protected Areas (DrWPAs)To identify groundwater bodies failing to meet the DrWPA objectives defined in Article 7 of the WFD or at risk of failing in the future.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusGeneral quality assessmentTo identify groundwater bodies where widespread deterioration in quality has or will compromise the strategic use of groundwater.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No measurable change anticipated.No anticipated impacts to the hydrologeological environment with no deterioration to the WFD StatusChemical ElementsPredicted change to status elements (green = none, amber = possibly, red = likely)Risk screening of potential to cause deterioration of current WFD statusProposed Development Overall ImpactQuantitative ElementsPredicted change to status elements (green = none, amber = possibly, red = likely)Mitigation MeasuresConstruction: The project-specific CEMP includes robust mitigation measures to protect the underlying hydrogeological environment. The CEMP will be a live document during the works. It sets out requirements and standards which must be met during the construction stage anand includes the relevant mitigation measures outlined in the EIA Report and any subsequent planning conditions. Mitigation measures for protection of water quality include a soil management, re-fuelling machinery and chemical handling and control of water during the construction phase. No signficant dewatering is required and as such there is no negative impact on quantitative status.Operation: The proposed development is designed to ensure the protection of the underlyinghydrogeological environment based on bulk fuel storage in bunded areas and no proposed discharges to groundwater. Majority of surface water is captured on site and reused for AD process. All discharges will be to the drainage ditches. However, all surface water captured on are treated prior to reuse and discharge off site. So any surface and groundwater interaction will not result in the detoriation of the WFD status of Cavan GWB. The proposed groundwater abstraction to maminum of 45m3/day will not cause any detoriation to the WFD quantitative status of the GWB based on the abstraction demand and the size of the GWB due to over abstraction.Cavan GWB (European Code: IE_NW_G_061)RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 8-33
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 8-34
APPENDIX B.
APPENDIX B
WATER FRAMEWORK DIRECTIVE ASSESSMENT MATRIX
1.1 Background to Surface Water Body Status & Groundwater Body Status
Under the WFD, surface water body status is classified on the basis of chemical and ecological status or
potential. Ecological status is assigned to surface water bodies that are natural and considered by the EPA
not to have been significantly modified for anthropogenic purposes (i.e., culverting). Ecological potential
is assigned to artificial and man-made water bodies (such as canals), or natural water bodies that have
undergone significant modification. The term ‘ecological potential’ is used as it may be impossible to
achieve good ecological status because of modification for a specific use, such as navigation or flood
protection. The ecological potential represents the degree to which the quality of the water body
approaches the maximum it could achieve. The worst-case classification is assigned as the overall surface
water body status, in a ‘one-out all-out’ system (i.e., by taking the worst case of all the combined risk
outcomes). This system is summarised below in Figure 1.
Figure 1. WFD classification elements for surface water body status (Environmental Agency, 2015)
1.1.2 Chemical Status
Chemical status is defined by compliance with environmental standards for chemicals that are priority
substances and/or priority hazardous substances, in accordance with the Environmental Quality
Standards Directive (2008/105/EC). This is assigned on a scale of good or fail. Surface water bodies are RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 8-35
only monitored for priority substances where there are known discharges of these pollutants; otherwise,
surface water bodies are reported as being at good chemical status.
1.1.3 Ecological Status
Ecological status or potential is defined by the overall health or condition of the watercourse. This is
assigned on a scale of High, Good, Moderate, Poor or Bad, and on the basis of four classification elements
or ‘tests’, as follows:
• Biological: This test is designed to assess the status indicated by a biological quality element
such as the abundance of fish, invertebrates or algae and by the presence of invasive species. The
biological quality elements can influence an overall water body status from Bad through to High.
• Physico-chemical: This test is designed to assess compliance with environmental standards for
supporting physicochemical conditions, such as dissolved oxygen, phosphorus and ammonia. The
physicochemical elements can only influence an overall water body status from Moderate through
to High.
• Specific pollutants: This test is designed to assess compliance with environmental standards for
concentrations of specific pollutants, such as zinc, cypermethrin or arsenic. As with the physico-
chemical test, the specific pollutant assessment can only influence an overall water body status
from Moderate through to High.
• Hydromorphology: For natural waterbodies, this test is undertaken when the biological and
physicochemical tests indicate that a water body may be of High status. It specifically assesses
elements such as water flow, sediment composition and movement, continuity, and structure of
the habitat against reference or ‘largely undisturbed’ conditions. If the hydromorphological
elements do not support High status, then the status of the water body is limited to Good overall
status. For artificial or highly modified waterbodies, hydromorphological elements are assessed
initially to determine which of the biological and physico-chemical elements should be used in the
classification of ecological potential. In all cases, assessment of baseline hydromorphological
conditions are an important factor in determining possible reasons for classifying biological and
physicochemical elements of a water body as less than Good, and hence in determining what
mitigation measures may be required to address these failing water bodies.
1.2 Background to Groundwater Body Status
Under the WFD, groundwater body status is classified on the basis of quantitative and chemical status.
Status is assessed primarily using data collected from the EPA monitoring network; therefore, the scale of
assessment means that groundwater status is mainly influenced by larger scale effects such as significant
abstraction or widespread/ diffuse pollution. The worst-case classification is assigned as the overall
groundwater body status, in a ‘one-out all-out’ system. This system is summarised in Figure 2 below.
1.2.1 Quantitative Status
Quantitative status is defined by the quantity of groundwater available as baseflow to watercourses and
water-dependent ecosystems, and as ‘resource’ available for use as drinking water and other consumptive
purposes. This is assigned on a scale of Good or Poor, and on the basis of four classification elements or
‘tests’ as follows:
• Saline or other intrusions: This test is designed to identify groundwater bodies where the
intrusion of poor quality water, such as saline water or water of different chemical composition, as
a result of groundwater abstraction is leading to sustained upward trends in pollutant
concentrations or significant impact on one or more groundwater abstractions.
• Surface water: This test is designed to identify groundwater bodies where groundwater
abstraction is leading to a significant diminution of the ecological status of associated surface water
bodies. RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 8-36
• Groundwater Dependent Terrestrial Ecosystems (GWDTEs): This test is designed to
identify groundwater bodies where groundwater abstraction is leading to “significant damage” to
associated GWDTEs (with respect to water quantity).
• Water balance: This test is designed to identify groundwater bodies where groundwater
abstraction exceeds the “available groundwater resource”, defined as the rate of overall recharge
to the groundwater body itself, as well as the rate of flow required to meet the ecological needs
of associated surface water bodies and GWDTEs.
1.2.2 Chemical Status
Chemical status is defined by the concentrations of a range of key pollutants, by the quality of groundwater
feeding into watercourses and water-dependent ecosystems and by the quality of groundwater available
for drinking water purposes. This is assigned on a scale of Good or Poor, and on the basis of five
classification elements or ‘tests’ as follows:
• Saline or other intrusions: This test is designed to identify groundwater bodies where the
intrusion of poor-quality water, such as saline water or water of different chemical composition,
as a result of groundwater abstraction is leading to sustained upward trends in pollutant
concentrations or significant impact on one or more groundwater abstractions.
• Surface water: This test is designed to identify groundwater bodies where groundwater
abstraction is leading to a significant diminution of the chemical status of associated surface water
bodies.
• GWDTEs: This test is designed to identify groundwater bodies where groundwater abstraction is
leading to “significant damage” to associated GWDTE’s (with respect to water quality).
• Drinking Water Protected Areas (DrWPAs): This test is designed to identify groundwater
bodies failing to meet the DrWPA objectives defined in Article 7 of the WFD or at risk of failing in
the future.
• General quality assessment: This test is designed to identify groundwater bodies where
widespread deterioration in quality has or will compromise the strategic use of groundwater.
Figure 2. WFD classification elements for groundwater body status (Environmental Agency, 2015)
RECEIVED: 28/08/2026
Monaghan Renewable Biogas Plant / 257501.0350
AWN Consulting Ltd 8-37
RECEIVED: 28/08/2026
AUGUST 2026
VOLUME III
APPENDICES TO
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
APPENDIX 10.4
GROUNDWATER ABSTRACTION
FEASIBILITY ASSESSMENT
Stream BioEnergy Ireland Limited
RECEIVED: 28/08/2026
RE
Groundwater Abstraction Feasibility Assessment
Anaerobic Digestor at Maghernakelly, Co. Monaghan
CLIENT
Stream Bio Energy
DOCUMENT REFERENCE
247501.0350
DATE
21 November 2025
AWN Consulting Ltd, The Tecpro Building, IDA Business & Technology Park, Clonshaugh, Dublin 17, D17 XD90
REPORT
RECEIVED: 28/08/2026
DOCUMENT CONTROL SHEET
Document Control Sheet
Our Reference 247501.0350
Original Issue Date 21 November 2025
Client: Stream Bio Energy
Client Address:
Revision Revision Date Description
Details Written by Approved by
Signature
Name Rashaqat Ali Siddiqui Teri Hayes
Title Environmental Consultants Director
Date 21 November 2025
Disclaimer
This report considers the specific instructions and requirements of our client. It is not intended for third-party
use or reliance, and no responsibility is accepted for any third party. The provisions in this report apply solely
to this project and should not be assumed applicable to other developments without review and modification. RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd
TABLE OF CONTENTS
1. INTRODUCTION 1
1.1 Background ..............................................................................................................1
1.1.1 Proposed Development .......................................................................................... 1
1.2 Objective of the Report ............................................................................................2
1.2.1 Sources of Information .......................................................................................... 2
2. HYDROLOGICAL SETTING 4
2.1 Geological Setting ....................................................................................................5
2.2 Hydrogeological Setting ...........................................................................................5
2.2.1 Aquifer Classification & Groundwater Body Characteristics ......................................... 5
2.2.2 Aquifer Vulnerability .............................................................................................. 6
2.2.3 Known Yields Water Supply Data ............................................................................ 8
2.2.4 Water Quality ..................................................................................................... 12
3. CONCLUSIONS 13
3.1 Summary of Hydrogeological Setting ..................................................................... 13
LIST OF FIGURES
Figure 1-1. Site Location Map 1
Figure 2-1. Aquifer Classification 6
Figure 2-2. Regional Recharge Map 8
Figure 2-3. Well Productivities in the Ordovician aquifers (CGSP, 2008) 9
Figure 2-4. Groundwater wells within Red Island Formation 10
LIST OF TABLES
Table 1-1. Vulnerability Mapping Guidelines (Source: DoELG, EPA, GSI, 1999) 7
Table 2-2. GSI Well Card Index 10
RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 1
1. INTRODUCTION
1.1 Background
AWN have been requested by Stream Bioenergy to carry out a Desktop Groundwater Abstraction Feasibility
Assessment for a proposed development of a Renewable Biogas Plant at Maghernakelly, Drum, Co.
Monaghan.
The site of the Proposed Development is located in Maghernakelly, Drum, Co. Monaghan, covering a total
area of approximately 6.2 hectares as shown in Figure 1.1. It is c.4km north of Cootehill and 17.5km
southwest of Monaghan town. The site is currently a greenfield site. Currently, the lands are undeveloped
and entirely unoccupied by any building structures. The site is comprised of two fields which are divided
by tree lined hedgerows and drainage ditches, with gated field accesses from the adjacent public roads.
It is bounded to the north by L2280 Drumcall Road, to the east by the R189 regional road, and to the
west by Maghernakelly Road. To the south, the site adjoins New Park Farma farmyard and an existing
residential property. The site is undulating with substantial elevation change from approximately 109mOD
in the southern section to around 93mOD at the northern boundary. Overhead power lines traverse the
site from east to west.
Figure 1-1. Site Location Map
1.1.1 Proposed Development
The Proposed Development comprises a renewable biogas plant designed to process up to 99,000 tonnes
per annum of organic feedstock, consisting predominantly of poultry manure, with smaller proportions of
cattle slurry and agri-food organic wastes. The facility will generate biogas through anaerobic digestion, RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 2
upgrade it to biomethane for injection into the national gas grid, and produce digestate outputs for reuse
in accordance with regulatory requirements.
Water demand for the facility will be met through a combination of sources, including installation of an
on-site groundwater well, supplemented by process-generated liquid streams and other backup supply
options as required.
1.2 Objective of the Report
The scope of work for this study has the following primary objective:
Identify from available information, potential groundwater yields on the site.
The following key areas were identified as requiring review within the desk study, in order to develop an
understanding of likely yields:
• Assess the groundwater resources available for development within the defined study area
with particular focus on the principal aquifer units and known well yield data.
• Review of sustainable yields from available field test data in order to confirm the estimated
‘sustainable yield’.
• Assessment of recharge based on meteorological data, aquifer vulnerability, and subsoil
properties.
• Identification of any constraints to sustainable abstraction.
1.2.1 Sources of Information
Reference is made in this report to information from a number of existing data sources and reports
including the following:
• Geology and hydrogeology, and drainage (including both quaternary deposits and bedrock geology
and associated hydrogeological data) within the local area, together with data on the hydrological
environment. Sources include Geological Survey of Ireland (GSI) www.gsi.ie mapping databases
(geotechnical data sets, karst features and borehole data),
• National Parks & Wildlife Service (NPWS): On-line data resources available at
http://webgis.npws.ie/npwsviewer/, and
• Environmental Protection Agency (EPA) on-line resources http://gis.epa.ie/Envision/.
The projected water requirements in terms of yield and quality, and daily usage trends, is discussed as
part of a feasibility assessment which also outlines the following:
• Summary of geology and hydrogeology; and
• Summary of likely well yield and water quality (based on desk study information).
With regard to the proposed trial borehole locations for site-specific sustainable yield assessment, these
investigations will be subject to detailed site assessment at the post-planning stage. This approach reflects
the exceptional cost associated with drilling and testing exploratory groundwater wells, which, for a project
of this scale and nature, can only be reasonably undertaken once planning permission has been secured. RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 3
The assessment will give due consideration to the findings of this study, the identification of on -site
hazards, areas of resource demand, and the practical requirements for safe access by drilling equipment. RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 4
2. HYDROLOGICAL SETTING
The Proposed Development site is located within the Erne WFD Catchment (Catchment ID: 36) and the
Dromore_sc_20 WFD sub-catchment (Dromore 60 WFD River Sub Basin; EPA, 2025). A field drain runs
along the perimeter of the site. A site walkover was carried out on 1st October 2024 by AWN
Hydrogeologist to establish site conditions. During the walkover it was identified that the site elevation
substantially decreases from south to north. Two field drains were noted along the western and eastern
boundary flowing in a northernly direction and discharging into an existing drain on the northern boundary
of the site parallel to L2280. The drain was observed to have very low volume with areas of dry drain,
making it difficult to confirm flow direction. However, based on the local topography and on site
observations it was determined that the drainage ditch discharges via a culvert under the R189 into
another drainage ditch, which is hydrologically connected to the Coolkill Lough Stream (EPA Code:
IE_NW_36D020700), located approximately 350 metres east of the proposed development, which
subsequently discharges into Coolkill Lough.
The Rockcorry Stream (EPA Code: IE_NW_36D020700) originates from Coolkill Lough and flows in a north
westerly direction before passing through Drumgole Lough (EPA Code: IE_NW_36_415). It then continues
in a southerly direction before ultimately discharging into the Dromore River (EPA Code:
IE_NW_36D020900), approximately 3 km from the proposed development site. According to EPA mapping
(see Figure 6-3), no watercourses traverse the proposed development site.
In relation to the Proposed Development site, the nearest (active) surface waterbody EPA monitoring
station is:
‘Br.W. of Clementstown’ (StationCode: RS36D020700) which is located in the DROMORE_070 waterbody
adjacent to Cootehill town c. 3.5km birds eye distance of the proposed development site.
The most recent water quality status recorded by the EPA (2022) at this monitoring station (EPA Code:
RS36D020700) is classified as Q3 Poor, which denotes moderately polluted waterbody. This Value is based
primarily on the relative proportions of pollution sensitive to tolerant macroinvertebrates (the young stages
of insects primarily but also snails, worms, shrimps etc.) resident at a river site. The EPA has confirmed
that the significant pressures for this waterbody are associated with agriculture, anthropogenic and, urban
wastewater.
According to EPA (2025), Coolkill Lough stream has a WFD status (2019-2024) of ‘Poor’ and a WFD risk
score of ‘At Risk of Not achieving Good Status’ by 2027. DROMORE_070 waterbody (EPA Code:
IE_NW_36D020900) is currently classified a by the EPA as having ‘Poor’ WFD water quality status (2016-
2021 period) and is ‘At Risk of Not achieving Good Status’. This ‘Poor’ status assigned to the Coolkill Lough
stream and Dromore_70 is due to its poor biological (invertebrate) status or potential.
According to the NPWS (2025) on-line database there are no special protected areas within, adjacent to
or in the immediate vicinity of the subject development site. The development site is not located within or
directly adjacent to any Natura 2000 site. The closest European listed sites are as follows:
► Drumgole Lough pNHA ((Site Code 001601) c. 930m North
► Dromore Lakes pNHA (Site Code 000001) c.2km north;
► Kilroosky Lough Cluster SAC (Site Code 001786) c.12km north west;
► Lough Oughter and Associated Loughs SAC (Site Code: 000007) c.14km west.
According to NPWS (2025), there are no NPWS protected areas in the vicinity of the Proposed Development
site. The nearest Natura 2000 Site is Kilroosky Lough Cluster SAC (Site code: 001786) located circa 12km
north of the proposed development. The development site has no hydrological connection with this SAC. RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 5
The site does have an indirect hydrological connection to the Drumgole pNHA (c. 9km Hydrological
distance and Lough Oughter and Associated Loughs SAC (c. 38km hydrological distance). However, the
connection is a long hydrological pathway allowing significant time for settlement and dilution and as
such there is no potential for change in water quality of this receiving habitat.
2.1 Geological Setting
According to GSI (2025), quaternary sediments in the site indicates the principal subsoil type in the area
comprises of till derived from tills derived from Paleozoic Sandstones and Shales which are of low
permeability, there is a small region of Alluvium sediments in the northern section of the proposed site
boundary.
The GSI classifies the bedrock beneath the site and the surrounding area as dominated by Greywacke,
microconglomerate & argillite. The bedrock underlying the site is part of the Red Island Formation and
made up of Greywacke, shale, sandstone & conglomerate. The lithological description comprises Green to
greenish-grey medium or coarse grained, locally conglomeratic, volcaniclastic greywacke.
2.2 Hydrogeological Setting
2.2.1 Aquifer Classification & Groundwater Body Characteristics
The GSI has devised a system for classifying the bedrock aquifers in Ireland. The aquifer classification for
bedrock depends on a number of parameters including, the area extent of the aquifer (km2), well yield
(m3/d), specific capacity (m3/d/m) and groundwater transmissivity (mm3/d). There are three main
classifications: regionally important, locally important and poor aquifers. Where an aquifer has been
classified as regionally important, it is further subdivided according to the main groundwater flow regime
within it. This sub-division includes regionally important fissured aquifers (Rf) and regionally important
karstified aquifers (Rk). Locally important aquifers are sub-divided into those that are generally moderately
productive (Lm) and those that are generally moderately productive only in local zones (Ll). Similarly, poor
aquifers are classed as either generally unproductive except for local zones (Pl) or generally unproductive
(Pu).
The GSI (2025) classifies the principal aquifer types in Ireland as:
Bedrock Aquifer
► Rkc – Regionally Important Aquifer – Karstified (conduit)
► Rkd – Regionally Important Aquifer – Karstified (diffuse)
► RK – Regionally Important Aquifer – Karstified
► Rf – Regionally Important Aquifer – Fissured bedrock
► Lm – Locally Important Aquifer – Bedrock which is Generally Moderately Productive
► Lk – Locally Important Aquifer – Karstified
► LI – Locally Important Aquifer – Bedrock which is Moderately Productive only in Local Zones
► PI – Poor Aquifer – Bedrock which is Generally Unproductive except for Local Zones
► PU – Poor Aquifer – Bedrock which is Generally Unproductive
Gravel Aquifer
► Lg - Locally Important Aquifer - Sand & Gravel
► Rg - Regionally Important Aquifer - Sand & Gravel
The site is underlain by Cavan Groundwater Body (GWB) EPA Code: IE_NW_G_061. According to GSI
(2025), the bedrock aquifer underlying the Proposed Development site is classified as a Poor Aquifer (PI),
i.e. Bedrock which is Generally Unproductive except for Local Zones as presented in Figure 2-1. The GSI RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 6
database does not presently indicate the presence of karst features in the vicinity of the site. The nature
of the Greywacke and Sandstones in Red Island Formation would also not tend to be karstified.
Figure 2-1. Aquifer Classification
In general, transmissivity rates (the rate at which water travels through a unit mass of rock) in these rock
units are likely to be low (less than 20m2/day) (GSI, 2004). However, higher values may be achieved in
faulted zones, especially in the coarser-grained rocks, which may be exemplified by the ‘excellent’ and
‘good’ yields. The available specific dry weather flows are low, ranging from 0.01-0.55 l/s/km2 suggesting
that these aquifers do not make a significant baseflow contribution to streamflow. Storativity is also
expected to be low.
The GWB is predominantly covered by till subsoil (71%), with a smaller proportion of peat (9%) and
approximately 10% of the body is mapped as rock outcrop/shallow subsoil.
In the absence of inter-granular permeability, groundwater flow is expected to be concentrated in
fractured and weathered zones and in the vicinity of fault zones. Available groundwater levels are mainly
0-10 m below ground level (60% <3 mbgl). Flow paths are likely to be short (30-300 m) with groundwater
discharging rapidly to nearby lakes, streams and small springs. There are observed deeper water strikes,
indicating that there is a component of deep groundwater flow, however shallow groundwater flow is
dominant throughout the GWB. Groundwater flow directions are expected to follow topography – overall
in a northerly direction.
2.2.2 Aquifer Vulnerability
Aquifer vulnerability is a term used to represent the intrinsic geological and hydrological characteristics
that determine the ease with which groundwater may be contaminated generally by human activities. Due
to the nature of the flow of groundwater through bedrock in Ireland, which is almost completely through
fissures, the main feature that protects groundwater from contamination, and therefore the most RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 7
important feature in protection of groundwater, is the subsoil (which can consist solely or of mixtures of,
peat, sand, gravel, glacial till, clays or silts). The vulnerability assessment is categorised as shown in Table
1 below.
Table 2-1. Vulnerability Mapping Guidelines (Source: DoELG, EPA, GSI, 1999)
Vulnerability
Rating
Hydrogeological Condition
Subsoil Permeability (type) and Thickness Unsaturated
Zone
Karst
Features
High
Permeability
(sand/ gravel)
Moderate
Permeability
(e.g. sandy
subsoil)
Low
Permeability
(e.g. clayey
subsoil, clay,
peat)
(Sand / gravel
aquifers only) (<30 m radius)
Extreme (E) 0 – 3 m 0 – 3 m 0 – 3 m 0 – 3 m -
High (H) >3 m 3 – 10 m 3 – 5 m >3 m n/a
Moderate (M) n/a >10 m 5 – 10 m n/a n/a
Low (L) n/a n/a >10 m n/a n/a
Notes: (1) n/a: Not applicable
(2) Precises permeability values cannot be given at present
(3) Release point of contaminants is assumed to be 1 – 2 m below ground surface
According to GSI regional mapping, the groundwater vulnerability rating is classified as ‘Low’ for the s ite.
Based on the description of the subsoils, Low vulnerability indicates an overburden depth of more than
10m underlying the site.
The recharge within this GBW occur via rainfall which infiltrates through area of shallow and more
permeable soil cover and outcrops. Due to areas of low permeability subsoils, a high proportion of the
available recharge will discharge to the streams in the GWB. In addition, the steep drumlin slopes will
promote surface runoff.
Desktop review of GSI recharge map indicates that the average annual recharge is 43mm/year in the
vicinity of the proposed development as presented in Figure 2-2. RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 8
Figure 2-2. Regional Recharge Map
2.2.3 Known Yields Water Supply Data
2.2.3.1 Groundwater Source Protection Zones
There are no GSI or EPA groundwater source protection zones in the immediate vicinity of the site (GSI,
2025). The nearest Public Supply Source Protection area is Clones Scotshouse PWS (IE_GSI_SPA_90)
located c. 10km west of the site. The PWS is located in the Cooldaragh formation which is comprised of
Silty Mudstone.
Cavan GWB: Lower Palaeozoic Rocks
Cavan Groundwater Source Protection (CGSP) Report was consulted. This outlines that the Lower
Palaeozoic (Ordovician and Silurian age) rocks in Cavan generally comprise sandstones and shales;
Ordovician rocks tend to be shalier and also contain rocks of a volcanic origin. The Ordovician and Silurian
age rocks in Co. Cavan are part of a larger area of these types of rocks, which is known as the Longford-
Down Inlier (McConnell et al., 2001).
In general, the rocks are characterised by low fissure permeability. Shaly layers within these rocks prevent
clean fractures from opening up under tectonic pressure. Fractures can become filled with fault gouge, a
clay material created by the disintegration of the rock material under tectonic forces.
This material seals up fractures, restricting the flow of groundwater. The coarser, thicker sandstone units
are likely to have a greater degree of fracturing than the more plastic interbedded shales. Brittle volcanic
layers may also have a greater degree of fracturing. Permeabilities in the upper few metres of the surface
weathered zone are often high although they decrease rapidly with depth. Results mainly from the drilling
of private domestic wells or for small industrial companies have shown that local zones of higher RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 9
permeability are present, indicated by the ‘high’ yields encountered. These yields are often associated with
fractures and faults. It is not possible, given the present data, to delineate the areas of higher permeability
within such formations.
The GSI has developed the concept of ‘productivity’ as a semi-quantitative method of utilising limited well
test data (Wright, 2000). A ‘borehole productivity index’ is assigned to a well from one of five classes: I
(highest), II, III, IV, and V, using a graphical comparison of well discharge (Q) with specific capacity (Sc).
Productivity and yield data were compiled and analysed within the county; the Ordovician aquifer occurs
in. Seventeen wells had productivity values. There are no records of wells with class I, II or III
productivities. According to GSI aquifer classification flowchart, commonly any aquifers which are classified
as PI has the transmissivity of less than 50 and the productivity index is mostly IV and V with a rare
occurrence of III.
Figure 2-3. Well Productivities in the Ordovician aquifers (CGSP, 2008)
Woods & Wright (2001) suggest that the groundwater levels in Ordovician rock units are variable but are
usually less than 10 m below ground surface, and that the aquifers are generally unconfined. Although
fractured, Ordovician and Silurian rocks generally have a low permeability and are mostly regarded as a
poor aquifer. Such rocks will often yield enough water to a well to supply 18 to 43 m3/day and occasionally
may achieve higher yields in major fracture zones. However, since the yields often depend on the
permeability developed in the uppermost few meters of broken and weathered rock, the yields will often
decrease markedly in dry spells as the water table falls. To overcome this, management of pumping is
taken on site e.g. Dual pump installation with interim pumping during dry spells which will not have
potential impact the quantitative status of the groundwater body.
Well Search & Yields
The GSI Well Card Index is a record of wells drilled in Ireland, water supply and site investigation
boreholes. It is noted that this record is not comprehensive as under the European Union (Water Policy)
(Abstractions Registration) Regulations 2018 (S.I. No. 261 of 2018), Water Environment (Abstractions and
Associated Impoundments) Act 2022 and S.I. No. 419/2024 - Water Environment (Abstractions and
Associated Impoundments) Regulations 2024 registration requirements, wells with abstraction volumes of
25m3/day and above are obligated to register with EPA. There are no groundwater wells registered with RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 10
EPA in the vicinity of the proposed development. To establish a general yield within the Red Island
Formation 71 wells were reviewed and are presented in Figure 2-4 and Table 2-2 show the surrounding
wells (and yields) relative to the development. Based on the review of the yields provided in Table 2-2, it
is safe to assume that there is a potential for 45m3/day yield with dual wells pumping to storage within
this aquifer based on potentially encountering fracture systems during well drilling.
Figure 2-4. Groundwater wells within Red Island Formation
Table 2-2. GSI Well Card Index
GSI Name Source
Type
Hole
depth
Bedrock
Depth County Source
Use
Yield
class Productivity Yield
M3/d
2331SEW170 Borehole 109.7 25 Cavan
Agricultural
& domestic
use
Poor 28
2331SEW164 Borehole 42.7 0 Cavan
Agricultural
& domestic
use
Poor V 21.8
2331SEW160 Borehole 38.1 0 Cavan Unknown Moderate III 78.5
2331NEW169 Dug well 3.1 0 Monaghan Unknown Poor 21.8
2331NEW170 Dug well 1.8 0 Monaghan Unknown Poor 19.6
2331NEW171 Dug well 3.7 0 Monaghan Unknown Poor 15.3
2331NEW172 Dug well 5.5 0 Monaghan Unknown Poor 30.5
2331NEW173 Dug well 3.7 0 Monaghan Unknown 0
2331NEW174 Dug well 1.8 0 Monaghan Unknown Moderate 43.6
2331NEW175 Dug well 3.1 0 Monaghan Unknown Poor 21.8 RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 11
GSI Name Source
Type
Hole
depth
Bedrock
Depth County Source
Use
Yield
class Productivity Yield
M3/d
2331NEW176 Borehole 29.6 0 Monaghan Unknown Poor 38.2
2331NEW177 Borehole 29 0 Monaghan Unknown Excellent 436
2331SEW037 Borehole 21.3 21.3 Monaghan Unknown Moderate III 87.3
2331SEW044 Borehole 5.2 5.2 Monaghan Other 0
2331SEW045 Borehole 11 0 Monaghan Other 0
2331SEW046 Borehole 6.5 6.5 Monaghan Other 0
2331SEW016 Borehole 0 0 Monaghan Unknown Poor 25.9
2331SEW017 Borehole 0 0 Monaghan Unknown Poor 25.9
2331SEW018 Borehole 0 0 Monaghan Unknown Poor 25.9
2331SEW020 Borehole 53 30 Monaghan Unknown Failure 0
2331SEW021 Borehole 37 30 Monaghan Unknown Poor 8.6
2331SEW023 Borehole 30 0 Monaghan Unknown Good 172.8
2331SEW024 Borehole 60 18 Monaghan Unknown Moderate 51.8
2331SEW025 Borehole 56 21 Monaghan Unknown Poor 6.9
2331SEW026 Borehole 47 0 Monaghan Unknown Moderate 64.8
2331SEW051 Borehole 11.5 0 Monaghan Other 0
2331SEW052 Borehole 11.5 0 Monaghan Other 0
2331SEW171 Borehole 137.2 0 Monaghan Domestic
use only Poor 16.4
2331NEW212 Borehole 11.5 0 Monaghan Other 0
2331SEW027 Borehole 52 0 Monaghan Unknown Moderate 86.4
2331SEW028 Borehole 45 0 Monaghan Unknown Poor 8.6
2331SEW029 Borehole 46 41 Monaghan Unknown Poor 34.6
2331SEW031 Dug well 1.8 0 Monaghan Unknown Poor 21.8
2331SEW032 Dug well 3.1 0 Monaghan Unknown Moderate 65.5
2331SEW033 Dug well 1.8 0 Monaghan Unknown Poor 30.5
2331SEW035 Dug well 2.4 0 Monaghan Unknown Moderate 54.5
2331SEW036 Dug well 2.4 0 Monaghan Unknown Moderate 43.6
2631SWW099 Borehole 68.6 39.6 Monaghan Domestic
use only Poor 32.7
2631SWW103 Borehole 10.5 0 Monaghan Other 0
2631NWW058 Dug well 6.7 1.2 Monaghan Unknown Poor 10.9
2631NWW059 Borehole 30.5 0.7 Monaghan Unknown Poor 10.9
2631NWW061 Borehole 37.8 0 Monaghan Unknown Moderate 43.6
2631NWW062 Borehole 77.7 6.1 Monaghan Unknown Failure 1.1
2631NWW063 Dug well 4.3 0 Monaghan Unknown 0
2631NWW064 Borehole 24.4 0 Monaghan Industrial
use Good 218
2631NWW065 Borehole 30.5 9.1 Monaghan Industrial
use Good 196
2631NWW066 Dug well 6.1 1.8 Monaghan Unknown Poor 13.1
2631NWW067 Borehole 30.5 0.9 Monaghan Unknown Moderate 87.3
2631NWW068 Borehole 41.4 6.1 Monaghan Unknown Poor 26.2
2631NWW069 Borehole 30.5 3 Monaghan Unknown Good III 273 RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 12
GSI Name Source
Type
Hole
depth
Bedrock
Depth County Source
Use
Yield
class Productivity Yield
M3/d
2631NWW070 Dug well 7.3 0 Monaghan Unknown Poor 19.6
2631NWW071 Dug well 4 1.5 Monaghan Unknown Poor 8.2
2631NWW072 Dug well 3.1 1.2 Monaghan Unknown Poor 13.1
2631NWW076 Dug well 3.4 0 Monaghan Unknown Poor 29
2631NWW080 Dug well 3.2 1.8 Monaghan Unknown Poor 27.3
2631NWW025 Borehole 36.6 14.9 Monaghan Unknown Failure 1.6
2631NWW026 Borehole 24.4 0 Monaghan Unknown Poor 30.5
2631SWW001 Unknown 13 0 Monaghan Unknown Failure 0.9
2631SWW004 Unknown 0 0 Monaghan Unknown 0
2631NWW013 Dug well 2.4 0.6 Monaghan Unknown Poor 13.1
2631NWW034 Borehole 28 15 Monaghan Unknown Poor 17.3
2631NWW036 Borehole 75 0 Monaghan Unknown Good 190
2631NWW122 Borehole 10.2 0 Monaghan Other 0
2631SWW010 Borehole 29 0 Monaghan Unknown Poor 32.7
2631SWW015 Dug well 3.1 0 Monaghan Unknown Poor 21.8
2631SWW016 Borehole 27.4 0 Monaghan Unknown Poor 14.2
2631SWW017 Dug well 4.9 0 Monaghan Unknown Moderate 43.6
2631NWW087 Dug well 4.3 0.6 Monaghan Unknown Poor 10.9
2631NWW088 Borehole 32.9 0 Monaghan Unknown Poor 16.4
2331SEW022 Borehole 81 18 Monaghan Unknown Failure 0
2631NWW060 Dug well 3.7 0 Monaghan Unknown 0
2.2.4 Water Quality
The groundwater body in the region of the site (Cavan GWB - European Code: IE_NW_G_061) for which
the site is located entirely within, has a WFD status of “Good” (WFD Period: 2019 -2024) and a WFD risk
score (3rd Cycle) of “Not at Risk” of not achieving good status. The objective is to protect the “Good status”
and “not at risk” score by recognising that the quality of the groundwater could be at risk in the future
due to point and diffuse sources of pollution. RECEIVED: 28/08/2026
Stream Bio Energy / 247501.0350
AWN Consulting Ltd 13
3. CONCLUSIONS
3.1 Summary of Hydrogeological Setting
• Overburden depths are expected to be more than 10m based on groundwater vulnerability and
subsoil type. This provides good protection to the underlying aquifer but also reduces recharge to
the aquifer.
• The site is underlain by Poor Aquifer (PI) which are generally Unproductive except for Local Zones
forming part of Cavan GWB, which is classified as of ‘Good status’ under the WFD.
• Well yield data for the area indicates variability within the aquifer. According to GSI PI aquifers
can produce a yield of up to 100 m3/day. Based on review of Cavan and Monaghan Groundwater
Source Protection report, the expected well yield within the Red Island Bedrock formation (which
underlies this site area) is between 18 m3/day to 43 m3/day. However, fractures aquifer systems
have a potential for producing much higher yields.
• Based on the review of the yields provided in Table 2-2, it is safe to assume that there is a potential
for 45m3/day yield with dual wells pumping to storage within this aquifer based on potentially
encountering fracture systems during well drilling.
• The aquifer is characterised by short flow paths which are not well connected. As such the zone
of influence during pumping is likely to be local with minimal impact on nearby baseflow in rivers.
RECEIVED: 28/08/2026