Loading...
HomeMy WebLinkAbout2660018 - F.I. Received Doc. - EIAR - Chapter 14 Climate, Environmental Impact Assessment Report CHAPTER 14 CLIMATE AUGUST 2026 VOLUME II ENVIRONMENTAL IMPACT ASSESSMENT REPORT Stream BioEnergy Ireland Limited RECEIVED: 28/08/2026 August 2026 | 14-1 Table of Contents 14 Climate .................................................................................................................................. 14-2 14.1 Introduction .......................................................................................................................... 14-2 14.2 Expertise & Qualifications ..................................................................................................... 14-3 14.3 Proposed Project ................................................................................................................... 14-3 14.3.1 Renewable Biogas Plant Site ................................................................................................. 14-3 14.3.2 Linear Gas Grid Connection................................................................................................... 14-4 14.4 Aspects Relevant to this Assessment .................................................................................... 14-5 14.5 Methodology ......................................................................................................................... 14-5 14.5.1 Relevant Legislation & Guidance .......................................................................................... 14-5 14.5.2 Greenhouse Gas Assessment Methodology ....................................................................... 14-15 14.5.3 Climate Change Risk Assessment Methodology ................................................................. 14-20 14.5.4 Site Surveys/Investigations ................................................................................................. 14-22 14.5.5 Consultation ........................................................................................................................ 14-22 14.6 Difficulties Encountered ...................................................................................................... 14-22 14.7 Baseline Environment ......................................................................................................... 14-22 14.7.1 Current GHG Baseline ......................................................................................................... 14-22 14.7.2 Future GHG Baseline ........................................................................................................... 14-23 14.7.3 Current CCRA Baseline ........................................................................................................ 14-24 14.7.4 Future CCRA Baseline .......................................................................................................... 14-25 14.8 The ‘Do Nothing’ Scenario .................................................................................................. 14-29 14.8.1 Renewable Biogas Plant Site ............................................................................................... 14-29 14.8.2 Linear Gas Grid Connection................................................................................................. 14-29 14.9 Potential Significant Effects ................................................................................................ 14-29 14.9.1 Greenhouse Gas Assessment .............................................................................................. 14-29 14.9.2 Climate Change Risk Assessment ........................................................................................ 14-37 14.9.3 Cumulative Effects .............................................................................................................. 14-39 14.9.4 Summary ............................................................................................................................. 14-41 14.10 Mitigation Measures ........................................................................................................... 14-41 14.10.1 Renewable Biogas Plant Site ............................................................................................... 14-41 14.10.2 Gas Grid Connection ........................................................................................................... 14-43 14.11 Residual Impact Assessment ............................................................................................... 14-43 14.11.1 Summary of Post-mitigation Effects ................................................................................... 14-44 14.11.2 Cumulative Residual Effects ................................................................................................ 14-44 14.12 Risk of Major Accidents or Disasters ................................................................................... 14-45 14.13 Worst Case Scenario ........................................................................................................... 14-45 14.14 Interactions ......................................................................................................................... 14-45 RECEIVED: 28/08/2026 August 2026 | 14-2 14.15 Monitoring .......................................................................................................................... 14-45 14.16 Summary of Mitigation and Monitoring ............................................................................. 14-45 14.17 Conclusion ........................................................................................................................... 14-46 14.18 References and Sources ...................................................................................................... 14-48 Table of Figures Figure 14.1 1900-2023 Temperature (°C) Temperature Anomalies (differences from 1961-1990) 14-25 Figure 14.2 Representative Concentration Pathways associated emission levels .......................... 14-26 Figure 14.3 Change of climate variables for Ireland for different Global warming thresholds ....... 14-27 Figure 14.4 Annualised GHG Emissions by Life-Cycle Stage ............................................................ 14-32 Figure 14.5 Total Annualised GHG Emissions and Offsets ............................................................... 14-33 Table of Tables Table 14-1 5-Year Carbon Budgets 2021-2025, 2026-2030 and 2031-2025 ...................................... 14-9 Table 14-2 Sectoral Emission Ceilings 2030 ....................................................................................... 14-9 Table 14-3 GHGA – Scenarios for Assessment ................................................................................. 14-16 Table 14-4 Significance Criteria for GHGA ....................................................................................... 14-19 Table 14-5 Vulnerability Matrix ....................................................................................................... 14-21 Table 14-6 Trends in Total National GHG Emissions 2021 – 2024 ................................................... 14-23 Table 14-7 Greenhouse Gas Assessment for Proposed Development Lifetime .............................. 14-34 Table 14-8 Estimated GHG emissions relative to sectoral budgets and GHG baseline ................... 14-36 Table 14-9 Climate Change Vulnerability Assessment ..................................................................... 14-38 Table 14-10 Summary of Construction and Operational Phase Likely Significant Effects in the absence of mitigation ..................................................................................................................................... 14-41 Table 14-11 Summary of Construction Phase Effects Post Mitigation ............................................ 14-44 Table 14-12 Summary of Construction Phase Mitigation and Monitoring ...................................... 14-45 Table 14-13 Summary of Operational Phase Mitigation and Monitoring ....................................... 14-46 14 Climate 14.1 Introduction This chapter of the EIAR was prepared to assess the potential significant effects of the proposed project on climate and the potential significant effects of climate change hazards on the project. A full description of the project is available in Chapter 2 Project Description. RECEIVED: 28/08/2026 August 2026 | 14-3 The climate assessment is divided into two distinct sections – a greenhouse gas assessment (GHGA) and a climate change risk assessment (CCRA). ▪ Greenhouse Gas Emissions Assessment (GHGA) – Quantifies the GHG emissions from a project over its lifetime. The assessment compares these emissions to relevant carbon budgets, targets and policy to contextualise magnitude. ▪ Climate Change Risk Assessment (CCRA) – Identifies the impact of a changing climate on a project and receiving environment. The assessment considers a projects vulnerability to climate change and identifies adaptation measures to increase project resilience. It should be read in conjunction with Chapter 6 Material Assets: Traffic and Transport, Chapter 8 Material Assets: Waste and Chapter 10 Water and Hydrology . 14.2 Expertise & Qualifications This chapter of the EIAR has been prepared by Dr. Jovanna Arndt of AWN Consulting, a Trinity Consultants Company. Dr. Jovanna Arndt holds a BSc. in Environmental Science and a Ph.D. in Atmospheric Chemistry from University College Cork. She is an Associate Member of both the Institute of Air Quality Management and the Institute of Environmental Sciences. She has carried out air quality and climate assessment for over 8 years and been involved in the preparation of EIARs for the following shortlist of relevant renewable energy projects: ▪ Codling Wind - Park Offshore Wind Farm (Planning ref. 320768) ▪ Bord Na Móna - Cúil Na Móna Anaerobic Digestion Facility (Planning ref. 309293) ▪ Nua Bioenergy - Lisheen Mine Site biomethane and bio-based fertilizer production facility (Planning ref. 2460936) ▪ Stream BioEnergy Ireland Ltd. - renewable biogas plant Little Island, Co. Cork (Planning ref. 255034) 14.3 Proposed Project The “proposed development” for which the Applicant seeks planning permission comprises the development of a Renewable Biogas Plant and alterations to the local road to facilitate access. The overall “project” subject to Environmental Impact Assessment (EIA) also includes the Linear Gas Grid Connection, which forms part of the wider development but lies outside the planning application boundary. The following is a summary of the Proposed Project. Please refer to Chapter 2 of this EIAR for the detailed description. 14.3.1 Renewable Biogas Plant Site The project consists of the construction and operation of a Renewable Biogas Plant and associated infrastructure. The principal elements of the plant comprise a main process building where the RECEIVED: 28/08/2026 August 2026 | 14-4 feedstock for the anaerobic digestion (AD) process is received. An odour control system with a dispersion stack will treat the air from the building. The feedstock passes to the AD tanks located within a bunded tank farm. There is a combined heat and power (CHP) building within which a gas fired CHP engine will generate electricity for the plant's energy needs. A Biogas Upgrade and Treatment Plant will be installed to produce biomethane (a renewable natural gas) that will be exported via a Gas Grid Entry Unit to the national gas grid. A CO2 Liquefaction plant will be installed to capture the carbon dioxide in the biogas, turning it into liquid CO₂. A Dryer Building is proposed, where the digestate will be dried, and a Pellet Hall will be constructed, where the digestate pellets will be stored prior to removal from the site for use as a natural fertiliser product. Ancillary elements include a gas dome, tanks to store incoming liquid feedstock, freshwater, firewater, and fuel, a backup gas flare, a backup generator, a plant building, and a control building. Widening of the local road, berms, a new site entrance, weighbridges, wheel washes, parking, lighting and all ancillary development works and services also form part of the development. A high-level process flow follows. 14.3.2 Linear Gas Grid Connection A gas transmission pipeline will provide a physical connection between the Renewable Biogas Plant and the existing national gas network in Dromore West. Co. Monaghan. While the development of the gas grid is not part of the planning application, as Gas Networks Ireland will deliver it, it is included in the EIAR for assessment purposes, as it forms part of the overall project for the EIA Directive. The works comprise the laying of an underground pipeline over approximately 3.5km within the public road corridor. RECEIVED: 28/08/2026 August 2026 | 14-5 14.4 Aspects Relevant to this Assessment During the construction phase engine emissions from site vehicles and machinery have the potential to impact climate through the release of Carbon Dioxide (CO2) and to a lesser extent, other greenhouse gases (GHGs). Embodied carbon of materials used in the construction of the development along with site activities will impact climate. Impacts to climate are assessed against Ireland’s obligations under the EU 2030 GHG targets and sectoral emissions ceilings. During the operational phase of the proposed development GHG emissions, the release of CO2, and savings (through the avoidance of more carbon intensive processes) have the potential to impact climate. GHG emissions will occur from vehicles accessing the site, as well has the operation of the CHP and boiler. Savings of CO2 will occur via the production of renewable biomethane from organic wastes, replacing conventional natural gas in the gas network, where biomethane has a lower carbon intensity than natural gas. Savings will also be achieved through to the use of organic wastes as feedstock, where emissions are avoided due to the material not being applied directly to land as a fertiliser, such as composting. Additionally, the use of digestate from the anaerobic digestion process as biofertiliser will provide a lower carbon intensity alternative to synthetic fertilisers, while the biogenic liquid CO2 captured from the digestion process will provide an alternative to liquid CO2 derived from more carbon intensive processes. Operational phase impacts will be long-term in duration. In addition, the vulnerability of the proposed development in relation to future climate change must be considered during the operational phase. 14.5 Methodology 14.5.1 Relevant Legislation & Guidance 14.5.1.1 Guidance The principal guidance and best practice documents used to inform the assessment of potential impacts on climate are summarised below. In addition to specific climate guidance documents, the following guidelines were considered and consulted in the preparation of this chapter: ▪ Guidelines on the Information to be Contained in Environmental Impact Assessment Reports (hereafter referred to as the Environmental Protection Agency (EPA) Guidelines) (EPA, 2022); and ▪ Environmental Impact Assessment of Projects – Guidance on the preparation of the Environmental Impact Assessment Report (European Commission, 2017). The assessment has made reference to national guidelines where available, in addition to international standards and guidelines relating to the assessment of climate impacts. These are summarised below: ▪ Transport Infrastructure Ireland (TII) PE-ENV-01104: Climate Guidance for National Roads, Light Rail and Rural Cycleways (Offline & Greenways) – Overarching Technical Document (TII, 2022a); RECEIVED: 28/08/2026 August 2026 | 14-6 ▪ Transport Infrastructure Ireland (TII) PE-ENV-01105: Climate Assessment Standard for Proposed National Roads (TII, 2022b); ▪ Transport Infrastructure Ireland (TII) GE-ENV-01106: TII Carbon Assessment Tool for Road and Light Rail Projects and User Guidance Document (TII, 2024); ▪ Institute of Environmental Management & Assessment (IEMA) Environmental Impact Assessment Guide to: Assessing GHG Emissions and Evaluating their Significance (hereafter referred to as the IEMA 2022 GHG Guidance) (IEMA, 2022); ▪ IEMA Environmental Impact Assessment Guide to: Climate Change Resilience and Adaptation (hereafter referred to as the IEMA 2020 EIA Guide) (IEMA, 2020a); ▪ IEMA GHG Management Hierarchy (hereafter referred to as the IEMA 2020 GHG Management Hierarchy) (IEMA, 2020b); ▪ IEMA Principles Series: Climate Change Mitigation & EIA (IEMA, 2010); ▪ Carbon Management in Infrastructure and Built Environment - PAS 2080 (BSI, 2023); and ▪ Technical Guidance on the Climate Proofing of Infrastructure in the Period 2021-2027 (European Commission, 2021a). 14.5.1.2 Legislation 14.5.1.2.1 International Legislation & Policy The Paris Agreement (UNFCCC, 2015), which entered into force in 2016, is an important milestone in terms of international climate change agreements and includes an aim of limiting global temperature increases to no more than 2°C (degrees Celsius) above pre-industrial levels with efforts to limit this rise to 1.5°C. Nationally determined contributions (NDCs) are at the heart of the Paris Agreement and the achievement of these long-term goals. NDCs comprise the efforts and actions by each country to reduce national emissions and adapt to the impacts of climate change. The Paris Agreement requires each country to prepare the NDCs that it intends to achieve, updating and enhancing the NDCs every 5 years. Countries are required to implement mitigation measures, with the aim of achieving the objectives of such contributions. Each of the EU Member States submit their own NDCs, which contribute to the overall EU NDC. The European Green Deal, published by the European Commission in December 2019, provides an action plan which aims for the EU to be climate neutral by 2050. The EU Green Deal highlights that further decarbonisation of the energy sector is critical to reach climate objectives in 2030 and 2050. The European Green Deal has increased the GHG emissions reduction 2030 target to at least 55% in comparison to 1990 levels. On 14 July 2021, the European Commission adopted a series of legislative proposals setting out how it intends to achieve climate neutrality in the EU by 2050, including the intermediate target of at least a 55% net reduction in greenhouse gas emissions by 2030. The package of proposals is known as the ‘Fit for 55’ package. The package includes revisions to the legislation put forward as part of the Climate and Energy Framework 2021-2030, including the EU Emissions Trading System (ETS), Effort Sharing Regulation, transport and land use legislation, setting out in real terms the ways in which the Commission intends to reach EU climate targets under the European Green Deal. RECEIVED: 28/08/2026 August 2026 | 14-7 The EU ETS was launched in 2005 as the world’s first international company- level ‘cap-and trade’ system for reducing emissions of greenhouse gases cost-effectively. The EU ETS regulates the GHG emissions of larger industrial emitters including electricity generation, cement manufacturing and heavy industry. Under this new package of legislative proposals, the sectors of the Irish economy covered by the current ETS must reduce emissions by 42% by 2030 compared to 2005 levels by increasing annual emissions reduction to 4.2% per annum. The non-ETS sector includes all domestic GHG emitters which do not fall under the ETS scheme and thus includes GHG emissions from transport, residential and commercial buildings and agriculture. These sectors must reduce emissions by 42% by 2030 compared to 2005 levels. Regulation (EU) 2021/1119 of the European Parliament and of the Council of 30 June 2021 establishing the framework for achieving climate neutrality and amending Regulations (EC) No 401/2009 and (EU) 2018/1999 (‘European Climate Law’) writes into law the goal set out in the European Green Deal for Europe’s economy and society to become climate-neutral by 2050. The law also sets the intermediate target of reducing net greenhouse gas (GHG) emissions by at least 55% by 2030, compared to 1990 levels. The 2021 EU Strategy on Adaptation to Climate Change sets out the pathway to prepare for the unavoidable impacts of climate change. The aim is that “by 2050, when we aim to have reached climate neutrality, we will have reinforced adaptive capacity and minimised vulnerability to climate impacts…” Adaptation refers to measures that can reduce the negative impact of climate change by, for example, ensuring a project is resilient to future increases in storm frequency and rainfall levels. The EU has adopted integrated monitoring and reporting rules to ensure progress towards its 2030 climate and energy targets and its international commitments under the 2015 Paris Agreement. Climate is also addressed specifically in Directive 2014/52/EU of the European Parliament and of the Council of 16 April 2014 amending Directive 2011/92/EU on the assessment of the effects of certain public and private projects on the environment. Recital (7) of Directive 2014/52/EU states that: “Over the last decade, environmental issues, such as resource efficiency and sustainability, biodiversity protection, climate change, and risks of accidents and disasters, have become more important in policy making. They should therefore also constitute important elements in assessment and decision-making processes”. Recital (13) of Directive 2014/52/EU states that: “Climate change will continue to cause damage to the environment and compromise economic development. In this regard, it is appropriate to assess the impact of projects on climate (for example greenhouse gas emissions) and their vulnerability to climate change”. Additionally Annex IV requires the following to be considered within Environmental Impact Assessment: RECEIVED: 28/08/2026 August 2026 | 14-8 ▪ Paragraph 4: “A description of the factors specified in Article 3(1) likely to be significantly affected by the project: population, human health, biodiversity (for example fauna and flora), land (for example land take), soil (for example organic matter, erosion, compaction, sealing), water (for example hydromorphological changes, quantity and quality), air, climate (for example greenhouse gas emissions, impacts relevant to adaptation), material assets, cultural heritage, including architectural and archaeological aspects, and landscape”. ▪ Paragraph 5 (f): “A description of the likely significant effects of the project on the environment resulting from, inter alia: the impact of the project on climate (for example the nature and magnitude of greenhouse gas emissions) and the vulnerability of the project to climate change”. 14.5.1.2.2 National Legislation In 2015, the Climate Action and Low Carbon Development Act 2015, as amended (the 2015 Act) (Government of Ireland, 2015) was enacted. The purpose of the 2015 Act is to enable Ireland ‘o as to reduce the extent of further global warming, pursue and achieve, by no later than the end of the year 2050, the transition to a climate resilient, biodiversity rich, environmentally sustainable and climate neutral economy (in this Act referred to as the "national climate objective").”(3.(1) of No. 46 of 2015). The 2015 Act made provision for a national mitigation plan, and a national adaptation framework. In addition, the 2015 Act provided for the establishment of the Climate Change Advisory Council with the function to advise and make recommendations on the preparation of the national mitigation and adaptation plans and compliance with existing climate obligations. The first Climate Action Plan (CAP) was published by the Irish Government in June 2019 (Government of Ireland, 2019). The Climate Action Plan 2019 outlined the then current status across key sectors including Electricity, Transport, Built Environment, Industry and Agriculture and outlined the various broadscale measures required for each sector to achieve ambitious decarbonisation targets. The 2019 CAP also detailed the required governance arrangements for implementation including carbon- proofing of policies, establishment of carbon budgets, a strengthened Climate Change Advisory Council and greater accountability to the Oireachtas. The fifth and most recent climate action plan, CAP25, was published in April 2025 (Government of Ireland, 2025a). Following on from Ireland declaring a climate and biodiversity emergency in May 2019, and the European Parliament approving a resolution declaring a climate and environment emergency in Europe in November 2019, the Government approved the publication of the General Scheme in December 2019, followed by the publication of the Climate Action and Low Carbon Development (Amendment) Act 2021 (hereafter referred to as the 2021 Climate Act), in March 2021, which amended the 2015 Act. The 2021 Climate Act was signed into Law on the 23rd July 2021, giving statutory effect to the core objectives stated within the CAP. The purpose of the 2021 Climate Act (Government of Ireland, 2021) is to provide for the approval of plans “for the purpose of pursuing the transition to a climate resilient, biodiversity rich and climate neutral economy by no later than the end of the year 2050”. The 2021 Climate Act also provides for “carbon budgets and a decarbonisation target range for certain sectors of the economy”. The 2021 Climate Act defines the carbon budget as “the total amount of greenhouse gas emissions that are permitted during the budget period”. RECEIVED: 28/08/2026 August 2026 | 14-9 In relation to carbon budgets, the 2015 Act states “A carbon budget, consistent with furthering the achievement of the national climate objective, shall be proposed by the Climate Change Advisory Council, finalised by the Minister and approved by the Government for the period of 5 years commencing on the 1 January 2021 and ending on 31 December 2025 and for each subsequent period of 5 years (in this Act referred to as a ‘budget period’)”. The carbon budget is to be produced for 3 sequential budget periods, as shown in Table 14-1. The carbon budget can be revised where new obligations are imposed under the law of the European Union or international agreements or where there are significant developments in scientific knowledge in relation to climate change. In relation to the sectoral emissions ceiling, the Minister for the Environment, Climate and Communications (the Minister for the Environment) shall prepare and submit to government the maximum amount of GHG emissions that are permitted in different sectors of the economy during a budget period and different ceilings may apply to different sectors. The sectorial emission ceilings for 2030 are published in CAP25 (Table 14-2). Table 14-1 5-Year Carbon Budgets 2021-2025, 2026-2030 and 2031-2025 Budget Period Carbon Budget Reduction Required 2021-2025 295 Mt CO2e Reduction in emissions of 4.8% per annum for the first budget period. 2026-2030 200 Mt CO2e Reduction in emissions of 8.3% per annum for the second budget period. 2031-2035 151 Mt CO2e Reduction in emissions of 3.5% per annum for the third provisional budget. Table 14-2 Sectoral Emission Ceilings 2030 Sector Baseline (MtCO2e) Carbon Budgets (MtCO2e) 2030 Emissions (MtCO2e) Indicative Emissions % Reduction in Final Year of 2025 – 2030 Period (Compared to 2018) 2018 2021-2025 2026-2030 Electricity 10 40 20 3 75 Transport 12 54 37 6 50 Built Environment – Residential 7 29 23 4 40 Built Environment – Commercial 2 7 5 1 45 Industry 7 30 24 4 35 Agriculture 23 106 96 17.25 25 Other (F-gases, waste, petroleum refining) 2 9 8 1 50 Land Use, Land-use Change and Forestry (LULUCF) 5 Reflecting the continued volatility for LULUCF baseline emissions to 2030 and beyond, CAP25 puts in place ambitious activity targets for the sector reflecting an EU-type approach. Total 68 Unallocated Savings - - 26 -5.25 - RECEIVED: 28/08/2026 August 2026 | 14-10 Sector Baseline (MtCO2e) Carbon Budgets (MtCO2e) 2030 Emissions (MtCO2e) Indicative Emissions % Reduction in Final Year of 2025 – 2030 Period (Compared to 2018) 2018 2021-2025 2026-2030 Legally Binding Carbon Budgets and 2030 Emission Reduction Targets - 295 200 - 51 14.5.1.3 Policy 14.5.1.3.1 Greenhouse Gas Assessment Policy 14.5.1.3.1.1 National Policy In December 2023, CAP24 was published, establishing key actions to deliver a 51% reduction in GHG emissions by 2030 (compared to 2018 levels) and achieve climate neutrality by 2050 (Government of Ireland, 2023). The updated and current CAP25, published in April 2025 (Government of Ireland, 2025a), builds on the progress of the previous four iterations of the CAP, with CAP23 first publishing carbon budgets and sectoral emission ceilings, and reaffirms Ireland’s climate ambition, with a focus on delivery, implementation and measurable outcomes, particularly ahead of the second carbon budget period (2026–2030). 2025 is the last year in the first 5-year carbon budget period. During the initial 5-year budget period the average annual reduction required was 4.8%, this increases to 8.3% in the second budget period (2026-2030). CAP25 retains the high-impact sectors where the biggest savings can be achieved, while emphasising public sector leadership and green procurement. These sectors include renewable energy; energy efficiency of buildings; transport; sustainable farming; sustainable business; and land-use change. CAP25 also includes targeted actions to decarbonise industrial heat and support the transition to carbon-neutral manufacturing processes. Public sector leadership is strengthened through a new Buying Greener: Green Public Procurement Strategy and Action Plan (2024–2027) (Government of Ireland, 2024a) the development of mandatory Climate Action Roadmaps, and enhanced emissions monitoring and reporting across government operations. The government has reinforced the public sector’s responsibility to lead by example, particularly through climate-proofing operations and sustainable procurement initiatives. To support innovation and ensure future economic resilience, IDA Ireland continues to attract and support businesses investing in climate technologies and low-carbon solutions. CAP25 highlights a significant 17% reduction in electricity emissions in early 2024, with wind power supplying nearly 40% of Ireland’s total electricity demand and over 100,000 rooftop microgenerators connected to the grid. Investments are ongoing in grid reinforcement, offshore wind development, and interconnectors with France and the UK to enhance renewable generation capacity. According to legal and policy analysts, these developments place Ireland among the top countries globally in per capita wind generation, while continuing to expand domestic and community-based renewable energy. EirGrid, Enterprise Ireland and IDA Ireland have recently signed an MoU to collectively support offshore wind development in Ireland. RECEIVED: 28/08/2026 August 2026 | 14-11 CAP25 also reinforces targets first outlined in CAP24 to reduce the embodied carbon of construction materials, with a 10% reduction by 2025 and 30% reduction by 2030 for materials produced and used in Ireland. Cement and high embodied carbon construction materials can be reduced through product substitution, reduced clinker content in cement and uptake of low-carbon construction methods, including those outlined in the Construction Industry Federation 2021 report Modern Methods of Construction (Construction Industry Federation, 2021). There also remains scope for the construction industry to use more timber in construction. In 2022, 24% of new construction in Ireland was built using timber frames to satisfy the demand for housing. Public bodies are now required under the Public Sector Mandate to use best practice project design to reduce embodied carbon; procure concretes with clinker replacements (lower carbon); and require that large construction projects produce a whole life cycle GHG emissions assessment. Further guidance on how the built environment can contribute to a circular, low-carbon economy is detailed in the recently published A Roadmap for a Resource Efficient Circular Built Environment. Furthermore, CAP25 advances sector-specific measures in green procurement, electrification of transport and heat, and just transition (with the introduction of a Just Transition Commission) to support vulnerable communities and ensure equitable decarbonisation. While transport emissions increased by 0.3%, electric vehicles and the expanded use of biofuels are highlighted as the most effective short- to medium-term strategies for emissions reductions in the sector. The Climate Action Plan 2025 Annex of Actions (Government of Ireland, 2025a) states goals specific to biomethane of 1 Terawatt hour (TWh) by 2025 and construction of 20 anaerobic digestor plants of scale. The proposed development represents 12% of the 1 TWh by 2025 goal. Also outlined in CAP25 is the introduction of the Renewable Heat Obligation (RHO), which will obligate suppliers over a certain threshold to ensure a proportion of the energy they supply is renewable, and it will incentivise the production of indigenously produced biomethane. 2024 saw the publication of Ireland’s National Biomethane Strategy (DAFM and DECC, 2024). This is Ireland’s first major policy statement on biomethane and is an important milestone in the development of an indigenous sector. The Strategy sets out twenty-five actions to be delivered in the coming years to enable the development of the sector and to achieve the government’s target of 5.7 TWh of indigenously produced biomethane by 2030. The proposed development represents 2% of the 5.7 TWh by 2030 goal. The publication of this Strategy was coupled with the launch of grant aid towards development of the sector which is expected to drive expansion of the anaerobic digestion sector towards achieving the 2030 target. Biomethane that satisfies the Renewable Energy Directive’s life cycle sustainability criteria can be classified as “a zero-carbon rated fuel”. Biomethane can therefore directly contribute to meeting Ireland’s decarbonisation targets. In April 2023, the Government published its Long-term Strategy on Greenhouse Gas Emissions Reductions (Government of Ireland, 2024b). This strategy provides a long-term plan on how Ireland will transition towards net carbon zero by 2050, achieving the interim targets set out in the Climate Action Plan. RECEIVED: 28/08/2026 August 2026 | 14-12 The National Planning Framework (Government of Ireland, 2025b), is the long-term, 20-year strategy for strategic planning and sustainable development of our urban and rural areas to 2040. It sets out the following climate-related objectives relevant for the proposed development: ▪ National Policy Objective 30: Facilitate the development of the rural economy, in a manner consistent with the national climate objective, through supporting a sustainable and economically efficient agricultural and food sector, together with forestry, fishing and aquaculture, energy and extractive industries, the bio-economy and diversification into alternative on-farm and off-farm activities, while at the same time noting the importance of maintaining and protecting biodiversity and the natural landscape and built heritage which are vital to rural tourism. ▪ National Policy Objective 66: The planning system will be responsive to our national environmental challenges and ensure that development occurs within environmental limits, having regard to the medium and longer-term requirements of all relevant environmental and climate legislation and the sustainable management of our natural capital. ▪ National Policy Objective 67: Support the circular and bio economy including in particular through greater efficiency in land and materials management, promoting the sustainable re- use and refurbishment of existing buildings and structures while conserving cultural and natural heritage, the greater use of renewable resources and by reducing the rate of land use change from urban sprawl and new development. ▪ National Policy Objective 69: Reduce our carbon footprint by integrating climate action into the planning system in support of national targets for climate policy mitigation and adaptation objectives, as well as targets for greenhouse gas emissions reductions as expressed in the most recently adopted carbon budgets. ▪ National Policy Objective 70: Promote renewable energy use and generation at appropriate locations within the built and natural environment to meet national objectives towards achieving a climate neutral economy by 2050. Additionally, the Northern & Western Regional Assembly Regional Spatial And Economic Strategy 2020-2032 (Government of Ireland, 2019) provides a high-level development framework for the Northern and Western Region, of which County Monaghan is a part, that supports the implementation of the National Planning Framework (NPF) and the relevant economic policies and objectives of Government. This strategy outlines the following Regional Policy Objectives (RPO) which are particularly relevant for the proposed development: ▪ RPO 4.27: It is an objective to support the National Policy Statement on the Bioeconomy (2018), and the exploration of opportunities in the circular resource-efficient economy, including undertaking a bioeconomy feasibility study for this region. This feasibility study will aim to identify (and map) areas of potential growth to inform the National Transition Agenda, enabling a Low Carbon, resilient nation. ▪ RPO 4.28: To support the potential creation of appropriately scaled local multi-feedstock bio- refining hubs across the region as well as potential creation of bio-districts/clusters. ▪ RPO 4.29: The Assembly supports the future-proofing of infrastructure planning to allow for the potential upgrading of existing industrial sites to bio-refining plants while also supporting the use of bio-renewable energy for the sustainable production of bio-based products. RECEIVED: 28/08/2026 August 2026 | 14-13 ▪ RPO 8.5: To support the build-out of the gas supply network into Counties Sligo, Roscommon, Donegal and Leitrim and in additional locations in the remainder of the region. ▪ RPO 8.6: Facilitate the delivery and expansion of natural gas infrastructure throughout the region and have regard to the location of existing gas infrastructure in assessing potential developments. ▪ RPO 8.7: Encourage and support innovative partnerships extending the gas network in the region, including the potential for gas to grid injection facilities along with anaerobic digestion facilities. 14.5.1.3.1.2 Local Policy The Monaghan County Council (MCC) Climate Action Plan 2024-2029 (MCC, 2024) outlines the Council's commitment to achieving significant reductions in GHG emissions while preparing for the impacts of climate change. It further states that it is part of longer-term efforts to support the delivery of the climate neutrality objective at local and community levels. The Climate Action Plan provides a mechanism for bringing together both adaptation and mitigation actions to help drive positive climate action and outcomes across the local authority and its administrative area. In relation to renewable energy development, Strategic Goal 1 Built Environment and Transport of the plan is to “increase our energy efficiency, reduce our reliance on fossil-based fuels, and positively influence the actions of others within our community.” In relation to waste management, Action No. SRM2 under Strategic Goal 5 Sustainability and Resource Management of the plan is to “support National Waste Management plan for the reduction of waste and other initiatives that promote the transition to a circular economy and as per the objectives of the new national waste management plan.” Action No. SRM3 relates specifically to biomethane, stating the plan will “support the development of biomethane potential within the county to generate sustainable energy and reduce the impact of organic manures on the environment. Whilst also advocating and exerting influence to ensure anaerobic digestion related development and activities promote climate action co-benefits and do not contravene relevant environmental protection criteria or cause significant negative environmental effects”. 14.5.1.3.2 Climate Change Vulnerability Policy The second National Adaptation Framework (NAF) (Government of Ireland, 2024c) was published in June 2024 in line with the five-year requirement of the 2015 Climate Act. The plan provides a whole of government and society approach to climate adaptation in Ireland in order to reduce Irelands vulnerability to climate change risks including extreme weather events, flooding, drought, loss of biodiversity, sea level rise and increased temperatures. Similar to the “Just Transition” when considering carbon emissions, the NAF aims for “Just Resilience” stating that: “A climate resilient Ireland will have a reduced reliance on fossil fuel, it will have widely accessible electrified public transport and will have transitioned towards sustainable agricultural practices such as agroforestry and organic farming.” The NAF highlights that there is a projected increased frequency of droughts, coupled with higher evapotranspiration rates, which could cause reduced river flow, groundwater recharge, and reservoir refill capacity, leading to potential water supply shortages. The NAF warns that national long-term RECEIVED: 28/08/2026 August 2026 | 14-14 water supply projects must be planned for within budgets to ensure the adaptation required to make Ireland resilient by 2050 and beyond is funded. With respect to the water sector the 2nd NAF states that the potential adaptation measures for the transport sector, which is led by the Department of Transport, are: ▪ Projected extreme precipitation may increase pluvial and fluvial flooding, impacting the transport sector with service disruptions, hazardous driving conditions, and bridge scour; ▪ Intensified windstorms may disrupt transport hubs, causing delays and cancellations, and affecting transport networks with fallen trees and debris; ▪ Sea level rise and intensified storms may significantly impact transport infrastructure in low- lying coastal areas, eroding coastlines, and estuaries; and ▪ Heatwaves and drought may degrade transport infrastructure, affecting road surfaces and rails, and require temperature control measures in hubs. The National Climate Change Risk Assessment (NCCRA) was published in June 2025 (EPA, 2025c). The NCCRA was required to be developed under Action 457 from the 2021 CAP (Government of Ireland, 2021). Action 457 seeks to “Further develop Ireland’s national climate change risk assessment capacity to identify the priority physical risks of climate change to Ireland’. The NCCRA uses definitions of the risk determinants from the Intergovernmental Panel on Climate Change (IPCC) Risk Framework (IPCC, 2023): ▪ Hazard - the potential occurrence of a natural or human-induced physical event or trend or physical impact that may cause loss of life, injury, or other health impacts, as well as damage and loss to property, infrastructure, livelihoods, service provision, ecosystems, and environmental resources ▪ Exposure - the presence of people, livelihoods, species or ecosystems, environmental functions, services, and resources, infrastructure, or economic, social, or cultural assets in places and settings that could be adversely affected ▪ Vulnerability - the propensity or predisposition to be adversely affected. Vulnerability encompasses a variety of concepts including sensitivity ▪ Risk - the potential for adverse consequences for human or ecological systems. When considering risk, the NCCRA assesses exposure and vulnerability for two future climate change scenarios or Representative Concentration Pathways (RCPs): ▪ RCP4.5 was selected as it represents a scenario aligned with the global temperature trajectory. ▪ RCP8.5 was selected as it represents a high-emissions scenario and achieves the highest level of modelled temperature increases by the end of the century. Consequently, this scenario will result in the highest level of physical risk for Ireland, and the greatest requirement for adaptation. These scenarios align with a conservative approach to assess risks to Ireland and assumes global emission reduction targets are not met. This aligns with the principle of precaution as stated in the NAF (DECC 2024). In addition to the future climate scenarios, the NCCRA assesses the risk from the future climate during the following timeframes: ▪ Present (~2030) RECEIVED: 28/08/2026 August 2026 | 14-15 ▪ Medium term (~2050) ▪ Long term (~2100). The Monaghan County Council Climate Action Plan 2024-2029 highlights the increasing risks posed by climate change to the county’s infrastructure, residents, and businesses, particularly from extreme weather events such as flooding, heatwaves, and droughts. Pluvial and fluvial flooding are identified as significant risks due more intense rainfall events. Without mitigation, these events are projected to lead to the inundation of properties, damage to infrastructure, and disruptions to transport networks. Key climate mitigation actions within the plan include developing and implementing flood-relief measures, including: ▪ “Ensure sustained services delivery by all core Council functions by incorporating climate considerations and preparedness into emergency and service delivery planning. ▪ Ensure all core Council services are adaptable to a changing climate. ▪ Ensure adaptation to climate change is mainstreamed and has a strong foundation in local level policies of Monaghan County Council. ▪ Manage and reduce risk of flooding to properties and infrastructure around the county. ▪ Understand by way of continuous review of data and information, the current and future impacts of extreme weather events and climate change. ▪ Promote natural and nature-based solutions to help build resilience. ▪ Support and create climate awareness and resilience in communities and business”. 14.5.2 Greenhouse Gas Assessment Methodology As per the EU guidance document Guidance on Integrating Climate Change and Biodiversity into Environmental Impact Assessment (European Commission, 2013) the climate baseline is first established with reference to EPA data on annual GHG emissions (see Section 14.7.1). The GHG assessment accounts for various components relating to the project during different life stages to determine the total impact of the development on climate. The reference study period (i.e. the assumed building life expectancy) for the purposes of the assessment is 30 years. Embodied carbon emissions are attributed to four main categories, taken from BS EN 15978. The categories are: ▪ Product Stages (Category A1 to A3) The carbon emissions generated at this stage arise from extracting the raw materials from the ground, their transport to a point of manufacture and then the primary energy used (and the associated carbon impacts that arise) from transforming the raw materials into construction products. ▪ Construction (Category A4 to A5) These carbon impacts arise from transporting the construction products to site, and their subsequent processing and assembly into the building. ▪ Use Stage (Category B1 to B7) This covers a wide range of sources from the GHG emissions associated with the operation of the building (B1), maintenance (B2), repair (B3), refurbishment (B4) and replacement (B5) of materials, and operational energy use (B6) and water use (B7). ▪ End of Life Stages (Category C1 to C4) The eventual deconstruction and disposal of the existing building at the end of its life takes account of the on-site activities of the demolition RECEIVED: 28/08/2026 August 2026 | 14-16 contractors. No ‘credit’ is taken for any future carbon benefit associated with the reuse or recycling of a material into new products. Reasonable conservative estimates have been used in this assessment where necessary to provide an estimate of the GHGs associated with the proposed development. The assessment takes into account two different scenarios for feedstock volumes, which affect the amount of transport required, and the volume of biomethane and biogenic CO2 produced. The quantities are shown below in Table 14-3. Table 14-3 GHGA – Scenarios for Assessment Effects Scenario 1 Scenario 2 Poultry Manure (tonnes/yr) 80,000 94,000 Cattle Manure (HGV) (tonnes/yr) 5,000 - Cattle Manure (Tractor & Trailor) (tonnes/yr) 5,000 5,000 Agri-Food Waste (tonnes/yr) 9,000 - Liquefied Carbon Dioxide (tonnes/yr) 13,000 15,000 Biomethane Export (m3/yr) 10,800,000 12.300,000 Flared Gas (Assume 2% of exported CH4) (m3/yr) 216,000 246,000 The GHGA has also taken the renewable biogas plant site and the gas grid connection elements of the proposed development into account, as described in the following sections. 14.5.2.1 Construction Phase PE-ENV-01104 (TII, 2022a) recommends the calculation of the construction stage GHG emissions and embodied carbon using the TII Online Carbon Tool (TII, 2024). Embodied carbon refers to the sum of the carbon needed to produce goods or services. It incorporates the energy needed in the mining or processing of raw materials, the manufacturing of products and the delivery of these products to site. The purpose of the embodied carbon assessment is to engage the design team in the consideration of embodied carbon at an early stage in the development and mitigate embodied carbon. This engagement aims to ensure carbon savings are made and to assist in aligning the project to Ireland’s CAP goal of Net Carbon Zero by 2050. The TII Online Carbon Tool (TII, 2024) has been commissioned by TII to assess GHG emissions associated with road or rail projects in Ireland. The TII Carbon Tool (TII, 2024) uses emission factors from recognised sources including the Civil Engineering Standard Method of Measurement (CESSM) Carbon and Price Book database (CESSM, 2013), which can be applied to a variety of developments, not just road or rail. The tool aligns with PAS 2080. The quantification of construction phase GHG emissions has considered the following: ▪ Topsoil clearance for the renewable biogas plant site. ▪ Excavation activities for the renewable biogas plant site and excavation activities for the gas grid connection. ▪ Materials required for the construction of the renewable biogas plant site e.g. concrete, steel etc. Quantities are based on data from construction of similar facilities in the Applicant's RECEIVED: 28/08/2026 August 2026 | 14-17 ownership and estimated total gross floor area of buildings and tanks. Materials for the gas grid connection pipeline have also been taken into account. ▪ Construction waste reuse, recycling or disposal. ▪ Transport (by heavy duty vehicles (HGV)) of construction materials and waste to a waste facility estimated to be within 30km of the proposed development. This includes the off-site transport of approximately 18,600 m³ of surplus excavated soil and stone arising from construction of the Renewable Biogas Plant. ▪ Transport of construction staff has also been considered (estimated to be within 30km of the proposed development). Quantification of the GHG emissions associated with the gas grid connection has been estimated as part of this impact assessment, based on professional experience of similar projects. 14.5.2.2 Operational Phase 14.5.2.2.1 GHG Emissions The quantification of operational phase GHG emissions has considered the following for the renewable biogas plant site: ▪ Transport (by heavy duty vehicles (HGV)) of feedstock from local sources to the proposed development, as well as transport of product to various destinations. Factors from the TII Carbon Tool have been used to quantify the transport emissions. ▪ Gas consumption (m3 per annum) by the dryer, 2 no. CHPs and boiler (assumed continuous year round) for power and heat generation, as well as by infrequent flare use (assumed 2% of the exported biomethane production) have been quantified using the 2024 SEAI carbon intensity for natural gas of 1.993 gCO2e/m3 (SEAI, 2025). Diesel usage has also been quantified using factors from the TII Carbon Tool. ▪ Anticipated use of consumables at the plant have been considered using factors based on data from similar facilities in the Applicant's ownership. No significant emissions are predicted for the gas grid connection. 14.5.2.2.2 GHG Emissions Offsets The GHG emissions associated with the construction and operation of the development will be offset by the production of the biogas and its conversion into renewable biomethane for direct injection into the national gas distribution system. Quantities of poultry manure, cattle manure and agri-food organic waste annually, as shown above in Table 14-3, will be used as feedstock to generate between 10,800,000 and 12,300,000 m3 of biomethane per year. Biomethane has a lower carbon intensity than natural gas, therefore the provision of biomethane in the national gas distribution system will displace an equivalent amount of natural gas and therefore, result in carbon savings when compared to the equivalent amount of natural gas. As per Annex VI of Directive (EU) 2018/2001 of the European parliament and of the council of 11 December 2018 on the promotion of the use of energy from renewable sources (recast) biomethane from biowaste off gas combustion has a default a carbon intensity factor of 14 gCO2e/MJ. For comparison the carbon intensity of natural gas is 94 gCO2e/MJ. The GHG emissions savings associated with the annual volume RECEIVED: 28/08/2026 August 2026 | 14-18 of biomethane produced by the proposed development and the equivalent amount of natural gas were quantified to demonstrate the beneficial impact of the proposed development. GHG savings from the use of ammonium sulphate and digestate fibre and pellets as biogenic fertiliser as an alternative to artificial fertiliser were also quantified. Approximately 9,000 tonnes of ammonium sulphate, 7,000 tonnes of digestate pellets and 60,000 tonnes of digestate fibre are expected annually from the anaerobic digestion process, which is available for use as biofertiliser. The GHGA also considers the capture of up to 15,000 tonnes of CO2 from the digestion process which will directly replace of CO2 from a more fossil fuel intensive process currently used by an industry partner. Poultry manure will be sourced from the significant concentration of poultry farms in County Monaghan and surrounding areas. Cattle manure will be sourced from cattle farms in the immediate surrounding area, while the agri-food organic waste will be sourced from food and poultry processing plants in the surrounding area. The transport of poultry manure in particular to the proposed development will occur over a shorter distance (c.30 km) relative to the current transport required to dispose of this waste, which according to a study conducted by Fehily Timoney on behalf of Monaghan County Council (2021) is currently required to be transported as far as mid-Wicklow. This represents avoided GHG emissions due to the proposed development. The use of poultry manure as feedstock for the proposed development will result in avoided CO₂e emissions as this manure will no longer be spread on land directly. Storage of the manure on farms prior to land-spreading releases GHGs such as methane and nitrous oxide (N2O) as a result of bacterial activity. Manure storage practices such as slatted tanks, lagoons, pits etc. result in higher GHG emissions compared to anaerobic digestion and subsequent digestate management by a facility such as the proposed development. The emissions offset due to this avoided activity have been quantified using information and emissions factor supplied by the applicant. 14.5.2.3 Significance Criteria for GHGA The Transport Infrastructure Ireland (TII) guidance document entitled PE-ENV-01104 Climate Guidance for National Roads, Light Rail and Rural Cycleways (Offline & Greenways) – Overarching Technical Document (TII, 2022a) outlines a recommended approach for determining the significance of both the construction and operational phases of a development. The significance of GHG effects set out in PE-ENV-01104 (TII, 2022a) is based on IEMA guidance (IEMA, 2022) which is consistent with the terminology contained within Figure 3.4 of the EPA’s (2022) Guidelines on the information to be contained in Environmental Impact Assessment Reports. The 2022 IEMA Guidance (IEMA, 2022) sets out the following principles for significance: ▪ When evaluating significance, all new GHG emissions contribute to a negative environmental impact; however, some projects will replace existing development or baseline activity that has a higher GHG profile. Therefore, the significance of a project’s emissions should be based on its net impact over its lifetime, which may be positive, negative or negligible; ▪ Where GHG emissions cannot be avoided, the goal of the EIA process should be to reduce the project’s residual emissions at all stages; and RECEIVED: 28/08/2026 August 2026 | 14-19 ▪ Where GHG emissions remain significant, but cannot be further reduced, approaches to compensate the project’s remaining emissions should be considered. The criteria for determining the significance of effects are a two-stage process that involves defining the magnitude of the impacts and the sensitivity of the receptors (i.e. Ireland’s National GHG targets). In relation to climate, there is no project specific assessment criteria, but the project will be assessed against the recommended TII significance determination. This takes account of any embedded or committed mitigation measures that form part of the design which should be considered. TII (TII 2022a) states that professional judgement must be taken into account when contextualising and assessing the significance of a project's GHG impact. TII reference the IEMA guidance (2022) which states that the crux of assessing significance is “not whether a project emits GHG emissions, nor even the magnitude of GHG emissions alone, but whether it contributes to reducing GHG emissions relative to a comparable baseline consistent with a trajectory towards net zero by 2050”. Significance is determined using the criteria outlined in Table 14-4 (derived from Table 6.7 of PE-ENV- 01104 (TII 2022a)) along with consideration of the following two factors: ▪ The extent to which the trajectory of GHG emissions from the project aligns with Ireland’s GHG trajectory to net zero by 2050; and ▪ The level of mitigation taking place. Table 14-4 Significance Criteria for GHGA Effects Significance Level Description Significant adverse Major adverse ▪ The project’s GHG impacts are not mitigated. ▪ The project has not complied with do-minimum standards set through regulation, nor provided reductions required by local or national policies; and ▪ No meaningful absolute contribution to Ireland’s trajectory towards net zero. Moderate adverse ▪ The project’s GHG impacts are partially mitigated. ▪ The project has partially complied with do-minimum standards set through regulation, and have not fully complied with local or national policies; and ▪ Falls short of full contribution to Ireland’s trajectory towards net zero. Not significant Minor adverse ▪ The project’s GHG impacts are mitigated through ‘good practice’ measures. ▪ The project has complied with existing and emerging policy requirements; and ▪ Fully in line to achieve Ireland’s trajectory towards net zero. Negligible ▪ The project’s GHG impacts are mitigated beyond design standards. ▪ The project has gone well beyond existing and emerging policy requirements; and ▪ Well ‘ahead of the curve’ for Ireland’s trajectory towards net zero. Beneficial Beneficial ▪ The project’s net GHG impacts are below zero and it causes a reduction in atmosphere GHG concentration. ▪ The project has gone well beyond existing and emerging policy requirements; and ▪ Well ‘ahead of the curve’ for Ireland’s trajectory towards net zero, provides a positive climate impact. Ireland’s carbon budgets can also be used to contextualise the magnitude of GHG emissions from the proposed development (TII, 2022a). The approach is based on comparing the net proposed development GHG emissions to the relevant carbon budgets (DECC, 2023a). With the publication of RECEIVED: 28/08/2026 August 2026 | 14-20 the Climate Action Act in 2021 and the Climate Action Plan 2025, sectoral carbon budgets have been published for comparison with the net GHG emissions from the proposed development over its lifespan. The aim of the carbon budgets is to ensure we are on a trajectory to meet the National Climate Objective of Net Zero by 2050. Additionally, CAP25 outlines goals of 1 TWh of biomethane production by 2025, while CAP24 and the National Biomethane Strategy aim for 5.7 TWh by 2030. 14.5.3 Climate Change Risk Assessment Methodology The assessment involves determining the vulnerability of the proposed development to climate change. This involves an analysis of the sensitivity and exposure of the development to climate hazards which together provide a measure of vulnerability. PE-ENV-01104 (TII, 2022a) states that the CCRA is guided by the principles set out in the overarching best practice guidance documents: ▪ Technical Guidance on the Climate Proofing of Infrastructure in the Period 2021-2027 (European Commission, 2021a); and ▪ The Institute of Environmental Management and Assessment, Environmental Impact Assessment Guide to: Climate Change Resilience and Adaptation (2nd Edition) (IEMA, 2020). The baseline environment information provided in Section 14.7, including future climate change modelling and input from other experts working on the proposed development (i.e. hydrologists) are used to assess the likelihood of a climate risk. First an initial screening CCRA based on the operational phase is carried out, according to the TII guidance PE-ENV-01104. This is carried out by determining the sensitivity of proposed development assets (i.e. receptors) and their exposure to climate change hazards. The proposed development asset categories must be assigned a level of sensitivity to climate hazards. PE-ENV-01104 (TII, 2022a) provides the list of asset categories and climate hazards to be considered. The asset categories will vary by development type and need to be determined on a development by development basis. ▪ Asset Categories Pavements; drainage; structures; utilities; landscaping; signs, light posts, buildings, and fences. ▪ Climate Hazards Flooding (coastal, pluvial, fluvial); extreme heat; extreme cold; wildfire; drought; extreme wind; lightning and hail; landslides; fog. The sensitivity is based on a High, Medium or Low rating with a score of 1 to 3 assigned as per the criteria below. ▪ High Sensitivity The climate hazard will or is likely to have a major impact on the asset category. This is a sensitivity score of 3. ▪ Medium Sensitivity It is possible or likely the climate hazard will have a moderate impact on the asset category. This is a sensitivity score of 2. RECEIVED: 28/08/2026 August 2026 | 14-21 ▪ Low Sensitivity It is possible the climate hazard will have a low or negligible impact on the asset category. This is a sensitivity score of 1. Once the sensitivities have been identified the exposure analysis is undertaken. The exposure analysis involves determining the level of exposure of each climate hazard at the project location irrespective of the project type. For example, flooding could be a risk if the project location is next to a river in a floodplain. Exposure is assigned a level of High, Medium or Low as per the below criteria. ▪ High Exposure It is almost certain or likely this climate hazard will occur at the project location, i.e. might arise once to several times per year. This is an exposure score of 3. ▪ Medium Exposure It is possible this climate hazard will occur at the project location, i.e. might arise a number of times in a decade. This is an exposure score of 2. ▪ Low Exposure It is unlikely or rare this climate hazard will occur at the project location, i.e. might arise a number of times in a generation or in a lifetime. This is an exposure score of 1. Once the sensitivity and exposure are categorised, a vulnerability analysis is conducted by multiplying the sensitivity and exposure to calculate the vulnerability. 14.5.3.1 Significance Criteria for CCRA The CCRA involves an initial screening assessment to determine the vulnerability of the proposed development to various climate hazards. The vulnerability is determined by combining the sensitivity and the exposure of the proposed development to various climate hazards. Vulnerability = Sensitivity x Exposure The vulnerability assessment takes any proposed mitigation into account. Table 14-5 details the vulnerability matrix; vulnerabilities are scored on a high, medium and low scale. TII guidance (TII, 2022a) and the EU technical guidance (European Commission, 2021a) note that if all vulnerabilities are ranked as low in a justified manner, no detailed climate risk assessment may be needed. Therefore, the impact from climate change on the proposed development can be considered to be not significant. However, where residual medium or high vulnerabilities exist the assessment may need to be progressed to a detailed climate change risk assessment and further mitigation implemented to reduce risks. An assessment of construction phase CCRA impacts is only required according to the TII guidance (TII, 2022a) if a detailed CCRA is required. Table 14-5 Vulnerability Matrix Exposure High (3) Medium (2) Low (1) Sensitivity High (3) 9 - High 6 – High 3 - Medium Medium (2) 6 - High 4 - Medium 2 - Low Low (1) 3 - Medium 2 – Low 1 - Low RECEIVED: 28/08/2026 August 2026 | 14-22 The screening CCRA, detailed in Section 14.9.2.2, did not identify any residual medium or high risks to the proposed development as a result of climate change. Therefore, a detailed CCRA for the construction and operational phase were scoped out. While a CCRA for the construction phase was not required, best practice mitigation against climate hazards is still recommended in Section 14.10. 14.5.4 Site Surveys/Investigations No surveys were required as part of the climate assessment. 14.5.5 Consultation A pre-planning meeting was held with Monaghan County Council in advance of lodging the planning application. During this consultation, the Planning Authority indicated in-principal support for the proposed development. It was also acknowledged that the proposed facility will require an Industrial Emissions (IE) Licence from the Environmental Protection Agency (EPA). As such, operational emissions, will fall within the remit of the EPA for regulation and control. This regulatory context was noted by the Planning Authority. Further details of the meeting and the issues discussed are set out in the Planning Statement submitted under separate cover. 14.6 Difficulties Encountered There were no difficulties encountered when compiling this assessment. 14.7 Baseline Environment PE-ENV-01104 (TII, 2022a) states that a baseline climate scenario should identify, consistent with the study area for the project, GHG emissions without the project for both the current and future baseline. Ireland declared a climate and biodiversity emergency in May 2019 and in November 2019 there was European Parliament approval of a resolution declaring a climate and environment emergency in Europe. This, in addition to Ireland’s current failure to meet its EU binding targets under Regulation 2018/842 (European Union, 2018) results in changes in GHG emissions either beneficial or adverse being of more significance than previously considered prior to these declarations. 14.7.1 Current GHG Baseline Data published in July 2025 (EPA, 2025a), indicates that Ireland exceeded, without the use of flexibilities, its 2024 annual limit set under EU’s Effort Sharing Decision (ESD) (406/2009/EC) by 1.03 Mt CO2e. However, the 2024 emissions represent the second consecutive year in which Ireland’s RECEIVED: 28/08/2026 August 2026 | 14-23 emission were below (-4.2%) 1990 levels. ETS (Emissions Trading Scheme) emissions decreased (-1.1%) and ESR (Effort Sharing Regulation) emissions decreased (-2.2%). Ireland’s target is an emission reduction of 626 kt of CO2e by 2030 on an average baseline of 2016 to 2018. The EPA estimate that 2024 total national GHG emissions, excluding LULUCF, have decreased by 2.0% on 2023 levels to 53.82 Mt CO2e, with a 0.7 Mt CO2e (-8.9%) reduction in electricity industries alone. This was driven by a 39.7% share of energy from renewables in 2024 and the complete phase-out of peat for electricity generation. Manufacturing combustion and industrial processes decreased by 4.6% to 6.0 Mt CO2e in 2024 due to declines in fossil fuel usage. The sector with the highest emissions in 2024 was agriculture at 37.9% of the total, followed by transport at 20.8%. For 2024, total national emissions (including LULUCF) were 57.53 Mt CO2e (EPA, 2025a) (Table 14-6). The current estimates of National greenhouse gas emissions (including LULUCF) in 2024 are 12.0% below 2018, well off the National Climate ambition of a 51% reduction by 2030. The data indicate that from 2021- 2024 Ireland has used 79% (186 Mt CO2e) of the 295 Mt CO2e Carbon Budget for the five- year period 2021-2025. This leaves 21% of the budget available for 2025, requiring a substantial 17.5% annual emissions reduction for 2025 to stay within budget. Table 14-6 Trends in Total National GHG Emissions 2021 – 2024 Sector Note 1 2021 2022 2023 2024 Total Budget (Mt CO2e) (2021-2025) % Budget 2021-2025 Used Annual Change 2023 to 2024 Electricity 9.89 9.69 7.57 6.95 40 85.25% -8.19% Transport 11.09 11.76 11.8 11.65 54 85.74% -1.27% Buildings (Residential) 6.87 5.75 5.35 5.61 29 81.31% 4.86% Buildings (Commercial and Public) 1.44 1.45 1.39 1.49 7 82.43% 7.19% Industry 7.09 6.62 6.31 6.01 30 86.77% -4.75% Agriculture 21.94 21.78 20.72 20.41 106 80.05% -1.50% Other Note 2 1.86 1.93 1.81 1.63 9 80.33% -9.94% LULUCF 4.63 3.98 3.89 3.89 – – 0 Total including LULUCF 64.82 62.99 58.83 57.64 295 82.81% -2.04% Note 1: Reproduced from latest emissions data on the EPA website (EPA, 2025a). Note 2: Other includes Petroleum refining, F-Gases and Waste (emissions from solid waste disposal on land, solid waste treatment (composting and anaerobic digestion), wastewater treatment, waste incineration and open burning of waste). 14.7.2 Future GHG Baseline The future baseline with respect to the GHGA can be considered in relation to the future climate targets which the assessment results will be compared against. In line with TII (TII, 2022) and ISEP GHG guidance (ISEP, 2022) the future baseline is a trajectory towards net zero by 2050, “whether it [the project] contributes to reducing GHG emissions relative to a comparable baseline consistent with a trajectory towards net zero by 2050”. RECEIVED: 28/08/2026 August 2026 | 14-24 The future baseline will be determined by Ireland meeting its targets set out in the CAP25, and future CAPs, alongside binding 2030 and net zero by 2050 EU targets. In order to meet the commitments under the Paris Agreement, the European Union (EU) enacted ‘Regulation (EU) 2018/842 on binding annual GHG emission reductions by Member States from 2021 to 2030 contributing to climate action to meet commitments under the Paris Agreement and amending Regulation (EU) No. 525/2013’ (hereafter referred to as the Regulation) (European Union, 2018). The Regulation aims to deliver, collectively by the EU in the most cost-effective manner possible, reductions in GHG emissions from the Emission Trading Scheme (ETS) and non-ETS sectors amounting to 43% and 30%, respectively, by 2030 compared to 2005. The Regulation was amended in April 2023 and Ireland must now limit its greenhouse gas emissions by at least 42% by 2030. The ETS is an EU-wide scheme which regulates the GHG emissions of larger industrial emitters including electricity generation, cement manufacturing and heavy industry. The non-ETS sector includes all domestic GHG emitters which do not fall under the ETS scheme and thus includes GHG emissions from transport, residential and commercial buildings and agriculture. In May 2025, the EPA released the report Ireland’s Greenhouse Gas Emissions Projections 2024-2055 (EPA, 2025b), which includes total projected emissions and a breakdown of projected emissions per sector under the ‘With Existing Measures’ and ‘With Additional Measures’ scenarios. The EPA projections indicate that currently implemented measures (With Existing Measures) will achieve a reduction of 10% on 2005 levels by 2030, significantly short of the 42% reduction target. If measures in the higher ambition (With Additional Measures) scenario are implemented, EPA projections show that Ireland can achieve a reduction of 22% by 2030, still short of the 42% reduction target. 14.7.3 Current CCRA Baseline The region of the proposed development has a temperate, oceanic climate, resulting in mild winters and cool summers. The Met Éireann weather station at Dublin Airport is the nearest, representative, weather and climate monitoring station to the proposed development with meteorological data recorded for the 30-year period from 1991 to 2020. The historical regional weather data for Dublin Airport meteorological station is representative of the current climate in the region of the proposed development. The data for the 30-year period from 1991 to 2020 indicates that the wettest months at Dublin Airport meteorological station were October and November, and the driest month on average was March (Met Éireann, 2025a). July was the warmest month with a mean temperature of 19.5 Celsius. January was the coldest month with a mean temperature of 8 Celsius. Met Éireann’s 2024 Climate Statement (Met Éireann, 2025) states 2024’s average shaded air temperature in Ireland is provisionally 10.72°C, which is 1.17°C above the 1961-1990 long-term average. This makes 2024 the fourth warmest year on record, 0.49 °C cooler than 2023, the warmest year on record. The majority of annual rainfall totals across the country were below their Long-term Average 1981-2010. Six stations (Mace Head, Co. Galway, Sherkin Island, Co. Cork, Dunsany, Co. Meath, Gurteen, Co. Tipperary, Athenry, Co. Galway and Finner, Co. Donegal) had their highest mean wind for August on record (record lengths ranging between 13 and 20 years) (see Figure 14.1). RECEIVED: 28/08/2026 August 2026 | 14-25 Figure 14.1 1900-2023 Temperature (°C) Temperature Anomalies (differences from 1961-1990) Recent weather patterns and records of extreme weather events recorded by Met Éireann have been reviewed. Considering the 2024 data, Met Éireann states that the latest Irish climate change projections indicate further warming in the future, including warmer winters. The record temperatures mean the likelihood of extreme weather events occurring has increased. This will result in longer dry periods and heavy rainfall events. Storm surges and coastal flooding due to sea level rise. Compound events, where coastal surges and extreme rainfall events occur simultaneously will also increase. Met Éireann has high confidence in maximum rainfall rates increasing but not in how the frequency or intensity of storms will change with climate change. 14.7.4 Future CCRA Baseline Impacts as a result of climate change will evolve with a changing future baseline. Changes have the potential to include increases in global temperatures and increases in the number of rainfall days per year. Therefore, it is expected that the baseline climate will evolve over time and consideration is needed with respect to this within the design of the proposed development. Ireland has seen increases in the annual rainfall in the north and west of the country, with small increases or decreases in the south and east (EPA, 2021b). The EPA have compiled a list of potential adverse impacts as a result of climate change including the following which may be of relevance to the proposed development (EPA, 2021b): ▪ More intense storms and rainfall events; ▪ Increased likelihood and magnitude of river and coastal flooding; ▪ Water shortages in summer in the east; ▪ Adverse impacts on water quality; and ▪ Changes in distribution of plant and animal species. RECEIVED: 28/08/2026 August 2026 | 14-26 TII’s guidance document PE-ENV-01104 (TII 2022a) states that for future climate change a moderate to high Representative Concentration Pathways (RCP) should be adopted. RPC4.5 is considered moderate, while RPC8.5 is considered high. Representative Concentration Pathways (RCPs) describe different 21st century pathways of GHG emissions depending on the level of climate mitigation action undertaken. National Framework for Climate Services (NFCS) was founded in June 2022 to streamline the provision of climate services in Ireland and will be led by Met Éireann. The aim of the NFCS is to enable the co - production, delivery and use of accurate, actionable and accessible climate information and tools to support climate resilience planning and decision making. In addition to the NFCS, further work has been ongoing into climate projects in Ireland through research under the TRANSLATE project. TRANSLATE (Met Éireann, 2024a) has been led by climate researchers from University of Galway – Irish Centre for High End Computing (ICHEC), and University College Cork – SFI Research Centre for Energy, Climate and Marine (MaREI), supported by Met Éireann climatologists. TRANSLATE’s outputs are produced using a selection of internationally reviewed and accepted models from both CORDEX and CMIP5. Representative Concentration Pathways (RCPs) provide a broad range of possible futures based on assumptions of human activity. The modelled scenarios include for “least” (RCP2.6), “more” (RCP4.5) or “most” (RCP8.5) climate change, see Figure 14.2. Source: TRANSLATE project storymap (Met Éireann 2024a) Figure 14.2 Representative Concentration Pathways associated emission levels TRANSLATE (Met Éireann, 2024c) provides the first standardised and bias-corrected national climate projections for Ireland to aid climate risk decision making across multiple sectors (for example, transport, energy, water), by providing information on how Ireland’s climate could change as global temperatures increase to 1.5˚C ,2˚C, 2.5˚C, 3˚C or 4˚C. Projections broadly agree with previous projections for Ireland. Ireland’s climate is dominated by the Atlantic Meridional Overturning Circulation (AMOC), a large system of ocean currents – including the Gulf Stream – characterised by a northward flow of warm water and a southward flow of cold water. Due to the AMOC, Ireland does not suffer from the extremes of temperature experienced by other countries at a similar latitude. Recent studies have projected that the AMOC could decline by 30 – 40 % by 2100, resulting in cooler North Atlantic Sea surface temperatures (SSTs) (Met Éireann, 2024c). Met Éireann projects that Ireland will nevertheless RECEIVED: 28/08/2026 August 2026 | 14-27 continue to warm, although the AMOC cooling influence may lead to reduced warming compared with continental Europe. AMOC weakening is also expected to lead to additional sea level rise around Ireland. With climate change Ireland’s temperature and rainfall will undergo more and more significant changes e.g. on average summer temperature could increase by more than 2°C, summer rainfall could decrease by 9% while winter rainfall could increase by 24% (see Figure 14.3). Future projects also include a 10-fold increase in the frequency of summer nights (values > 15°C) by the end of the century, a decrease in the frequency of cold winter nights and an increase in the number of heatwaves. A heatwave in Ireland is defined as a period of 5 consecutive days where the daily maximum temperature is greater than 25°C. Source: TRANSLATE project storymap (Met Éireann, 2024c) Figure 14.3 Change of climate variables for Ireland for different Global warming thresholds The TRANSLATE research report (Met Éireann, 2024c) finds that night-time temperatures will warm more than day-time temperatures, with temperatures increases across all seasons but the highest in the summer (with an increase of 0.5°C to 3.5°C). Autumn is projected to have the highest increase in average minimum temperatures (with an increase of 1.1°C to 4.4°C). The variance is dependent on the scenario that is being reviewed. While these temperatures are projected across all of Ireland, they increase most in the east of the country compared to the west. With respect to rainfall, increases of 4% to 38% are projected, however this will not be spread across the year as during summer months there are projected decreases in rainfall beyond the 2°C warming scenario. In January 2024 the EPA published Ireland’s Climate Change Assessment Synthesis Report (EPA, 2024e) which contained four volumes: ▪ Volume 1: Climate Science: Ireland in a Changing World ▪ Volume 2: Achieving Climate Neutrality by 2050 ▪ Volume 3: Being Prepared for Ireland’s Future Climate ▪ Volume 4: Realising the Benefits of Transition and Transformation RECEIVED: 28/08/2026 August 2026 | 14-28 This report reinforces the existing and future risks arising from climate change. Volume 1 (EPA, 2024e) states that under Early action, the temperature increase averaged across the island of Ireland relative to the recent past (1976 to 2005) would reach 0.91°C (0.44 to 1.10°C) by mid-century before falling back to 0.80°C (0.34 to 1.07°C) at the end of the century. Whereas under Late action, by the end of the century it is projected that the temperature increases could be 2.77°C (2.02 to 3.49°C). Heat extremes will become more frequent and more severe and cold extremes will become less frequent and less severe with further warming. Precipitation was 7% higher over the period 1991 to 2020 than over the 1961 to 1990 period. The average future predicted increase in precipitation is <10% in annual mean accumulated. By 2100 projected additional rises in sea level range from 0.32 to 0.6m under early action to 0.63 to 1.01m under late action scenarios, with greater storm surges potentially effecting critical infrastructure along the coastline. Projections of changes in storminess are highly uncertain and translate into large uncertainties in future frequency and intensity of extreme waves. Volume 3 of Ireland’s Climate Change Assessment Synthesis Report (EPA, 2024e) discusses how water supplies will face growing pressures resulting in increased water demand and how options need to be developed, including potential new sources. The report states the key role of critical infrastructure for delivering public services, economic development and a sustainable environment. These are exposed to a range of climate extremes. Failures in critical infrastructure can cascade across other sectors and present a multi-sector risk due to climate change. The report references the EPA’s Critical Infrastructure Vulnerability to Climate Change report (EPA, 2021a) as the most substantial research project in Ireland to date on climate change and critical infrastructure which assesses the future performance of Ireland’s critical infrastructure when climate is considered. The Critical Infrastructure Vulnerability to Climate Change report states with respect to water availability and quality, that flood risk and heatwaves have a medium vulnerability index and the underground supply network has a high vulnerability to snowstorms and cold spells. However, while the vulnerability is high, the exposure is likely to reduce due to future climate change resulting in less cold weather events. The risk assessment highlights the co-dependence of the water sector to the energy sector, and how vulnerability in the energy sector may have cascading impacts. Volume 4 of Ireland’s Climate Change Assessment Synthesis Report (EPA, 2024e) calls for system change, including a transformation of urban settings. Stating that meaningful urban transformation can create a better living environment while simultaneously reducing emissions. The projections were echoed by the Updated High-resolution Climate Projections for Ireland Research Report: 471 (EPA, 2024f) which was in broad agreement with previous research. The future autumn and winter months are projected to be up to 10% wetter, while summer is projected to be up to 8% drier. RECEIVED: 28/08/2026 August 2026 | 14-29 14.8 The ‘Do Nothing’ Scenario 14.8.1 Renewable Biogas Plant Site Under the “Do Nothing” scenario, no industrial-scale anaerobic digestion (AD) facility is developed on the Renewable Biogas Plant Site and the existing use of the land remain largely unchanged, i.e. in agricultural use. However, the county faces a critical poultry waste management challenge, with high concentrations of production that cannot be addressed at scale by small, dispersed measures alone. The proposed development represents the only proven large-scale solution currently implemented in the country. The gas grid in Co. Monaghan is extremely limited. While this particular site may remain undeveloped, it is very likely that a facility of similar scale will be developed locally, as the management must be addressed to ensure a viable poultry industry, protect water quality, and manage environmental pressures. 14.8.2 Linear Gas Grid Connection No gas grid installation over the 3.5 km road would occur under the “Do Nothing” scenario. Consequently, there would be no disruption to the road corridor, and no temporary disturbance associated with construction activities such as earthworks. In the Do Nothing Scenario the potential impacts of GHG emissions discussed in the below sections will not occur. If the proposed development is not constructed the operational GHG emissions or offsets associated with the proposed development will not occur, directly impacting Ireland’s trajectory to net zero by 2050 and its ability to meet sectoral targets for electricity, agriculture and waste as set out in CAP25. Decarbonising sectors which currently rely on natural gas with biomethane (i.e. heat and temperature), as well as agriculture by reducing its reliance on synthetic fertilisers, is a key strategy in CAP25. The Do Nothing scenario, without the GHG emissions savings potential of the proposed development, will therefore have a direct, long-term and negative effect on climate. 14.9 Potential Significant Effects 14.9.1 Greenhouse Gas Assessment There is the potential for greenhouse gas emissions to atmosphere during the construction and operational phases of the proposed development, as well as emissions offsets as a result of the operational phase. As per the TII guidance (2022), the significance of the effect of GHG emissions on climate is assessed for the total GHG emissions across all proposed development stages (Section 14.5.2) in both Scenario 1 and Scenario 2 (as described in Section 14.5.2). As outlined in Section 14.5.2, the following assessment considers the impacts associated with the renewable biogas plant site and estimates the quantification of the GHG emissions associated with the gas grid connection. RECEIVED: 28/08/2026 August 2026 | 14-30 14.9.1.1 Construction Phase Emissions Embodied carbon is carbon dioxide emitted during the manufacture, transport and construction of building materials, together with site activities. The most significant proportion of carbon emissions tend to occur during the construction phase because of embodied carbon in construction materials and emissions from construction activities, however this is not always the case depending on the end purpose of the development. The construction phase assessment is broken down into the following stages as per Section 14.5.2: ▪ Product stage (A1 – A3); ▪ Transportation to site (A4); and ▪ Site operations (construction activities) (A5). The construction phase GHG emissions comprise stages A1 – A5 and include the site clearance, earthworks, construction materials, the transport of the materials to site, construction activities and construction waste disposal and transport. The construction phase emissions primarily include the construction of any buildings on site and transport emissions. Table 14-7 outlines the construction stage emissions under each category. The construction phase is predicted to result in approx. 14,678 tCO2e, of which materials contribute 90% of these emissions. In the case of the overall lifecycle of the proposed development, construction phase emissions are a minor fraction of the overall project GHG emissions (489 tCO2e from the construction phase annualised relative to 14,384 – 14,395 tCO2e emitted annually by the operational phase). The construction phase emissions are discussed further in the context of total proposed development GHG emissions and the relevant sectoral emissions in Section 14.8.1.3. 14.9.1.2 Operational Phase Emissions The operational phase GHG emissions comprise the Use Stage stages B4 – B7, and include operational energy use, chemical additives, diesel usage, and transport of the feedstock to the site and product off site. The GHG assessment has highlighted the areas where the highest GHG emissions occur, specifically as a result of the continuous combustion of gas by the CHPs, boiler, dryer to heat and power the site, and infrequently by the flare, comprising 46% of total annual operational GHG emissions from the proposed development (see Table 14-7). The operational phase emissions are discussed further in the context of total proposed development GHG emissions and the relevant sectoral emissions in Section 14.9.1.4. 14.9.1.3 Operational Phase Emissions Offsets The GHG emissions associated with the construction and operation of the development will be offset by the production of the biogas and its conversion into renewable biomethane for direct injection into the national gas distribution system. Between approx. 21,888 and 24,928 tCO2e can be avoided annually by displacing natural gas by biomethane from the proposed development. GHG savings from digestate use as biogenic (ammonium sulphate) fertiliser and biogenic digestate fertiliser as an alternative to artificial fertiliser were also quantified. Approximately 635 tCO2e and 7,569 tCO2e can be avoided annually by using biogenic ammonium sulphate and digestate fertiliser, RECEIVED: 28/08/2026 August 2026 | 14-31 respectively, from the proposed development instead of synthetic fertiliser produced from more carbon intensive processes. The proposed development will use poultry manure as the primary feedstock, thereby diverting this manure from being spread onto agricultural land where it emits the GHG nitrous oxide (N2O). This represents a total emissions avoidance of between 7,426 and 8,725 tCO2e annually. The proposed development will capture and liquefy between 13,000 and 15,000 tonnes of CO2 from the digestion process and will directly replace CO2 from a more fossil fuel intensive process (such as fertiliser production), which is an equivalent to an emissions offset of between 13,000 and 15,000 tCO2e annually. 14.9.1.4 Total GHG Emissions Over Construction and Operational Phases Figure 14.4, Figure 14.5 and Table 14-7 show the annual GHG emissions and offsets for the proposed development in both Scenario 1 and Scenario 2 (as described in Section 14.5.2). The largest source of GHG emissions from the proposed development is from the continuous combustion of natural gas by the CHPs, boiler, dryer to heat and power the site, and infrequently by the flare. These sources contribute 46% of the annual GHG emissions from the proposed development. The largest impact in terms of GHG emissions offsets is from the displacement of fossil fuel methane (natural gas) by the biomethane produced by the proposed development, which will avoid between approx. 21,888 and 24,928 tCO2e annually. The emissions from the construction phase are comparatively very small and would be paid back in less than a month by the operational phase emissions offsets. The annual emissions from operation of the proposed development would be paid back in less than 4 months by the operational phase emissions offsets. RECEIVED: 28/08/2026 August 2026 | 14-32 Figure 14.4 Annualised GHG Emissions by Life-Cycle Stage RECEIVED: 28/08/2026 August 2026 | 14-33 Figure 14.5 Total Annualised GHG Emissions and Offsets RECEIVED: 28/08/2026 August 2026 | 14-34 Table 14-7 Greenhouse Gas Assessment for Proposed Development Lifetime Stage GHG Assessment Category Elements Considered Annualised Predicted GHG Emissions (tCO2e) Relevant Sector for Carbon Budget Comparison Scenario 1 Scenario 2 Construction Phase A5 Clearance Site preparation and topsoil clearance 0.1 0.1 Industry A1-A3 Materials Building materials, concrete, steel etc. Based on data from construction of similar facilities in Applicant's ownership, and estimated total gross floor area of buildings and tanks 441 441 Industry A4 Material Transport HGV and LGV trips 36 36 Transport A5 Excavation Rock, topsoil and other excavation 4 4 Industry Construction Worker Travel to Site Car trips by construction staff, assumed 30 km per trip 6 6 Transport Construction Waste Disposal Mixed construction and demolition waste 0.2 0.2 Waste Construction Waste Transport HGV transport of waste offsite (assumed within 30km of the site) 2 2 Transport Operational Phase B1 Operational Materials Use Chemical additives, engine & general lubrication oil 1,342 1,342 Transport B4-B5 Operational Energy Gas consumption by dryer, boiler and CHPs (assumed continuous), and flare (intermittent throughout the year), plus diesel usage 12,789 12,702 Industry B6 Operational Transport HGV trips for feedstock, digestate and CO2. 265 281 Electricity Emissions Offsets CO2 Offsets Operational Biogas Production GHG Offset Methane emissions avoidance from feedstock and displacement of fossil fuel methane as combustion fuel -21,888 -24,928 Electricity Operational Biogenic CO2 GHG Offset Liquefied CO2 captured from digestion process offsetting CO2 derived from fossil fuel intensive processes -13,000 -15,000 Industry Operational Biogenic Fertiliser GHG Offset Avoided emissions from replacing artificial fertiliser with biogenic ammonium sulphate fertiliser -635 -635 Agriculture Operational Digestate Fertiliser Value GHG Offset Avoided emissions from replacing artificial fertiliser with biogenic digestate fertiliser -7,569 -7,569 Agriculture Avoided Nitrous Oxide (N2O) Emissions Avoided emissions of N2O from use of manure as feedstock, instead of N2O being released by manure spreading on agricultural land -7,426 -8,725 Agriculture Avoided agri- food waste GHG emissions Avoided emissions from use of agri-food waste as feedstock for the proposed development (includes reduced transport -117 0 Transport RECEIVED: 28/08/2026 August 2026 | 14-35 Stage GHG Assessment Category Elements Considered Annualised Predicted GHG Emissions (tCO2e) Relevant Sector for Carbon Budget Comparison Scenario 1 Scenario 2 distance to waste facility and avoided waste disposal) Totals Scenario 1 Scenario 2 Total Construction Phase Emissions 489 tCO2e annualised 489 tCO2e annualised Total Operational Phase Emissions 14,395 tCO2e (annually) 14,384 tCO2e (annually) Total Emissions Offsets -50,635 tCO2e (annually) -56,857 tCO2e (annually) Total Annual Emissions Includes GHG emissions offsets by using waste feedstock to produce biogas, displacement of fossil methane by biogas, digestate as biofertiliser and biogenic CO2 -35,751 tCO2e (annually) -42,473 tCO2e (annually) In Table 14-8, predicted annual GHG emissions have been compared against the carbon budget for the electricity, transport, industry and waste sectors in 2030 (DECC, 2023a), against Ireland’s total GHG emissions in 2024, against Ireland’s EU 2030 target of a 42% reduction in ETS sector emissions (Electricity falls under ETS) based on 2005 levels (12.95 Mt CO2e) and against Ireland’s EU 2030 target of a 42% reduction in non-ETS sector emissions (i.e. categories other than Electricity) based on 2005 levels (27.7 Mt CO2e) (set out in Regulation EU 2018/842 of the European Parliament and of the Council). The proposed development is estimated to result in total annual GHG emissions of between 14,884 and 14,873 tCO2e, which is equivalent to 0.03% of Ireland’s total 2024 GHG emissions. The proposed development is also estimated to result in total annual GHG emissions offsets of between -50,635 and -56,857 tCO2e, which is equivalent to -0.1% of Ireland’s total 2024 GHG emissions i.e. the offset represents a reduction of national GHG emissions by these percentages. This takes account of the GHG emissions offsets from using feedstock to produce biogas, thereby avoiding methane emissions, and displacement of fossil methane by biomethane, thereby avoiding use of the more carbon intensive natural gas, as well as digestate biofertiliser and biogenic CO2. Total annual emissions which fall under ETS (i.e. electricity generation or consumption) are approx. 0.1% of Ireland’s ETS 2030 target, while emissions offsets which fall under ETS equate to approximately -0.2% of Ireland’s ETS 2030 target. Total annual emissions which fall under non-ETS (i.e. all categories other than electricity) are approximately 0.003% of Ireland’s non-ETS 2030 target, while the emissions offset in this category equates to approx. -0.1% of Ireland’s non-ETS 2030 target. The total annualised electricity-related (i.e. energy production and consumption) GHG emissions are approx. 0.4% of the 2030 Electricity sector budget, while the emissions offset in this category equates to approx. -0.7% of the 2030 Electricity sector budget. The total annualised waste-related GHG emissions are approx. 0.00002% of the 2030 Waste sector budget. These emissions originate from the construction phase – there are no significant waste-RECEIVED: 28/08/2026 August 2026 | 14-36 related emissions predicted during the operational phase. The emissions offset in this category equates to approx. -0.01% of the 2030 Waste sector budget. The total annualised industry-related GHG emissions are approx. 0.01% of the 2030 Industry sector budget, while the emissions offset in this category equates to approx. -0.3% of the 2030 Industry sector budget. The total annualised transport-related GHG emissions are approx. 0.01% of the 2030 Transport sector budget, while the emissions offset in this category equates to approx. -0.001% of the 2030 Transport sector budget. The total annual agriculture-related emissions offset equates to approx. -0.05% of the 2030 Agriculture sector budget. Table 14-8 Estimated GHG emissions relative to sectoral budgets and GHG baseline Target/Sectoral Budget (tCO2e) Proposed Develop- ment Annualised Development GHG Emissions (tCO2e) % of Relevant Target/ Budget Annualised Development GHG Offsets (tCO2e) % of Relevant Target/ Budget Scenario 1 Scenario 2 Scenario 1 Scenario 2 Ireland's 2024 Total GHG Emissions (existing baseline) 58,896,000 Total 14,885 14,874 0.03% -50,635 -56,857 -0.1% Non ETS 2030 Target 27,721,670 Total (non Electricity) 754 770 0.003% -28,747 -31,929 -0.1% ETS 2030 Target 12,953,240 Total Electricity 12,789 12,761 0.1% -21,888 -24,928 -0.2% 2030 Sectoral Budget (Industry Sector) 4,000,000 Total Industry 445 445 0.01% -13,000 -15,000 -0.3% 2030 Sectoral Budget (Transport Sector) 6,000,000 Total Transport 309 325 0.01% n/a n/a n/a 2030 Sectoral Budget (Electricity Sector) 3,000,000 Total Electricity 12,789 12,761 0.4% -21,888 -24,928 -0.7% 2030 Sectoral Budget (Waste Sector) 1,000,000 Total Waste 0.2 0.2 0.00002% -117 n/a -0.01% 2030 Sectoral Budget (Agriculture Sector) 17,250,000 Total Agriculture n/a n/a n/a -8,061 -9,360 -0.05% 14.9.1.5 GHGA Significance of Effects The TII guidance states that the following two factors should be considered when determining significance: ▪ The extent to which the trajectory of GHG emissions from the project aligns with Ireland’s GHG trajectory to net zero by 2050; and ▪ The level of mitigation taking place. RECEIVED: 28/08/2026 August 2026 | 14-37 The proposed development will result in GHG emissions offsets through using feedstock to produce biogas and in turn biomethane for distribution into the national gas network, thereby avoiding use of the more carbon intensive natural gas. The use of digestate biofertiliser instead of synthetic, the use of manure as a feedstock instead of spreading on agricultural land and the capture of biogenic CO2 also provide emissions offsets. This is a positive impact on Ireland’s greenhouse gas emissions, in line with the goals of CAP24 and CAP25 (where the development will provide over 12% of the 2025 biomethane production target), the National Biomethane Strategy (where the development will provide over 2% of the 2030 biomethane production target) and Ireland’s GHG net zero by 2050 trajectory. The level of mitigation described in Section 14.10 has been taken into account when determining the significance of the proposed development’s GHG emissions. According to the TII significance criteria described in Section 14.5.2.3 and Table 14-4, the significance of the GHG emissions during the construction and operational phase is beneficial. In accordance with the EPA guidelines (EPA, 2022), the above significance equates to a significance of effect of GHG emissions during the construction and operational phase which is direct, long-term, positive and slight, which is overall not significant in EIA terms. 14.9.2 Climate Change Risk Assessment 14.9.2.1 Construction Phase A detailed CCRA of the construction phase has been scoped out for the renewable biogas plant site and gas grid connection, as discussed in Section 14.5.3. However, consideration has been given to the proposed development’s vulnerability to the following climate change hazards with best practice mitigation measures proposed in Section 14.10: • Flood Risk due to increased precipitation, and intense periods of rainfall. This includes fluvial and pluvial flooding; • Increased temperatures potentially causing drought, wildfires and prolonged periods of hot weather; • Reduced temperatures resulting in ice or snow; and • Major Storm Damage – including wind damage. 14.9.2.2 Operational Phase In order to determine the vulnerability of the proposed development to climate change the sensitivity and exposure of the development to various climate hazards must first be determined. The following climate hazards have been considered in the context of the proposed development: flooding (coastal, pluvial, fluvial); extreme heat; extreme cold; wildfire; drought; extreme wind; lightning, hail and fog. Wildfire and landslides were not considered relevant to the proposed development due to the proposed development location and have been screened out of the assessment. The sensitivity of the proposed development to the above climate hazards is assessed irrespective of the proposed development location. Table 14-9 details the sensitivity of the proposed development on a scale of high (3), medium (2) and low (1). Once the sensitivity has been established the exposure RECEIVED: 28/08/2026 August 2026 | 14-38 of the proposed development to each of the climate hazards is determined, this is the likelihood of the climate hazard occurring at the proposed development location and is also scored on a scale of high (3), medium (2) and low (1). The product of the sensitivity and exposure is then used to determine the overall vulnerability of the proposed development to each of the climate hazards. The results of the vulnerability assessment are detailed in Table 14-9. This CCRA has taken the renewable biogas plant site and gas grid connection elements into account. Table 14-9 Climate Change Vulnerability Assessment Climate Hazard Sensitivity Exposure Vulnerability Flooding (Coastal, Pluvial, Fluvial) 1 (Low) 2 (Medium) 2 (Low) Extreme Heat 1 (Low) 2 (Medium) 2 (Low) Extreme Cold 1 (Low) 2 (Medium) 2 (Low) Drought 1 (Low) 1 (Low) 1 (Low) Extreme Wind 1 (Low) 1 (Low) 1 (Low) Lightning & Hail 1 (Low) 1 (Low) 1 (Low) Fog 1 (Low) 1 (Low) 1 (Low) The sensitivity and exposure of the area was determined with reference to a number of online tools and with input from the various discipline specialists on the project team. It was concluded that the proposed development does not have any significant vulnerabilities to the identified climate hazards as described in the below sections. All vulnerabilities are classified as low. 14.9.2.2.1 Flooding A Flood Risk Assessment (FRA) was undertaken by AWN Consulting and is submitted as part of this planning application (Appendix 10.2 of Chapter 10 Water and Hydrology of this EIAR). This document was reviewed to inform the climate change vulnerability assessment and assess the potential for flooding at the proposed development site. The FRA has concluded that the proposed development site is located in Flood Zone C (zone of lowest flood risk, where the probability of flooding is less than 0.1%), and is therefore at low risk of fluvial flooding. In terms of pluvial flooding (from surface water runoff), the FRA concludes the following: “Surface water discharge from all areas will be collected and directed to an attenuation/rainwater harvesting system. Collected rainwater will be utilised in the wheel washing and floor washing processes. Excess surface water will be attenuated in an underground tank and discharged from the site to an approved location at greenfield runoff rates. The network will be designed to cater for a 1 in 100-year event with a 30% addition to account for climate change.” The FRA also concludes that the site is at low risk of groundwater flooding. It can be concluded that overall, the proposed development has low vulnerability to flood risk. 14.9.2.2.2 Extreme Wind, Fog, Lightning & Hail In relation to extreme winds, buildings and structures shall be designed to the appropriate standards to account for the relevant wind loadings events for RCP4.5 and RCP8.5. If required as part of the RECEIVED: 28/08/2026 August 2026 | 14-39 building design, lightning protection shall be provided for. Hail and fog are not predicted to significantly affect the development buildings or plant due to their design. It can be concluded that overall, the proposed development has low vulnerability to extreme wind, fog, lightning and hail. 14.9.2.2.3 Extreme Temperatures (Heat & Cold) & Drought Extreme temperatures, both extreme heat and extreme cold, have the potential to impact the building materials and some related infrastructure. However, high quality, durable building materials will be selected for the proposed development at the detailed design stage. Throughout detailed design phase, the architects will be using guidance documents to inform with design detail decisions including; the EU Commission Technical Guidance on Adapting Buildings to Climate Change (European Commission (2021a), and the latest available IPCC report. In addition, should updated EuroCodes be published prior to completion of detailed design, which will include consideration for climate impacts, these design standards will be taken into account. 14.9.2.2.4 Wildfires In relation to wildfires, the Think Hazard! tool developed by the Global Facility for Disaster Reduction and Recovery (GFDRR, 2025), indicates that the wildfire hazard is classified as medium for the Monaghan area. This means that there is between a 10% to 50% chance of experiencing weather that may cause disruptions and low but tangible risk of life and property loss in any given year. Future climate modelling indicates that there could be an increase in the weather conditions which are favourable to fire conditions, these include increases in temperature and prolonged dry periods. However, due to the project location in a predominantly agricultural area, the risk of wildfire is significantly lessened and it can be concluded that the proposed development is of low vulnerability to wildfires. 14.9.2.2.5 Summary Overall, the proposed development has at most low vulnerabilities to the identified climate hazards. Therefore, no detailed risk assessment is required. 14.9.2.3 CCRA Significance of Effects With design mitigation in place, there are no significant risks to the proposed development as a result of climate change. In accordance with the EPA Guidelines (EPA, 2022), the significance of effect of the impacts to the proposed development as a result of climate change are direct, long-term, negative and imperceptible, which is overall not significant in EIA terms. 14.9.3 Cumulative Effects With respect to the requirement for a cumulative assessment the IEMA (IEMA, 2022) and TII (TII, 2022a) guidance on which the assessment is based states that: “the identified receptor for the GHG Assessment is the global climate and impacts on the receptor from a project are not geographically constrained, the normal approach for cumulative assessment in EIA is not considered applicable. By presenting the GHG impact of a project in the context of its alignment to Ireland’s trajectory of net zero and any sectoral carbon budgets, this assessment will demonstrate the RECEIVED: 28/08/2026 August 2026 | 14-40 potential for the project to affect Ireland’s ability to meet its national carbon reduction target. This assessment approach is considered to be inherently cumulative”. As per the above, the cumulative impact of the proposed development in relation to GHG emissions is considered direct, long-term, positive and significant. 14.9.3.1 Digestate While the proposed development does not include the land spreading of digestate, land spreading of digestate produced at the proposed development is considered a reasonably foreseeable indirect activity associated with the future operation of the facility, and has been considered accordingly within this chapter of the EIAR. The overall climate impact of digestate spreading depends on multiple variables, including the method of application (e.g. surface spreading vs. injection), local soil and climatic conditions, and the baseline (existing) fertiliser regime for the relevant lands that the digestate would replace at the relevant time. For reasons already explained at Chapter 2, it is not feasible to identify the specific locations, timing, method, application rates, and characteristics of individual third party land parcels on which digestate will be applied by third party landowners and occupiers are. As such, it is not possible to undertake a site-specific quantitative assessment of potential GHG emissions from land spreading of digestate produced by the proposed development. Nonetheless, provided the land spreading activity is undertaken in accordance with the Good Agricultural Practice framework (as defined at Chapter 2), the following will control and minimise the risk of GHG emissions: • Maximum digestate application rates; • Prohibited spreading periods (e.g. during winter months); • The use of low emission spreading techniques, • Requirements for soil condition and weather suitability; Furthermore, the use of use of digestate from the proposed development is likely to displace the existing baseline production and use of chemical fertilisers (a highly energy-intensive process) and would help to close the nutrient loop in a circular economy framework. According to the Anaerobic Digestion and Bioresources Association, “1 tonne of artificial fertiliser replaced with digestate, saves 1 tonne of oil and 7 tonnes of CO2 emissions” , resulting in GHG emissions reductions of an estimated 476,000 t-CO2e/annum. Given these factors, while some localised GHG emissions may arise indirectly from digestate application, these are considered to be effectively mitigated through regulatory compliance. The overall climate impact is not considered to be significant, and in cumulative terms, the use of digestate is likely to result in net positive climate outcomes relative to the baseline alternative of unmanaged organic waste disposal or exclusive reliance on artificial fertilisers. RECEIVED: 28/08/2026 August 2026 | 14-41 In conclusion, land spreading of digestate is well-regulated and aligns with national and EU climate policy objectives. No significant adverse cumulative or indirect impacts on climate are anticipated, and some positive impacts may arise through avoided emissions and reduced fertiliser dependency. 14.9.4 Summary The following table summarises the identified likely significant effects on climate due to the proposed development before mitigation measures are applied. Table 14-10 Summary of Construction and Operational Phase Likely Significant Effects in the absence of mitigation Aspect Likely Significant Effect Quality Significance Extent Probability Duration Type All elements of the proposed development (Biogas Plant and Gas Grid) GHG emissions and savings from construction and operation Positive Not significant - slight National Likely Long-term Direct Climate change and related vulnerability of the proposed development Negative Not significant - imperceptible Local Likely Long-term Direct 14.10 Mitigation Measures 14.10.1 Renewable Biogas Plant Site 14.10.1.1 Incorporated Design Mitigation A number of measures have been incorporated into the design of the development to mitigate against the impacts of future climate change. For example, adequate attenuation and drainage have been incorporated into the design of the development to avoid potential flooding impacts as a result of increased rainfall events in future years. These measures have been considered when assessing the vulnerability of the proposed development to climate change (Section 14.9.2). An Energy & Sustainability report has been prepared by Metec and is submitted separately with this planning application. This report has been reviewed in order to inform this assessment. As per the Energy & Sustainability report, the proposed development will comply with Part L 2022 (Buildings Other Than Dwellings). As part of the development’s efforts to further reduce energy consumption, the project is targeting a minimum A3 BER (Building Energy Rating) across the development. The development design has followed the “Be Mean, Be Lean, Be Green” energy hierarchy approach which includes: RECEIVED: 28/08/2026 August 2026 | 14-42 ▪ Using less resources (“Be Mean”) – this is achieved through high-performance U-values, improved air tightness and improved thermal transmittance and thermal bridging design. ▪ Using resources efficiently (“Be Lean”) – this is achieved through installation of low energy plant, increased use of natural ventilation where feasible, increased use of natural daylight where feasible and use of energy efficient LED lighting where artificial lighting is required. ▪ Using renewable technologies (“Be Green”) – various renewable technologies are being investigated for the proposed development and will be fully developed during the detailed design. Such options include combined heat and power (CHP), air source heat pump, VRF heat pump and solar photovoltaics. Additionally, the proposed development incorporates electric vehicle charging and bicycle parking and water efficiency measures (such as low consumption sanitary fittings) will be incorporated into the development design. These measures will aid in reducing the impact to climate during the operational phase of the proposed development in line with the goals of the Climate Action Plan. 14.10.1.2 Construction Phase Mitigation Embodied carbon of materials and GHG emissions associated with construction activities will be the primary source of climate impacts during the construction phase. Best practice measures to reduce the GHG emissions of the construction works include: ▪ Appointing a suitably competent contractor who will undertake waste audits detailing resource recovery best practice and identify materials can be reused/recycled; ▪ Materials will be reused on site where possible; ▪ Prevention of on-site or delivery vehicles from leaving engines idling, even over short periods; ▪ Ensure all plant and machinery are well maintained and inspected regularly; ▪ Minimising waste of materials due to poor timing or over ordering on site will aid to minimise the embodied carbon footprint of the site; and ▪ Sourcing materials locally where possible to reduce transport related CO2 emissions. In terms of impact on the proposed development due to climate change, during construction the Contractor will be required to mitigate against the effects of extreme rainfall/flooding through site risk assessments and method statements. The Contractor will also be required to mitigate against the effects of extreme wind/storms, temperature extremes through site risk assessments and method statements. All materials used during construction will be accompanied by certified datasheets which will set out the limiting operating temperatures. Temperatures can affect the performance of some materials, and this will require consideration during construction. During construction, the Contractor will be required to mitigate against the effects of fog, lighting and hail through site risk assessments and method statements. 14.10.1.3 Operational Phase Mitigation The proposed development by design will reduce GHG emissions during the operational phase as follows: RECEIVED: 28/08/2026 August 2026 | 14-43 ▪ The proposed development will use organic waste as the feedstock in Scenario 1, thereby diverting this waste stream from composting. This represents a total emissions avoidance of between 2,060 tCO2e over the 30 year lifetime of the proposed development, or 69 tonnes annually (if avoidance of composting disposal of organic waste is assumed). Measures have been incorporated into the of the development to mitigate the impacts of future climate change. For example, adequate attenuation and drainage have been incorporated to avoid potential flooding impacts due to increased rainfall events in future years. These measures have been considered when assessing the vulnerability of the proposed development to climate change (see Section 14.9.2.2). 14.10.2 Gas Grid Connection The climate effects of the gas grid connection have been assessed as part of the overall project. These works are outside the control of the applicant, and any mitigation identified for them is presented as recommended rather than committed. As part of the separate consenting process for the gas grid connection, it is expected that Gas Networks Ireland will implement similar construction and operational phase mitigation measures as outlined above in Sections 14.10.1 and Error! Reference source not found. for the renewable biogas plant site. The GHG emissions associated with in particular the excavation activities, materials required for construction of the grid connection and transport of materials and staff can be mitigated with measures similar to those outlined in Sections 14.10.1 and Error! Reference source not found., which are typical for the industry and this type of development. Additionally as a public sector body, Gas Networks Ireland will have obligations under the Buying Greener: Green Public Procurement Strategy and Action Plan 2024-2027 (Government of Ireland, 2024a) to prioritise procurement of goods and services with lower associated GHG emissions, which if implemented will reduce the impact of the construction and operation of the gas grid connection. 14.11 Residual Impact Assessment The impact to climate as a result of a proposed development must be assessed as a whole for all phases. The proposed development will result in GHG emissions offsets through using feedstock to produce biogas and in turn biomethane for distribution into the national gas network, thereby avoiding use of the more carbon intensive natural gas. The use of digestate biofertiliser instead of synthetic, the use of manure as a feedstock instead of spreading on agricultural land and the capture of biogenic CO2 also provide emissions offsets. Emissions offset from these activities total between 50,635 and 56,857 tCO2e annually. This is a positive impact on Ireland’s greenhouse gas emissions, in line with the goals of CAP24 and CAP25 (where the development will provide over 12% of the 2025 biomethane production target), the National Biomethane Strategy (where the development will provide over 2% of the 2030 biomethane production target) and Ireland’s GHG net zero by 2050 trajectory. TII reference the IEMA guidance which states that the crux of assessing significance is “not whether a project emits GHG emissions, nor even the magnitude of GHG emissions alone, but whether it contributes to reducing GHG emissions relative to a comparable baseline consistent with a trajectory towards net zero by 2050”. RECEIVED: 28/08/2026 August 2026 | 14-44 As per the assessment criteria in Table 14.3, the residual impact of the proposed development in relation to GHG emissions is beneficial. In accordance with the EPA guidelines (EPA, 2022), the above significance equates to a significance of effect of GHG emissions during the construction and operational phase, which is direct, long-term, positive and slight, which is overall not significant in EIA terms. In relation to climate change vulnerability, it has been assessed that there are no significant risks to the proposed development as a result of climate change. The residual effect of climate change on the proposed development is considered direct, long-term, negative and imperceptible, which is overall not significant in EIA terms. 14.11.1 Summary of Post-mitigation Effects The following table summarises the identified likely significant residual effects during the construction and operational phases of the proposed development following the application of mitigation measures. Table 14-11 Summary of Construction Phase Effects Post Mitigation Aspect Likely Significant Effect Quality Significance Extent Probability Duration Type All elements of the proposed development (Biogas Plant and Gas Grid) GHG emissions and savings from construction and operation Positive Not significant - slight National Likely Long-term Direct Climate change and related vulnerability of the proposed development Negative Not significant - imperceptible Local Likely Long-term Direct 14.11.2 Cumulative Residual Effects With respect to the requirement for a cumulative assessment the IEMA (IEMA, 2022) and TII (TII, 2022a) guidance on which the assessment is based states that: “the identified receptor for the GHG Assessment is the global climate and impacts on the receptor from a project are not geographically constrained, the normal approach for cumulative assessment in EIA is not considered applicable. By presenting the GHG impact of a project in the context of its alignment to Ireland’s trajectory of net zero and any sectoral carbon budgets, this assessment will demonstrate the potential for the project to affect Ireland’s ability to meet its national carbon reduction target. This assessment approach is considered to be inherently cumulative”. As per the above, the cumulative impact of the proposed development in relation to GHG emissions is considered direct, long-term, positive and significant. RECEIVED: 28/08/2026 August 2026 | 14-45 14.12 Risk of Major Accidents or Disasters As detailed in Section 14.9.2.2, climate change has the potential to alter weather patterns and increase the frequency of rainfall in future years. However, the potential for flooding on site has been reviewed and adequate attenuation and drainage have been provided for to account for increased rainfall in future years. All climate change-related risks were categorised as ‘low’ as per Section 14.9.2.2. There are no additional likely risks of major accidents and disasters in relation to climate associated with the proposed development. Appropriate control measures (such as tank design and lightning protection) will be in place to ensure unplanned GHG emissions are avoided. 14.13 Worst Case Scenario A worst-case assessment has been undertaken to evaluate the maximum credible effects of the proposed development. This considers the full extent, scale, and all operational elements. As a result, Section 14.9 details the worst-case impact for the proposed development. The assessment focuses on effects under normal operational conditions and excludes low-probability events, such as major accidents or disasters, as set out above. Therefore, the residual effects assessment is representative of the worst case scenario. 14.14 Interactions Please refer to Chapter 18. 14.15 Monitoring There is no monitoring required for the construction or operational phases based on this assessment. However, in order to operate (pending planning permission) the proposed development will be subject to an Industrial Emissions (IE) Licence, which is regulated by the EPA. As part of this IE licence, GHG emissions will be quantified and reported to the EPA on an annual basis, and the EPA may impose licence conditions relating to energy use, energy efficiency and measures to reduce GHG emissions. 14.16 Summary of Mitigation and Monitoring The following table summarises the Construction Phase mitigation and monitoring measures. Table 14-12 Summary of Construction Phase Mitigation and Monitoring Aspect Likely Significant Effect Mitigation Monitoring All elements of the proposed development (Biogas Plant and Gas Grid) Impact of proposed development greenhouse gas ▪ Appointing a suitably competent contractor who will undertake waste audits detailing resource recovery best practice and identify materials can be reused/recycled; ▪ Materials will be reused on site where possible; No monitoring proposed. RECEIVED: 28/08/2026 August 2026 | 14-46 Aspect Likely Significant Effect Mitigation Monitoring emissions on climate. ▪ Prevention of on-site or delivery vehicles from leaving engines idling, even over short periods; ▪ Ensure all plant and machinery are well maintained and inspected regularly; ▪ Minimising waste of materials due to poor timing or over ordering on site will aid to minimise the embodied carbon footprint of the site; and ▪ Sourcing materials locally where possible to reduce transport related CO2 emissions. Vulnerability of proposed development to future climate change. ▪ Contractor will be required to mitigate against the effects of extreme rainfall/flooding, extreme winds/storms, temperature extremes, fog, lightning and hail through site risk assessments and method statements. ▪ All materials used during construction will be accompanied by certified datasheets which will set out the limiting operating temperatures. No monitoring proposed. The following Table summarises the Operational Phase mitigation and monitoring measures. Table 14-13 Summary of Operational Phase Mitigation and Monitoring Aspect Likely Significant Effect Mitigation Monitoring All elements of the proposed development (Biogas Plant and Gas Grid) Impact of proposed development greenhouse gas emissions on climate. Incorporated design mitigation relating to operational energy usage. See Section 14.10 for further details. No monitoring proposed. Vulnerability of proposed development to future climate change. Incorporated design mitigation regarding drainage design, building design. See Section 14.10 for further details. No monitoring proposed. 14.17 Conclusion This chapter has reviewed and analysed the potential and the predicted impacts of the proposed development with regards to climate. These impacts have been considered for both the construction and operational phases of the proposed development. The cumulative impact of the proposed development and surrounding developments have also been considered. From the assessment completed, the proposed development is anticipated to deliver annual greenhouse gas emissions offsets of between approx. -50,635 and -56,857 tCO2e per annum through using feedstock to produce biogas, thereby avoiding methane emissions, and displacement of fossil methane by biomethane, thereby avoiding use of the more carbon intensive natural gas, as well as digestate biofertiliser and biogenic CO2. These GHG offsets represent a 0.1% reduction in emissions relative to Ireland’s 2024 national GHG emissions, and a 0.1% reduction in emissions which contribute RECEIVED: 28/08/2026 August 2026 | 14-47 to the 2030 electricity sectoral budget. Note that CAP25 targets the construction of 20 anaerobic digestor plants of scale. The offsets associated with the proposed development together with similar offsets achievable by these other target plants therefore have the potential to make a significant contribution to national GHG reduction targets. This is a positive impact on Ireland’s greenhouse gas emissions, in line with the goals of CAP24 and CAP25, where the development will provide over 12% and 2% of the 2025 and 2030 biomethane production targets, respectively. The biomethane produced by the development can be classified as “a zero-carbon rated fuel” if it satisfies the Renewable Energy Directive’s life cycle sustainability criteria, and will therefore directly contribute to meeting Ireland’s decarbonisation targets. The development is also fully in line with national planning objectives (through the National Planning Framework and the Northern & Western Regional Assembly Regional Spatial And Economic Strategy 2020-2032, which directly support circular and bioeconomy, the creation of appropriately scaled local multi-feedstock bio-refining hubs across the region as well as creation of bio-districts/clusters, the build-out of the gas supply network in the region, and encourage and support innovative partnerships extending the gas network in the region, including the potential for gas to grid injection facilities along with anaerobic digestion facilities. The proposed development, through its GHG emissions savings potential, will make an important contribution both annually and over its lifetime to Ireland meeting its legal obligations under EU climate law to achieve the net carbon zero target for 2050. Anaerobic digestors are a key action in terms of national policy and decarbonising energy production, without which Ireland will struggle to achieve Ireland’s GHG targets. The proposed development should therefore be considered an essential installation in aiding Ireland’s legal climate compliance and combatting the national climate emergency. Certain industrial sectors, as well as some residential areas in Ireland are reliant on the natural gas network for heating and energy production, with few technologies available to offset and displace fossil gas. Biomethane is uniquely suited to displace carbon intensive fossil gas in the grid, directly addressing emissions from hard-to-abate sectors such as heat and transport. Domestic biomethane production also helps to increase Ireland’s energy security through the use of domestic resources to reduce reliance on foreign energy imports. These specific benefits highlight the unique advantages offered by anaerobic digestion technology, which cannot be so comprehensively achieved through other alternatives. The plant will produce stable and valuable sustainable fertilisers which will offset carbon intensive artificial fertiliser, and can be used locally, encouraging a local market to use less carbon intensive products in agriculture and enabling local farmers to deliver net zero farming. Provided all mitigation measures as set out in this chapter are implemented, the overall predicted effect of the proposed development on GHG emissions is direct, positive, long-term and slight, while the effect of climate change risk on the proposed development is direct, negative, long-term and imperceptible. RECEIVED: 28/08/2026 August 2026 | 14-48 14.18 References and Sources Civil Engineering Standard Method of Measurement (CESSM) (2013) Carbon and Price Book database. Construction Industry Federation (2021) Modern Methods of Construction Environmental Protection Agency (EPA) (2020a) State of the Irish Environment Report (Chapter 2: Climate Change) Environmental Protection Agency (EPA) (2020b) Research 339: High-Resolution Climate Projections for Ireland – A Multi-Model Ensemble Approach Environmental Protection Agency (EPA) (2021) What impact will climate change have for Ireland? [Online] Available at https://www.epa.ie/environment-and-you/climate-change/what-impact-will- climate-change-have-for-ireland/ [Date Accessed: October 2025] Environmental Protection Agency (EPA) (2022) Guidelines on the Information to be Contained in Environmental Impact Assessment Reports Environmental Protection Agency (2025a) Ireland's Final Greenhouse Gas Emissions 1990-2024 EPA (2025b) Ireland’s Greenhouse Gas Emissions Projections 2024-2055 European Commission (2013) Guidance on Integrating Climate Change and Biodiversity into Environmental Impact Assessment European Commission (2014) 2030 Climate and Energy Policy Framework European Commission (2017) Environmental Impact Assessment of Projects: Guidance on the preparation of the Environmental Impact Assessment Report European Commission (2021a) Technical guidance on the Climate Proofing of Infrastructure in the Period 2021-2027 European Commission (2021b) 2030 EU Climate Target Plan European Commission (2021b) Forging a climate-resilient Europe - the new EU Strategy on Adaptation to Climate Change. European Union (2018) Regulation 2018/842 on binding annual greenhouse gas emission reductions by Member States from 2021 to 2030 contributing to climate action to meet commitments under the Paris Agreement and amending Regulation (EU) No. 525/2013 Global Facility for Disaster Reduction and Recovery (GFDRR) (2025) Think Hazard! Government of Ireland (2015) Climate Action and Low Carbon Development Act Government of Ireland (2018) Climate Action Plan 2019 Government of Ireland (2019) Northern & Western Regional Assembly Regional Spatial And Economic Strategy 2020-2032 Government of Ireland (2020) Climate Action Plan 2021 Government of Ireland (2021) Climate Action and Low Carbon Development (Amendment) Act 2021 (No. 32 of 2021) Government of Ireland (2022) Climate Action Plan 2022 RECEIVED: 28/08/2026 August 2026 | 14-49 Government of Ireland (2023a) Climate Action Plan (CAP) 2024 Government of Ireland (2024a) Buying Greener: Green Public Procurement Strategy and Action Plan (2024–2027) Government of Ireland (2024b) Long-term Strategy on Greenhouse Gas Emissions Reductions Government of Ireland (2024c) National Adaptation Framework (NAF) Government of Ireland (2024d) National Biomethane Strategy Government of Ireland (2025a) Climate Action Plan (CAP) 2025 Government of Ireland (2025b) National Planning Framework (First Revision) Institute of Sustainability & Environmental Professionals (ISEP) (formerly known as IEMA) (2020a) Environmental Impact Assessment Guide to: Climate Change Resilience and Adaptation Institute of Sustainability & Environmental Professionals (ISEP) (formerly known as IEMA) (2020b) GHG Management Hierarchy Institute of Sustainability & Environmental Professionals (ISEP) (formerly known as IEMA) (2022) Environmental Impact Assessment Guide to: Assessing GHG Emissions and Evaluating their Significance Met Éireann (2024a) TRANSLATE: One Climate Resource for Ireland. [Online] Available at: https://www.met.ie/science/translate [Date Accessed: October 2025] Met Éireann (2024b) Ireland’s 30-year Climate Averages [Online] Available at: https://www.met.ie/climate/30-year-averages [Date Accessed: October 2025] Met Éireann (2024c). TRANSLATE research report. Met Éireann (2025) 2024 Climate Statement Monaghan County Council (MCC) (2024) Monaghan County Council Climate Change Action Plan 2024 -2029 Sustainable Energy Authority of Ireland (SEAI) (2024). Conversion Factors. Available from: seai.ie/data- and-insights/seai-statistics/conversion-factors/ [Date Accessed: October 2025] The Geological Society of Ireland (GSI) (2025) Landslide Susceptibility Mapping Database Transport Infrastructure Ireland (2022a) PE-ENV-01104: Climate Guidance for National Roads, Light Rail and Rural Cycleways (Offline & Greenways) – Overarching Technical Document Transport Infrastructure Ireland (2022b) PE-ENV-01106: Air Quality Assessment of Specified Infrastructure Projects Transport Infrastructure Ireland (2025) GE-ENV-01106: TII Carbon Assessment Tool for Road and Light Rail Projects and User Guidance Document Transport Infrastructure Ireland (2024) TII Road Emissions Model (REM): Model Development Report – GE-ENV-01107 Fehily Timoney (2021) Baseline Study Poultry Sector, Co. Monaghan RECEIVED: 28/08/2026 CHAPTER 15 CULTURAL HERITAGE: BUILT HERITAGE & ARCHAEOLOGY VOLUME II ENVIRONMENTAL IMPACT ASSESSMENT REPORT Stream BioEnergy Ireland Limited AUGUST 2026 RECEIVED: 28/08/2026 August 2026 | 15-1 Table of Contents 15 Cultural Heritage: Built Heritage & Archaeology .................................................................. 15-5 15.1 Introduction .......................................................................................................................... 15-5 15.1.1 Expertise & Qualifications ..................................................................................................... 15-5 15.2 Proposed Project ................................................................................................................... 15-6 15.2.1 Renewable Biogas Plant Site ................................................................................................. 15-6 15.2.2 Linear Gas Grid Connection................................................................................................... 15-7 15.2.3 Aspects Relevant to this Assessment .................................................................................... 15-7 15.3 Methodology ......................................................................................................................... 15-8 15.3.1 Relevant Legislation & Guidance .......................................................................................... 15-8 15.3.2 Desktop Study ..................................................................................................................... 15-10 15.3.3 Site Surveys / Investigations ............................................................................................... 15-10 15.3.4 Study Area (Zone of Influence) ........................................................................................... 15-11 15.3.5 Consultation ........................................................................................................................ 15-15 15.3.6 Impact Assessment Methodology ....................................................................................... 15-15 15.4 Difficulties Encountered ...................................................................................................... 15-16 15.5 Baseline Environment ......................................................................................................... 15-16 15.5.1 Cultural Heritage Context ................................................................................................... 15-16 15.5.2 Archaeological Heritage (Designated Assets) ..................................................................... 15-53 15.5.3 Architectural Heritage (Designated Assets) ........................................................................ 15-67 15.5.4 Undesignated Cultural Heritage .......................................................................................... 15-72 15.6 The ‘Do Nothing’ Scenario .................................................................................................. 15-75 15.6.1 Renewable Biogas Plant Site ............................................................................................... 15-75 15.6.2 Linear Gas Grid Connection................................................................................................. 15-75 15.7 Potential Significant Effects ................................................................................................ 15-75 15.7.1 Construction Phase ............................................................................................................. 15-75 15.7.2 Operational Phase ............................................................................................................... 15-76 15.7.3 Cumulative Effects .............................................................................................................. 15-78 15.7.4 Summary ............................................................................................................................. 15-78 15.8 Mitigation Measures ........................................................................................................... 15-79 15.8.1 Renewable Biogas Plant Site ............................................................................................... 15-79 15.8.2 Linear Gas Grid Connection................................................................................................. 15-81 15.9 Residual Impact Assessment ............................................................................................... 15-81 15.9.1 Construction Phase ............................................................................................................. 15-81 15.9.2 Operational Phase ............................................................................................................... 15-81 15.9.3 Cumulative Effects .............................................................................................................. 15-82 RECEIVED: 28/08/2026 August 2026 | 15-2 15.9.4 Summary of Post-mitigation Effects ................................................................................... 15-82 15.9.5 Cumulative Residual Effects ................................................................................................ 15-83 15.10 Risk of Major Accidents or Disasters ................................................................................... 15-83 15.11 Worst Case Scenario ........................................................................................................... 15-83 15.12 Interactions ......................................................................................................................... 15-83 15.13 Monitoring .......................................................................................................................... 15-83 15.14 Summary of Mitigation and Monitoring ............................................................................. 15-83 15.15 Conclusion ........................................................................................................................... 15-84 15.15.1 Renewable Biogas Plant Site ............................................................................................... 15-85 15.15.2 Linear Gas Grid Connection................................................................................................. 15-85 15.16 References and Sources ...................................................................................................... 15-86 15.16.1 Documentary References .................................................................................................... 15-86 15.16.2 Online Sources .................................................................................................................... 15-88 Table of Figures Figure 15-1 Study area for proposed renewable biogas plant site .................................................. 15-12 Figure 15-2 Comparative ZVT showing potential visibility of proposed development in a bare ground scenario and with existing screening ............................................................................................... 15-13 Figure 15-3 Study area for proposed linear gas grid connection .................................................... 15-14 Figure 15-4 Excerpt of the Down Survey map showing the approximate location of the proposed Renewable Biogas Plant ................................................................................................................... 15-21 Figure 15-5 Excerpt of the First Edition six-inch OS map showing the location of the proposed renewable biogas plant site and soil location area.......................................................................... 15-23 Figure 15-6 Excerpt of the OS six-inch historic map showing the approximate location of the proposed linear gas grid connection, with relevant features highlighted and detail in insets ........................ 15-24 Figure 15-7 Excerpt of the OS 25-inch historic map showing the approximate location of the proposed renewable biogas plant site ............................................................................................................. 15-26 Figure 15-8 Excerpt of the OS 25-inch historic map showing the approximate location of the proposed linear gas grid connection, with relevant features highlighted ....................................................... 15-27 Figure 15-9 Aerial imagery (OSi 1995) of the proposed development site ..................................... 15-28 Figure 15-10 Satellite imagery (Google Earth Pro 2024) of the proposed site ................................ 15-29 Figure 15-11 Previous archaeological investigations in the vicinity of the proposed development site ......................................................................................................................................................... 15-30 Figure 15-12 Townland boundaries within and around proposed development site ..................... 15-32 Figure 15-13 Fields assessed during site inspection of proposed biogas plant site, showing cultural heritage receptors in its vicinity ....................................................................................................... 15-33 Figure 15-14 Google StreetView imagery of Laganeers Bridge, facing west ................................... 15-41 RECEIVED: 28/08/2026 August 2026 | 15-3 Figure 15-15 NIAH record photograph of Dartrey Estate entrance gateway (NIAH Ref. 41402216) .. 15- 42 Figure 15-16 Google StreetView imagery of Dartrey Estate entrance gateway (NIAH Ref. 41402216), facing south ...................................................................................................................................... 15-43 Figure 15-17 Summary interpretation of geophysical survey results (after Leigh 2024) ................ 15-45 Figure 15-18 Test trench layout over geophysical survey results (Coen 2024) ............................... 15-48 Figure 15-19 Details of Archaeological Area 1 in Trench 6 (Coen 2024) ......................................... 15-49 Figure 15-20 Location of test trenches within proposed development site ................................... 15-52 Figure 15-21 Detail of T1 showing archaeological features (Baldwin 2026) ................................... 15-53 Figure 15-22 Recorded monuments within study area for proposed development site ................ 15-54 Figure 15-23 Recorded hilltop enclosure (MO022-008) as visible on current aerial imagery ......... 15-55 Figure 15-24 Locations of recorded monuments assessed for visual impact .................................. 15-57 Figure 15-25 Photomontage showing existing view (top) and view of proposed biogas plant to north- east of recorded hilltop enclosure post-mitigation (bottom) .......................................................... 15-61 Figure 15-26 Photomontage showing existing view (top) and view of proposed biogas plant to north- east of recorded stone row post-mitigation (bottom) .................................................................... 15-62 Figure 15-27 Recorded monuments along proposed linear gas grid connection route .................. 15-66 Figure 15-28 NIAH sites within study area for the proposed renewable biogas plant site ............. 15-68 Figure 15-29 Protected Structures within study area for the proposed linear gas grid connection ... 15- 69 Figure 15-30 NIAH sites within study area for the proposed linear gas grid connection ................ 15-71 Figure 15-31 Undesignated cultural heritage within study area for the proposed renewable biogas plant site .......................................................................................................................................... 15-73 Figure 15-32 Undesignated cultural heritage sites within study area for the proposed linear gas grid connection ....................................................................................................................................... 15-74 Figure 15-33 Landscaping proposed for biogas plant site ............................................................... 15-80 RECEIVED: 28/08/2026 August 2026 | 15-4 Table of Tables Table 15.1 Placenames within the study area ................................................................................. 15-31 Table 15.2 Details of trenches excavated under Licence No. 24E01224 ......................................... 15-46 Table 15.3 Details of trenches excavated under Licence No. 26E0370 ........................................... 15-50 Table 15.4 Recorded monuments within 1km of proposed renewable biogas plant site ............... 15-54 Table 15.5 Summary of Construction Phase Likely Significant Effects in the absence of mitigation .. 15- 78 Table 15.6 Summary of Operational Phase Likely Significant Effects in the absence of mitigation 15-78 Table 15.7 Summary of Construction Phase Effects Post Mitigation .............................................. 15-82 Table 15.8 Summary of Operational Phase Effects Post Mitigation ................................................ 15-82 Table 15.9 Summary of Construction Phase Mitigation and Monitoring ........................................ 15-83 Table 15.10 Summary of Operational Phase Mitigation and Monitoring ........................................ 15-84 RECEIVED: 28/08/2026 August 2026 | 15-5 15 Cultural Heritage: Built Heritage & Archaeology 15.1 Introduction This chapter of the EIAR was prepared to assess the potential significant effects of the proposed project on the cultural heritage, archaeology and architectural heritage environment (‘cultural heritage’1 hereafter) within the site for the proposed Biogas Plant located in Magheranakelly townland, Drum, Co. Monaghan and a Linear Gas Grid Connection along the R188 and R189 public roads (‘proposed dproject’ hereafter).The purpose of the study is to assess the possible significance of the receiving cultural heritage environment and to identify and evaluate the significance of the impact of the proposed development on this environment and to suggest any mitigation measures that might be appropriate. It should be read in conjunction with Appendices 15.1 – 15.5. 15.1.1 Expertise & Qualifications This chapter of the EIAR has been prepared by Dr Karen O’Toole and Dr Clare Crowley of Courtney Deery Heritage Consultancy. Dr O’Toole has a BA in Archaeology and History from University College Dublin (2017), an MSc in Experimental Archaeology and Material Cultural from University College Dublin (2018), and a PhD in Archaeology from University College Dublin (2024). Dr O’Toole has over 7 years’ experience in the field of Cultural Heritage (archaeology, built heritage, history, and folklore). She has carried out numerous surveys and evaluations of archaeological and historic monuments, buildings, sites, and landscapes, for the purposes of academic research, conservation, assessment, management, and development control. She provides advice, assessment, management, protection, and promotion for heritage related issues. She has undertaken a variety of Cultural Heritage studies and assessments, including EIAR research and fieldwork and been involved in the preparation of EIARs for the following projects: ▪ National Cricket Centre, Sport Ireland Campus, Co. Dublin (Planning Ref. FW25A/0173E) ▪ Lissenhall Park and Ride, Lissenhall Little, Swords, Co. Dublin (Planning Ref. F25A/0710E) ▪ Kellystown LRD, Co. Dublin (Planning Ref. FW25A/0418E and FW25A/0419E) Dr Crowley is a Cultural Heritage Consultant, Senior Archaeologist, and EIA Manager at Courtney Deery Heritage Consultancy Ltd. She has over 25 years’ experience in the field of Cultural Heritage (archaeology, built heritage, history, folklore). She is experienced in the management and production of Cultural Heritage EIAs for large-scale infrastructural projects (such as roads, wind farms, solar PV farms, and gas and water pipeline schemes, including SIDs) from the scoping stage through to oral hearing. 1 Cultural Heritage is a broad term that includes Archaeological Heritage, Built (Architectural) Heritage, Portable Heritage, Intangible Heritage, and other resources inherited from the past by contemporary society. RECEIVED: 28/08/2026 August 2026 | 15-6 15.2 Proposed Project The “proposed development” for which the Applicant seeks planning permission comprises the development of a Renewable Biogas Plant and alterations to the local road to facilitate access. The overall “project” subject to Environmental Impact Assessment (EIA) also includes the Linear Gas Grid Connection, which forms part of the wider development but lies outside the planning application boundary. The following is a summary of the Proposed Project. Please refer to Chapter 2 of this EIAR for the detailed description. 15.2.1 Renewable Biogas Plant Site The project consists of the construction and operation of a Renewable Biogas Plant and associated infrastructure. The principal elements of the plant comprise a main process building where the feedstock for the anaerobic digestion (AD) process is received. An odour control system with a dispersion stack will treat the air from the building. The feedstock passes to the AD tanks located within a bunded tank farm. There is a combined heat and power (CHP) building within which a gas fired CHP engine will generate electricity for the plant's energy needs. A Biogas Upgrade and Treatment Plant will be installed to produce biomethane (a renewable natural gas) that will be exported via a Gas Grid Entry Unit to the national gas grid. A CO2 Liquefaction plant will be installed to capture the carbon dioxide in the biogas, turning it into liquid CO₂. A Dryer Building is proposed, where the digestate will be dried, and a Pellet Hall will be constructed, where the digestate pellets will be stored prior to removal from the site for use as a natural fertiliser product. Ancillary elements include a gas dome, tanks to store incoming liquid feedstock, freshwater, firewater, and fuel, a backup gas flare, a backup generator, a plant building, and a control building. Widening of the local road, berms, a new site entrance, weighbridges, wheel washes, parking, lighting and all ancillary development works and services also form part of the development. A high-level process flow follows. RECEIVED: 28/08/2026 August 2026 | 15-7 15.2.2 Linear Gas Grid Connection A gas transmission pipeline will provide a physical connection between the Renewable Biogas Plant and the existing national gas network in Dromore West. Co. Monaghan. While the development of the gas grid is not part of the planning application, as Gas Networks Ireland will deliver it, it is included in the EIAR for assessment purposes, as it forms part of the overall project for the EIA Directive. The works comprise the laying of an underground pipeline over approximately 3.5km within the public road corridor. 15.2.3 Aspects Relevant to this Assessment The aspects of the proposed development relevant to this assessment are: • Site preparation works: Including clearance of vegetation, topsoil stripping and grading to establish a stable foundation and levels across the Renewable Biogas Plant Site. • Site utilities and infrastructure: Including excavation to facilitate service trenches, and underground utilities. • Site wide landscaping: Including planting of vegetation. RECEIVED: 28/08/2026 August 2026 | 15-8 15.3 Methodology 15.3.1 Relevant Legislation & Guidance 15.3.1.1 Legislation The following legislation was consulted to inform the assessment: ▪ Architectural Heritage (National Inventory) and Historic Monuments (Miscellaneous Provisions) Act, 2000; ▪ Council of Europe Convention for the Protection of the Architectural Heritage of Europe, 19852; ▪ Council of Europe European Convention on the Protection of the Archaeological Heritage, 19923; ▪ European Landscape Convention (ELC), 20004; ▪ Heritage Act, 1995; ▪ Historic and Archaeological Heritage and Miscellaneous Provisions Act 20235. ▪ National Monuments (Amendments) Acts, 1930-2014; ▪ ICOMOS Xi’an Declaration on the Conservation of the Setting of Heritage Structures, Sites and Areas, 2005; ▪ Planning and Development Act, 2000, as amended (‘PDA 2000’ hereafter). Excerpts from the relevant legislation are contained in Appendix 15.1. 15.3.1.2 Standards and Guidelines The following standards and guidelines were consulted to inform the assessment: ▪ Burra Charter, the Australia ICOMOS Charter for Places of Cultural Significance, 2013; ▪ ICOMOS Xi’an Declaration on the Conservation of the Setting of Heritage Structures, Sites and Areas, 2005; 2 Ratified by Ireland in 1991 3 Ratified by Ireland in 1997 4 Ratified by Ireland in 2002 5 The Historic and Archaeological Heritage and Miscellaneous Provisions Act 2023 was enacted in October 2023 and this Act is now law. The Minister for DHLGH commenced certain provisions in May 2024 (S.I. No. 252/2024) which relate to World Heritage Property in the State, inventories, the protection of certain records, the promotion of heritage, and the issuing of statutory guidance. Certain related and supporting provisions concerning implementation and enforcement are also commenced. Further provisions in December 2024 (S.I. No. 663/2024) relate to underwater cultural heritage, another Commencement Order in March 2025 (S.I. No. 88/2025) relates to prohibitions, offences, defences and procedural matters, and a Commencement in December 2025 (S.I. No. 555/2025) relating to the return of stolen or illegally exported cultural objects . However, until the Act is fully commenced, the National Monuments Acts and the Architectural Heritage (National Inventory) and Historic Monuments (Miscellaneous Provisions) Act have not yet been repealed and therefore remain in force. RECEIVED: 28/08/2026 August 2026 | 15-9 ▪ Department of Arts, Heritage and the Gaeltacht (2015). National Landscape Strategy for Ireland 2015 – 2025. ▪ Department of Arts, Heritage, Gaeltacht and the Islands (1999). Frameworks and Principles for the Protection of the Archaeological Heritage; ▪ Department of the Environment and Local Government (2000). Landscape and Landscape Assessment – Consultation Draft of Guidelines for Planning Authorities; ▪ Environmental Protection Agency (EPA) (2022). Guidelines on the information to be contained in Environmental Impact Assessment Reports (‘the EPA guidelines’ hereafter); ▪ Historic England (2017). Historic Environment Good Practice Advice in Planning Note 3: The Setting of Heritage Assets (2nd Edition); ▪ Historic Scotland (2010). Managing Change in the Historic Environment; ▪ National Roads Authority (2005). Guidelines for the Testing and Mitigation of the Wetland Archaeological Heritage for National Road Schemes; ▪ The Heritage Council (2010). Proposals for Ireland’s Landscapes; ▪ Transport Infrastructure Ireland (TII;2024). Guidelines for Cultural Heritage Impact Assessment of TII National Road and Greenway Projects (‘the TII guidelines’ hereafter); ▪ TII & Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs (2017). Code of Practice for Archaeology agreed between the Minister for Arts, Heritage, Regional, Rural and Gaeltacht Affairs and Transport Infrastructure Ireland. 15.3.1.3 Planning Policy County Monaghan has a rich archaeological heritage of rock art, earthworks, ringforts, cairns, crannogs, burial grounds, as well as items of industrial archaeology such as mills, remnants of the Great Northern Railway and the Ulster Canal. The Monaghan County Development Plan (CDP; 2025- 2031) acknowledges that archaeological heritage is a finite resource and once lost cannot be replaced. For this reason, great importance should be given to their protection, preservation and to the enhancement of their archaeological interest where possible. All known recorded monuments (and any new archaeological discoveries) are protected under Section 12 of the National Monuments (Amendment) Act (1994) and under the Historic and Archaeological Heritage and Miscellaneous Provisions Act (2023). The continued conservation of the protected structures listed in the Record of Protected Structures (RPS) in the Monaghan CDP (2019-2025) and their setting is important in retaining the quality of the County’s built environment. The RPS includes additions made following the detailed survey of County Monaghan for the National Inventory of Architectural Heritage (NIAH) in 2015, such as post boxes, stone bridges, water pumps, religious buildings, industrial buildings / structures and houses. The CDP also notes that there are structures of distinctive traditional styles throughout County Monaghan and whilst these may not be included in the record of protected structures, they reflect the unique local history and character of place. The CDP also notes the importance of the designed landscapes, historic gardens and demesnes associated with some of Monaghan’s country houses. Specific policies relating to archaeological heritage, built and architectural heritage, and designed landscapes are detailed in Appendix 15.2. RECEIVED: 28/08/2026 August 2026 | 15-10 15.3.2 Desktop Study The evaluation process ensures that all designations relating to cultural heritage assets, and any cultural heritage features that are revealed through research, field assessment and consultation, are clearly articulated. A review of the following information took place in order to inform the desktop study: ▪ The National Monuments, Preservation Orders, Register of Historic Monuments list for County Monaghan was sourced directly from the DHLGH; ▪ Record of Monuments and Places (RMP) and Sites and Monuments Record (SMR): The SMR, as revised in the light of fieldwork, formed the basis for the establishment of the statutory RMP in 1994 (RMP; pursuant to Section 12 of the National Monuments (Amendment) Act, 1994; see Appendix 15.1). The RMP records known upstanding archaeological monuments, their original location (in cases of destroyed monuments) and the position of possible sites identified as cropmarks on vertical aerial photographs. The information held in the RMP files is read in conjunction with published constraint maps; ▪ Record of Protected Structures (RPS) and Architectural Conservation Areas (ACAs); ▪ The topographical files of the National Museum of Ireland; ▪ Archaeological Inventory of County Monaghan, 1986; ▪ Cartographical sources, including the Down Survey barony and parish maps c. 1656, and various editions of the OS Maps; ▪ Griffith’s Valuation, 1853; ▪ Excavations Bulletins and Excavations Database (1970-2025); ▪ Monaghan County Development Plan 2025-2031; ▪ National Inventory of Architectural Heritage (NIAH), Building Survey and Garden Survey; ▪ Townland names and toponomy (loganim.ie); ▪ National Folklore Collection (Duchas.ie); ▪ Museums, Collections and Archives database (Heritage Council of Ireland); ▪ Aerial imagery (Google Earth 2001–2025, Bing 2024; OSi 1995, 2000 to 2013); and ▪ Other documentary sources (as listed in the references, Section 15.16). The mapping and data analysis was managed through ArcGIS (geographical information software). Information was structured by the identification of cultural heritage assets, such as the RMP, RPS, NIAH and National Monuments, as point data on the programme. For this project the RMP datasets were obtained from www.archaeology.ie. The National Monuments list was sourced directly from the Department of Housing, Local Government and Heritage (DHLGH) and added as a layer. The NIAH dataset was also obtained from www.archaeology.ie and was cross-referenced with the Record of Protected Structures in the County Development Plan. The Geographical Information System (GIS) for the project formed a permanent renewable database to provide information for the EIA process. 15.3.3 Site Surveys / Investigations Site inspections were carried out on 10th July 2024, 10th October 2025 and 8th April 2026, including inspections of the proposed renewable biogas plant site and a windshield survey of the proposed linear gas grid connection. These were carried out in the context of an assessment of the cultural heritage potential of study area, taking cognisance of the potential implications of the development RECEIVED: 28/08/2026 August 2026 | 15-11 on the surviving cultural heritage landscape. It also considered the setting of relevant designated cultural heritage assets in the vicinity. A geophysical survey was undertaken by J.M. Leigh Surveys Ltd between the 17th and 19th September 2024. The survey aimed to identify any geophysical responses that may represent the remains of unknown subsurface archaeology within the application area. The survey comprised a detailed gradiometer survey, conducted under Licence No. 24R0379, issued by the Department of Housing, Local Government and Heritage. The results of the survey are summarised in Section 15.5.1.10, while a full copy of the geophysical survey report is provided in Appendix 15-4 of this EIAR. Archaeological test excavation was carried out within the proposed development site between 30th June to 1st July 2025 under Licence No. 24E01224. The test excavations sought to confirm the archaeological nature of the anomalies identified on the geophysical survey and to confirm their nature and extent, in so far as was possible, within the constraints of the proposed development boundary. A number of additional test trenches were excavated within the proposed development site under Licence No. 26E0370 on 29th June 2026. These trenches extend into areas that did not record any anomalies in the geophysical survey in order to verify the robustness of the results. The results of the testing are summarised in Sections 15.5.1.11 and 15.5.1.12, while a full copy of the reports are provided in Appendices 15-5 and 15-6 of this EIAR. 15.3.4 Study Area (Zone of Influence) 15.3.4.1 Renewable Biogas Plant Site The study area for cultural heritage includes the site of the proposed development and the surrounding area within a radius of 1km (Figure 15.1). Recorded archaeological monuments within 1km can serve as a good indicator of previously unidentified sites of archaeological potential in the area. A 1km radius also allows for the assessment of potential impacts on the setting of cultural heritage assets, e.g. designed landscapes associated with country houses. Professional judgement was used to determine where the study area should be extended to consider archaeological sites / monuments / historic buildings / protected structures that lie beyond its boundaries. This ensures that any potential indirect effects on cultural heritage assets, e.g. potential effect on setting, are assessed. In addition, recorded archaeological monuments and known archaeological sites in the surrounding landscape can serve as a good indicator of the below-ground archaeological potential in the study area. The Zone of Theoretical Visibility (ZVT; Figure 15-2) defined for the proposed development site was consulted to support and supplement the professional judgement applied in defining the study area for cultural heritage. The ZVT demonstrates where visibility is or is not likely to occur and, as a result, as required and where appropriate, the relationship of structures, sites, monuments, and complexes that fall outside the study area were considered and evaluated. The wider landscape was also considered, to provide an archaeological and historical context for the proposed development. RECEIVED: 28/08/2026 August 2026 | 15-12 Figure 15-1 Study area for proposed renewable biogas plant site RECEIVED: 28/08/2026 August 2026 | 15-13 Figure 15-2 Comparative ZVT showing potential visibility of proposed development in a bare ground scenario and with existing screening 15.3.4.2 Linear Gas Grid Connection Given the linear nature of the gas transmission pipeline and that it will be laid within the existing public road corridor, a study area measuring 50m either side of the route was established. This created a 100m assessment corridor along the gas transmission route (Figure 15.3). Given the limited potential for indirect setting effects within the road-dominated environment, this 100m assessment corridor was sufficient to assess built and archaeological heritage sites along or immediately adjacent to the existing road and to allow for potential subsurface archaeological features that may extend closer or into the road. Professional judgement was used to determine where the study area should be extended to consider archaeological sites / monuments or historic structures that lie beyond its RECEIVED: 28/08/2026 August 2026 | 15-14 boundaries. As required and where appropriate, the relationship of structures, sites, monuments, and complexes that fall outside this study area is considered and evaluated. Figure 15-3 Study area for proposed linear gas grid connection RECEIVED: 28/08/2026 August 2026 | 15-15 15.3.5 Consultation Consultation with the National Monument Service (NMS) was carried out in October 2025, following submission of the Phase 1 archaeological testing report (Licence No. 24E01224) for review, to provide an outline of the proposed mitigation and the approach for visual impact assessment. Consultation with NMS took place on 20 March 2026 to agree an appropriate strategy for further archaeological testing within the proposed development site (Phase 2, Licence No. 26E0370). The setting of the hilltop enclosure (RMP MO022-008) was also discussed during this consultation. 15.3.6 Impact Assessment Methodology Cultural heritage sites / landscapes are considered to be a non-renewable resource and cultural heritage material assets are generally considered to be location sensitive. In this context, any change to their environment, such as construction activity and ground disturbance works, could adversely affect these sites. The likely significance of all impacts is determined in consideration of the magnitude of the impact and the baseline rating upon which the impact has an effect (i.e. the importance (sensitivity or value) of the cultural heritage asset). Having assessed the magnitude of impact with respect to the importance of the asset, the overall significance of the impact is then classified as imperceptible, not significant, slight, moderate, significant, very significant or profound, as per the EPA guidelines. A glossary of impact assessment terms, including the criteria for the assessment of impact significance, is contained in Appendix 15.3 in Volume III of this EIAR. In accordance with the TII guidelines (2024), the criteria used to evaluate the importance of an archaeological site, monument or complex are as follows: existing status (level of protection), condition or preservation, documentation or historical significance, group value, rarity, visibility in the landscape, fragility or vulnerability, and amenity value. The cultural heritage environment is assigned a baseline rating, taking into account the importance, value and / or sensitivity of the receiving environment (cf. Appendix 15.3). Architectural heritage sites include structures listed in the RPS, which have statutory protection. They also include structures listed in the NIAH Building Survey, demesne landscapes and historic gardens listed in the NIAH Garden Survey, and undesignated, newly identified sites such as examples of vernacular architecture (e.g. a dry-stone wall or upstanding structure depicted on the first edition OS six-inch map). In this assessment, each building or structure that is considered is assigned a rating in accordance with the NIAH system, or is stated to be not of special architectural interest (cf. Appendix 15.3). Impacts on the setting of heritage assets describe how the presence of a development changes the surroundings of a cultural heritage asset in such a way that it affects (positively or negatively) the heritage significance of that asset. Visual impacts are most commonly encountered but other environmental factors such as noise, light or air quality can be relevant in some cases. Such impacts may be encountered at all stages in the life cycle of a development from construction to decommissioning but they are only likely to be considered significant during the prolonged operational life of a development. RECEIVED: 28/08/2026 August 2026 | 15-16 15.3.6.1 Construction Phase Impacts on cultural heritage assets during construction can include, for example, the following: ▪ The removal or part removal of a cultural heritage asset due to construction activities; ▪ Ground disturbance and excavation, caused by construction activities, which may lead to the damage, destruction or removal of recorded or previously unknown (newly revealed) cultural heritage assets; and ▪ The degradation of the setting and amenity of a monument or the severance / fragmentation of interrelated features. 15.3.6.2 Operational Phase Impacts on cultural heritage assets during the operational phase can include for example: ▪ Maintenance works, though the impact risk to recorded or previously identified cultural heritage assets is considered to be low; ▪ A change that negatively impacts on a sense of place (i.e. detracts from the setting of historic features) and that cannot be mitigated has the potential to be considered a significant or profound impact throughout the operational life of the proposed development; ▪ Potential visual impacts on cultural heritage features due to a change in the character of the receiving historic environment. This change may have a positive or negative affect on the heritage asset; ▪ Potential vibration impacts may occur as a result of vehicles in close proximity to or above cultural heritage assets, such as upstanding historic monuments / buildings. 15.4 Difficulties Encountered No difficulties were encountered in the course of this assessment. 15.5 Baseline Environment The archaeological and historical background and cultural heritage context presented in Sections 15.6.1 to 15.6.8 and is relevant to the proposed development as a whole, unless otherwise stated. In these sections, where necessary, reference to each of the two core elements of the proposed development (i.e. the renewable biogas plant site or the linear gas grid connection) will be clearly signposted, in the text or through the use of headings. 15.5.1 Cultural Heritage Context 15.5.1.1 Archaeological and Historical Background The history and archaeology of County Monaghan are bound up in the county’s environmental legacy, with its drumlin hills, impeded drainage and lake lands. The political boundaries of the Gaelic territories of south Ulster with the midland regions of Ireland coincide remarkably with the serried ranks of drumlins, separated by scrubland and wet bottom lands, which made movement by military groups particularly difficult (Duffy 1995). The whole region presented a great challenge, not only to RECEIVED: 28/08/2026 August 2026 | 15-17 the Anglo-Norman government in Dublin, but also to local Gaelic and Anglo-Norman lords attempting to consolidate their agriculturally poor territories. 15.5.1.1.1 Prehistory (c. 7000 BC – AD 400) Evidence for known prehistoric activity surrounding the proposed development site is sparse, with very few sites or finds being noted in this area. The closest site of potential prehistoric origin is the hilltop enclosure (RMP MO022-008) located c. 185m to the south-west of the proposed renewable biogas plant site, in Maghernakelly townland. The monument is an embanked enclosure, measuring 107m by 69m. Its position on a hilltop, at an elevation of 400m OD is typical of some Irish hillforts, but the absence of any other distinguishing characteristics means that a broader classification of ‘hilltop enclosure’ is applied. Many small hillforts, particularly those under 1ha in size (as in this case) and known as ‘hill-top enclosures’, are difficult to distinguish from early medieval ringforts, some of which occur in similar landscape settings (O’Brien 2017) (e.g. in Monaghan’s drumlin landscape). Prehistoric hilltop enclosures can range in date from the Neolithic period (c.4000–2500 BC) to the Iron Age (c. 500BC to c. 400AD), though evidence from excavated examples now indicates that many were constructed during the middle / late Bronze Age (c.1600–500 BC). There is also a stone row (RMP MO017-068) known as the ‘Grey Stones’ which located c. 900m north of the proposed renewable biogas plant site, in Drumgole townland. The site is situated on a north- east facing slope on the summit of a drumlin ridge that runs along an east/north-east to west/south- west orientation. A fourth stone, standing 5m to the south of the row also follows the same orientation as the other stones. While dating this type of monument without archaeological excavation can be extremely difficult, sites such as this are typically considered to be prehistoric in date, commonly dating to the Bronze Age. Their function is most likely to have been utilitarian, as an astronomical tool to mark seasonal changes for farming practices, or as a route or territorial boundary (Ó Súilleabháin et al. 2018). More concrete evidence for prehistoric activity exists in the wider landscape, for example a megalithic court tomb (RMP MO018-043) in Edergole townland, c. 4.2km north-east of the proposed renewable biogas plant site. Court tombs make up around 30% of the classified megalithic tombs identified in Ireland and are defined by the presence of an uncovered court which is generally situated at the broader end of a long trapezoidal cairn that is defined by megalithic kerbstones in front of a covered burial gallery. These sites have a distinctive distribution pattern and are more commonly found in the northern third of the island (O’Sullivan and Downey 2019). Court tombs typically date to the very early part of the Neolithic period, c. 3700-3570 BC, although some examples may also have been reused in the Chalcolithic / Early Bronze Age (Schulting et al. 2012). The example from Edergole (RMP MO018- 043) is located at the bottom of the west facing slope of a knoll on the crest of a drumlin ridge running east-west. It has since been incorporated into the northern bank of a road (L6330), which also runs along the east-west axis of the site. At the east/north-east of the monument, two jambs surmounted by a large lintel provide access to the burial gallery. Later and more substantial prehistoric activity in the wider landscape around the proposed development site is represented by an upstanding section of the Black Pig’s Dyke (RMP MO021-011), the eastern extent of which is c. 10km from the proposed site. The Black Pig’s Dyke comprises around a dozen individual linear earthworks which occur across the width of the north midlands and south RECEIVED: 28/08/2026 August 2026 | 15-18 Ulster, and it is among the most extensive and best preserved examples of this monument type on the island. Folk tradition states that the earthworks were torn into the landscape by a rampaging giant mystical pig, while in the 20th century the earthworks were interpreted as the remains of a formerly unified territorial boundary for Ulster known as ‘the Great Wall of Ulidia’. Today, it is recognised that the interpretation of this monument is much more complex encompassing multiple phases of remodelling and refurbishment, as well as considerable variability between the upstanding sections (Ó Drisceoil and Condit 2015). While linear earthworks such as this may date to the Bronze, the Black Pig’s Dyke mainly dates to the Iron Age (c. 500 BC – AD 500). 15.5.1.1.2 Early Medieval Period (c. AD 400 – 1200) The Early Medieval Period is well-represented in the area around the proposed development site from an archaeological perspective, particularly in relation to settlement evidence. There are a number of ringforts in the wider landscape (RMP MO022-007001; MO022-009; MO023-004; MO023-001; MO018-045; MO017-066; MO017-064; MO022-006). Ringforts are among the most common monuments in Ireland and consist of areas enclosed by an earthen bank formed by material thrown up from the digging of a concentric ditch on its outside. They are usually enclosed by a single bank (univallate) while bivallate or trivallate ringforts (i.e. those enclosed by double or triple rings of banks) are less common. The number of banks and ditches enclosing these monuments is considered to reflect the status of the site, rather than the strengthening of its defences (Stout 1997). Variations include the raised or platform rath type, in which the interior has been artificially raised, often in a number of stages throughout the occupation of the site and ultimately presenting as a flat -topped mound (Edwards 2005). Archaeological excavation has shown that most ringforts functioned as defensible family homesteads, and most were built during the Early Medieval period (5th - 9th century AD). However, some appear to have evidence of Iron Age activity, while others were inhabited as late as the 17th century. They are typically found at slightly higher ground, such as the summits and slopes of small hills and drumlins, affording good views and drainage (Edwards 2005), as is the case in Monaghan’s drumlin landscape. This landscape setting typology may suggest an early medieval date for the hilltop enclosure (RMP MO022-008) in Maghernakelly. Excavation within the interior of ringforts has revealed the remains of circular and rectangular dwelling houses as well as smaller huts probably used to stall animals, with timber forming the principal building material. The enclosing earthworks would also have protected domestic livestock from natural predators such as wolves. Specialist activities appear to have taken place at some of these sites, with a number showing evidence of metalworking. One of the ringfort sites (RMP MO022-007001), located c. 1km south-west of the proposed renewable biogas plant site also appears to be associated with a souterrain (RMP MO022-007002). Souterrains are artificial underground or semi-subterranean passages and chambers built of stone and/or wood, often with entrances within the house, from the farmyard, or from the ditch surrounding the enclosure (O’Sullivan et al. 2014 [2021]). These sites are typically interpreted as having been used for storage, for refuge or both, and recent experimental archaeological research has demonstrated that the conditions within souterrains are suitable for the cold storage of foodstuffs such as dairy (Meharg 2019). The souterrain in Drumanny (RMP MO022-007002) presents as a hollow with a diameter of c. RECEIVED: 28/08/2026 August 2026 | 15-19 5m on the perimeter of the associated ringfort (RMP MO022-007001) and has been interpreted as the site of a collapsed souterrain. There are also a number of lakes in the wider area around the proposed development site which give rise to an additional form of Early Medieval settlement – crannogs (RMP MO023-002; MO022-003; MO017-067; MO022-021). Crannogs (lake settlements) are a distinctively Irish form of settlement enclosure, typically defined as artificial islets of stone, timber and soil enclosed within a wooden palisade, but can also include stone cairns without palisades, deliberately enhanced natural islands and occupation platforms situated along lake shore edges but not necessarily surrounded by water (O’Sullivan et al. 2014 [2021]). Archaeological evidence shows that Irish crannogs can vary widely in morphology and construction and, although typically found in single isolated examples, there are some instances of crannog clusters along lakes and lakeshores which may indicate individual sites within the groups were contemporary but may have had differing roles. These sites often provide evidence for long chronologies of construction, occupation and abandonment, resulting in sites that are considerably built up over time. Crannogs appear to have had a range of functions and their use changed over time. Like their dryland counterpart, the ringfort, the size and complexity of their construction is typically interpreted as a display of social status and power. Some sites appear to have been seasonal or permanent royal residences, while others functioned as ecclesiastical sites such as storage places for holy relics or even hermitages. However, for the most part they are the dwellings of the moderately wealthy, representing more remote and easily defensible counterparts to the ringfort (O’Sullivan et al. 2014 [2021]). 15.5.1.1.3 Late Medieval Period (c. AD 1200 – 1600) Archaeological evidence for activity in the area around the proposed development site during the later medieval period is sparse. The Anglo-Normans invaded Ireland in 1169, taking Dublin a year later. They came under the leadership of Gilbert de Clare, otherwise known as Strongbow. He led the invasion at the request of Dermot McMurrough, the dispossessed king of Leinster. At this time the study area formed part of the kingdom of Airghialla, which was under the control of the O’Carrolls. Attempts by the Anglo-Normans to conquer this area were slow to start. As with elsewhere in the country, the initial penetration was marked by the erection of a series of earthwork castles, such as the motte and bailey in Clones (RMP MO011-008001), c. 20km north-west of the proposed site. As English rule became more solidified in following decades, the barony of Dartree (in which the proposed development site is located), together with the baronies of Cremorne and Farney were part of the grant of Ardee made to Peter Pippard c. 1190 (Otway-Ruthven 1968). By the mid-14th century, the area was under the control of the Gaelic Irish MacMahon family who remained in power there until the end of the 16th century (Ó Dufaigh and Duffy 1999). In 1591 a process of settlement commenced in Monaghan aimed at abolishing landholding under Irish law and eliminating the rule of the MacMahons. As a result of the 1591 settlement, Monaghan was excluded from the later Plantation of Ulster (Duffy 1981). 15.5.1.1.4 Post-Medieval Period (c. AD 1600 – 20th century) There is little archaeological evidence for activity in the study area for much of the post -medieval period. It is not until the 19th century that we have substantial records from the area. In his RECEIVED: 28/08/2026 August 2026 | 15-20 Topographical Dictionary of Ireland, Lewis (1837) describes the parish of Ematris, in which the proposed development is located. He records that the parish is home to 7541 inhabitants and that the soils of the region are comprised of rich shallow loam above deep stiff clay which is very difficult to cultivate. The primary industries of the area are described as weaving linen and agriculture. Lewis (1837) also notes a number of gentlemanly seats within the parish, including the New Park estate, which formerly incorporated the site of the proposed renewable biogas plant. Another nearby estate, Forest View, is depicted in the First Edition six-inch mapping (1834), just over 1km south-west of the proposed development site. The 25-inch Ordnance Survey mapping of the area, produced in 1908, shows the presence of an Orange Hall on the opposite side of the existing L2280 public road, known locally as Drumcall Road, which bounds the proposed renewable biogas plant site to the north. Orange Halls are the meeting places of the Orange Order, an international Protestant fraternal order, best known for its annual celebration of William of Orange’s victory at the Battle of the Boyne in 1690 on the 12th of July. It is unclear when this Orange Hall was built, but it is recorded on both the 25-inch and Last Edition six- inch (1910) mapping for the area. The site inspections carried out as part of this assessment identified the upstanding remains of this structure, however the site is now densely overgrown and the structure is poorly visible from the roadside. As a result, its present condition could not be fully assessed (see also Section 15.5.1.9). Monaghan, Cavan and Donegal are the only counties of Ulster that remained in the Irish Free State, and later the Republic of Ireland, after partition in 1921. In 1911, more than one-fifth of the population in these counties was Protestant (Fitzpatrick 2002), meaning the Orange Halls played an important role in the social, political and religious life of this segment of the population. In 1921, 57 halls were known in Monaghan and by 1965, although the numbers had declined 40 remained with an estimated 700 members (Fitzpatrick 2002). Following partition, Orange demonstrations continued to be held across Monaghan, Donegal and Cavan, although this came to an end in Monaghan in 1931. Information about a planned armed interference with the annual Monaghan Orange parade by local Republicans put an end to county demonstrations, but smaller parades from the Orange Halls to the local church were planned. By the middle of the 20th century, most southern Orange members attended the demonstrations in Northern Ireland rather than host their own, as continues to be the case today (Walker 2012). The presence of an Orange House in the area of the proposed development is an important aspect of this cultural heritage and is of local historical interest. 15.5.1.2 Cartographic Analysis 15.5.1.2.1 Down Survey (c. 1654-56) The Down Survey of 1656-58 was, at the time, the most detailed cartographic survey in the world, undertaken in order to measure the land forfeited from the Catholic population to be redistributed amongst merchant adventurers and loyal English soldiers. The ‘Barony Map of Dartry (Dartree)’ shows the lands in and around Maghernakelly townland (Figure 15-4). The land is recorded as comprising 23 plantation acres of unprofitable land and 61 plantation acres of profitable land, all of which was forfeited. The unprofitable land appears to largely consist of ‘bogg (bog) common’ in the northeast of the townland. This is part of a larger stretch of bog that runs along a north-east/south-west axis to the north of the townland. RECEIVED: 28/08/2026 August 2026 | 15-21 The Down Survey also records the contemporary land ownership of each parcel of land mapped. In 1641, the townland was in the ownership of a Protestant named Thomas Burnett who also appears to have owned a total of 30 townlands within the barony of Dartree. By 1670 the land had changed hands and Maghernakelly is recorded as being in the ownership of a Protestant named Richard Dawson. Dawson is also recorded as having owned 22 townlands in Dartree barony and 2 townlands in the barony of Cremorne. Figure 15-4 Excerpt of the Down Survey map showing the approximate location of the proposed Renewable Biogas Plant 15.5.1.2.2 Ordnance Survey Mapping (19th / early 20th century) The first edition Ordnance Survey (OS) six-inch map of 1834 provides the earliest complete and accurate survey of the study area. On this map, the proposed renewable biogas plant site forms part of the northern extent of the New Park estate (Figure 15-5). New Park House, outbuildings and gardens, which at this time was occupied by Dacre Hamilton (Lewis 1837), are depicted to the south of the proposed renewable biogas plant site. The recorded hilltop enclosure (RMP MO022-008) to the south-west is depicted as an embanked enclosure, labelled ‘fort’, with farm outbuildings built into the bank on its southern side. No features are depicted or otherwise indicated at the site of the stone row (RMP MO017-068) in Drumgole townland (image not shown). The road layout in the area around the proposed site in the early 19th century is consistent with the modern layout shown in later aerial and satellite imagery (Section 15.5.1.3). RECEIVED: 28/08/2026 August 2026 | 15-22 The proposed site encompasses parts of three fields, as depicted on the 1834 map edition, at the rear of the New Park estate. This was a relatively small estate associated with New Park house, a middle- sized house, with a range of outbuildings forming a courtyard to the east and north. To the south of the house an area of parkland is depicted containing specimen trees and an observatory, with an carriageway curving from an estate entrance and lodge to the north-west, to the front of the house. A secondary entrance from the east provided access into a yard at the side of the courtyard buildings. The fields in which the site is located are to the north of the house and at the time of this map edition, were separated from it by the courtyard buildings and a semi-circular copse of trees. A walled kitchen garden with fruit trees is shown to the east of the tree copse. The positioning of these elements indicates a separation (and screening) between the working part of the estate and the areas designed for show or for leisure, and it is likely that the fields to the north were in agricultural use, as they are today. A small building is depicted at the roadside within the northernmost field, within the proposed development site. The northern boundary of the estate (and the proposed site) coincides with the townland boundary, which at this time is marked by a road (the present L6330 road). The south-west and north-west boundaries of the estate (and the proposed site) were also delineated by public roads, as they are still. Along the proposed linear gas grid connection, the first edition OS six-inch map (Figure 15-6) recorded ringfort (RMP MO022-009) is depicted as a sub-circular area planted with coniferous trees to the west of the existing R189 public road. Further south along the potential gas grid connection, a brick field is marked to the east of the R189 public road. As the proposed linear gas grid connection passes along the R188, it follows the boundary of what was then known as the Dawson Grove demesne (NIAH Garden Survey Ref. 1218). Finally, the proposed linear gas grid connection terminates at a former estate labelled as Dromore Lodge on the historic map. RECEIVED: 28/08/2026 August 2026 | 15-23 Figure 15-5 Excerpt of the First Edition six-inch OS map showing the location of the proposed renewable biogas plant site RECEIVED: 28/08/2026 August 2026 | 15-24 Figure 15-6 Excerpt of the OS six-inch historic map showing the approximate location of the proposed linear gas grid connection, with relevant features highlighted and detail in insets RECEIVED: 28/08/2026 August 2026 | 15-25 The Ordnance Survey 25-inch maps were produced from the 1890s and into the early 20th century at a scale of 25-inches-to-a-mile. The enhanced resolution of these maps can often provide more detail about an area. The 25-inch maps for the present study area were produced in 1908 (Figure 15-7). There has been little change overall in the c. 70 years since the area was last surveyed, although the biggest development has been the considerable subdivision of land within the proposed site and in the wider landscape around it which has resulted in a greater number of individual fields that are depicted. The land within the proposed renewable biogas plant site had been subdivided to create five fields. New Park House remains as previously shown. The specimen trees and observatory had been removed from the former parkland, thus it is possible that it had been given over to grazing, with additional tree-plantation to the front (south of the house). The former kitchen garden layout within the walled garden appears is no longer shown and trees have been removed from its outer boundaries. An Orange Hall is now depicted to the north of the proposed renewable biogas plan site. The road network shown has not changed significantly since the previous edition of the mapping. The small roadside building at the northern boundary of the estate is no longer depicted. Along the proposed linear gas grid connection (Figure 15-8), the trees on the ringfort (RMP MO022- 009) appear to have been cleared and the enclosing ditch and bank are more clearly depicted. The brick field is no longer shown but a bridge, labelled Laganeers Bridge, is shown further south along what is now the R188 public road. The Last Edition of the six-inch OS mapping for the study area was produced in 1910, only two years after the 25-inch mapping and very little changed in the area during this time. As a result, this edition of the OS mapping is not shown here. RECEIVED: 28/08/2026 August 2026 | 15-26 Figure 15-7 Excerpt of the OS 25-inch historic map showing the approximate location of the proposed renewable biogas plant site RECEIVED: 28/08/2026 August 2026 | 15-27 Figure 15-8 Excerpt of the OS 25-inch historic map showing the approximate location of the proposed linear gas grid connection, with relevant features highlighted RECEIVED: 28/08/2026 August 2026 | 15-28 15.5.1.3 Aerial Imagery The proposed development is shown in OS aerial imagery produced in 1995 (Figure 15-9). The general layout of the study area has not changed significantly, with the road networks visible generally reflecting those shown in the historical OS mapping. New Park House and its formal garden layout survive to the south of the proposed development site and the hilltop enclosure (RMP MO022-008) can also be seen to the south-west. The Orange Hall also appears to be present to the north of the proposed site, though the location is largely obscured by tree-cover / vegetation, while the imagery in general tends to reflect the rural nature of the area. Within the proposed development site itself, the field layout and boundaries have changed slightly compared to those shown in the earlier historical mapping, with fewer individual fields visible. There is no evidence in this aerial imagery of the estate planting that was formerly shown in the First Edition six-inch OS map of the area. Figure 15-9 Aerial imagery (OSi 1995) of the proposed development site More recent satellite imagery from April 2024 shows there has been very little subsequent change in the study area (Figure 15-10). The road network is unchanged, and the wider landscape continues to reflect the rural nature of the area. Field boundaries within the proposed development site have, however, continued to change with the proposed renewable biogas plant site now occupying parts of two fields where the internal field boundary consists of a line of trees. RECEIVED: 28/08/2026 August 2026 | 15-29 Figure 15-10 Satellite imagery (Google Earth Pro 2024) of the proposed site 15.5.1.4 Topographical Files of the National Museum of Ireland The National Museum of Ireland Finds Database (2010) does not record any stray finds within the proposed development site or within the study area. 15.5.1.5 Previous Archaeological Investigations There have been no previous archaeological investigations within the proposed development. Indeed, there has been very little previous archaeological investigation in the study area also. This is likely a reflection of the rural nature of the proposed development site and the scarcity of development-led archaeological investigations. RECEIVED: 28/08/2026 August 2026 | 15-30 There has been only one previous archaeological investigation within 1km of the proposed biogas renewable energy plant and none within the 100m assessment corridor for the linear gas grid connection. Archaeological test excavations were carried out at a site in Maghernakelly, c. 635m south-west of the proposed renewable biogas plant site, in December 2006 (Licence No. 06E1132; Excavations.ie Ref. 2006:1676; Figure 15-11). The site was located on the grounds of a disused mushroom factory and had been granted planning permission for the construction of two residential properties. The site was also located within the Zone of Notification surrounding a ringfort (RMP MO022-009). A total of seven trenches were excavated; however, no features, deposits or artefacts of archaeological significance were identified at the site. Figure 15-11 Previous archaeological investigations in the vicinity of the proposed development site 15.5.1.6 Placename Evidence Townland names are a rich source of information, not only on the topography, land ownership and land use within the landscape, but also on its history, archaeological monuments and folklore. Where a monument has been forgotten or destroyed, a place name may still refer to it and may indicate the possibility that the remains of certain sites survive below the ground surface. The OS surveyors wrote down townland names in the 1830s and 1840s, when the entire country was mapped for the first time. The mapmakers, soldiers and antiquarians who collected the placenames and local history varied in their interests and abilities. While most placenames were anglicised or translated relatively accurately, some were corrupted virtually beyond recognition. Nonetheless, a variety of placenames – whether RECEIVED: 28/08/2026 August 2026 | 15-31 of Irish, Viking, Anglo-Norman, English, or, in very rare cases, Anglo-Saxon origin – appears throughout Ireland, and the appearance of the different languages is often a good indicator of the cultural heritage, and therefore the archaeological record of the area. Most of the townland names in the area are of Gaelic Irish origin (Table 15.1). This is perhaps unsurprising given that the county of Monaghan was predominantly under Gaelic-Irish control until the Cromwellian Conquest of the mid-17th century. The townland names of the area also typically refer to the topography of the local landscape. For example, the proposed development site is located within Maghernakelly townland, whose Irish name, Machaire na Coille, refers to the “plain of the wood”. Similarly, the Irish placename for Dernamoyle, to the east of the proposed development site, is Doire na Maoile, “oakwood of the bald”, also referencing a wooded area. Of the remaining townlands that are found within the study area, the Irish placenames of three townland begin with Droim -, which refers to a ridge, reflecting the drumlin landscape of the wider area around the site. There are two townland names with English origins, Dawson Grove Demesne and Freame Mount Demesne, both of which derive their placenames from the landowners in that area. Table 15.1 Placenames within the study area Townland Parish Barony Origin Irish name and origin / meaning Dawson Grove Demesne Ematris Dartree English Garrán an Dásanaigh Dernamoyle Ematris Dartree Irish Doire na Maoile, “oakwood of the bald” Dromore West Ematris Dartree Irish An Droim Mór Thiar, “the big ridge” Drumanny Ematris Dartree Irish Droim Eanaigh, “the marsh of the ridge” Drumcall Ematris Dartree Irish Droim Chathail, “Cahill’s ridge” Drumgarkin Ematris Dartree Irish Droim Dhearcan, ‘Dearcan’s ridge’ Drumgole Ematris Dartree Irish Droim Gabhla, “ridge over the forked streams” Dyan Ematris Dartree Irish An Daingean, “the fortress” Freame Mount Demesne Ematris Dartree English Diméin an Daingin Maghernakelly Ematris Dartree Irish Machaire na Coille, “plain of the wood” Tattygare Ematris Dartree Irish An Táite Gearr, “the short tate” (a tate is a land measure of 60 Irish acres) 15.5.1.7 Townland Boundaries The boundaries were described and recorded in the great surveys following the land confiscations of the mid-17th century and were further standardised in the mid-19th century with the work of the Ordnance Survey. Townland boundaries were often laid out along natural features including rivers, streams and high ground or manmade features such as roads and walls. Townlands and other landholdings were further subdivided into individual fields generally by means of earthen banks, which over time were colonised by hedgerow and trees. The typology of the RECEIVED: 28/08/2026 August 2026 | 15-32 boundaries can vary in different parts of the country, with some areas favouring distinctive high, wide earthen banks or just stone walling; sometimes there is a combination of earth and stone, with a stone-revetment or a facing on an earthen bank. The north/north-western boundary of the proposed biogas plant site coincides with the Magheranakelly-Drumcall townland boundary, which is formed by the existing L2280 public road where it borders the proposed development (Figure 15-12). Figure 15-12 Townland boundaries within and around proposed development site 15.5.1.8 Folklore The National Folklore Collection (www.duchas.ie) database has no records relating to the study area. 15.5.1.9 Results of Site Inspection Site inspections were carried out on 10th July 2024, 10th October 2025 and 8th April 2026, including inspections of the proposed renewable biogas plant site, a windshield survey of the proposed linear gas grid connection. The purpose of the field inspection was to provide an understanding of the topography and land use within the proposed development site and to assess its setting and condition in relation to existing archaeological, architectural and cultural heritage features. Known designated sites or features of cultural heritage interest identified in the desktop assessment, were inspected where accessible, and their settings and any prominent views were considered. This included inspections of the recorded hilltop enclosure (RMP MP022-008) and stone row (RMP MO017-068); a visual impact assessment of both monuments is provided in Section 15.5.2.1.3. 15.5.1.9.1 Renewable Biogas Plant Site The proposed renewable biogas plant site comprises two pasture fields (Figure 15-13). Field 1 is a large, irregularly shaped field under pasture. The site is accessed from the south/south-west by a RECEIVED: 28/08/2026 August 2026 | 15-33 private farming track (Plate 15.1) and a second entrance is present to the north of the field, providing access from the adjacent public road (L2280). The proposed south/south-east boundary for the development is c. 35m from the existing tree line to the south. This tree-line marks the edge of a semi- circular tree-copse that once occupied the area to the rear of the courtyard buildings at New Park House (as depicted on the historic mapping (Section 15.5.1.2.2); New Park House and its setting are described further below). Mature trees and hedgerow form the boundary of Field 1 to the east, while in the north-east, north/north-west and west the boundary consists of mature trees and hedgerows adjacent to public roads (R189, L2280 and L22802 respectively; Plate 15.2). The ground surface is steeply undulating and slopes downwards towards the north (Plate 15.3). Overhead cables are present within the field, roughly bisecting area. New Park House is not visible from this field, being screened by the topography, modern farm buildings and mature trees. Figure 15-13 Fields assessed during site inspection of proposed biogas plant site, showing cultural heritage receptors in its vicinity RECEIVED: 28/08/2026 August 2026 | 15-34 Plate 15-1 Farm track providing access to fields inspected, facing east/north-east Plate 15-2 View of Field 1, facing north Plate 15-3 View of Field 1, facing south, towards New Park House RECEIVED: 28/08/2026 August 2026 | 15-35 The recorded hilltop enclosure (RMP MO022-008) is closest in Field 1, c. 185m south-west of the proposed development site’s western boundary. It is visible from within the field, delineated by the mature trees along its banks (Plate 15.4 & 15.5). Sites such as these are located at prominent high points within the landscape and are designed to take in good views of their surrounds. The recorded monument is described further in Section 15.5.2.1.3, which also discusses the recorded stone row. Plate 15-4 View of hilltop enclosure from Field 1, facing west/south-west Plate 15-5 Southern edge of hilltop enclosure showing scarp and tree-lined bank, facing west RECEIVED: 28/08/2026 August 2026 | 15-36 To the north of Field 1, on the opposite side of the L2280 public road, stand the remains of the Orange Hall (BH1), which is depicted in the historic mapping (Sections 15.5.1.2). The site has been almost completely obscured by vegetation, including trees, but the structure does appear to be upstanding (Plate 15.5). Only the corrugated metal roof is visible from the roadside, and the site appears to have been abandoned. The condition of the structure could not be determined from the roadside due to the extensive vegetation cover. Plate 15-6 View of Orange Hall obscured by vegetation, facing north Field 2 is a mid-sized, triangular field under pasture. The site is bounded to the south by hedgerow and to the north/north-east and west by mature trees and hedgerow (Plate 15.6). To the north/north- east the exterior of the field boundary is formed by a public road (R189), where the hedgerow has been recently cut/is well maintained. To the east, the hedgerow tends to be more scrubby. The ground surface has a more gradual slope than in Field 1, which falls more steeply downward towards the north/north-east and the R189 road (Plate 15.7). The field is nestled amongst the undulating drumlin landscape that surrounds it. Plate 15-7 View of Field 2, facing north/north-east RECEIVED: 28/08/2026 August 2026 | 15-37 Plate 15-8 View of Field 2, facing east 15.5.1.9.1.1 Former New Park Estate Both Fields 1 and 2 are part of the former New Park estate, as included in the NIAH Garden Survey (NIAH Garden Survey Ref. 1211) and depicted on the First Edition six-inch Ordnance Survey historical mapping (1834). The 18/19th century New Park house (BH2; Plate 15.8) is situated at a slightly lower elevation than the nearby hilltop enclosure (RMP MO022-008). It is oriented to take in the views to the south/south-east. An older courtyard and outbuildings, along with more recent farm buildings, situated to the rear and side of the house, provide a buffer between the house and the proposed development site. This, along with the mature tree boundaries, provides effective screening for the house, which faces away from the proposed development site to the south/south-east. The designed vista for house in this direction is an area shown on the 1834 OS map as parkland, with specimen trees and an observatory, though the latter are not depicted on the later edition OS maps. The former parkland survives only as a large pasture field, sloping down from the house, with some trees along its boundaries. The views from this aspect take in the landscape beyond. Some of the boundaries to the rear (north / north-east) of the house are part of the estate planting depicted on the 1834 OS map. This includes a curving line of trees on the south side of Field 1, at the rear of the modern farmyard (the remaining boundary of a former small, wooded area). On the south side of Field 2 (outside the proposed development site), there is also a small triangular field which is bounded by deep ditches and a high bank planted with trees. This was once a small field, perhaps a paddock, immediately adjacent to the walled garden. The latter is no longer present. The topography of Fields 1 and 2, in addition to the presence of the existing modern farming complex at a slightly elevated point, combine to assist with the screening of the site in relation to the 18th / 19th century house. RECEIVED: 28/08/2026 August 2026 | 15-38 Plate 15-9 New Park House, facing west Plate 15-10 Former parkland to the front (south) of New Park House RECEIVED: 28/08/2026 August 2026 | 15-39 Plate 15-11 View eastwards showing the complex of modern and historic farm buildings and mature trees to the side and rear of New Park House Plate 15-12 View eastwards towards New Park House. Proposed development site, Field 1, can be seen sloping down to the north and the former parkland to the front of the house sloping to the south. RECEIVED: 28/08/2026 August 2026 | 15-40 Plate 15-13 View towards New Park House (roofline visible) from within the modern farm yard, facing south-east 15.5.1.9.2 Linear Gas Grid Connection A windshield survey of the proposed linear gas grid connection route was also carried out on 10th October 2025. The proposed route follows the footprint of the existing R188 and R189 public roads. The public roads are typically bounded on either side by mature trees and hedgerow. As described above in Section 15.5.1.2, the R188 public road traverses a bridge known as ‘Laganeers Bridge’ (BH3). The low parapet walls are of coursed random-range dressed-faced ashlar construction, with dressed quarry-faced ashlar with margin draft capstone coping. The road is quite narrow at this point and it was not possible to stop to get a photograph, but Google StreetView provides good coverage of the area (Figure 15.13). The current condition of the bridge structure is consistent with that shown in the Google StreetView imagery. On the day of the windshield survey, the Dromore river was swollen and the adjacent field to the south-west was also flooded. RECEIVED: 28/08/2026 August 2026 | 15-41 Figure 15-14 Google StreetView imagery of Laganeers Bridge, facing west The proposed route also passes alongside the protected Dartrey Estate Wall (RPS No.: 414; NIAH Ref. 41402226) which fronts onto the existing R188 public road. The condition of the wall is quite good in places (Plate 15.15), while elsewhere some portions have been lowered or even demolished. The entrance gateway (NIAH Ref. 41402216) recorded by the NIAH (see Figure 15.15) is also located adjacent to the existing R188. Its condition has changed since it was recorded by the NIAH in 2012, with elements of the flanking walls (to the north) having been damaged and one of the gates and gate piers removed (Figure 15.16). No other features of cultural heritage interest were identified as part of the windshield survey. RECEIVED: 28/08/2026 August 2026 | 15-42 Plate 15-14 View of protected Dartrey estate wall (RPS No.: 414; NIAH Ref. 41402226), facing east Figure 15-15 NIAH record photograph of Dartrey Estate entrance gateway (NIAH Ref. 41402216) RECEIVED: 28/08/2026 August 2026 | 15-43 Figure 15-16 Google StreetView imagery of Dartrey Estate entrance gateway (NIAH Ref. 41402216), facing south 15.5.1.10 Results of Geophysical Survey (Licence No. 24R0379) A detailed gradiometer survey was carried out within the proposed renewable biogas plant site between 17th-19th September 2024 (Licence No. 24R0379; Leigh 2024; Figure 15-17). The full report is provided in Appendix 15-4 of this EIAR. The survey area for the renewable biogas plant site included both fields within the proposed plant site: Area A to the west and Area B to the east. The main aim of the survey was to identify any geophysical responses that may represent the remains of unknown archaeology within the application area. Two adjacent areas of potential archaeological interest were identified in Area A (1 and 2 on Figure 15-17). The areas comprise isolated responses within areas of increased magnetic response. These were interpreted as reflecting either recent activity or archaeological pits comprising of burnt material or archaeological burnt spreads. A faint linear trend (3 on Figure 15-17) runs through Area A and most likely representing a former field division. Along this there are two isolated responses (4 on Figure 15-17) and associated linear trends (5 on Figure 15-17). They form a vague rectilinear pattern, and it was possible that plough damaged RECEIVED: 28/08/2026 August 2026 | 15-44 archaeological remains are represented here. However, it was equally likely that they are more recent in origin, perhaps contemporary with the former field division. Archaeological interpretation was tentative. In Area B, two isolated responses (7 on Figure 15-17) were identified immediately adjacent to the existing field boundary. The responses had a magnetic signature indicative of short ditch-type features. However, their proximity to the existing field boundary made interpretation unclear. These may have resulted from more recent activity. Broad responses were evident in Areas A and B (6 and 8 on Figure 15-17). These were interpreted as natural in origin, most likely reflecting variations within the sub-soil. They were not considered to be of archaeological interest. RECEIVED: 28/08/2026 August 2026 | 15-45 Figure 15-17 Summary interpretation of geophysical survey results (after Leigh 2024) RECEIVED: 28/08/2026 August 2026 | 15-46 15.5.1.11 Phase 1 Archaeological Test Excavation (Licence No. 24E1224) Archaeological test excavation was carried out within the proposed renewable biogas plant site between 30th June – 1st July 2025 under Licence No. 24E01224. The test excavation sought to confirm the archaeological nature of the anomalies identified on the geophysical survey and to confirm their nature and extent, in so far as was possible. The testing report was submitted to NMS in compliance with the licensing requirements and is provided in Appendix 15-5 of this EIAR. A total of 9 test trenches were excavated, the majority of which targeted anomalies identified in the geophysical survey (Table 15.2; Figure 15-18). In general, the geophysical survey proved to be reliable. Almost all of the geophysical signals corresponded to subsoil cut features though some variations were identified. A single area of archaeological interest was identified during the course of testing and termed Archaeological Area (AA) 1 (Figure 15-19). It comprised an archetypal burnt mound deposit, F10. Burnt mounds, sometimes also termed fulachta fia, are prehistoric sites that present as charcoal stained soils with frequent heat-affected stone. Burnt mounds developed as heated stone was placed in a water filled pit or trough to heat or boil water for one or a variety of domestic, ritual or industrial purposes. Troughs can sometimes be lined with wood or other material, evidence for structures can survive while mounds of the discarded heated stone and associated charcoal usually build up around the trough. Relatively common sites in Ireland, they were most frequently used during the Bronze Age period (c. 2200 – 800 BC). The burnt mound deposit was truncated by the modern ditch F09 that was recorded on the early OS maps. It revealed that the deposit F10, visible on the surface of the trench as an irregular deposit with angular outlines, also filled a subsoil cut feature. With straight sides and a flattish base, the feature was 0.25m in depth. The surface deposit was recorded for 2.8m north-west/south-east and between 0.5m and 1.4m in width as it extended out of the trench to the north-east. Given the dimensions and morphology, the subsoil cut feature likely represents a trough: a water-filled pit where the heated stone was placed for the burnt mound process. Any associated mound, formed from the discarded heated stone, is likely to have been dispersed by the action of ploughing or other agricultural practices over the millennia. Table 15.2 Details of trenches excavated under Licence No. 24E01224 Trench No. Geophysical Anomaly Dimensions (L x W x D in metres) Comment T01 1 48 x 1.8 x 0.3-0.4 Contains brick making residue F3 in location of geophysical anomaly 1. No archaeology found. T02 2 30 x 1.8 x 0.3-0.4 Contains brick making residue F4 in location of geophysical anomaly 2. No archaeology found. T03 3 21 x 1.8 x 0.25- 0.35 No features in location of curvilinear geophysical anomaly. Contains ditch F5 in location of linear geophysical anomaly 3 (former field boundary). No archaeology found. RECEIVED: 28/08/2026 August 2026 | 15-47 Trench No. Geophysical Anomaly Dimensions (L x W x D in metres) Comment T04 3, 4 30 x 1.8 x 0.3-0.4 Contains ditch F6 in location of geophysical anomaly 3 (former field boundary) & brick making residue F7 in location of rectilinear geophysical anomalies 4. No archaeology found. T05 Not specifically identified in geophysical survey 21 x 1.8 x 0.3-0.45 Contains brick residue F8 in location of geophysical anomaly. T06 5 20 x 1.8 x 0.25- 0.35 Contains ditch F9 (former field boundary) in location of geophysical anomaly 5 & burnt mound deposit & trough F10 in location of geophysical ‘pit’ anomaly. T07 5 20 x 1.8 x 0.3-0.4 Contains ditch F11 (former field boundary, same as ditch F9 in Trench 6) in proximity to geophysical anomaly 5. No archaeology found. T08 6, 7 30 x 1.8 x 0.35-0.5 Contains brick making residue F12 in location of geophysical anomaly 7. No feature for ‘natural’ anomaly 6. No archaeology found. T09 n/a 32 Investigating geophysical ‘blank’ area. No archaeology found. Total 232 linear metres; 417.6 sq. metres RECEIVED: 28/08/2026 August 2026 | 15-48 Figure 15-18 Test trench layout over geophysical survey results (Coen 2024) RECEIVED: 28/08/2026 August 2026 | 15-49 Figure 15-19 Details of Archaeological Area 1 in Trench 6 (Coen 2024)RECEIVED: 28/08/2026 August 2026 | 15-50 15.5.1.12 Phase 2 Archaeological Test Excavation (Licence No. 26E0370) Consultation with National Monuments Service (NMS) (DHLGH) took place on 20 March 2026 to agree an appropriate strategy for further archaeological testing within the proposed development site. Given the type of archaeology encountered in the Phase 1 testing, the potential for the discovery of metal artefacts was deemed to be low, therefore metal-detection was not proposed as part of the method statement for the Phase 2 testing. The method statement was approved by NMS and a licence was issued (Licence No. 26E0370). A number of additional test trenches were excavated within the proposed development site under Licence No. 26E0370, as detailed below. These trenches extend into areas that did not record any anomalies in the geophysical survey in order to verify the robustness of the results. Previously excavated Trench 6 (Licence No. 24E1224; Coen, 2024) was extended in order to reveal the full extent of the burnt mound (Archaeological Area 1, as described in Section 15.5.1.11). The testing report was submitted to NMS in compliance with the licensing requirements and is provided in Appendix 15-6 of this EIAR. 11 test trenches totalling approximately 360 linear metres were excavated across Fields 1 and 2 (Table 15.3; Figure 15-20). The purpose of the programme of archaeological testing was to verify the robustness of the geophysical results and as a result, test trenches T2 – T11 were placed in areas were no archaeological features were identified on the geophysical survey. Previously excavated Trench 6 (Licence No. 24E1224; Coen, 2024) was extended (forming T1) in order to reveal the full extent of the burnt mound (AA1). The area archaeological interest (AA1) was further defined and its extents confirmed. It comprised a spread of burnt mound material (C3) and a possible associated trough (C5), both of which were truncated by a modern linear ditch (C4) (Figure 15-21). The spread is approximately 3m (east – west) by 2.8m (north – south) and was on average 0.10m deep. No additional archaeological features or finds were identified within the proposed development area. Table 15.3 Details of trenches excavated under Licence No. 26E0370 Trench No. Dimensions (L x W x D in metres) Orientation of trench Findings T1 20m x 1.80m x 0.35m East-northeast – West- southwest Remains of a fulacht fia with possible trough T2 30m x 1.80m x 0.25m/0.30m Northeast – Southwest No archaeology found T3 40m x 1.80m x 0.35m Northeast – Southwest No archaeology found T4 50m x 1.80m x 0.30m North – South No archaeology found T5 30m x 1.80m x 0.25m East – West No archaeology found T6 40m x 1.80m x 0.35m North – South No archaeology found T7 30m x 1.80m x 0.30m North - South No archaeology found T8 30m x 1.80m x 0.35m North – South No archaeology found T9 30m x 1.80m x 0.30m North – South No archaeology found RECEIVED: 28/08/2026 August 2026 | 15-51 Trench No. Dimensions (L x W x D in metres) Orientation of trench Findings T10 30m x 1.80m x 0.30m Northeast - Southwest No archaeology found T11 30m x 1.80m x 0.25m Northeast – Southwest No archaeology found RECEIVED: 28/08/2026 August 2026 | 15-52 Figure 15-20 Location of test trenches within proposed development site RECEIVED: 28/08/2026 August 2026 | 15-53 Figure 15-21 Detail of T1 showing archaeological features (Baldwin 2026) 15.5.2 Archaeological Heritage (Designated Assets) 15.5.2.1 Renewable Biogas Plant Site 15.5.2.1.1 National Monuments in State Care or Local Authority Ownership There are no national monuments or sites under Preservation Order located within the proposed renewable biogas plant site or within the 1km study area. 15.5.2.1.2 Recorded monuments (RMP / SMR sites) There are no recorded monuments within the proposed renewable biogas plant site. There are five recorded monuments within 1km of the proposed renewable biogas plant site (Table 15.3; Figure 15-22), representing activity in the landscape from the prehistoric to the early medieval periods. The nearest of these is a large oval hilltop enclosure (RMP MO022-008), situated on top of a drumlin to the south-west of the proposed renewable biogas plant site (Figure 15-23); the enclosing bank is c. 185m from the proposed development at its closest point. The enclosure is depicted on the first edition six-inch OS map (1834) as an embanked enclosure and survives above ground, measuring 107m by 69m. Whether this is a prehistoric hilltop enclosure or an example of a large early medieval ringfort is undetermined. A visual impact assessment of the monument is provided in Section 15.5.2.1.3. RECEIVED: 28/08/2026 August 2026 | 15-54 Another indicator of prehistoric (possibly Bronze Age) activity is the stone row recorded c. 900m to the north (RMP MO017-068) (Figure 15-22). This is the only recorded monument within the study area that is located roughly north/north-east of the proposed renewable biogas plant site, therefore, theoretically within sight of the hilltop enclosure with the potential for an interrupted view. As such, it is included in the visual impact assessment in Section 15.5.2.1.3. There are also two upstanding ringforts are located c. 1km south and south-west of the proposed development (RMP MO022-009 & MO022-007001), one of which has an associated souterrain (RMP MO022-007002). These and other relevant archaeological sites in the wider landscape are discussed in the context of the archaeological and historical background. Table 15.4 Recorded monuments within 1km of proposed renewable biogas plant site RMP /SMR No. Type Townland ITM E ITM N Distance (from proposed development) MO017-068---- Stone row Drumgole 658853 819100 c. 900m MO022-007001- Ringfort - rath Drumanny 658449 817767 c. 1km MO022-007002- Souterrain Drumanny 658465 817783 c. 1km MO022-008---- Hilltop enclosure Maghernakelly 658783 818147 c. 185m MO022-009---- Ringfort – rath Maghernakelly 659198 817720 c. 1km Figure 15-22 Recorded monuments within study area for proposed development site RECEIVED: 28/08/2026 August 2026 | 15-55 Figure 15-23 Recorded hilltop enclosure (MO022-008) as visible on current aerial imagery 15.5.2.1.3 Visual Impact Assessment The proposed biogas plant site has been assessed in order to establish how or if its position affects the wider historic and prehistoric landscape. It should be noted that visual impacts are closely related to impacts on the setting of individual monuments and cultural heritage receptors. In accordance with accepted guidance, setting is not exclusively about the visual envelope, it embraces considerably more than just views, an impact on setting will only occur if the change affects the contribution made by setting to the significance of the asset. For example, views and interrelationships with other monuments in the landscape are an important aspect of historic setting. So, while the level of visual change has been documented as part of this process, this impact assessment strives to assess the effect on the significance of the asset. It is possible to make major changes to setting and have little effect on the significance of the asset because the setting contributes little to that significance. Therefore, impact magnitude is expressed in terms of the degree to which the significance of the asset is increased or decreased. The proposed development site is situated in a drumlin landscape. This topography inherently limits long-distance views and contributes to a more enclosed and constrained visual context, as demonstrated by the ZVT (see Section 15.3.4 and Figure 15-2). The location of the proposed biogas plant at the base of a drumlin ridge also limits its potential visibility in the wider landscape. RECEIVED: 28/08/2026 August 2026 | 15-56 Views from the hilltop enclosure (RMP MO022-008) demonstrate that this is a working agricultural landscape (Plate 15-15 to Plate 15-17). In addition to the small-scale dispersed housing and farm complexes that are visible, there are also existing industrial elements such as the reservoir tanks on a hilltop east of the stone row (RMP MO017-068), a wind farm to the north-west and another to the south/south-east. Based on the results of the site inspection and a review of the photomontages produced, there will be a change to the views from and to the setting of the recorded hilltop enclosure (RMP MO022-008), located c. 185m south-west of the proposed biogas plant site. Hilltop enclosures are deliberately located on local prominences and are typically designed to have 360-degree views of the surrounding landscape. The proposed development will be considerable in scale and will be visible from the monument (Figure 15-25). This visual change will restrict / alter views in one direction, to the north- east of the site only. This will interrupt views in this direction, but it should be noted that this will not interrupt any existing intervisibility with other recorded monuments in the wider landscape around the hilltop enclosure. The potential for intervisibility between the hilltop enclosure (RMP MO022-008) and the stone row (RMP MO017-068) was considered as part of this assessment, with both sites visited and inspected (Figure 15-24). In addition, photomontages were prepared by the Landscape and Visual specialists to inform the assessment of the monuments’ settings. The stone row is located c. 1.5km north-east of the hilltop enclosure (measured from the edge of the enclosure) and comprises four stones, one set out of alignment to the south (Plate 15-18). There are no reciprocal views. The stone row is not visible from the hilltop enclosure, a result of the topography and intervening field boundaries. Similarly, the field boundary south of the stone row currently prevents a view of the hilltop enclosure, despite its prominent position (Plate 15-19). It should also be noted that there is no reason to assume that any such visual connection would have been important in the context of these two monuments in the past. While both may be prehistoric in date (a fact not in evidence), this would not necessarily imply a designed, functional or contemporaneous relationship between the monuments. With regard to the setting of the stone row, the site visit and photomontage demonstrated that the existing field boundary to the south of the stone row, even without summer foliage, will largely obscure the proposed development from view at the stone row (Figure 15-26). Given this, there would be no impact on the setting of the stone row. Visual relationships between recorded monuments in the surrounding landscape would not be interrupted or otherwise affected by the proposed development. RECEIVED: 28/08/2026 August 2026 | 15-57 Figure 15-24 Locations of recorded monuments assessed for visual impact RECEIVED: 28/08/2026 August 2026 | 15-58 Plate 15-15 View north-west from hill-top enclosure Plate 15-16 View south/south-east from hill-top enclosure RECEIVED: 28/08/2026 August 2026 | 15-59 Plate 15-17 View north/north-east from hill-top enclosure towards the stone row Plate 15-18 Stone row, facing north-west RECEIVED: 28/08/2026 August 2026 | 15-60 Plate 15-19 Stone row, facing south towards the proposed development site and hilltop enclosure RECEIVED: 28/08/2026 August 2026 | 15-61 Figure 15-25 Photomontage showing existing view (top) and view of proposed biogas plant to north-east of recorded hilltop enclosure post-mitigation (bottom) RECEIVED: 28/08/2026 August 2026 | 15-62 Figure 15-26 Photomontage showing existing view (top) and view of proposed biogas plant to north-east of recorded stone row post-mitigation (bottom)RECEIVED: 28/08/2026 August 2026 | 15-63 15.5.2.2 Linear Gas Grid Connection 15.5.2.2.1 National Monuments in State Care or Local Authority Ownership There are no national monuments or sites under Preservation Order located within the proposed route. 15.5.2.2.2 Recorded monuments (RMP / SMR sites) The proposed route traverses the Zone of Notification (ZoN) of a recorded ringfort (RMP MO022-009) in Maghernakelly townland (Figure 15.20). The proposed route follows the existing R189 public road at this location. The monument, as depicted on the historic maps, comprises a sub-circular enclosure. The curve in the road to the east (the existing R189) suggests that it was originally routed to avoid the monument. The ringfort was visited as part of the Archaeological Survey of Ireland (ASI) in 1986, and was described as follows: ‘located towards the bottom of a SE-facing slope. This is a circular grass and scrub-covered area (diam. 36m E-W; 34.5m N-S) that slopes down to the S and is defined by an earthen bank (at N: Wth of base 4.7m; int. H 0.8m; ext. H 1.45m) that is largely reduced to an external scarp. There is an outer fosse (at NE: Wth of top 2.5m; Wth of base 1.9m; D 0.3m) W-NE that has been deepened W-N where it has an outer field bank. There are several gaps in the bank but the original entrance is not identified.’ The monument was visited as part of this assessment and viewed from the roadside. The outer fosse and bank along the east side of the ringfort have been removed to create a wider verge (Plate 15-20 and Plate 15-21). Available Google Street View imagery from 2019 (Plate 15-22) and satellite imagery from May 2020 (Plate 15-23) show the monument much as described in 1986, indicating that the work took place sometime between late 2020 and the site visit in 2024. There is no record of associated archaeological investigations and it appears that the work (and partial removal of the monument) was carried out without archaeological supervision. Depending on the depth of the ground disturbance during the works, it is possible that there could be intact remains of the monument surviving below present surface level within the verge. There is also the potential for associated archaeological material to be found within the road carriageway, beneath the existing surface. Archaeological testing (Licence No. 06E1132) to the south of the monument, directly across the road from it, produced no archaeological material. RECEIVED: 28/08/2026 August 2026 | 15-64 Plate 15-20 View of recorded monument facing south-west, showing levelled area where ringfort bank has been removed and roadside fence set back Plate 15-21 View north-east showing levelled area and new roadside fence at recorded monument RECEIVED: 28/08/2026 August 2026 | 15-65 Plate 15-22 Ringfort bank visible immediately inside the road fence (Google Earth Street View 2019), facing south/south-west Plate 15-23 Above left: Recorded monument prior to works, with original roadside boundary (Google Earth 5/2020). Above right: Recorded monument showing current condition, with expanded area of verge along its east side (Google Earth 9/18/2024). RECEIVED: 28/08/2026 August 2026 | 15-66 Figure 15-27 Recorded monuments along proposed linear gas grid connection route RECEIVED: 28/08/2026 August 2026 | 15-67 15.5.3 Architectural Heritage (Designated Assets) 15.5.3.1 Renewable Biogas Plant Site 15.5.3.1.1 Architectural Conservation Areas There are no architectural conservation areas (ACAs) within the proposed renewable biogas plant site or within the 1km study area. 15.5.3.1.2 Protected Structures There are no protected structures within the proposed renewable biogas plant site or within the 1km study area. 15.5.3.1.3 National Inventory of Architectural Heritage The National Inventory of Architectural Heritage (NIAH) does not record any buildings or structures of architectural heritage interest either within the proposed renewable biogas plant site or within the 1km study area. While not designated assets with statutory protection, NIAH sites are included on an inventory (the NIAH) that is used to inform the Record of Protected Structures (RPS) and can result in future additions to the RPS. 15.5.3.1.3.1 New Park House estate The proposed renewable biogas plant site is located within the northern extent of the former New Park estate which is included in the NIAH Garden Survey (NIAH Garden Survey Ref. 1211; Figure 15.21). The site was occupied in the 1830s by Dacre Hamilton and changed hands in the 1850s becoming the home of Thomas Hamilton and valued at £10. The estate would later become the home of the Carleton family in the early 20th century. The Garden Survey record is based on the extent of the site as shown in the First Edition six-inch OS mapping of 1834 (see Figure 15.4). The estate as it appears on the 1834 map is described in Section 15.5.1.2.2. On the map, New Park House can be seen facing onto an area of parkland. Parklands typically contain specimen trees (or groups thereof), dotted throughout, as in this case on the 1830s map, and were generally positioned to the front of a house, offering a vista to be enjoyed from it. As also noted in the NIAH Garden Survey, the parkland is no longer depicted on the revised edition OS six-inch and 25-inch maps post-1834. The specimen trees and an observatory were removed some time in the 19th century between the publication of the 1834 map and the revised edition of 1908. The area to the front (south) of the house remains undeveloped (stock fencing indicates that it is now used for grazing) and retains the same shape as the former parkland. The fields in the estate to the north of the house (where the proposed biogas plant site is located) are not shown as parkland on the historic map (quite often fields at the rear of an estate would be put to agricultural use, much as they are today). The portion of the former grounds on the 1834 OS map, which lies within the proposed biogas plant site, is now in use as agricultural land and no boundary walls, mature trees or other features survive in this area. The boundary remains defined only by virtue of the roads that line the northeast and west perimeters. It is no longer legible as a part of a 19th century estate. The area containing the proposed biogas plant site is not parkland and does not contribute to the setting of the house; it is considered to have negligible significance in the context of the setting of the house. RECEIVED: 28/08/2026 August 2026 | 15-68 Figure 15-28 NIAH sites within study area for the proposed renewable biogas plant site 15.5.3.2 Linear Gas Grid Connection 15.5.3.2.1 Architectural Conservation Areas There are no ACAs within the proposed route or within the 100m assessment corridor. 15.5.3.2.2 Protected Structures There is one protected structure alongside the proposed linear gas grid connection route, the Dartrey Estate Wall (RPS No.: 414; NIAH Ref. 41402226; Figure 15.22). Located along the south-eastern and eastern boundary of the existing R188 public road, the demesne wall marks the extent of the former Dawson Grove and Fairfield Demesne estates which were amalgamated into the Dartrey Demesne in the 19th century. The walls feature coursed rubble stone construction with vertical rubble stone RECEIVED: 28/08/2026 August 2026 | 15-69 copings and were built c. 1800. Some of the walls do not survive, but those that do are typical of Irish estate walls, being of simple design, and considerable height. Figure 15-29 Protected Structures within study area for the proposed linear gas grid connection RECEIVED: 28/08/2026 August 2026 | 15-70 15.5.3.2.3 National Inventory of Architectural Heritage In addition to the Dartrey Estate Wall (RPS No.: 414; NIAH Ref. 41402226), the NIAH records one further structure of architectural heritage interest within the proposed route. This is the entrance gateway (NIAH Ref. 41402216; Figure 15.23) to the former Dartrey House estate. It comprises entrance gates and associated flanking walls that were constructed c. 1860. The gates are decorative cast-iron gates that are hung on square-plan cut limestone piers with recessed corners and carved plinths and capitals. The flanking walls are s-curved red brick in Flemish bond with cut limestone capping and plinth and terminate in matching square-plan piers. The NIAH Garden Survey also records the historic garden / designed landscape of the former Dartrey House estate (NIAH Garden Survey Ref. 1218; Figure 15.23). The estate was situated to the north-west of Dromore and Inner Loughs close to the Monaghan-Cavan county border. It comprised a sprawling demesne of forest and parkland. The estate featured walled gardens and a large complex of associated outbuilding. The associated house, Dartrey House, was demolished in the 1946 and much of the land is now in use as Coillte forest. RECEIVED: 28/08/2026 August 2026 | 15-71 Figure 15-30 NIAH sites within study area for the proposed linear gas grid connection RECEIVED: 28/08/2026 August 2026 | 15-72 15.5.4 Undesignated Cultural Heritage 15.5.4.1 Renewable Biogas Plant Site Two features of cultural heritage interest were identified during the desk-based assessment, an Orange Hall (BH1) and New Park House (BH2). Both features comprise features of local architectural and historic interest. An Orange Hall (BH1) was identified on historic mapping to the north of the proposed renewable biogas plant site. It first appears on the 25-inch OS map published in 1908 (Figure 15.24). It is depicted as a rectangular building surrounded by trees set within a rectangular plot. An Ordnance Survey benchmark is shown at the south-western corner of the structure. The feature was visited during the field inspection and, while now completely overgrown, the structure itself does appear to remain upstanding. It comprises a corrugated metal structure set in an area of dense trees (see Section 15.5.1.9); New Park House (BH2) lies to the south of the proposed development and was also identified on historic mapping. It is first depicted on the First Edition six-inch OS map, published in 1834 (Figure 15.24). The structure is shown within the New Park estate and is oriented to the south/south-east, taking in views of the associated parkland and an observatory (both features now gone). The house is a detached three-bay two-storey farmhouse (see Section 15.5.1.9). It is likely of 18th or 19th century construction and remains in use as a private residence. One further feature of cultural heritage interest was also identified as a result of the archaeological test excavations (Licence No. 24E01224), a burnt mound (AA1; Figure 15.24). With straight sides and a flattish base, the feature was 0.25m in depth. The surface deposit was recorded for 2.8m north- west/south-east and between 0.5m and 1.4m in width as it extended out of the trench to the north- east. Given the dimensions and morphology, the subsoil cut feature likely represents a trough: a water-filled pit where the heated stone was placed for the burnt mound process. RECEIVED: 28/08/2026 August 2026 | 15-73 Figure 15-31 Undesignated cultural heritage within study area for the proposed renewable biogas plant site 15.5.4.2 Linear Gas Grid Connection One feature of cultural heritage interest was identified along the proposed linear gas grid connection route during the desk-based assessment: BH3, a bridge known as ‘Laganeers Bridge’ (Figure 15.25). The Laganeers were a rebel force formed in north-west Ulster during the 1641 Rebellion. The rebellion was a response to the poor economic circumstances of the Ulster Scots and, indeed the native Irish, in the wake of the Ulster Plantation. The Laganeers are remembered as one of the most efficient fighting forces of this war6, although their connection to this part of Monaghan is unclear. The bridge is first named on the 25-inch OS map published in 1908, indicating that the bridge is likely of late 19th- or early 20th century construction. The bridge is considered to be of local cultural heritage and historic interest. 6 https://ulsterhistoricalfoundation.com/the-scots-in-ulster/from-ulster-to-america/plantation RECEIVED: 28/08/2026 August 2026 | 15-74 Figure 15-32 Undesignated cultural heritage sites within study area for the proposed linear gas grid connection RECEIVED: 28/08/2026 August 2026 | 15-75 15.6 The ‘Do Nothing’ Scenario 15.6.1 Renewable Biogas Plant Site Under the ‘Do Nothing’ scenario, no industrial-scale anaerobic digestion (AD) facility would be developed at the proposed renewable biogas plant site. The existing use of the land under pasture and its landscape and visual character would remain largely unchanged. There would be no impact on the below-ground archaeology identified within the site (truncated fulacht fia remains) and no visual impact on the recorded hilltop enclosure (RMP MO022-008). 15.6.2 Linear Gas Grid Connection Under the ‘Do Nothing’ scenario, no proposed linear gas grid connection would be installed along the R188 and R189 public roads. As a result, there would be no ground disturbance along the road corridor and no impact on any potential below-ground archaeological remains that may survive within its footprint at the ZoN for the recorded ringfort (RMP MO022-009). 15.7 Potential Significant Effects 15.7.1 Construction Phase 15.7.1.1 Renewable Biogas Plant Site 15.7.1.1.1 Designated Cultural Heritage Sites There are no designated cultural heritage receptors within the redline boundary of the proposed renewable biogas plant site. The nearest is a recorded monument is a large oval hilltop enclosure (RMP MO022-008), the enclosing bank is c. 185m from the proposed development at its closest point. No direct physical impacts are anticipated based on the current layout of the biogas plant site, but temporary / short-term impacts on the setting and visual amenity of the monument may occur. 15.7.1.1.2 Undesignated Cultural Heritage Sites Geophysical survey (Licence 24R0379) followed by two phases of archaeological testing (Licence 24E01224 & 26E0370) within the redline boundary of the proposed renewable biogas plant site identified only one site of archaeological interest. These were the truncated remains of a probable fulacht fia (AA1). Fulachta fia, sometimes known as burnt mounds, are relatively common prehistoric archaeological sites. Given the fragile and partially truncated nature of the surviving archaeological deposits, and their relatively small scale, this example is assigned a low sensitivity rating. Substantial groundworks will occur during the construction of the proposed development and the magnitude of impact on this archaeological feature is very high. This would result in a significant, negative, permanent impact on the archaeological feature. There are also two undesignated features of cultural heritage interest located in the vicinity of the proposed renewable biogas plant site, an Orange Hall (BH1) and New Park House (BH2). There will be no potential direct impacts on BH1 or BH2. RECEIVED: 28/08/2026 August 2026 | 15-76 15.7.1.2 Linear Gas Grid Connection 15.7.1.2.1 Designated Cultural Heritage Sites The proposed grid connection intersects the ZoN for a recorded ringfort (RMP MO022-009), where the proposed grid follows the public road east of the monument. The monument itself lies outside of the existing road carriageway, though remains of the enclosure may be present subsurface within a widened grass verge. There is a potential for the survival of below-ground associated archaeological remains within this ZoN along the public road. There is precedent for the preservation of archaeological remains to survive beneath road surfaces, despite modern interventions. Groundworks associated with the proposed grid connection would result in a potential impact (direct, negative and permanent) on any archaeological remains that may be present subsurface. The proposed linear gas grid connection, as it follows the footprint of the existing R188 and R189 public road, passes adjacent to the protected Dartrey Estate Wall (RPS 414; NIAH 41402226) and the associated entrance gateway (NIAH 41402216). Given the nature of the works, cable trenching within the public road, there would be no potential impact on these features of architectural heritage merit. 15.7.1.2.2 Undesignated Cultural Heritage Sites The proposed linear gas grid connection traverses an undesignated bridge known as Laganeer’s Bridge (BH3). This is an area that has been previously disturbed, and it is deemed that there is a very limited potential to reveal any buried features of a historic interest and that the impact is negligible. There would be no impact due to nature of the works, as cable trenching would take place within the modern road surface and will not require disturbance to parapet walls. 15.7.2 Operational Phase 15.7.2.1 Renewable Biogas Plant Site 15.7.2.1.1 Archaeological Heritage As described in Section 15.5.2.1.3, there will be a change to the views and setting of the recorded hilltop enclosure (RMP MO022-008). This negative visual change will restrict / alter views in one direction, to the north-east of the monument only. The integrity, understanding or cultural value of the monument will be unaffected, as will its archaeological fabric. The effect of the introduction of the proposed biogas plant site on the setting of the recorded monument from a cultural heritage perspective would be of a medium magnitude, in which there is a noticeable change in the receiving environment in one direction but this change does not alter the integrity of the monument. Taking into account the medium sensitivity of the monument, this is considered to be an overall moderate impact. The construction of the proposed renewable biogas plant will result in a moderate indirect negative impact on the setting and visual amenity of the recorded monument during the operational phase. As described in Section 15.5.2.1.3, the existing field boundary adjacent to the stone row (RMP MO017- 068) in Drumgole, even without summer foliage, will largely obscure the proposed development from view at the stone row. Given this, there will be no impact on the setting of the stone row. RECEIVED: 28/08/2026 August 2026 | 15-77 Stone rows are typically considered to be prehistoric in date, commonly dating to the Bronze Age, and their function is most likely to have been utilitarian, as an astronomical tool to mark seasonal changes for farming practices, or as a route or territorial boundary. This particular monument is an isolated example, it is not located on a hill-top, nor is it a prominent feature in the landscape, being difficult to see from a distance. Any views and vistas to or from the monument are likely to accidental rather than deliberately planned, and as such do not contribute to the significance of the monument and its setting. Should the screening field boundary be removed or denuded, in whole or in part, rendering the proposed development more visible (albeit not entirely), this would represent a visual change. However, taking into account the site type and its setting as described, the potential impact on the stone row would be imperceptible. The assessment demonstrated that there is no currently no intervisibility between the hilltop enclosure and the stone row, due to a combination of the intervening field boundaries and the topography. It should also be noted that there is no reason to assume that any connection would have been important in the context of these two monuments in the past. While both may be prehistoric, there is no evidence indicating a designed, functional or contemporaneous relationship between the monuments. Visual relationships between recorded monuments in the surrounding landscape would not be interrupted or otherwise affected by the proposed development. 15.7.2.1.2 Architectural Heritage The part of the former New Park estate (NIAH Garden Survey 1211) in which the proposed development will be located, is now in use as agricultural land and is no longer legible as a part of a 19th century estate. No boundary walls, mature trees or other landscape design features survive in this area. The estate boundary remains defined only by virtue of the roads that delineate the north-eastern and western perimeters. The proposed development will not be visible from New Park House (BH2), the historic setting of which is focused on the grounds south of the house. The house was oriented to take advantage of the views southwards, which once included an area of parkland (now pasture) directly in front of the house. The area containing the proposed development does not contribute to the significance of the house or its setting, and given the absence of any landscape design features or historic landscape character in this part of the estate, it is considered to have a low sensitivity rating. The magnitude of impact on the former estate would be medium, resulting in a slight direct negative impact on the New Park estate during the operational phase. 15.7.2.1.3 General All other cultural heritage issues will be resolved by mitigation during the pre-construction phase or construction phase, in advance of the operational phase. 15.7.2.2 Linear Gas Grid Connection All cultural heritage issues will be resolved by mitigation during the pre-construction phase or construction phase, in advance of the operational phase. No operational phase impacts were identified for the proposed linear gas grid connection. RECEIVED: 28/08/2026 August 2026 | 15-78 15.7.3 Cumulative Effects 15.7.3.1 Renewable Biogas Plant Site All permitted and proposed developments within 1km have been assessed in conjunction with the proposed development. These include one-off and small-scale residential developments as well as small-scale agricultural / industrial developments. No cumulative impacts have been identified in relation to archaeological, architectural or cultural heritage. 15.7.3.2 Linear Gas Grid Connection All permitted and proposed developments within 50m have been assessed in conjunction with the proposed development. These include one-off and small-scale residential developments as well as small- to large-scale agricultural / industrial developments. No cumulative impacts have been identified in relation to archaeological, architectural or cultural heritage. 15.7.4 Summary The following Table summarises the identified likely significant effects during the construction phase of the proposed development before mitigation measures are applied. Table 15.5 Summary of Construction Phase Likely Significant Effects in the absence of mitigation Aspect Likely Significant Effect Quality Significance Extent Probability Duration Type Biogas Plant AA1, fulacht fia Negative Significant Recommended area of excavation: 100m2 Likely Permanent Direct Gas Grid ZoN of RMP MO022-009, ringfort Potentially Negative Undetermined Within the ZoN Likely Permanent Direct The following Table summarises the identified likely significant effects during the operational phase of the proposed development before mitigation measures are applied. Table 15.6 Summary of Operational Phase Likely Significant Effects in the absence of mitigation Aspect Likely Significant Effect Quality Significance Extent Probability Duration Type Biogas Plant RMP MO022- 008, hilltop enclosure Negative Moderate View to north-east Likely Permanent Indirect RECEIVED: 28/08/2026 August 2026 | 15-79 Aspect Likely Significant Effect Quality Significance Extent Probability Duration Type Biogas Plant New Park House estate Negative Slight 2 fields at the rear of the former estate Likely Permanent Direct Gas Grid None N/A N/A N/A N/A N/A N/A 15.8 Mitigation Measures 15.8.1 Renewable Biogas Plant Site 15.8.1.1 Incorporated Design Mitigation Excess material excavated from within the site will be repurposed as landscaping fill material, which shall afford the possibility of developing screening berms on the southeastern and northwestern portions of the proposed development site. These berms will be subject to a comprehensive suite of planting to further integrate the proposed development within the landscape and minimise visual impact (Figure 15.26). While this will help to screen the proposed development, particularly from the east and south, minimising any visual impact in these directions, it will not be an effective mitigation in relation to the hilltop enclosure (RMP MO022-008). The structures associated with the plant have been designed to echo the style of local agricultural buildings, with colours to assist them to blend into the surrounding landscape and skyline (see Figure 15.19). The field boundary between the Renewable Biogas Plant Site and the hilltop enclosure will be left in place. Although this will not screen the upper sections of the Renewable Biogas Plant structures, along with the berms and structure design, it will assist in minimising the visual distraction of a modern industrial plant in the north-eastern view from the hilltop enclosure (RMP MO022-008). RECEIVED: 28/08/2026 August 2026 | 15-80 Figure 15-33 Landscaping proposed for biogas plant site 15.8.1.2 Construction Phase Mitigation The proposed development layout precludes the preservation in situ of the archaeological remains identified during testing. Given the fragile and partially truncated nature of the surviving archaeological deposits, and their relatively small scale, it is considered an appropriate mitigation that the remains of fulacht fia AA1 will be preserved by record, i.e. subject to full archaeological excavation. While the additional archaeological testing confirmed the extents of the fulacht fia remains, the proposed excavation cutting to resolve this area of archaeological interest will measure approximately 10m x 10m around the known archaeological features to ensure that any additional features that may be present are identified and fully recorded. The archaeological excavation will be carried out in advance of construction (prior to works commencing), under licence to the National Monuments Service (NMS) (Department of Housing, Local Government and Heritage (DHLGH)), subject to their approval of a licence application and method statement. Licences can take up to 4 weeks to procure. 15.8.1.3 Operational Phase Mitigation The potential moderate impact on the setting of the recorded hilltop enclosure (RMP MO022-008) has been addressed as much as is possible through the incorporated design mitigation described in Section 15.8.1.1. Residual impact on this receptor is addressed below. RECEIVED: 28/08/2026 August 2026 | 15-81 While the line of the estate boundaries of this part of the former New Park estate are being retained, the potential slight impact on the former estate cannot otherwise be mitigated. All cultural heritage issues will be resolved by mitigation during the pre-construction phase or construction phase, in advance of the operational phase. As a result, no mitigation is required at operational stage. 15.8.2 Linear Gas Grid Connection As part of the proposed linear gas grid connection intersects the ZoN for a recorded monument (RMP MO022-009, ringfort), a Section 12 notification of works will be required. Under Section 12 of the 1994 amendment of the National Monuments Act, all monuments listed on the 'Record of Monuments and Places' (RMP) are given a minimum level of protection in the form of a requirement to give two months’ notice in writing to the Minister for Housing, Local Government and Heritage of intention to interfere. In this case, a description of the proposed works will have to be forwarded to the Minister in order to demonstrate that the monument in question will remain unaffected by the said works. It is recommended that archaeological monitoring under licence to the NMS (DHLGH) be carried out where groundworks occur within the ZoN for the recorded ringfort (RMP MO022-009). 15.9 Residual Impact Assessment This section assesses potential significant environmental impacts which remain after mitigation measures are implemented. 15.9.1 Construction Phase Following the implementation of the above-stated construction phase mitigation, no significant residual effects are predicted to occur in relation to archaeological heritage. Any archaeological features present that require excavation will thus be permanently removed, in whole or in part from the landscape. However, the archaeological excavation of the sites or parts thereof that lie within the proposed site, will involve full recording of all archaeological features, finds and deposits. The results of the excavations will add to the body of knowledge, resulting in a reduction of the likely effect on the known archaeological site from significant to moderate. 15.9.2 Operational Phase Following the implementation of the incorporated design mitigation, an indirect moderate negative residual impact is predicted to remain on the visual amenity and setting of the recorded hilltop enclosure (RMP MO022-008). The proposed development is considerable in scale and while the associated landscaping and individual structure design have been devised to minimise and soften the appearance of the biogas plant, the construction of the plant will still restrict / alter views to the north- east of the recorded monument during the operational phase. Thus, given the nature of the proposed development, the proposed landscape design would not reduce the impact as assessed, with the predicted residual effect remaining at moderate (an RECEIVED: 28/08/2026 August 2026 | 15-82 acceptable level in EIAR terms). It should be noted that this effect does not represent a loss of, or direct physical impact on, the monument and its principal archaeological characteristics, and the greater part of its wider setting will remain unchanged. The slight negative impact on the New Park estate is predicted to remain for the duration of the operational phase. It should be noted that these setting impacts are reversible and will cease upon decommissioning, should that situation occur. 15.9.3 Cumulative Effects 15.9.3.1 Renewable Biogas Plant No cumulative effects were identified. 15.9.3.2 Gas Grid Connection No cumulative effects were identified. 15.9.4 Summary of Post-mitigation Effects The following Table summarises the identified likely significant residual effects during the construction phase of the proposed development following the application of mitigation measures. Table 15.7 Summary of Construction Phase Effects Post Mitigation Aspect Likely Significant Effect Quality Significance Extent Probability Duration Type Biogas Plant AA1, fulacht fia Negative Moderate Recommended area of excavation: 100m2 Likely Permanent Direct Gas Grid ZoN of RMP MO022-009, ringfort Potentially Negative Undetermined Within the ZoN Likely Permanent Direct The following Table summarises the identified likely residual significant effects during the operational phase of the proposed development post mitigation. Table 15.8 Summary of Operational Phase Effects Post Mitigation Aspect Likely Significant Effect Quality Significance Extent Probability Duration Type Biogas Plant RMP MO022- 008, hilltop enclosure Negative Moderate Views to north-east Likely Permanent Indirect RECEIVED: 28/08/2026 August 2026 | 15-83 Aspect Likely Significant Effect Quality Significance Extent Probability Duration Type Biogas Plant New Park House estate Negative Slight 2 fields at the rear of the former estate Likely Permanent Direct Gas Grid None N/A N/A N/A N/A N/A N/A 15.9.5 Cumulative Residual Effects No significant cumulative residual effects were identified for the proposed development. 15.10 Risk of Major Accidents or Disasters There are no expected significant adverse effects of the project on the environment deriving from the vulnerability of the project to risks of major accidents and / or disasters. 15.11 Worst Case Scenario In the unlikely event that archaeological mitigation as detailed in Section 15.8 were not implemented, contrary to the approved plans and conditions of planning permission, the subsurface remains would not be preserved by record, resulting in the loss of physical features and their associated data. However, under the approved development, this outcome is not anticipated, as mitigation will be implemented in line with regulatory requirements. 15.12 Interactions Please refer to Chapter 18. 15.13 Monitoring All archaeological and cultural heritage issues will be resolved at the pre-construction and construction stages of the proposed project. This will include licensed archaeological monitoring of top soil stripping activity in the proposed biogas plant site. It is also recommended that similar archaeological monitoring protocols are implemented for the linear gas grid connection, particularly where ground works intersect the ZoN of a recorded ringfort (RMP MO022-009 ). 15.14 Summary of Mitigation and Monitoring The following Table summarises the Construction Phase mitigation and monitoring measures. Table 15.9 Summary of Construction Phase Mitigation and Monitoring RECEIVED: 28/08/2026 August 2026 | 15-84 Aspect Likely Significant Effect Mitigation Monitoring Biogas Plant Direct negative significant effect on AA1 Preservation by record through licensed archaeological excavation, resulting in a moderate negative residual effect. Archaeological issues will be resolved at the pre- construction and construction stages, including any necessary archaeological monitoring / inspection work required. Gas Grid Potential direct negative effect on any surviving below-ground archaeology within ZoN of RMP MO022- 009, ringfort Section 12 Notification of Works Licensed archaeological monitoring of ground disturbance works within ZoN As above The following Table summarises the Operational Phase mitigation and monitoring measures. Table 15.10 Summary of Operational Phase Mitigation and Monitoring Aspect Likely Significant Effect Mitigation Monitoring Biogas Plant No likely significant effects. Indirect negative moderate effect RMP MO022-008, hilltop enclosure. This effect on its setting does not represent a loss of, or direct physical impact on, the monument and its principal archaeological characteristics, and the greater part of its wider setting will remain unchanged. Incorporated design mitigation, including screening berms and a comprehensive suite of planting. Residual effect will remain at moderate for the duration of operational phase. None required during operational phase Biogas Plant No likely significant effects. Indirect negative slight effect Former New Park estate (NIAH Garden Survey Ref. 1211), in an area of the estate that is of low sensitivity. Retention of estate boundary alignment. Residual effect will remain at slight for the duration of operational phase. None required during operational phase Gas Grid None N/A N/A 15.15 Conclusion The Proposed Project comprises two elements: the Renewable Biogas Plant, which forms the Proposed Development for which planning permission is sought, and the approximately 3.5 km Linear RECEIVED: 28/08/2026 August 2026 | 15-85 Gas Grid Connection, which will be delivered separately by Gas Networks Ireland but forms part of the overall project for the purposes of EIA. The proposed development is situated in a drumlin landscape in a working agricultural landscape. The proposed renewable biogas plant site represents a greenfield area under pasture, while the proposed grid connection follows the road corridor of the existing R189 and R188 public roads. 15.15.1 Renewable Biogas Plant Site Geophysical survey and targeted archaeological testing identified the truncated remains of a fulacht fia or burnt mound within the proposed renewable biogas plant site. The archaeological remains will be preserved by record, i.e. subject to full licensed archaeological excavation, prior to works commencing. The residual effect will be moderate negative. The closest recorded monument is a large oval hilltop enclosure (RMP MO022-008), located c. 185m to the south-west (measured from the enclosing bank of the monument). The proposed development is considerable in scale and while the associated landscaping and individual structure design have been devised to minimise and soften the appearance of the biogas plant, the construction of the plant will restrict / alter views to the north-east of the recorded monument during the operational phase. This will likely result in an indirect moderate negative residual impact on the visual amenity and setting of the monument. It should be noted that this effect does not represent a loss of, or direct physical impact on, the monument and its principal archaeological characteristics, and the greater part of its wider setting will remain unchanged. Visual relationships between recorded monuments in the surrounding landscape would not be interrupted or otherwise affected by the proposed development. The part of the former New Park estate (NIAH Garden Survey Ref. 1211) containing the proposed development does not contribute to the significance of the house or its setting, and given the absence of any landscape design features or historic landscape character in this part of the estate, it is considered to have a low sensitivity rating. A slight direct negative impact on the New Park estate was identified during the operational phase and will remain for its duration. These setting impacts are reversible and will cease upon decommissioning, should that situation occur. 15.15.2 Linear Gas Grid Connection The proposed linear gas grid connection intersects the ZoN for a recorded ringfort (RMP MO022-009). The monument itself lies outside of the existing road corridor, however there is a potential for the survival of associated below-ground archaeological remains within this ZoN. A Section 12 notification of works may be required and it is recommended that licensed archaeological monitoring will take place of groundworks where they occur within the ZoN. Given that the proposed linear gas grid connection route travels along the existing roadway, there are no potential impacts on any items or structures of architectural heritage merit. However, the construction team should be made aware of the locations of those RPS / NIAH sites that are situated in the immediate vicinity of the potential gas grid route, namely the Dartrey Estate walls (RPS No.: RECEIVED: 28/08/2026 August 2026 | 15-86 414; NIAH Ref. 41402226) and the Dartrey Estate entrance gateway (NIAH Ref. 41402216). All precautions should be taken to ensure that there is no accidental impact on any of the boundary treatments associated with these sites / structures during the construction phase. 15.16 References and Sources 15.16.1 Documentary References Duffy, P. 1981 “Patterns of Landownership in Gaelic Monaghan in the Late Sixteenth Century”, Clogher Record 10(3), 304-322. Duffy, S. 1995 “The first Ulster plantation: John de Courcy and the men of Cumbria” in T. B. Barry, Robin Frame, and Katharine Simms (eds), Colony and frontier in medieval Ireland: essays presented to J. F. Lydon, 1-27. London: Hambledon Press. Edwards, N. 2005 “The archaeology of early medieval Ireland, c. 400-1169” in D. Ó Cróinín (ed.) A New History of Ireland 1: Prehistoric and Early Ireland, 235-370. Oxford: Oxford University Press. Joyce, P.W. 1910a The Origin and History of Irish Names and Places, Vol. 1. Dublin: M.H. Gill and Son. Joyce, P.W. 1910b The Origin and History of Irish Names and Places, Vol. 2. Dublin: Talbot Press. Joyce, P.W. 1920 The Origin and History of Irish Names and Places, Vol. 3. Dublin: Educational Company of Ireland. Lewis, S. 1837 A topographical dictionary of Ireland, 2 vols. London. Lewis and Co. Meharg, T. 2019 “Going Underground: An Experimental Archaeological Investigation of an Early Medieval Irish Souterrain”, EXARC Journal 2019/02. O’Brien, W. 2017. ‘The development of the hillfort in prehistoric Ireland’, in Proceedings of the Royal Irish Academy: Archaeology, Culture, History, Literature, Vol. 117C, pp. 3-61. Ó Drisceoil, C. and Condit, E. 2015 “The Black Pig’s Dyke – Power Lines in the Landscape”, Archaeology Ireland Heritage Guide No. 68. Ó Dufaigh, S. and Duffy, J. 1999 “Medieval Monaghan: The Evidence of the Placenames”, Clogher Record 16(3), 7-28. Ó Súilleabháin, M., Downey, L., and Downey, D. 2018 Antiquities of Rural Ireland. Dublin: Wordwell. O’Sullivan, A.; McCormick, F.; Kerr, T.; and Harney, L. 2014[2021] Early Medieval Ireland, AD 400- 1100: The evidence from archaeological investigations. Dublin: Royal Irish Academy. O’Sullivan, M. and Downey, L. 2019 “Court Tombs”, Archaeology Ireland 33(1), 35-38. Otway-Ruthven, A. J. 1968. A history of medieval Ireland. London. RECEIVED: 28/08/2026 August 2026 | 15-87 Schulting, R.; Murphy, E.; Jones, C.; and Warren, G. 2012 “New dates from the north and a proposed chronology for Irish court tombs”, Proceedings of the Royal Irish Academy 112C, 1-60, Stout, G., 1997. The Irish Ringfort. Dublin: Four Courts Press. RECEIVED: 28/08/2026 August 2026 | 15-88 15.16.2 Online Sources www.maps.osi.ie www.archaeology.ie www.downsurvey.tcd.ie www.buildingsofireland.ie (NIAH) www.excavations.ie www.heritagemaps.ie www.askboutireland.com (Griffith’s Valuation) www.landedestates.ie RECEIVED: 28/08/2026 AUGUST 2026 VOLUME II ENVIRONMENTAL IMPACT ASSESSMENT REPORT CHAPTER 16 MAJOR ACCIDENTS & DISASTERS Stream BioEnergy Ireland Limited RECEIVED: 28/08/2026 August 2026 | 16-1 Table of Contents 16 Major Accidents and Disasters .............................................................................................. 16-3 16.1 Introduction .......................................................................................................................... 16-3 16.2 Expertise & Qualifications ..................................................................................................... 16-3 16.3 Project Description ................................................................................................................ 16-3 16.3.1 Renewable Biogas Plant Site ................................................................................................. 16-3 16.3.2 Linear Gas Grid Connection................................................................................................... 16-4 16.3.3 Aspects Relevant to this Assessment .................................................................................... 16-4 16.4 Methodology ......................................................................................................................... 16-6 16.4.1 Site Specific Risk Assessment Methodology ......................................................................... 16-6 16.4.2 Difficulties Encountered ........................................................................................................ 16-8 16.5 Major Accidents .................................................................................................................... 16-9 16.5.1 Consultation .......................................................................................................................... 16-9 16.6 Baseline Environment ......................................................................................................... 16-10 16.6.1 Nearby Residential Establishments ..................................................................................... 16-10 16.6.2 Nearby Industrial Establishments ....................................................................................... 16-10 16.6.3 Nearby Seveso Establishments ........................................................................................... 16-11 16.6.4 Seismic Activity.................................................................................................................... 16-11 16.6.5 Landslides ............................................................................................................................ 16-13 16.6.6 Flood Risk ............................................................................................................................ 16-14 16.6.7 Hyrdology ............................................................................................................................ 16-14 16.7 Based on the TII methodology (2009) the importance of the hydrological features at this site is rated as ‘Low’ importance based on the assessment that the attribute has a low-quality significance or value on a local scale, based on the fact that it is not an area of water supply, within a flood zone or an amenity area.The ‘Do Nothing’ Scenario ................................................................................ 16-15 16.8 Potential Significant Effects ................................................................................................ 16-16 16.8.1 Hazardous Materials ........................................................................................................... 16-16 16.8.2 COMAH Status ..................................................................................................................... 16-21 16.8.3 Major Accident Hazards ...................................................................................................... 16-23 16.8.4 Construction Phase ............................................................................................................. 16-24 16.8.5 Operational Phase ............................................................................................................... 16-28 16.8.6 Decommissioning ................................................................................................................ 16-36 16.8.7 Cumulative Effects .............................................................................................................. 16-36 16.9 Mitigation Measures ........................................................................................................... 16-36 16.9.1 Renewable Biogas Plant Site ............................................................................................... 16-36 16.9.2 Gas Grid Connection ........................................................................................................... 16-37 16.10 Residual Impact Assessment ............................................................................................... 16-37 RECEIVED: 28/08/2026 August 2026 | 16-2 16.11 Monitoring .......................................................................................................................... 16-37 16.12 Interactions ......................................................................................................................... 16-37 16.13 Conclusion ........................................................................................................................... 16-37 16.14 References and Sources ...................................................................................................... 16-39 Table of Figures Figure 16.1 Nearby Residential Dwellings........................................................................................ 16-10 Figure 16.2 Ireland Seismic Activity Map ......................................................................................... 16-12 Figure 16.3 Landslide Susceptibility Map (GSI Ireland) .................................................................... 16-13 Table of Tables Table 16-1 Risk Classification - Likelihood ......................................................................................... 16-7 Table 16-2 Risk Classification - Consequence .................................................................................... 16-7 Table 16-3 Example Risk Matrix ......................................................................................................... 16-8 Table 16-4 EPA Licenced Facilities nearby to the Proposed Development Site .............................. 16-11 Table 16-5 Hazardous Material Inventory ....................................................................................... 16-17 Table 16-6 COMAH Calculation ........................................................................................................ 16-22 Table 16-7 COMAH Factorisation ..................................................................................................... 16-22 Table 16-8 Major Accident Hazards at Proposed Development ...................................................... 16-23 Table 16-9 Assessment of Major Accidents and Disasters for Construction Phase......................... 16-25 Table 16-10 Assessment of Major Accidents and Disasters for Operational Phase ........................ 16-29 RECEIVED: 28/08/2026 August 2026 | 16-3 16 Major Accidents and Disasters 16.1 Introduction This chapter assesses the potential for major accidents and disasters (MAD) arising from both the Proposed Development that is, the elements for which planning permission is being sought from Monaghan County Council and the wider Project, which also includes the associated gas pipeline connection to be delivered separately by Gas Networks Ireland. Although the pipeline does not form part of the planning application, it is considered in this chapter insofar as sufficient information is available and because it falls within the overall project definition for the purposes of the EIA Directive. The assessment has been prepared in accordance with the EPA Guidelines (2022) and relevant EU and national legislation and considers the vulnerability of the development to external hazards as well as the potential for the project to give rise to major accidents or disasters. This includes events such as fire, explosion, severe weather, flooding, infrastructure failure or other low-probability/high- consequence scenarios. This chapter of the EIAR should be read in conjunction with the architectural and engineering drawings submitted as part of this planning application. 16.2 Expertise & Qualifications This chapter of the Environmental Impact Assessment Report has been prepared by Matthew Michie a Senior Environmental Consultant at AWN Consulting Limited. Matthew holds an MChem and a MSc (Physical Chemistry). Matthew has 5 years’ experience in environmental consulting and process safety and has been involved in numerous EIARs for a range of projects including commercial, residential, industrial, pharmaceutical and data centre developments. 16.3 Project Description 16.3.1 Renewable Biogas Plant Site The development consists of the construction and operation of a Renewable Biogas Plant and associated infrastructure. The principal elements of the plant comprise a main process building where the feedstock for the anaerobic digestion (AD) process is received. An odour control system with a dispersion stack will treat the air from the building. The feedstock passes to the AD tanks located within a bunded tank farm. There is a combined heat and power (CHP) building within which a gas fired CHP engine will generate electricity for the plant's energy needs. A Biogas Upgrade and Treatment Plant will be installed to produce biomethane (a renewable natural gas) that will be exported via a Gas Grid Entry Unity to the national gas grid. A Dryer Building is proposed, where the digestate will be dried, and a Pellet Hall will be constructed, where the digestate pellets will be stored prior to removal from the site for use as a natural fertiliser product. Ancillary elements include a gas dome, tanks to store incoming liquid feedstock, freshwater, firewater, and fuel, a backup gas flare, a backup generator, a plant building, and a control building. A new site entrance, weighbridges, wheel RECEIVED: 28/08/2026 August 2026 | 16-4 washes, parking facilities, and all ancillary development works and services also form part of the development. A high-level process flow follows. 16.3.2 Linear Gas Grid Connection A gas transmission pipeline will provide the physical connection between the Renewable Biogas Plant and the existing national gas network at Dromore West, Co. Monaghan. While the development of this gas grid connection does not form part of the planning application, as it will be delivered separately by Gas Networks Ireland under the CRU consenting process, it is included within the EIAR for assessment purposes. This approach reflects the requirements of the EIA Directive, which mandates assessment of the entire project, including all ancillary infrastructure necessary for its operation. The works comprise the laying of an underground pipeline over approximately 3.5 km within the public road corridor. 16.3.3 Aspects Relevant to this Assessment When considering a development of this nature, the potential impacts to major accidents and disasters will be assessed. The aspects of the proposed development that are relevant to major accidents are as follows: • Storage and handling of biogas • Storage and handling of organic material • Storage of hazardous chemicals RECEIVED: 28/08/2026 August 2026 | 16-5 • Presence of pressurised equipment This assessment is a review of major accident hazards and disasters based on the engineering design, drawings and documentation. 16.3.3.1 Industrial Emissions Directive The proposed Renewable Biogas Plant will be an Industrial Emissions Directive (IED) licensed facility. As such, the design and operation of the site incorporate robust measures to prevent major accidents and limit potential consequences, in line with EU and national guidance: • The site will be regulated under the EU Industrial Emissions Directive (IED 2010/75/EU), which requires operators to apply Best Available Techniques (BAT) to prevent accidents, limit emissions, and ensure safe operation. • Compliance with the BAT conclusions published in the relevant BREF (Best Available Techniques Reference Document) for anaerobic digestion activities ensures that site design, process control, and safety management follow industry best practice. • The plant will incorporate redundant safety systems to manage risks such as overpressure, gas leaks, and fire. • Storage areas for fuels, chemicals, and digestate are bunded and ventilated, minimising the risk of spills and uncontrolled releases. • The tank farm bund’s containment capacity has been designed in accordance with Section 4 of CIRIA ‘C736F – Containment systems for the prevention of pollution – Secondary, tertiary and other measures for industrial and commercial premises’ • Process equipment includes automatic shutdown and alarm systems to prevent escalation of incidents. Real time monitoring of gas flow, inspection and maintenance of safety devices and gas leakage surveys will be carried out in all areas where gas is produced, stored, transported and used. • All aspects of the plant will be controlled and monitored by a central electronic Supervisory Control and Data Acquisition (SCADA) telemetry control system. The system will allow for maintenance of optimum conditions required at the various stages of the process to ensure safe and efficient operation of the plant. • Staff will follow standard operating procedures (SOPs) covering chemical handling, gas storage, maintenance, and emergency response. • Regular training and drills are conducted to ensure all personnel can respond effectively to emergencies. • The site will maintain a comprehensive emergency response plan, including response to chemical spills, gas releases, fire, and extreme weather events. • Coordination with local emergency services ensures that off-site impacts are minimised. The MA&D risk at this IED-licensed site will be managed through a combination of BAT-compliant design, operational controls, and emergency preparedness, in accordance with both EU and national guidance. While the risk of major accidents cannot be entirely eliminated, adherence to these standards ensures that any potential incidents are unlikely to result in significant off-site consequences. RECEIVED: 28/08/2026 August 2026 | 16-6 16.4 Methodology The following relevant legislation, policy, and guidance has informed the preparation of this chapter: • EPA ‘Guidelines on the Information to be contained in Environmental Impact Assessment Reports’ (2022); • EIAR Directive 2014/52/EU, which requires consideration of “the expected significant adverse effects of the project on the environment deriving from the vulnerability of the project to risks of major accidents and/or natural disasters relevant to the project consented.” • Health and Safety Authority (HSA) Guidance on Technical Land-Use Planning Advice, for planning authorities and COMAH establishment operators (2023); • Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015; • HSA Guide to the COMAH Regulations 2015 (S.I. No. 209 of 2015); • Building Regulations (Part A Amendment) Regulations 2012 (as amended) (SI No. 138 of 2012) – Structural Safety; • Safety, Health and Welfare at Work (Construction) Regulations 2013 (as amended) (hereafter referred to as the Safety, Health and Welfare (Construction) Regulations) (S.I. No. 291 of 2013); and • A Framework for Major Emergency Management. Guidance Document 10 (DECLG 2015). The EPA Guidelines, 2022, state that: “To address unforeseen or unplanned effects the Directive further requires that the EIAR takes account of the vulnerability of the project to risk of major accidents and /or disasters relevant to the project concerned and that the EIAR therefore explicitly addresses this issue. The extent to which the effects of major accidents and / or disasters are examined in the EIAR should be guided by an assessment of the likelihood of their occurrence (risk). This may be supported by general risk assessment methods or by systematic risk assessments required under other legislation e.g. a COMAH (Control of Major Accident Hazards involving Dangerous Substances) assessment. The potential for a project to cause risks to human health, cultural heritage or the environment due to its vulnerability to external accidents or disasters is considered where such risks are significant, e.g. the potential effects of floods on sites with sensitive facilities. Where such risks are significant then the specific assessment of those risks in the form of a Seveso Assessment (where relevant) or Flood Risk Assessment may be required.” 16.4.1 Site Specific Risk Assessment Methodology The risk assessment identifies and quantifies risks focusing on potentially significant adverse effects of the development on the environment, deriving from its vulnerability to risks of relevant major accidents and/or disasters. The approach to identifying and quantifying risks associated with the proposed development by means of a sites specific risk assessment is derived from the EPA Guidelines on information to be contained in EIAR (EPA, 2022). RECEIVED: 28/08/2026 August 2026 | 16-7 The criterion for categorising impact is derived from the EPAs Guidance on Assessing and Costing Environmental Liabilities (2014). In this guidance, the risk assessment methodology commences with the establishment of risk classification criteria followed by risk analysis based on these criteria. Risk classification tables are required in order to evaluate and rank the risks compared with each other. They form the basis for rating the likelihood of an event occurring and the consequence of impact if the event occurs. The approach used in this assessment is summarised as follows and has been derived from relevant guidance as described above: • Identification of hazardous substances which could be present over the lifecycle of the Proposed Development, including flammable substances, materials harmful to the environment and materials harmful to human health. • Consideration of the quantities and storage arrangements associated with these substances and the prospective operations at the Proposed Development involving these materials. • Identification of potential Major Accidents and Disasters (MA&D) Risk Events associated with these materials and operations. Assessment of the vulnerability of the Proposed Development to disasters as a result of, for example, location, infrastructure, climatic conditions and geological events. • Where credible MA&Ds Risk Events and Disasters are identified, the reasonable worst-case consequence of a of each Risk Event is assessed in qualitative terms, based on factors including receptors which could be affected, and mitigation measures already in place (see Table 16-1)) • The likelihood and consequence ratings are combined to form a risk score for risk evaluation (see Table 16-2). Table 16-1 Risk Classification - Likelihood Rating Category Description 1 Very low Very low chance of hazard occurring 2 Low Low chance of hazard occurring 3 Medium Medium chance of hazard occurring 4 High High chance of hazard occurring 5 Very high Very high chance of hazard occurring Table 16-2 Risk Classification - Consequence Rating Category Description 1 Trivial Small number of people affected, no fatalities No contamination to environment 2 Minor Single fatality: limited number of people affected; a few serious injuries Localised contamination effects of short duration 3 Moderate Significant number of people in affected area impacted with multiple fatalities RECEIVED: 28/08/2026 August 2026 | 16-8 Rating Category Description Contamination effects widespread or of extended duration 4 Major 5 to 50 fatalities, up to 100 serious injuries Heavy contamination, localised effects, or extended duration 5 Massive Large numbers of people impacted with a significant number of fatalities (>50), injuries in the hundreds Very heavy contamination, widespread effects of extended duration The risks are then ranked according to their own risk score (1-5) in a colour coded matrix able which allows risks to be easily displayed and prioritised. The colour codes are as follows and indicated in Table 16-3 below: • Red – high level risks requiring priority action (overall risk scores of 15-25); • Yellow – medium-level risks requiring action, but not as critical as red-coded risks (overall risk scores of 8-12); and • Green (light and dark) – low-level risks requiring continuing awareness and monitoring on a regular basis (overall risk scores of 1-6). Table 16-3 Example Risk Matrix Consequence Trivial Minor Moderate Major Massive Likelihood Very High Low Medium High High High High Low Medium Medium High High Medium Low Low Medium Medium High Low Low Low Low Medium Medium 16.4.2 Difficulties Encountered This chapter focuses on major accident scenarios and natural disasters based on current design and inventory. No difficulties were encountered in completing this chapter. RECEIVED: 28/08/2026 August 2026 | 16-9 16.5 Major Accidents For the purpose of this assessment, the definition of a ‘Major Accident’ is taken from the guidelines on Major Accidents and Disasters within EIA published by Institute of Environmental Management and Assessment (IEMA, 2020). “A major accident is an event (for instance, train derailment or major road traffic accident) that threatens immediate or delayed serious environmental effects to human health, welfare and / or the environment and requires the use of resources beyond those of the client or its appointed representatives (i.e., contractors) to manage”. Major accidents can be caused by disasters resulting from both man-made and natural hazards. A disaster is a man-made / external hazard (such as an act of terrorism) or a natural hazard (such as an earthquake) with the potential to cause an event or situation that meets the definition of a major accident. In general, major accidents and / or disasters should be considered as part of an assessment where the development has the potential to cause the loss of life, permanent injury and/or temporary or permanent destruction of an environmental receptor which cannot be restored through minor clean-up and restoration”. For the purpose of this assessment, the definition of a ‘Disaster’ is as follows (IEMA, 2020): “a natural hazard (e.g. earthquake) or a man-made external hazard (e.g. act of terrorism) with the potential to cause an event or situation that meets the definition of a major accident.” For the purposes of this assessment, the definition of ‘Vulnerability’ is as follows (IEMA, 2020): “Vulnerability – describes the potential for harm as a result of an event, for example due to sensitivity or value of receptors. In the context of the EIA Directive, the term refers to ‘exposure and resilience’ of the proposed development to the risk of a major accident and / or disaster. Vulnerability is influenced by sensitivity, adaptive capacity, and magnitude of impact; and Significant environmental effect (in relation to a major accident and / or disaster assessment) – includes the loss of life, permanent injury and temporary or permanent destruction of an environmental receptor which cannot be restored through minor clean-up and restoration.” 16.5.1 Consultation A pre-planning meeting was held with Monaghan County Council prior to lodging the planning application. The Council indicated in principle support for the development, subject to compliance with all relevant policies and objectives. It was acknowledged that the site is subject to an Industrial Emissions (IED) licence, and as such, operational emissions fall under the remit of the EPA. Further details regarding the meeting can be found in the Planning Statement submitted under separate cover. Of particular relevance to this assessment was the acknowledgment of the IED licensing requirements for operational emissions. RECEIVED: 28/08/2026 August 2026 | 16-10 16.6 Baseline Environment 16.6.1 Nearby Residential Establishments The Proposed Development site is located in an area which is predominantly rural in nature, with a dispersed residential population. The nearest residence is located approximately 35m to the south (landowner dwelling). Residential dwellings located within 500m of the site are shown on Figure 16- 1. Figure 16.1 Nearby Residential Dwellings 16.6.2 Nearby Industrial Establishments Table 16-4 details the industrial sites in the vicinity of the proposed development, which operate under Directive 2010/75/EU (the industrial emissions directive) licences from the Environmental Protection Agency. Licensed facilities are required to comply with specific licence conditions, including monitoring and reporting on their emissions (such as emissions into the air, water, and soil), to ensure that they do not pose a risk to human health or the environment. RECEIVED: 28/08/2026 August 2026 | 16-11 Table 16-4 EPA Licenced Facilities nearby to the Proposed Development Site Registration number Name Category Licence type Distance (km) P1128 Carleton Poultry Limited Industry IEL 0.5 P1124 Mr Steven & Ms Ann Niblock Industry IEL 1.9 P1071 Ak Agriculture Limited Industry IEL 2.5 16.6.3 Nearby Seveso Establishments Seveso establishments have a “consultation distance” which is defined as “a distance or area relating to an establishment, within which there are potentially significant consequences for human health or the environment from a major accident at the establishment” (COMAH Regulations). The proposed development site is not located within the consultation zones of any Seveso establishment; therefore, there are no constraints to the proposed development at this location from nearby Seveso establishments. There are no Seveso Establishments withing 10 km of the proposed development. 16.6.4 Seismic Activity In Ireland, seismic activity is recorded by the Irish National Seismic Network. The Geophysics Section of the School of Cosmic Physics, Dublin Institute for Advanced Studies, has been recording seismic events in Ireland since 1978 (www.dias.ie). This network consists of several seismometers that are located throughout Ireland. Figure 16.2 illustrates historical and recorded seismic events since 1980. RECEIVED: 28/08/2026 August 2026 | 16-12 Figure 16.2 Ireland Seismic Activity Map Seismic activity and earthquake risk in Ireland are generally considered to be low. This is because Ireland is located on the western edge of the Eurasian Plate, which is a tectonic plate that is not known for its seismic activity. However, earthquakes can still occur in Ireland, although they are typically small and have little impact. It can be seen in Figure 16-2 that there is no significant seismic activity recorded in the vicinity of the proposed development. Therefore, the likelihood of seismic activity impacting the proposed development is negligible; and therefore, not significant. RECEIVED: 28/08/2026 August 2026 | 16-13 16.6.5 Landslides Much of the Earth’s surface is covered by unconsolidated sediments which can be especially prone to instability. Water often plays a key role in lubricating the slope failure. Instability is often significantly increased by man’s activities in building houses, roads, drainage and agricultural changes. Landslides, mud flows, bog bursts (in Ireland) and debris flows are a are a natural hazard that can occur. These can cause damage to property, infrastructure, and the natural environment, and can also pose a risk to human life. In general, risk of landslides in Ireland is considered to be low, as the country is not located in a region with high seismic activity or large mountain ranges. Landslides are more common in unconsolidated material than in bedrock, and where the sea constantly erodes the material at the base of a cliff landslides and falls lead to recession of the cliffs. Landslides have occurred in Ireland in recent years in upland peat areas due to disturbance of peat associated with construction activities. Figure 16.3 Landslide Susceptibility Map (GSI Ireland) RECEIVED: 28/08/2026 August 2026 | 16-14 The landslide susceptibility map identifies areas which are subject to landslides and is measured from low to high. The landslide susceptibility map considers the location of landslides and what causes them (slope, soil type and the impact of the flow of water). It can be seen in Figure 16-3 that the area surrounding the proposed development has a low susceptibility of landslides. Therefore, the likelihood of a landslide impacting the proposed development is negligible; therefore, not significant. 16.6.6 Flood Risk A Stage 1 Flood Risk Assessment has been completed, by AWN Consulting Ltd. (see Appendix 10.2 Volume III II), in accordance with the Department of the Environment, Heritage and Local Government (DoEHLG) Flood Risk Management Guidelines for Planning Authorities published by the OPW in 2009. Overall, it is concluded that this proposed development, and the surrounding area is not at risk from flooding since the proposed development is located in Flood Zone C. The type of development is classed as a ‘Less Vulnerable Development’. This type of development is deemed appropriate for this flood zonation. No residual risk is foreseen as the development is located outside any flooding zones associated with future scenarios. The development includes a drainage and attenuation strategy that have been designed with an allowance of 30% increase in flows as suggested per the 2009 Guidelines. It is concluded that the proposed development, and the surrounding area, is not at risk from flooding since the proposed development is located in Flood Zone C. It is concluded that the risk of flooding to the proposed development will be minimal; therefore, the likelihood of a flood impacting the proposed development is unlikely and not significant. 16.6.7 Hyrdology Chapter 10 Water (Hydrology & Hydrogeology) provides the detailed assessment of the receiving hydrological and hydrogeological environment. The proposed development site is located within the Erne WFD Catchment (Catchment ID: 36) and the Dromore_sc_20 WFD sub-catchment (Dromore 60 WFD River Sub Basin; EPA, 2025). The Rockcorry Stream (EPA Code: IE_NW_36D020700) originates from Coolkill Lough and flows in a north westerly direction before passing through Drumgole Lough (EPA Code: IE_NW_36_415). It then continues in a southerly direction before ultimately discharging into the Dromore River (EPA Code: IE_NW_36D020900), approximately 3 km from the proposed development site. According to EPA mapping, no watercourses traverse the proposed development site. Surface Water Quality In relation to the Proposed Development site, the nearest (active) surface waterbody EPA monitoring station is: ‘Br.W. of Clementstown’ (StationCode: RS36D020700) which is located in the DROMORE_070 waterbody adjacent to Cootehill town c. 3.5km birds eye distance of the proposed development site. The most recent water quality status recorded by the EPA (2022) at this monitoring station (EPA Code: RS36D020700) is classified as Q3 Poor, which denotes moderately polluted waterbody. This Value is RECEIVED: 28/08/2026 August 2026 | 16-15 based primarily on the relative proportions of pollution sensitive to tolerant macroinvertebrates (the young stages of insects primarily but also snails, worms, shrimps etc.) resident at a river site. Bathing Waters and Recreational Waterbodies A review of Environmental Sensitivity Mapping online maps that includes the Register of Protected Areas (RPA) under the Water Framework Directive (WFD) has shown that there are no Recreational Waters, Bathing Waterbodies, or Surface Water Drinking RPA, within the proposed development or located near the Coolkill Lough Stream, the Rockcorry Stream or downstream in the Coolkill Lough. Water Supplies A review of the Environmental Protection Agency (EPA) online mapping, which includes the Register of Protected Areas (RPA) established under the Water Framework Directive (WFD), indicates that there are no nearby streams or loughs, classified as a Nutrient Sensitive Areas. These areas are designated in accordance with the Urban Wastewater Treatment (UWWT) Directive (91/271/EEC) and relevant national legislation, including S.I. 254/2001, S.I. 440/2004, and S.I. 48/2010. In this context, the identified waterbody is used to define the extent of the nutrient-sensitive designation. Existing Water and Wastewater Utilities There are no existing water or wastewater utilities located within the boundary of the proposed development site or in its immediate surrounding area. This is primarily due to the predominantly greenfield nature of the landscape surrounding the site. Surface Water Abstraction There is one known reported abstraction from surface water in the vicinity of the proposed development (GSI, 2025). The area is supplied by Drumgole group water scheme which abstract water from Annaghmakerig Lough located c.1.9km north of the proposed development. However, no hydrological connection is identified between the site and this lough. Rating of Importance of Hydrological Attributes 16.7 Based on the TII methodology (2009) the importance of the hydrological features at this site is rated as ‘Low’ importance based on the assessment that the attribute has a low-quality significance or value on a local scale, based on the fact that it is not an area of water supply, within a flood zone or an amenity area.The ‘Do Nothing’ Scenario The EIA Directive requires the following to be described relating to the future receiving environment (the ‘Do Nothing’ scenario): “an outline of the likely evolution thereof without implementation of the project as far as natural changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of environmental information and scientific knowledge”. RECEIVED: 28/08/2026 August 2026 | 16-16 Under a ‘do-nothing’ scenario, if the proposed development does not proceed, there will be no change to the risk of a major accident and/or disaster at the site. 16.8 Potential Significant Effects 16.8.1 Hazardous Materials 16.8.1.1 Construction Phase Flammable Gas Cylinders Construction and maintenance activities may require welding which can be carried out using compressed gases such as acetylene. There is the potential for a release of flammable gas, including an explosive depressurisation event, for example due to accidental damage to a gas cylinder, pressure regulator, or associated pipework. The released gas could be ignited, resulting in a fire or explosion. The potential impacts of which could include harm to persons due to thermal radiation and damage to property. Concrete There is the potential for an accidental release of concrete into the soil, or surface water during the construction of the proposed Biogas Plant. Concrete is not classified hazardous in accordance with the Chemical, Label and Packaging (CLP) Regulations (EC No. 1272/2008); however, concrete paste is alkaline (pH 10-14); therefore, the potential impacts if concrete enters the environment via a release to water, include: • Raising the pH causing harm to aquatic ecosystems. • Cause sedimentation on aquatic beds, which could harm flora and fauna. Containment systems to intercept any material released are set out in the Outline Construction Environmental Management Plan (CEMP). This assessment assumes standard construction best practice, including designated concrete washout areas and immediate containment of accidental spills. Therefore, it is not considered credible that a release of concrete could lead to a consequence that meets the criteria of a Major Accident and will not be considered further in this assessment. Fuel Storage Small quantities of diesel will be present on-site for use in construction vehicles. Diesel has flammable and environmental hazards. Diesel is classified as an ignition category 3 substance, following the criteria in the Guidance on Technical Land Use Planning (HSA, 2023); therefore, it has an ignition probability of 0. Therefore, flammable hazards associated with diesel are not credible and will not be considered further in this assessment. RECEIVED: 28/08/2026 August 2026 | 16-17 Due to the small quantities of diesel involved, it is not considered credible that a spill of diesel would meet the criteria for a Major Accident and it will not be considered further in this assessment. 16.8.1.2 Operational Phase Table 16-5 details the inventory of hazardous materials at the proposed Renewable Biogas Plant Site during the operational phase. All materials stored at the proposed development will be contained within dedicated storage tanks or appropriate containers. All materials will be stored in suitably bunded areas with weather protection, where appropriate, and will be subject to regular inspections and periodic integrity testing. As described in Chapter 2 of this report, all handling of feedstock and pre-treatment activities will be carried out indoors with no external offloading or storage. The Main Process Building will be constructed to a high standard and specification, using leak resistant building fabric. Table 16-5 Hazardous Material Inventory Substance Maximum Storage (t) Hazard Statements Biogas 6 Flammable Gas 1, H220 Press. Gas Compr. Gas, H280 LPG 16 Flammable Gas 1, H220 Press. Gas Compr. Gas, H280 Sulphuric Acid 234.4 Corrosive to Metals, (Category 1) H290 Skin corrosion, (Sub-category 1A) H314 Serious eye damage, (Category 1) H318 FerroSorp (Iron hydroxide) 20.2 Na Diesel 6 Flammable liquid and vapour Category 3 – H226 Acute toxicity, inhalation Category 4 -H332 Skin corrosion/irritation Category 2 - H315 Carcinogenicity Causes Category 2 - H351 Specific target organ toxicity Category - H373 Aspiration hazard Category 1 - H304 Toxic to aquatic life Category 2 - H411 RECEIVED: 28/08/2026 August 2026 | 16-18 Substance Maximum Storage (t) Hazard Statements Glycol 1 Acute oral toxicity Category 4 - H302 Specific target organ toxicity (single exposure) Category 3 - H373 Specific target organ toxicity - (repeated exposure) Category 2 Grease Cartridges No storage NA Hydrochloric Acid (30%) 2.5 Corrosive to Metals, (Category 1) H290 Skin irritation, (Category 2) H315 Eye irritation, (Category 2) H319 Specific target organ toxicity -single exposure, (Category 3) H335 General Oil (e.g. Mobilgear 600 XP 220) 1 Mixture: MINES, C12-14-TERT-ALKYL c Acute Tox. 2 H330 Acute Tox. 3 H311 Acute Tox. 4 H302 Skin Sens. 1A H317 Aquatic Acute 1 H400 Aquatic Chronic 1 H410 Skin Corr. 1B H314 (Z)-OCTADEC-9-ENYLAMINE, C16-18 -ALKYLAMINES cute Tox. 4 H302 Asp. Tox. 1 H304 Specific Target Organ Toxicity 3 H335 Aquatic Acute 1 H400 Aquatic Chronic 1 H410 Skin Corr. 1B H314 Specific Target Organ Toxicity 2 H373 Struvite Suppressant 1 Skin Corrosion/Irritation - Category 3, H316 Eye Irritation - Category 2b, H320 Specific Target Organ Toxicity (Single Exposure) – Category 3, H335 Carbon Dioxide 100 Contains gas under pressure, may explode if heated H280 RECEIVED: 28/08/2026 August 2026 | 16-19 Substance Maximum Storage (t) Hazard Statements Activated Carbon 504 Self-heating substances/mixtures Category 2 H252 Sodium Hydroxide (caustic soda) 35 Corrosive to Metals, (Category 1) H290 Skin corrosion, (Sub-category 1A) H314 Serious eye damage, (Category 1) H318 Formic acid 2.5 Acute toxicity (if inhalative) Category 3; H331 Acute toxicity (oral) Category 4; H302 Serious eye damage/eye irritation: Category 1 H318 Skin corrosion/irritation: Category 1A H314 Antifoam agents 32.5 The product has not been classified as hazardous and does not need to be labelled according to regulation (EU) no 1272/2008 (CLP). Amine solution (mono- ethanolamine) 2.5 Acute toxicity, Oral (Category 4), H302 Acute toxicity, Inhalation (Category 4), H332 Acute toxicity, Dermal (Category 4), H312 Skin corrosion (Sub-category 1B), H314 Serious eye damage (Category 1), H318 Specific target organ toxicity - single exposure (Category 3), Respiratory system, H335 Long-term (chronic) aquatic hazard (Category 3), H412 Biogas There is the potential for a loss of containment of biogas from storage or pipework due to mechanical failure of pipework, connections or fittings, such as corrosion or fatigue, or as a consequence of accidental damage to equipment and pipework such as a dropped object, an impact with vehicles or machinery. If released and ignited, the potential consequences of a biogas release include fire and explosion. The potential impacts of a fire and / or explosion as a result of a release of biogas include: 1. A fire incident that has the potential to extend to nearby areas. RECEIVED: 28/08/2026 August 2026 | 16-20 2. Thermal radiation from a fire and/or explosion overpressures could pose risks to individuals, including the possibility of serious injury. 3. Potential for health effects resulting from exposure to smoke. 4. Potential for damage to property within the establishment. Liquefied Petroleum Gas (LPG) LPG will be stored in 3 No. 4-tonne tanks at the proposed development. There is the potential for a loss of containment of LPG from storage or pipework due to mechanical failure of pipework, connections or fittings, such as corrosion or fatigue, or as a consequence of accidental damage to equipment and pipework such as a dropped object, an impact with vehicles or machinery. If released and ignited, the potential consequences of a release of LPG include fire and explosion. The potential impacts of a fire and / or explosion as a result of a release of LPG include: 1. A fire incident that has the potential to extend to nearby areas. 2. Thermal radiation from a fire and/or explosion overpressures could pose risks to individuals, including the possibility of serious injury. 3. Potential for health effects resulting from exposure to smoke. 4. Potential for damage to property within the establishment. Formic acid Small quantities of formic will be present on-site during the operation of the proposed development. Formic acid has environmental hazards. Due to the small quantities of formic acid involved, it is not considered credible that a spill of formic acid would meet the criteria for a Major Accident and it will not be considered further in this assessment. Fuel Storage Small quantities of diesel will be present on-site during the operation of the proposed development. Diesel has flammable and environmental hazards. Diesel is classified as an ignition category 3 substance, following the criteria in the Guidance on Technical Land Use Planning (HSA, 2023); therefore, it has an ignition probability of 0. Therefore, flammable hazards associated with diesel are not credible and will not be considered further in this assessment. Due to the small quantities of diesel involved, it is not considered credible that a spill of diesel would meet the criteria for a Major Accident and it will not be considered further in this assessment. Organic Material As detailed in Chapter 2 (Project Description), the proposed Renewable Biogas Plant has been designed to process a range of organic feedstocks, predominantly poultry manure, reflecting the high concentration of poultry farming within County Monaghan. RECEIVED: 28/08/2026 August 2026 | 16-21 Upon delivery to the site, incoming feedstocks are directed to pre-treatment processing within the Main Process Building, where the material is homogenised and converted into a pumpable slurry. This slurry is subsequently transferred via enclosed pipework to the primary digester tanks located within the bunded tank farm. Following completion of the anaerobic digestion process, the digestate is returned to the Main Process Building for pasteurisation and post-treatment. At no stage in the process are these materials classified as hazardous and they do not need to be labelled according to regulation (EU) no 1272/2008 (CLP). A complete failure of the anaerobic digestion process represents a loss of biological performance rather than a loss of structural integrity or containment and, in itself, does not constitute a major accident scenario. Such a failure would primarily result in reduced or ceased biogas production and the need for controlled shutdown or process recovery. Structural failure of a digester tank within the bunded tank farm, including rupture and release of organic material to the surrounding environment, is a possible major accident scenario. While organic material processed at the facility is non-hazardous, it is recognised that a structural failure of a digester tank within the bunded tank farm, including rupture and release of organic material to the surrounding environment, is a possible major accident scenario. 16.8.2 COMAH Status The provisions of the 2015 COMAH Regulations do not apply to sub-COMAH status facilities. Schedule 1 (Application of the Regulations) sets out the dangerous substance hazard categories (Part 1) and named dangerous substances (Part 2), and qualifying quantities for the application of the lower tier and upper tier requirements of the regulations. The COMAH status of the proposed development is calculated as follows. RECEIVED: 28/08/2026 August 2026 | 16-22 Table 16-6 COMAH Calculation Dangerous substance COMAH Classification q Quantity Q1 Lower tier threshold (Column 2, Part 1, Schedule 1, S.I. 209 of 2015) (tonnes) Q2 Lower tier threshold (Column 3, Part 1, Schedule 1, S.I. 209 of 2015) (tonnes) q/Q1 Fraction of Lower tier threshold q/Q2 Fraction of Upper tier threshold tonnes Named Substances Liquified Petroleum Gas (LPG) Named (P) 16 50 200 0.32 0.08 Petroleum products and alternative fuels (Diesel) Named (P, E) 6 2500 25000 0.0012 0.00012 Health General Oil H2 1 50 200 0.02 0.005 Formic Acid H2 3 50 200 0.06 0.015 Physical Biogas P2 6 10 50 0.64 0.13 Environmental General Oil E1 1 100 200 0.01 0.005 In completing the factorisation calculation specified in Note 4 to Schedule 1 of the COMAH Regulations 2015, the following results were obtained: Table 16-7 COMAH Factorisation Group q/Q total Lower Tier q/Q total Upper Tier A (Health Hazards) 0.08 0.02 B (Physical Hazards) 0.92 0.20 C (Environmental Hazards) 0.01 0.01 RECEIVED: 28/08/2026 August 2026 | 16-23 It is concluded that the q/Q total for each group (health hazards, physical hazards and environmental hazards) is <1. It is concluded that the proposed development will be a sub-COMAH facility. The provisions of the COMAH Regulations 2015 do not apply to the proposed development. 16.8.3 Major Accident Hazards The HSA have published Guidance on Technical Land Use Planning Advice (HSA, 2023) which outlines major accident hazards for different types of hazardous installations in Ireland. Table 16-8 details the major accidents for the proposed development following the HSA’s guidance document. Table 16-8 Major Accident Hazards at Proposed Development Installation Loss of Containment Scenario Consequence/Event Energy Centre (CHP Building) Release from Process Vessel Vapour Cloud Explosion Biogas Compressors Release from Process Vessel Vapour Cloud Explosion LPG Storage Area Instantaneous Failure Fireball Vapour Cloud Explosion Flash Fire Continuous Leak over 10 Minutes / 10mm pipe leak over 30 minutes Jet Fire Vapour Cloud Explosion Flash Fire Diesel Tank Area Release of Environmentally Hazardous material (Diesel) Major Accident to the Environment Anaerobic Digester Tanks Instantaneous Failure Fireball Vapour Cloud Explosion Flash Fire Continuous Leak over 10 Minutes Jet Fire Vapour Cloud Explosion Flash Fire Carbon Dioxide Tank Release from Vessel Oxygen Depletion (asphyxiation) Natural Gas Pipeline Rupture of Pipeline Fireball/Jet fire VCE Flash fire Pipeline Leak of 0.1D Fireball/Jet fire VCE Flash fire RECEIVED: 28/08/2026 August 2026 | 16-24 The major accident scenarios listed in Table 16-8 represent the potential consequences of loss of containment under worst-case conditions. The likelihood of such events is extremely low due to multiple containment and safety measures incorporated into the design, including bunding, leak detection, pressure relief systems, and staff training. Firewater runoff is also considered as a major accident hazard in this assessment; however, it is a secondary hazard associated with fire events. In the event of a major fire on-site, the firewater runoff would contain a mixture of materials that could be harmful to the surrounding environment. Firewater retention requirements will be considered at final design and will follow the methodology set out in the Guidance on Retention Requirements for Firewater Run-off (EPA, 2019). 16.8.4 Construction Phase A site-specific Construction Environmental Management Plan (CEMP) and a Health and Safety Plan produced by the Engineering and Construction Contractor, covering the construction and commissioning of the Proposed Development, will be prepared to ensure compliance with relevant health and safety legislation including the Safety, Health and Welfare at Work Act. The following scenarios have been identified that could impact the construction phase of the project: ▪ Extreme weather resulting in result structural damage and/or pollution to soils, groundwater, or surface waters. ▪ Release of environmentally harmful material ▪ Compressed Gas Cylinder release ▪ Storm events resulting in structural damage and/or pollution to groundwater and surface waters. ▪ Flooding ▪ Natural Gas release (from Linear Gas Connection) The impact and likelihood of these scenarios is assessed in Table 16-9. All activities involving hazardous materials will follow strict safety protocols, and the likelihood of major accidents affecting the public is extremely low. There are no likely impacts on the project or to off-site receptors during the construction phase in relation to major accidents and disasters. RECEIVED: 28/08/2026 August 2026 | 16-25 Table 16-9 Assessment of Major Accidents and Disasters for Construction Phase Risk ID Natural Disaster Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score C1 Extreme weather resulting in structural damage and/or pollution to soils, groundwater or surface waters Human health, biodiversity, soils and geology, hydrology and hydrogeology 2 The proposed development will be constructed, and operated in accordance with all relevant planning, building and environmental licensing codes (Building Regulations, 2012). The engineering design of the facilities will take operation at future climatic conditions into account. 1 All construction activities will be suspended during extreme weather events. 2 C2 Storm events (including lightning) resulting in structural damage and/or pollution to groundwater and surface waters Human health, biodiversity, soils and geology, hydrology and hydrogeology 2 The engineering design of the Proposed Development will incorporate lightning mitigation. This will be assessed in accordance with recognised industry standards such as EN/IEC 62305. 1 All construction activities will be suspended during extreme weather events. 2 RECEIVED: 28/08/2026 August 2026 | 16-26 Risk ID Natural Disaster Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score C3 Flooding Human health, biodiversity, soils and geology, hydrology and hydrogeology 2 A Flood Risk Assessment was prepared in accordance with ’The Planning System and Flood Risk Management -Guidelines for Planning Authorities’ issued by the Department of Environment, Heritage and Local Government in November 2009. It was concluded that the proposed development is within Flood Zone C. 1 The flood risk assessment concluded that there is no flood risk to the site. 2 C4 Flash fire, Explosion or Jet fire following compressed gas cylinder release (e.g. acetylene for welding) Human Health 3 There is potential for harm to persons on-site in the vicinity of the hazardous gas release. There will be a berm fronting the public road, providing shielding effects to persons off-site. Detailed method statements, plans and assessments will be produced to carry out compressed gas activities safely. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 1 European Industrial Gases Association standard procedures will be used for the storage and use of gas cylinders. When not in use, cylinders will be stored in external, well-ventilated areas and when in use, appropriately certified equipment will reduce the potential for ignition if a flammable gas is accidentally released. 3 RECEIVED: 28/08/2026 August 2026 | 16-27 Risk ID Natural Disaster Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score C5 Flash fire, Explosion or Jet fire following natural gas release Human Health 3 There is potential for harm to persons in the vicinity of the hazardous gas release. There will be a berm fronting the public road, providing shielding effects to persons off-site. An Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 1 The Gas Networks Ireland (GNI) Code of Practice for Working in the Vicinity of the Transmission Network (Procedure No: AO/PR/127, 2021) will be followed. Detailed method statements, plans and assessments will be produced to carry out natural gas activities safely. 3 RECEIVED: 28/08/2026 August 2026 | 16-28 16.8.5 Operational Phase The major accident hazards, during the operational phase, for the proposed development are presented in Table 16-10. In the scoping phase for this EIAR the potential for impacts to human health and impacts to the environment were assessed. The following scenarios have been identified that could impact the operational phase of the project: ▪ Release of Biogas at the Anaerobic Digesters ▪ Release of Upgraded Biogas at Gas Grid Entry Unit ▪ Release of LPG from LPG tank ▪ Extreme weather resulting in structural damage ▪ Storm events resulting in structural damage ▪ Flooding ▪ Release of organic material at the Anaerobic Digesters All activities involving hazardous and organic materials will follow strict safety protocols, and the likelihood of major accidents affecting human health and the environment is extremely low. The impact and likelihood of these scenarios is assessed in Table 16-10. There are no likely impacts to off- site receptors, as a result of the proposed development, during the operational phase in relation to major accidents and disasters. The proposed development and overall project will comply with the requirements of all relevant health, safety and environmental legislation. RECEIVED: 28/08/2026 August 2026 | 16-29 Table 16-10 Assessment of Major Accidents and Disasters for Operational Phase Risk ID Major Accident Scenario Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score O1 Vapour Cloud Explosion (VCE) following gas release at CHP Human Health 4 There is potential for harm to persons on-site in the vicinity of the CHP compound. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 1 The proposed development will be operated and managed in accordance with all Regulatory requirements. The compound will have a certified leak detection system, which will trip the incoming gas supply if biogas is detected. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 4 RECEIVED: 28/08/2026 August 2026 | 16-30 Risk ID Major Accident Scenario Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score O2 Vapour Cloud Explosion, Jet Fire, Flash Fire and Fireball following release at the Gas Grid Entry Unit Human Health 4 There is potential for harm to persons on-site in the vicinity of the Gas Grid Entry Unit. There will be a berm fronting the public road, providing shielding effects to persons off-site. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 1 The Gas Networks Ireland (GNI) Code of Practice for Working in the Vicinity of the Transmission Network (Procedure No: AO/PR/127, 2021) will be followed. The design will be subject to numerous formal process safety studies to identify and mitigate hazards, such Hazard and Operability (HAZOP) studies. Detailed method statements, plans and assessments will be produced to carry out gas activities safely. Detailed method statements, plans and assessments will be produced to carry out natural gas activities safely. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 4 RECEIVED: 28/08/2026 August 2026 | 16-31 Risk ID Major Accident Scenario Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score O3 Vapour Cloud Explosion, Jet Fire, Flash Fire and Fireball following release at an Anaerobic Digester Human Health 4 There is potential for harm to persons on-site in the vicinity of the digesters. There will be a berm fronting the public road, providing shielding effects to persons off-site. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 1 The design equipment and pipework will be to industry codes and standards to reduce the potential for a loss of containment, including the use of welded connections to avoid potential leak sources. The design will be subject to numerous formal process safety studies to identify and mitigate hazards, such Hazard and Operability (HAZOP) studies. Detailed method statements, plans and assessments will be produced to carry out natural gas activities safely. The Proposed Development will be operated and managed in accordance with all Regulatory requirements. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 4 RECEIVED: 28/08/2026 August 2026 | 16-32 Risk ID Major Accident Scenario Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score O4 Vapour Cloud Explosion, Jet Fire, Flash Fire and Fireball following release at LPG tank Human Health 4 There is potential for harm to persons on-site in the vicinity of the LPG compound There will be a berm fronting the public road, providing shielding effects to persons off-site. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 1 The Irish Standard. 3216:2010+A1:2014 Code of Practice – Bulk storage of liquefied petroleum gas (LPG) – (Edition 2) will be followed. The design will be subject to numerous formal process safety studies to identify and mitigate hazards, such Hazard and Operability (HAZOP) studies. Detailed method statements, plans and assessments will be produced to carry out LPG activities safely. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 4 O5 Extreme heat or cold weather resulting in result structural damage and/or pollution to soils, groundwater or surface waters Human health, biodiversity, soils and geology, hydrology and hydrogeology 2 The proposed development will be constructed, and operated in accordance with all relevant planning, building and environmental licencing codes (Building Regulations, 2012). The engineering design of the facilities will take operation at 1 A Standard Operating Procedure will be implemented for plant operation by personnel during extreme heat and cold. 2 RECEIVED: 28/08/2026 August 2026 | 16-33 Risk ID Major Accident Scenario Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score future climatic conditions into account. O6 Storm events (including lightning) resulting in structural damage and/or pollution to groundwater and surface waters Human health, biodiversity, soils and geology, hydrology and hydrogeology 2 The engineering design of the Proposed Development will incorporate lightning mitigation. This will be assessed in accordance with recognised industry standards such as EN/IEC 62305. 1 A Standard Operating Procedure will be implemented for plant operation by personnel during extreme heat and cold. 2 O7 Flooding Human health, biodiversity, soils and geology, hydrology and hydrogeology 2 A Flood Risk Assessment was prepared in accordance with ’The Planning System and Flood Risk Management -Guidelines for Planning Authorities’ issued by the Department of Environment, Heritage and Local Government in November 2009. It was concluded that the proposed development is within Flood Zone C. 1 The flood risk assessment concluded that there is no flood risk to the site. RECEIVED: 28/08/2026 August 2026 | 16-34 Risk ID Major Accident Scenario Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score O8 Flash fire, Explosion or Jet fire following natural gas release Human Health 3 There is potential for harm to persons in the vicinity of the hazardous gas release. 1 The natural gas pipeline will be underground. The HSA have stated that a release from a below ground pipeline is 1x10-8 per m per year. Therefore, a release of natural gas is very unlikely. 3 O9 Dispersion of CO2 Human health 3 There is the potential for harm from asphyxiation as CO2 is heavier than air and in confirmed spaces displaces oxygen. 1 Design of the process systems to industry codes and standards. Detailed method statements, plans and assessments will be produced to carry out CO2 activities safely. A Site Emergency Response Plan will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. 3 O10 Release of organic material Environment 3 There is potential for high levels of nitrogen and phosphorus to enter surface waters and groundwater. This could lead to eutrophication, causing oxygen depletion and environmental degradation. Based on the TII methodology (2009) the importance of the 1 The digester tank farm bund containment system has been designed in accordance with Section 4 of CIRIA C736F. Compliance with this demonstrates that the containment system has been explicitly designed to manage worst- credible spill events. Therefore, a release of organic material from a digester would be contained within a bund. 3 RECEIVED: 28/08/2026 August 2026 | 16-35 Risk ID Major Accident Scenario Impact Consequence Rating Basis of Consequence Likelihood Rating Basis of Likelihood Risk Score hydrological features at this site is rated as ‘Low’ importance. In the event of a release elsewhere on-site, the proposed development has been designed to have site-wide fully contained engineered process water system is designed to prevent the release of potentially polluting materials to local drains. RECEIVED: 28/08/2026 August 2026 | 16-36 16.8.6 Decommissioning As an Industrial Emissions Licensed site, a Closure, Restoration & Aftercare Management Plan (CRAMP) will be implemented in the event that the site will be decommissioned. The CRAMP will reflect the relevant legislation and guidance available at the time of decommissioning. Mitigation against the risk of major accidents and disasters will be embedded in the CRAMP. Decommissioning of gas infrastructure will be conducted following GNI’s established procedures and the best practices in place at the time of closure. This process will include the safe isolation of all gas infrastructure, removal of the gas inventory, and de-energisation of equipment. Pipework will be purged, degassed, and rendered inert according to GNI’s transmission decommissioning procedure AM/BP/107. Where applicable, any redundant underground infrastructure may be filled with grout to ensure long-term stability. 16.8.7 Cumulative Effects Cumulative effects relate to the potential effects of the proposed development in combination of the potential effects of other developments (referred to as ‘cumulative developments’) within the surrounding area. During both the construction and operational phases, no likely impacts to off-site receptors are predicted. Therefore, from a Major Accidents and Disasters perspective, cumulative effects are considered imperceptible and neutral. No significant cumulative impacts are anticipated in relation to other developments in the vicinity. 16.9 Mitigation Measures The assessment did not identify any likely significant effects arising from the proposed development. The mitigation measures outlined are proportionate to the risks assessed and are either inherent in the design, already integrated into operational controls, or appropriately addressed through established emergency planning procedures. 16.9.1 Renewable Biogas Plant Site A site Major Accident Prevention Policy, including an Emergency Response Plan, will be developed prior to the commencement of operations and will include detailed procedures in the event of a major accident. This plan will follow the framework detailed in Guidance Document 10 of A Framework for Major Emergency Management (DECLG 2015). This plan will contain detailed plans for the response to emergencies such as loss of containment from an Anaerobic Digester, release cylinders of compressed natural gas and severe weather events. The proposed development has been designed in line with good industry practice, and, as such, mitigation against the risk of major accidents and/or disasters is embedded through the design and in accordance with planning and legislative requirements. As no likely significant effects were identified, no additional mitigation measures are proposed. RECEIVED: 28/08/2026 August 2026 | 16-37 16.9.2 Gas Grid Connection These works are outside the control of the applicant, and any mitigation identified for them is presented as recommended rather than committed. 16.10 Residual Impact Assessment The residual effects are the final predicted or intended effects which occur after the proposed mitigation measures have been implemented. As no likely significant effects were identified, no additional mitigation measures are proposed. Therefore, residual effects are not relevant for this assessment. 16.11 Monitoring The berm fronting the public road will be constructed and verified in line with standard geotechnical engineering practices. Material quality, compaction, and slope stability will be inspected and signed off by a qualified engineer prior to handover. Ongoing monitoring of hazardous materials and safety systems will be carried out as part of the site’s Major Accident Prevention Policy and Emergency Response Plan. This ensures the continued effectiveness of controls. The detailed monitoring results, including emissions and plant performance, will be reported annually to the EPA in line with regulatory requirements. Gas Networks Ireland will operate and monitor the Linear Gas Connection according to its regulatory and safety procedures, including leak detection and periodic inspections. 16.12 Interactions Please refer to Chapter 18. 16.13 Conclusion This chapter has reviewed and analysed the potential and the predicted impacts of the proposed development with regards to major accidents and disasters. These impacts have been considered for both the construction and operational phases of the proposed development. The cumulative impact of the proposed development and surrounding developments have also been considered. The proposed development will operate under the relevant licensing and regulatory controls, IED/Industrial Emissions Licence and will be subject to ongoing monitoring and inspections (e.g., integrity checks, leak detection, firewater retention) as part of normal operation under the licence. The proposed development will be a sub-COMAH facility and the provisions of the COMAH Regulations 2015 do not apply to the proposed development. RECEIVED: 28/08/2026 August 2026 | 16-38 There are no Seveso Establishments withing 10 km of the proposed development. The proposed development site is not located within the consultation zones of any Seveso establishment; therefore, there are no constraints to the proposed development at this location from nearby Seveso establishments. There is no significant seismic activity recorded in the vicinity of the proposed development. Therefore, the likelihood of seismic activity impacting the proposed development is negligible; therefore, not significant. The area surrounding the proposed development has a low susceptibility of landslides. Therefore, the likelihood of a landslide impacting the proposed development is negligible; therefore, not significant. The proposed development, and the surrounding area, is not at risk from flooding since the proposed development is located in Flood Zone C. It is concluded that the risk of flooding to the proposed development will be minimal; therefore, the likelihood of a flood impacting the Proposed Development is unlikely and not significant. It is concluded that there are no likely significant impacts to off-site receptors, as a result of the proposed development, during the construction and operational phase in relation to major accidents and disasters. It is concluded that the overall predicted effect, with regards to major accidents and disasters, of the proposed development is not significant. RECEIVED: 28/08/2026 August 2026 | 16-39 16.14 References and Sources Health and Safety Authority Guidance on Technical Land-Use Planning Advice, for planning authorities and COMAH establishment operators (2023) Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations, 2015 (COMAH Regulations 2015) Institute for Environmental Management and Assessment (IEMA) Major Accidents and Disasters in EIA – A Primer (IEMA, 2020) Flood Risk Assessment, AWN Consulting Ltd. (2025) Guidelines on the Information to be contained in Environmental Impact Assessment Reports, Environmental Protection Agency (2022) European Commission (EC), Environmental Impact Assessment of Projects: Guidance on the preparation of the Environmental Impact Assessment Report (EC, 2017). Guidance on Assessing and Costing Environmental Liabilities, Environmental Protection Agency (2014) RECEIVED: 28/08/2026 Stream BioEnergy Ireland Limited CHAPTER 17 SUMMARY OF MITIGATION & MONITORING MEASURES VOLUME II ENVIRONMENTAL IMPACT ASSESSMENT REPORT AUGUST 2026 RECEIVED: 28/08/2026 August 2026 | 17-1 Table of Contents 17 Summary of Mitigation & Monitoring Measures .................................................................. 17-2 17.1 Introduction .......................................................................................................................... 17-2 17.1.1 Construction Phase Mitigation Measures ............................................................................. 17-5 17.1.2 Operational Phase Mitigation Measures .............................................................................. 17-8 17.1.3 Monitoring .......................................................................................................................... 17-11 Table of Tables Table 17-1 Incorporated Design Mitigation ....................................................................................... 17-2 Table 17-2 Construction Phase Mitigation Measures ........................................................................ 17-5 Table 17-3 Operational Phase Mitigation Measures ......................................................................... 17-8 RECEIVED: 28/08/2026 August 2026 | 17-2 17 Summary of Mitigation & Monitoring Measures 17.1 Introduction A key objective of the Environmental Impact Assessment process is to identify likely significant environmental effects at the pre-consent stage and, where necessary, to identify measures to avoid, prevent, reduce or otherwise mitigate such effects. This chapter summarises the incorporated design measures, mitigation measures and monitoring measures identified in Chapters 4 to 16 of the EIAR. The mitigation and monitoring measures applicable to the Renewable Biogas Plant will be incorporated, as appropriate, into the detailed design, Construction Environmental Management Plan (CEMP), operational procedures and other relevant management plans. Construction-phase measures will be incorporated into the CEMP and other relevant construction management plans prior to commencement of the applicable works, while operational measures will be implemented through the design and operation of the facility and, where applicable, through the Industrial Emissions licensing regime. The Linear Gas Grid Connection does not form part of the Proposed Development for which planning permission is sought and will be delivered separately by Gas Networks Ireland under the applicable statutory consenting process. The Applicant does not have control over the detailed design, construction or operation of the Linear Gas Grid Connection and cannot commit Gas Networks Ireland to particular mitigation or monitoring measures. Accordingly, where mitigation or monitoring measures are identified in this EIAR in respect of the Linear Gas Grid Connection, they are presented as recommendations for implementation by Gas Networks Ireland, having regard to GNI's applicable statutory, technical, environmental, construction and operational management requirements. Table 17-1 Incorporated Design Mitigation Aspect Mitigation Population & Human Health ▪ Plant uses best available technologies and systems with planned preventative maintenance to minimise equipment failure. ▪ Operated by skilled and trained personnel qualified to manage a biogas facility. ▪ Feedstock delivered in covered HGVs and handled within enclosed buildings to contain odours. ▪ Main process building sealed; negative pressure maintained with ventilation and air extraction systems. ▪ Extracted air treated via scrubbers, biofilters, and activated carbon filters; discharged through 40m stack to ensure pollutant dispersion. ▪ Fast-acting roller doors and air curtains at HGV entry points reduce fugitive emissions and odour. ▪ Noise reduction via earth berms along southern and eastern boundaries, acoustic enclosures for noise sources, and controlled HGV entry/exit times (07:00–19:00). ▪ Water protection via proper storage, containment, drainage systems, emergency procedures, training, and spill kits; adherence to Land & Soil and Water & Hydrology mitigation. ▪ No significant impacts on human health from Water & Hydrology, Hydrogeology, Land, Soils, or Geology; no further mitigation required. ▪ Visual/landscape design mitigates impacts through site regrading, berm formation, and colour scheme; landscape mitigation measures detailed in Landscape Design Statement and Plan. RECEIVED: 28/08/2026 August 2026 | 17-3 Aspect Mitigation Landscape & Visual ▪ Earthworks regrade site so primary structures sit within the landform, reducing height and visual prominence. ▪ Berms (~6 m high) along southern and eastern boundaries provide screening from public roads and receptors. ▪ Additional roadside berm along L-road frontage limits visibility and integrates development into landscape. ▪ Facility layout clusters taller, complex structures to the west, away from public view; main process building inside berm for coherence and reduced visual clutter. ▪ Grouping and consolidation of plant elements create a unified and legible built form. ▪ Colour scheme designed to blend with surrounding landscape: greens on lower sections, light grey on upper sections to echo natural backdrop. Material Assets: Traffic & Transport ▪ Site access via L2280 on northern road frontage; local road improvements proposed (widening and realignment). ▪ Roadworks confined to public road or applicant-controlled lands. ▪ Occasional local feedstock traffic may arrive via L2280 from Drum, but mostly existing traffic will divert into the site. ▪ Main HGV traffic will use adjoining regional road network for both construction and operational phases. ▪ Internal pedestrian provision includes segregated circulation routes. ▪ High-quality, slip-resistant materials for crossings; dropped crossings designed with shallow gradients for accessibility for all users. Material Assets: Built Services ▪ Surface Water Management: Engineered drainage system with controlled collection and attenuation; infrastructure sized to prevent exceedance flows, reduce sediment transport, and protect downstream systems. ▪ Foul Water & Welfare: On-site welfare facilities during construction with sealed systems; permanent foul water infrastructure segregates solid and liquid streams for safe containment and off-site management. ▪ Water Supply: Process water sourced from reused liquid fractions, attenuated stormwater, and on - site well; potable water connection included as back-up. ▪ Power Supply: Overhead lines re-routed around site; plant self-supplies via on-site CHP engines; backup supply capacity confirmed; utility works conducted safely to minimise service interruptions. ▪ Telecommunications: Connections utilise existing adjacent networks. ▪ Gas Infrastructure: Gas grid connection follows GNI standards, established corridors, and incorporates isolation, pressure control, and monitoring. ▪ Protection of Existing Services: Layout avoids unnecessary interaction with underground services; all works comply with regulatory and utility-provider standards. Material Assets: Waste ▪ Suitable excavated soil and stone will be reused within the Renewable Biogas Plant site for engineering fill, landscaping and screening berms. Approximately 18,600 m³ of surplus excavated soil and stone will require off-site management in accordance with the RWMP. ▪ Correct classification and segregation of soils to identify and manage any potentially contaminated material. ▪ Visual inspection and environmental soil testing (hydrocarbons, metals, PAHs, standard soil classification) to prevent negative impacts on workers, water, and soil. Land & Soils ▪ Proper storage and containment of hazardous substances to prevent contamination. ▪ Engineered drainage systems designed in line with best practice, standards, and relevant guidelines. ▪ Design measures embedded to minimise potential adverse effects on land, soils, and geology. RECEIVED: 28/08/2026 August 2026 | 17-4 Aspect Mitigation Water (Hydrology & Hydrogeology) ▪ Proper storage and containment of hazardous substances to prevent contamination of water. ▪ Engineered drainage systems designed according to best practice, standards, and guidelines. ▪ Design measures embedded to minimise adverse effects on hydrogeology and hydrology. Biodiversity ▪ Engineered stormwater drainage system designed to manage runoff and reduce sediment/pollutant transport, following SuDS principles and CIRIA C753. ▪ Indoor delivery, handling, and processing of feedstock within sealed systems to prevent environmental contamination. ▪ Impermeable surfaces and bunded containment systems for all tanks and pipework to prevent spills (CIRIA C736 compliant). ▪ Stormwater reuse via AD process; discharge only when storage is full, with attenuation to match greenfield runoff (1 in 100-year event + climate change allowance). ▪ Channel drains, swales, and oil-water interceptors incorporated to treat runoff before discharge or reuse. ▪ Containment and recycling of all process effluent and wash-down water to AD process. ▪ Maintenance of ≥5 m ecological buffer zones around ditches to protect amphibian routes and water quality. ▪ Multi-stage odour control system and backup gas flare to minimise odour and GHG emissions; all combustion and stacks comply with EPA limits. ▪ Bunding and secondary containment of all raw material, fuel, fire water, and liquid waste tanks to prevent leaks/spills. ▪ Road improvements at site entrance (widening, realignment) and wheel washes to reduce traffic impacts, dust, and sediment transfer. ▪ Retention of existing hedgerows and treelines where possible; replacement planting where loss occurs. ▪ Landscape mitigation includes native hedgerows, woodland species (high, low, understorey), and wildflower planting to enhance biodiversity and integrate with local habitat. Noise & Vibration ▪ Earth berms along southern and eastern boundaries reduce noise emissions from the site. ▪ All site processes occur within the fully enclosed main process building. ▪ Fast-acting roller shutter doors at HGV entry points maintain buildings closed at all times. ▪ External plant and equipment designed to comply with operational noise limits. Air Quality ▪ Feedstock delivery, handling and processing will take place within enclosed buildings maintained under negative pressure. Extracted air will be treated through the odour control system prior to discharge through the 40 m stack. Fast-acting doors and air curtains will minimise fugitive emissions during vehicle access. Process emission points will be designed and operated in accordance with the applicable IE Licence requirements. Climate ▪ Adequate attenuation and drainage designed to manage increased rainfall and potential future flooding. ▪ Compliance with Part L 2022 (Buildings Other Than Dwellings) and targeting minimum A3 BER. ▪ Energy hierarchy “Be Mean, Be Lean, Be Green” applied: o Be Mean: High-performance U-values, improved air tightness, reduced thermal bridging. o Be Lean: Low-energy plant, natural ventilation, daylight use, energy-efficient LED lighting. o Be Green: Renewable technologies including CHP, heat pumps, and solar PV. ▪ Provision of electric vehicle charging and bicycle parking. ▪ Incorporation of water efficiency measures, e.g., low consumption sanitary fittings. Cultural Heritage ▪ Excavated material reused to form screening berms on southeastern and northwestern site areas. ▪ Berms planted to integrate development into the landscape and reduce visual impact, especially from east and south. RECEIVED: 28/08/2026 August 2026 | 17-5 Aspect Mitigation ▪ Plant structures designed to reflect local agricultural building styles and colours to blend with the surrounding landscape. ▪ Existing field boundary between the site and hilltop enclosure retained to minimise visual distraction from the recorded monument. Major Accidents & Disasters ▪ The Renewable Biogas Plant incorporates process-safety and containment measures including bunded storage, leak detection, pressure control and shutdown systems, appropriate separation and containment of hazardous materials and emergency response arrangements. The detailed design will be subject to applicable process safety studies and statutory requirements. The Linear Gas Grid Connection will be designed and operated in accordance with GNI's applicable safety, integrity and monitoring requirements. 17.1.1 Construction Phase Mitigation Measures Table 17-2 Construction Phase Mitigation Measures Aspect Mitigation Population & Human Health ▪ Biogas Plant: Implementation of mitigation measures as set out in the specialist chapters ▪ Gas Grid: Implementation of mitigation measures as set out in the specialist chapters Landscape & Visual ▪ Adherence to the CEMP, with a qualified CEMP Coordinator appointed for the construction duration. ▪ Implementation of good site management: perimeter hoarding, controlled site lighting, tidy site, proper storage/compound placement, dust minimisation, clean public areas. ▪ Full tree and hedgerow protection following BS5837, with measures implemented per the Arboricultural Report. ▪ Embedded mitigation by design at Biogas Plant Site: o Site regraded to set primary structures into landform, reducing height and visual prominence. o 6 m high berm created along southern and eastern boundaries for screening. o Additional roadside berm introduced. o Layout clusters taller elements to the west, away from receptors. o Main building positioned internally to reduce clutter and create coherent massing. o Colour scheme using local landscape tones (greens at lower levels, light grey upper sections). ▪ Landscape mitigation proposals: o Minimise views of structures and assimilate development into the landscape. o Reinforce landscape character and existing features. o Improve biodiversity by diversifying vegetation. o Shape berms to reflect natural drumlin topography. o Use mature planting to accelerate early screening. o Replant / reinforce boundaries where vegetation removal occurs. ▪ Hedgerow measures: o Western boundary hedgerow retained and bolstered (under-planting, whip planting, advanced nursery stock). o New ‘Type 2’ hedgerows planted on southern boundary (3–4m maintained height). ▪ Native woodland planting introduced around boundaries and internal locations, using mixed canopy layers and local provenance stock. ▪ Native wildflower seeding along northern boundary near entrance to soften views. ▪ Linear Gas Grid Connection: Construction and reinstatement will be undertaken by Gas Networks Ireland in accordance with its applicable construction and environmental management RECEIVED: 28/08/2026 August 2026 | 17-6 Aspect Mitigation requirements. Disturbed road verges and vegetation will be appropriately reinstated following completion of the works. Material Assets: Traffic & Transport ▪ General Construction Traffic: Construction Traffic Management Plan (CTMP) & ‘Construction Environmental Management Plan’ (CEMP) Material Assets: Built Services ▪ Implementation of all construction-phase mitigation in Section 7.9.2, including coordination with service providers, verification of underground services, utility surveys (GPR & electromagnetic), exclusion zones, strict quality control for pipe laying, and full adherence to the CEMP at the Biogas Plant. ▪ Linear Gas Grid Connection: Protection of existing utilities and services will be undertaken by Gas Networks Ireland in accordance with its applicable technical, construction and utility-coordination requirements, including service verification, safe excavation and appropriate quality-control procedures. Material Assets: Waste ▪ Biogas Plant – Litter Pollution: The Contractor will be required to fully implement the RWMP throughout the duration of the proposed construction phase. ▪ Biogas Plant – Unlicensed Waste Collection (Illegal Dumping): All waste leaving the site will be recorded and copies of relevant documentation maintained. ▪ Biogas Plant – Insufficient Waste Facilities: All waste leaving the site will be recorded and copies of relevant documentation maintained. ▪ Biogas Plant – Lack of Waste Classification: All waste material leaving site will be correctly classified and segregation prior to removal where possible. ▪ Gas Grid: Construction resources and waste arising from the pipeline works will be managed by Gas Networks Ireland in accordance with its applicable construction, environmental and waste management procedures and relevant waste legislation. Land & Soils ▪ Renewable Biogas Plant: • Excavation, stockpiling and soil handling will be managed in accordance with the CEMP, SSWMP and RWMP. • Excavated material will be subject to visual inspection and, where required to establish its classification or suitability for a proposed receiving facility, appropriate environmental testing will be undertaken. • Appropriate controls will be implemented for refuelling, concrete works, storage of hazardous materials, sediment control and accidental spills. • Suitable excavated material will be reused within the site where practicable and surplus material will be transferred by suitably authorised contractors to appropriately authorised receiving facilities. ▪ Linear Gas Grid Connection: • Soil excavation, handling, reinstatement, pollution prevention and management of excavated material will be undertaken by Gas Networks Ireland in accordance with its applicable construction and environmental management procedures. Water (Hydrology & Hydrogeology) ▪ Renewable Biogas Plant: • Implementation of the CEMP and Soil and Surface Water Management Plan. • Appropriate sediment and surface-water controls, including silt-control measures and management of runoff from disturbed areas. • Controlled refuelling and storage of fuels and chemicals, provision of spill-response equipment and appropriate management of concrete works. • Appropriate management, treatment and/or disposal of water arising from excavations. RECEIVED: 28/08/2026 August 2026 | 17-7 Aspect Mitigation ▪ Linear Gas Grid Connection: • Gas Networks Ireland will implement appropriate pollution-prevention, excavation-water, sediment-control and spill-response measures in accordance with its applicable construction and environmental management requirements. Specific water-protection measures will apply in the vicinity of the three identified watercourse crossings. Biodiversity ▪ All mitigation from CEMP and specialist chapters (Air Quality, Landscape, Land & Soils, Noise & Vibrations, Water) adopted for ecological protection. ▪ Outline CEMP and Soil & Surface Water Management Plan set out measures for managing construction impacts on biodiversity. ▪ Flora and Fauna: o Ecological Clerk of Works (ECoW) oversees hedgerow clearance, ensures mitigation, and supervises replanting. o Hedgerows enhanced via supplementary native planting; rotational cutting to maintain habitat diversity; minimum height of 2 m. o Root protection zones retained to maintain bat foraging and commuting potential. o Hedgerows and trees to be removed are cut at minimum 30 cm above ground. o Pre-clearance checks will be undertaken where required prior to vegetation removal. If an active bird nest is identified, works capable of affecting the nest will cease and appropriate exclusion and/or timing measures will be established by the ECoW. If a potential or confirmed bat roost is identified, the relevant works will cease pending assessment by a suitably qualified bat ecologist. Any requirement for licensing will be determined in accordance with the applicable statutory requirements and, where appropriate, in consultation with NPWS. o Ecological protection, biosecurity and reinstatement measures associated with the Linear Gas Grid Connection will be implemented by Gas Networks Ireland in accordance with its applicable construction and environmental management procedures. Noise & Vibration ▪ Biogas Plant: Construction noise impacts on surrounding NSLs controlled using best practice measures from BS 5228-1. ▪ Gas Grid Connection: Best-practice construction noise and vibration controls will be implemented in accordance with BS 5228 and GNI's applicable construction and environmental management requirements. Air Quality ▪ Control of construction dust (from construction activities and trackout) using measures in line with IAQM Guidance (2024) and Section 13.11.1. Climate ▪ Greenhouse Gas Emissions: o Appoint competent contractor to undertake waste audits, identify materials for reuse/recycling. o Reuse materials on-site where possible. o Prevent vehicle engine idling. o Maintain and inspect plant and machinery regularly. o Minimise material waste through proper timing and ordering. o Source materials locally where possible to reduce transport CO₂ emissions. • Vulnerability to Future Climate Change: o Contractor to mitigate effects of extreme rainfall/flooding, winds/storms, temperature extremes, fog, lightning, hail via site risk assessments and method statements. o All construction materials accompanied by certified datasheets specifying limiting operating temperatures. Cultural Heritage ▪ Biogas Plant: o Direct negative effect on AA1: Preservation by record through licensed archaeological excavation. RECEIVED: 28/08/2026 August 2026 | 17-8 Aspect Mitigation o Following completion of the licensed archaeological excavation of AA1, topsoil stripping and other initial ground disturbance across the remainder of the Renewable Biogas Plant site will be subject to archaeological monitoring by a suitably qualified archaeologist under the appropriate licence. Should previously unidentified archaeological material be encountered, works in the affected area will cease pending assessment and consultation with the National Monuments Service. ▪ Gas Grid: o Potential negative effect on below-ground archaeology within Zone of Notification (ZoN) of RMP MO022-009, ringfort: Section 12 Notification of Works and licensed archaeological monitoring of ground disturbance. Major Accidents & Disasters ▪ Renewable Biogas Plant: • Construction will be undertaken in accordance with the CEMP, Health and Safety Plan and applicable statutory safety requirements. • Appropriate procedures will apply to the storage and use of compressed gas cylinders, fuels and other potentially hazardous materials and to works during extreme weather. ▪ Linear Gas Grid Connection: • Pipeline construction, tie-in and commissioning activities will be undertaken by Gas Networks Ireland in accordance with its applicable construction, commissioning, safety and emergency- response requirements. 17.1.2 Operational Phase Mitigation Measures Table 17-3 Operational Phase Mitigation Measures Aspect Mitigation Population & Human Health ▪ Biogas Plant (Landscape and Visual Impacts): Implementation of mitigation measures as set out in the specialist chapters ▪ Biogas Plant (Air Quality): Implementation of mitigation measures as set out in the specialist chapter ▪ Biogas Plant (Traffic Generation): Implementation of mitigation measures as set out in the specialist chapter ▪ Biogas Plant (Noise Emissions): Implementation of mitigation measures as set out in the specialist chapters Landscape & Visual ▪ Landscape planting (hedgerows, woodland, wildflower areas) allowed to mature, providing long- term screening and integration into landscape character. ▪ Boundary planting maintains a 3–4 m height; woodland thicket reaches 8–10 m to break up massing. ▪ Linear Gas Grid Connection: Following construction, affected road surfaces, verges and other disturbed areas will be reinstated by Gas Networks Ireland in accordance with its applicable reinstatement requirements. Material Assets: Traffic & Transport ▪ Operational Traffic: Driver Induction Training ▪ Operational Traffic: Site Records Material Assets: Built Services ▪ Implementation of SuDS-based stormwater drainage design and maintenance/upgrade of on-site built services at the Biogas Plant in accordance with service provider requirements. RECEIVED: 28/08/2026 August 2026 | 17-9 Aspect Mitigation ▪ No operational-phase mitigation measures required for the Gas Grid connection infrastructure (maintained by GNI). Material Assets: Waste ▪ Biogas Plant – Unlicensed Waste Collection (Illegal Dumping): The Operator will ensure that all waste leaving the Site will be transported by suitable permitted contractors and taken to suitably registered, permitted or licensed facilities. ▪ Biogas Plant – Poor Waste Segregation: The Operator will ensure that all waste materials will be stored in colour coded bins or other suitable receptacles in designated, easily accessible locations. Bins will be clearly identified with the approved waste type to ensure there is no cross contamination of waste materials. ▪ Biogas Plant – Litter Pollution: The Operator will ensure that all waste collected from the Site of the proposed Development will be reused, recycled or recovered, where possible, with the exception of those waste streams where appropriate facilities are c urrently not available. ▪ Gas Grid: N/A Land & Soils ▪ Biogas Plant – Accidental Spills, Leaks and Discharges: Regular inspection of surface water drainage system including hydrobrake, separators / interceptors, and foul sewers is recommended ensure no accidental discharge occurs to underlying geology. Full ad herence to and implementation of the OEMP. ▪ Biogas Plant – Increased Sediment Run Off from Hardstanding Areas carrying Sediment and Pollutants into the Soil and Bedrock Off-Site: Regular inspection of surface water drainage system including hydrobrake, separators / interceptors, and foul sewers is r ecommended ensure no accidental discharge occurs to underlying geology. Full adherence to and implementation of the OEMP. ▪ Biogas Plant – Future Maintenance Works on Underground Services and Infrastructure involving Soil Excavations and Soil Disturbance and Disposal: Regular inspection of surface water drainage system including hydrobrake, separators / interceptors, and foul sewers is recommended ensure no accidental discharge occurs to underlying geology. Full adherence to and implementation of the OEMP. ▪ Gas Grid – No impact: Not Required Water (Hydrology & Hydrogeology) ▪ Renewable Biogas Plant: • Implementation and maintenance of the permanent surface water management system, including rainwater harvesting, attenuation, flow controls, proprietary surface-water treatment measures and hydrocarbon interception. • Inspection and maintenance of bunding, drainage and containment infrastructure. • Supplementary groundwater abstraction will be operated within the sustainable yield established through pump testing. ▪ Linear Gas Grid Connection: • Following construction and reinstatement, no specific operational hydrology or hydrogeology mitigation is required. Biodiversity ▪ Lighting: Operational lighting will be designed and operated to minimise unnecessary light spill onto retained hedgerows, treelines and other potential bat commuting and foraging features. Lighting will be kept to the minimum necessary for safe operation of the facility. ▪ Noise: Potentially noisy equipment housed within buildings or acoustic containers; noise engineered to minimise impacts on fauna. ▪ Surface water & process effluent: o Impermeable site surfaces; bunds and containment for all tanks and pipework. o Process effluent and wash-down water contained and recycled to AD process to prevent spillages to drains or nearby streams. ▪ SuDS measures: Rainwater harvesting, attenuation storage, oil/water separators, and silt traps to manage surface water runoff. RECEIVED: 28/08/2026 August 2026 | 17-10 Aspect Mitigation ▪ Foul drainage: Treated in on-site package treatment plant and recirculated to AD process. ▪ Regulatory compliance: IE License from EPA ensures strict environmental operation requirements. Noise & Vibration ▪ Biogas Plant: o Plant noise limits implemented. o Site vehicle movements restricted during daytime. ▪ Gas Grid: : Following construction and reinstatement, the buried pipeline will not comprise an active operational noise or vibration source and no specific operational mitigation is required. Air Quality ▪ Operational phase process emissions controlled under IE licence conditions. Climate ▪ Greenhouse Gas Emissions: o Incorporate design mitigation relating to operational energy usage. ▪ Vulnerability to Future Climate Change: o Incorporated design mitigation for drainage and building design. Cultural Heritage ▪ Biogas Plant: o RMP MO022-008, hilltop enclosure: Incorporated design mitigation including screening berms and planting. Major Accidents & Disasters ▪ Renewable Biogas Plant: • Operation in accordance with applicable process-safety, containment, inspection, leak-detection and emergency-response procedures. • Detailed process-safety studies, including HAZOP as appropriate, will inform the final design and operating procedures. • A Firewater Retention Risk Assessment will be completed in accordance with EPA guidance and any required retention measures will be incorporated prior to operation. • Emergency response arrangements will address credible loss-of-containment, fire, explosion, severe-weather and other relevant scenarios. ▪ Linear Gas Grid Connection: • The pipeline will be operated and monitored by Gas Networks Ireland in accordance with its applicable safety, integrity, leak-detection, inspection and emergency-response requirements. RECEIVED: 28/08/2026 August 2026 | 17-11 17.1.3 Monitoring Monitoring will be undertaken throughout the construction and operational phases of the Renewable Biogas Plant, as appropriate, to verify the effective implementation of the mitigation measures identified within the specialist chapters of this EIAR and to confirm compliance with the relevant planning, environmental and regulatory requirements. During construction, the CEMP Coordinator and relevant environmental specialists will undertake inspections and monitoring in accordance with the CEMP and associated management plans. This will include monitoring of construction traffic and compliance with agreed routing and delivery arrangements; maintenance of records relating to waste generation, classification, transport and destination; inspection of soil, surface water, sediment and pollution-prevention controls; and environmental testing of excavated material where required to establish its classification or suitability for a proposed receiving facility. Construction noise and dust monitoring will be undertaken in accordance with the requirements identified in Chapters 12 and 13 respectively. Ecological monitoring will include supervision and inspection by the Ecological Clerk of Works and/or site environmental personnel as required during construction, including oversight of relevant vegetation clearance and ecological protection measures. Following completion of the development, the Landscape and Ecology Aftercare Plan will provide for monitoring and management of retained vegetation, new planting, seeding and habitat creation areas for a minimum of three growing seasons or three years following completion, whichever is longer. Archaeological monitoring will be undertaken in accordance with the measures set out in Chapter 15. This will include the licensed archaeological excavation and preservation by record of AA1 prior to the relevant construction works and archaeological monitoring of topsoil stripping and initial ground disturbance across the remainder of the Renewable Biogas Plant site. Any previously unidentified archaeological material encountered during the works will be managed in consultation with the National Monuments Service and in accordance with the applicable statutory requirements. During operation of the Renewable Biogas Plant, monitoring will be undertaken through the facility's operational management systems and, where applicable, in accordance with the requirements of the Industrial Emissions Licence. This will include maintenance of waste and traffic records; inspection and maintenance of surface water drainage, treatment, attenuation and containment infrastructure; operational emissions monitoring; and operational noise monitoring in accordance with IE Licence requirements. Appropriate inspection, integrity testing and monitoring of containment, storage, process safety, leak detection and emergency response systems will also be undertaken as part of the operation of the facility. Landscape and ecological monitoring will continue during the establishment period to confirm the successful establishment of proposed planting and habitat enhancement measures and to identify any requirement for replacement planting or remedial management. Monitoring and maintenance will thereafter continue as appropriate as part of the long-term landscape management of the site. RECEIVED: 28/08/2026 August 2026 | 17-12 The Linear Gas Grid Connection will be delivered separately by Gas Networks Ireland and the Applicant cannot commit GNI to particular monitoring measures. The monitoring measures identified in the specialist chapters in respect of the Linear Gas Grid Connection are therefore presented as recommendations for implementation by GNI. These include, as appropriate, verification of soil, water, pollution-prevention, ecological and reinstatement measures during construction; archaeological monitoring in the vicinity of RMP MO022-009 in accordance with the applicable statutory requirements; and operational inspection, integrity monitoring and leak detection in accordance with GNI's applicable regulatory, technical, environmental and safety procedures. No specific operational noise, air quality or hydrological monitoring has been identified as necessary in respect of the buried Linear Gas Grid Connection following construction and reinstatement. RECEIVED: 28/08/2026 CHAPTER 18 INTERACTIONS OF THE FOREGOING Stream BioEnergy Ireland Limited AUGUST 2026 VOLUME II ENVIRONMENTAL IMPACT ASSESSMENT REPORT RECEIVED: 28/08/2026 August 2026 |18-1 Table of Contents 18 Interactions of the Foregoing ................................................................................................ 18-3 18.1 Introduction .......................................................................................................................... 18-3 18.2 Population and Human Health .............................................................................................. 18-4 18.2.1 Construction Phase ............................................................................................................... 18-4 18.2.2 Operational Phase ................................................................................................................. 18-7 18.2.3 Interaction of Effects on Common Receptors ....................................................................... 18-9 18.3 Landscape and Visual ............................................................................................................ 18-9 18.3.1 Construction Phase ............................................................................................................... 18-9 18.3.2 Operational Phase ............................................................................................................... 18-10 18.4 Traffic & Transportation ...................................................................................................... 18-11 18.4.1 Construction Phase ............................................................................................................. 18-11 18.4.2 Operational Phase ............................................................................................................... 18-12 18.5 Material Assets: Built Services ............................................................................................ 18-13 18.5.1 Construction Phase ............................................................................................................. 18-13 18.5.2 Operational Phase ............................................................................................................... 18-13 18.6 Material Assets: Waste ....................................................................................................... 18-14 18.6.1 Construction Phase ............................................................................................................. 18-14 18.6.2 Operational Phase ............................................................................................................... 18-15 18.7 Land and Soils ...................................................................................................................... 18-16 18.7.1 Construction Phase ............................................................................................................. 18-16 18.7.2 Operational Phase ............................................................................................................... 18-17 18.8 Water (Hydrology & Hydrogeology).................................................................................... 18-17 18.8.1 Construction Phase ............................................................................................................. 18-17 18.8.2 Operational Phase ............................................................................................................... 18-18 18.9 Biodiversity .......................................................................................................................... 18-19 18.9.1 Construction Phase ............................................................................................................. 18-19 18.9.2 Operational Phase ............................................................................................................... 18-20 18.10 Noise and Vibration ............................................................................................................. 18-21 18.10.1 Construction Phase ............................................................................................................. 18-21 18.10.1.1 Population and Human Health ................................................................................. 18-21 18.10.1.2 Traffic and Transport................................................................................................ 18-22 18.10.1.3 Biodiversity............................................................................................................... 18-22 18.10.2 Operational Phase ............................................................................................................... 18-22 18.11 Air Quality ........................................................................................................................... 18-23 18.11.1 Construction Phase ............................................................................................................. 18-23 18.11.2 Operational Phase ............................................................................................................... 18-24 RECEIVED: 28/08/2026 August 2026 |18-2 18.12 Climate ................................................................................................................................ 18-24 18.12.1 Construction Phase ............................................................................................................. 18-24 18.12.2 Operational Phase ............................................................................................................... 18-25 18.13 Cultural Heritage - Built Heritage Architectural and Archaeology ...................................... 18-25 18.13.1 Construction Phase ............................................................................................................. 18-26 18.13.2 Operational Phase ............................................................................................................... 18-26 18.14 Major Accidents and Disasters ............................................................................................ 18-27 18.14.1 Construction Phase ............................................................................................................. 18-27 18.14.2 Operational Phase ............................................................................................................... 18-28 18.15 Conclusion ........................................................................................................................... 18-28 Table of Tables Table 18-1 Summary of Interactions between Environmental Factors ........................................... 18-30 RECEIVED: 28/08/2026 August 2026 |18-3 18 Interactions of the Foregoing 18.1 Introduction The construction and operational effects associated with the Proposed Project have been assessed within the relevant technical chapters of this EIAR. Environmental effects do not necessarily occur in isolation and an effect arising in relation to one environmental factor may interact with, influence or compound an effect arising in relation to another environmental factor. This chapter therefore considers the interactions and interrelationships between the environmental factors assessed throughout the EIAR. For the purposes of this chapter, the Proposed Project comprises the Renewable Biogas Plant and the associated Linear Gas Grid Connection, insofar as both form part of the project assessed for EIA purposes. The assessment considers interactions arising during both the construction and operational phases of the Proposed Project. In particular, consideration is given to circumstances where a common receptor may be affected through more than one environmental pathway, for example through the combined influence of traffic, noise, air quality, odour, landscape and visual effects on Population and Human Health, or through interactions between Land and Soils, Water quality and Biodiversity. The existence of an interaction does not, in itself, mean that an additional or significant environmental effect will arise. In many cases, the interaction is inherent in, and has already informed, the assessment undertaken within the relevant technical chapters. Accordingly, this chapter does not duplicate the detailed assessment presented elsewhere in the EIAR. Rather, it identifies the main interactions between environmental factors, describes the nature of those interactions and, where appropriate, records the significance of the resulting effects having regard to the mitigation measures identified in the relevant chapters. Table 18.1, presented at the end of this chapter, provides a consolidated summary of the interactions identified during the construction and operational phases. The detailed basis for the conclusions identified in the table is set out in Sections 18.2 to 18.14 below. This chapter has been prepared by Paula Galvin, who has over 20 years’ professional experience in spatial planning and environmental assessment. Paula holds an MSc in Spatial Planning, an MA in Geography and a BA in English and Geography. She also holds a Diploma in Environmental Impact Assessment Management and an Advanced Diploma in Planning and Environmental Law. Paula has extensive experience in the preparation, coordination and review of Environmental Impact Assessment Reports, including the assessment of interactions between environmental disciplines and the integration of specialist technical inputs into the overall EIA. Her experience includes renewable energy and bioenergy developments and, in particular, anaerobic digestion and biomethane projects. Relevant project experience includes work on the Tully biogas development in Northern Ireland and the Little Island Renewable Biogas Plant in Cork for Stream BioEnergy, in addition to the current Proposed Project. . RECEIVED: 28/08/2026 August 2026 |18-4 18.2 Population and Human Health Population and Human Health has the potential to interact with a number of the environmental factors assessed in this EIAR. These interactions arise where changes to the physical environment, including landscape and visual amenity, traffic, noise, air quality and odour, water quality, land and soils, waste management and built services, have the potential to influence residential amenity, safety, health or wellbeing. For the purposes of this section, the assessment considers the Proposed Project, comprising the Renewable Biogas Plant and the associated Linear Gas Grid Connection. Where an interaction relates specifically to either component, this is identified below. The assessment is receptor focused. In addition to considering each environmental pathway individually, regard is had to the potential for more than one effect to be experienced by a common receptor at the same time. The relevant interactions during the construction and operational phases are considered below. 18.2.1 Construction Phase 18.2.1.1 Landscape and Visual Construction of the larger elements of the Renewable Biogas Plant will require cranes, construction plant and other large machinery. These elements are likely to be visible above intervening hedgerows within the immediate and near surroundings of the site and will result in a temporary change in the visual environment experienced by local residents and other receptors. As assessed in the Landscape and Visual Impact Assessment, construction phase visual effects associated with the Renewable Biogas Plant are considered negative and short term, ranging from substantial moderate to moderate. The interaction with Population and Human Health mainly relates to temporary effects on visual amenity and the experience of the surrounding environment during construction. 18.2.1.2 Material Assets: Traffic and Transport Construction of the Proposed Project will generate additional vehicle movements associated with construction personnel, HGV movements, plant deliveries, the importation of construction materials and the removal of material. Increased construction traffic on the local road network has the potential to result in noise, dust, congestion and road safety effects and may increase the potential for conflict between vehicles and pedestrians or cyclists. Temporary disruption of pedestrian and cycle movements may also arise where works take place on or adjacent to the public road network, including during construction of the Linear Gas Grid Connection. The Traffic and Transport assessment identifies the construction traffic effect on human health as negative, not significant and short term. RECEIVED: 28/08/2026 August 2026 |18-5 18.2.1.3 Noise and Vibration Construction activities associated with the Proposed Project will involve the use of a range of plant and equipment with the potential to generate elevated noise levels. The greatest potential construction noise effects arise during particular phases of work at the Renewable Biogas Plant, including advanced works and utility diversions. In the absence of mitigation, effects at the closest noise sensitive locations may range up to significant to very significant and temporary. Following implementation of the identified mitigation measures, residual construction noise effects range from negative, not significant and temporary to short term to negative, significant and temporary, with the highest residual effects associated with advanced works and utility diversions at the closest noise sensitive locations. Residual vibration effects are assessed as negative, not significant and temporary to short term. Construction of the Linear Gas Grid Connection will also result in localised and temporary noise as works progress along the public road corridor. The interaction between Noise and Vibration and Population and Human Health therefore relates to temporary disturbance and effects on residential amenity during construction, including a significant residual effect associated with advanced works and utility diversions at the closest noise sensitive locations. Construction traffic also contributes to the noise environment. The interaction between traffic and noise is assessed as imperceptible to slight, reflecting the relatively low changes in traffic flows associated with the Proposed Project. 18.2.1.4 Air Quality The key potential construction phase air quality effect is associated with dust generated by construction activities and vehicle movements, with the potential for dust nuisance and human exposure at sensitive receptors. The Air Quality assessment identifies a low risk of dust related human health effects during construction. Subject to implementation of the identified mitigation measures, the interaction between Air Quality and Population and Human Health is assessed as direct, short term, negative, localised and not significant. 18.2.1.5 Land and Soils Construction activities associated with the Proposed Project have the potential to affect soil quality through accidental releases of fuels, oils, hydrocarbons or other pollutants. Where contamination occurs, a potential pathway to human health may arise through direct contact or exposure to contaminated dust or vapours. The Renewable Biogas Plant site has historically and currently been used primarily for agriculture, and no known hazardous waste or significant existing soil contamination has been identified. The likelihood of encountering contaminated material is therefore considered low. The interaction between Land and Soils and Population and Human Health arises through the potential source pathway receptor relationship between accidental soil contamination and subsequent human exposure. Following implementation of the mitigation measures identified in the RECEIVED: 28/08/2026 August 2026 |18-6 Land and Soils Chapter, the residual construction effect is assessed as short term, imperceptible and neutral. Construction of the Linear Gas Grid Connection also presents a potential contamination pathway through accidental releases associated with trenching and construction plant. Subject to implementation of the recommended mitigation measures, the residual effect is likewise assessed as short term, imperceptible and neutral. 18.2.1.6 Water, Hydrology and Hydrogeology Construction activities associated with the Proposed Project have the potential to affect surface water and groundwater quality through accidental fuel or oil spillages, contaminated surface water runoff, increased suspended solids and other construction related pollutants. There are no recorded recreational waters, bathing waterbodies or surface water abstraction points located downstream of the Renewable Biogas Plant site. The Drumgole Group Water Scheme abstracts from Annaghmakerig Lough approximately 1.9 km north of the site; however, the Water assessment has established that there is no hydrological connection between the Proposed Development and the lough. The interaction between Water, Hydrology and Hydrogeology and Population and Human Health therefore concerns the potential for construction related releases to create an exposure pathway through groundwater or surface water. Following implementation of the Soil and Surface Water Management Plan and the pollution prevention and mitigation measures identified in the Water, Hydrology and Hydrogeology Chapter, the residual construction effects associated with accidental spills, sediment runoff and contamination of surface water and groundwater are assessed as neutral, imperceptible and short term. The same residual rating applies to construction of the Linear Gas Grid Connection. Accordingly, no significant residual interaction with Population and Human Health is predicted. 18.2.1.7 Material Assets: Waste Construction of the Proposed Project will generate a range of waste materials. Incorrect classification, storage, handling or disposal of construction waste could result in litter, pollution or contamination, with consequent potential effects on residential amenity and human health. The interaction with Population and Human Health therefore arises where inappropriate waste management could create secondary effects through litter, vermin, soil or water contamination or other nuisance effects. A project specific Resource Waste Management Plan has been prepared for the construction phase and provides for the appropriate classification, segregation, storage, reuse, recovery and disposal of waste. Together with the mitigation measures identified in the Waste and Population and Human Health Chapters, these measures will minimise the potential for secondary effects on local residents and human health. RECEIVED: 28/08/2026 August 2026 |18-7 Following implementation of these measures, the residual construction phase effect associated with waste management is assessed as short term, imperceptible and neutral. Accordingly, no significant residual interaction with Population and Human Health is predicted. 18.2.2 Operational Phase During the operational phase, the key interactions with Population and Human Health relate to landscape and visual change, traffic, noise, air quality and odour, waste management, land and soils, water and Major Accidents and Disasters. 18.2.2.1 Landscape and Visual The Renewable Biogas Plant will introduce a long-term change to the existing landscape, with the greatest influence occurring within the immediate surroundings of the site. The Landscape and Visual Impact Assessment identifies operational visual effects ranging from imperceptible, neutral and long-term to moderate, negative and long-term. While the Renewable Biogas Plant has the potential to be prominent in certain views, no significant landscape or visual effects are identified. The interaction with Population and Human Health therefore relates to effects on views, landscape character and visual amenity experienced by local residents and other receptors. 18.2.2.2 Material Assets: Traffic and Transport Operation of the Renewable Biogas Plant will generate an average of 28 HGV trips per day, together with limited staff vehicle movements due to shift working. Having regard to the rural location and relatively low volume of additional traffic, the interaction with Population and Human Health is assessed as neutral, imperceptible and long term/long-term . The plant will operate 24 hours per day, seven days per week; however, deliveries will be restricted to 07:00 to 19:00 Monday to Saturday, with no HGV or LGV deliveries during evening or night time periods. These controls also limit traffic related noise and amenity effects. The Linear Gas Grid Connection will not generate routine operational traffic once installed. 18.2.2.3 Noise and Vibration Operational noise from the Renewable Biogas Plant has the potential to affect residential amenity at nearby noise sensitive locations. Predicted operational noise levels at all noise sensitive locations are at or below the adopted nighttime design limit of 35 dB LAeq,T applicable to areas of low background noise. The residual operational effect is assessed as negative, slight and long-term, and significant health effects are not anticipated. No operational noise or vibration interaction is identified for the Linear Gas Grid Connection once installed. RECEIVED: 28/08/2026 August 2026 |18-8 18.2.2.4 Air Quality Operational emissions from the Renewable Biogas Plant have the potential to interact with Population and Human Health through exposure at sensitive receptors. Detailed dispersion modelling concludes that pollutant concentrations will comply with applicable air quality standards and that the residual operational air quality effect is direct, long-term , negative and not significant. Odour represents a further potential interaction with residential amenity. Odour dispersion modelling predicts concentrations of 0.9 to 1.0 OUE/m³ at the worst case sensitive residential receptor, representing a maximum of 68% of the applicable 1.5 OUE/m³ guideline value. The residual odour effect is therefore assessed as direct, negative, long-term and slight and is not significant. Operational traffic related air quality effects are also not predicted to be significant. 18.2.2.5 Material Assets: Waste Inappropriate storage or management of operational waste could result in litter, localised pollution or the attraction of vermin, with potential consequent effects on residential amenity and human health. Implementation of the Operational Waste Management Plan and the mitigation measures identified in the Waste Chapter will minimise these pathways. The residual interaction with Population and Human Health is assessed as long-term , imperceptible and neutral. 18.2.2.6 Land and Soils During operation of the Renewable Biogas Plant, the potential interaction with Population and Human Health relates to accidental spills or releases affecting soil quality. Following implementation of the operational mitigation measures, the residual effect on Land and Soils is assessed as neutral, imperceptible and long-term. No residual operational effect is identified for the Linear Gas Grid Connection once installed. 18.2.2.7 Water, Hydrology and Hydrogeology There are no recorded recreational waters, bathing waterbodies or surface water abstraction points hydrologically downstream of the Renewable Biogas Plant site. The Drumgole Group Water Scheme abstracts from Annaghmakerig Lough approximately 1.9 km north of the site; however, no hydrological connectivity exists between the site and the lough. Following implementation of the operational drainage, containment and pollution prevention measures, residual effects on surface water and groundwater are assessed as neutral, imperceptible and long-term. Accordingly, no significant interaction with Population and Human Health is identified. No operational effect arises from the Linear Gas Grid Connection once installed. RECEIVED: 28/08/2026 August 2026 |18-9 18.2.2.8 Major Accidents & Disasters Potential major accident scenarios associated with operation of the Proposed Project include fire, explosion and releases of natural gas, biogas or CO₂, with the potential for effects on persons in the vicinity. The Proposed Project incorporates engineered and operational safety controls, leak detection, containment systems and emergency response procedures. Having regard to these measures and the low likelihood of the identified events, the interaction between Major Accidents and Disasters and Population and Human Health is assessed as not significant. 18.2.3 Interaction of Effects on Common Receptors A number of the effects identified above may be experienced by the same receptor. During construction, local residents may experience a combination of visual change, additional traffic, construction noise and dust. During operation, receptors in the vicinity of the Renewable Biogas Plant may experience its long-term visual presence together with operational noise, traffic, air emissions and odour. These effects have been assessed within the relevant technical chapters. The potential for combined effects has been considered having regard to their nature, magnitude, duration and timing and the sensitivity of the receptor. Having regard to the residual effects identified above and the mitigation and operational controls incorporated into the Proposed Project, the interaction of effects on common receptors does not give rise to an additional significant adverse effect beyond those identified and assessed within the individual technical chapters. 18.3 Landscape and Visual Landscape and Visual effects associated with the Proposed Project have the potential to interact with Population and Human Health, Biodiversity and Cultural Heritage. These interactions arise through changes to landscape character, views and visual amenity, habitat and landscape planting, and the setting of cultural heritage receptors. The identified interactions arise from the Renewable Biogas Plant. The Linear Gas Grid Connection will be installed below ground and does not give rise to an operational landscape or visual interaction once installed. 18.3.1 Construction Phase 18.3.1.1 Population and Human Health Construction of the Renewable Biogas Plant will introduce cranes, plant and machinery into the landscape and will result in temporary changes to the character and appearance of the site and surrounding area. RECEIVED: 28/08/2026 August 2026 |18-10 Construction phase visual effects are assessed as negative and short term, ranging from substantial moderate to moderate. The interaction with Population and Human Health relates to temporary effects on views and visual amenity experienced by local residents and other receptors. 18.3.1.2 Biodiversity Construction of the Renewable Biogas Plant will result in the removal of areas of improved agricultural grassland, sections of hedgerow and the central treeline, giving rise to an interaction between physical landscape change and habitat loss. The direct residual habitat effect is assessed in the Biodiversity Chapter as negative, local, minor and short term and not significant. Landscape mitigation provides for replacement and enhancement through new native hedgerow, woodland, grassland and wildflower planting. . 18.3.2 Operational Phase 18.3.2.1 Population and Human Health During operation, the Renewable Biogas Plant will represent a long-term change within the immediate landscape. Operational visual effects range from imperceptible, neutral and long-term to moderate, negative and long-term. The interaction with Population and Human Health relates to the effect on views, perceived landscape character and visual amenity. While the Renewable Biogas Plant has the potential to be prominent in certain views, no significant landscape or visual effects on receptors within the study area are identified. 18.3.2.2 Biodiversity The landscape mitigation strategy provides for additional native hedgerow planting, new woodland, grassland and wildflower areas and enhancement of retained hedgerows. These measures assist in integrating the Renewable Biogas Plant into the surrounding landscape while also providing ecological enhancement. Following establishment of the proposed planting, the residual operational habitat effect is assessed as beneficial, minor and long-term and not significant. 18.3.2.3 Cultural Heritage Landscape and Visual and Cultural Heritage interact where changes to views and landscape character affect the setting or appreciation of heritage receptors. A key operational interaction relates to the recorded hilltop enclosure RMP MO022-008, approximately 110 m southwest of the Renewable Biogas Plant. The development will alter views to RECEIVED: 28/08/2026 August 2026 |18-11 the north-east from the monument only. The Cultural Heritage assessment confirms that this change will not interrupt existing visual relationships with other recorded monuments in the surrounding landscape and will not alter the integrity of the monument. Following incorporated landscape and design mitigation, the residual effect on its setting and visual amenity is assessed as indirect, moderate, negative and long-term. No additional significant interaction between Landscape and Visual and Cultural Heritage is identified. 18.4 Traffic & Transportation Traffic and Transport associated with the Proposed Project has the potential to interact with Population and Human Health, Land and Soils, Water, Noise and Vibration, Air Quality and Climate. These interactions arise through construction vehicle movements, the transport of materials and excavated soils, traffic-related noise and emissions, and the potential for accidental pollution associated with vehicles and plant. 18.4.1 Construction Phase 18.4.1.1 Population and Human Health Construction of the Proposed Project will generate additional movements associated with construction personnel, HGVs, plant deliveries, imported materials and the removal of surplus material. Construction of the Linear Gas Grid Connection will also result in temporary works within the public road corridor. These movements have the potential to affect road safety, accessibility and residential amenity and to cause temporary disruption to pedestrians and cyclists. Following implementation of the construction traffic management measures, the residual construction traffic effect on Population and Human Health is assessed as negative, not significant and short term. 18.4.1.2 Land and Soils Construction of the Proposed Project will require the importation of construction materials and the removal of surplus soil and stone, generating HGV movements on the surrounding road network. Excavated material associated with the Linear Gas Grid Connection will similarly require appropriate management and transport. The interaction between Land and Soils and Traffic and Transport therefore arises directly from the excavation, importation, reuse and off-site movement of materials. These movements are incorporated within the construction traffic assessment and, following implementation of the identified construction traffic management measures, the residual interaction is assessed as negative, not significant and short term. 18.4.1.3 Water, Hydrology and Hydrogeology Construction vehicles and plant create a potential pathway for accidental releases of fuels, oils or other pollutants to surface water or groundwater. Following implementation of the pollution prevention and surface water management measures identified for the Proposed Project, the residual effect on the water environment associated with accidental spills, leaks and discharges is assessed as neutral, imperceptible and short term. RECEIVED: 28/08/2026 August 2026 |18-12 18.4.1.4 Noise and Vibration Construction traffic has the potential to increase road traffic noise on roads surrounding the Proposed Project. The Noise and Vibration assessment considers this interaction by reference to changes in traffic flows. Having regard to the relatively low changes in traffic flows, the interaction between construction traffic and noise is assessed as imperceptible to slight. 18.4.1.5 Air Quality Construction traffic may generate dust through vehicle movements and trackout of material onto the public road network, together with vehicle exhaust emissions. The dust emission magnitude associated with trackout is classified as medium, based on an anticipated 20 to 50 outward HGV movements per day at peak periods. Following implementation of the identified dust mitigation measures, no significant residual air quality effect associated with construction traffic is predicted. 18.4.1.6 Climate Construction vehicles will generate greenhouse gas emissions through fuel consumption. The interaction between Traffic and Transport and Climate is assessed as direct, short term, negative and not significant. 18.4.2 Operational Phase During operation, Traffic and Transport interactions arise from traffic associated with the Renewable Biogas Plant. The Linear Gas Grid Connection will not generate routine operational traffic once installed. 18.4.2.1 Population and Human Health Operation of the Renewable Biogas Plant will generate an average of 28 HGV trips per day, together with limited staff vehicle movements due to shift working. Having regard to the rural location and relatively low volume of additional traffic, the residual interaction with Population and Human Health is assessed as neutral, imperceptible and long-term. 18.4.2.2 Noise and Vibration Deliveries to and from the Renewable Biogas Plant will be restricted to 07:00 to 19:00 Monday to Saturday, with no HGV or LGV deliveries during evening or night time periods. These controls limit the potential for operational traffic noise to affect nearby noise sensitive receptors during the more sensitive periods. The interaction between Traffic and Transport and Noise and Vibration is assessed as imperceptible to slight. 18.4.2.3 Air Quality Operational traffic will generate vehicle exhaust emissions. However, the increase in traffic does not meet the applicable TII screening criteria for detailed operational traffic-related air quality assessment. Accordingly, no significant operational air quality effect arising from traffic is predicted. RECEIVED: 28/08/2026 August 2026 |18-13 18.4.2.4 Climate Operational vehicle movements will generate greenhouse gas emissions. The interaction between Traffic and Transport and Climate is assessed as direct, long-term, negative and not significant. 18.5 Material Assets: Built Services The Proposed Project has the potential to interact with built services through construction works affecting existing infrastructure and through the servicing requirements of the Renewable Biogas Plant during operation. The interactions relate to Water, Population and Human Health, Traffic and Transport, Noise and Vibration and Air Quality. 18.5.1 Construction Phase 18.5.1.1 Water, Hydrology and Hydrogeology Construction activities may interact with surface water drainage infrastructure through runoff and dewatering and will generate temporary water supply and wastewater requirements. Following implementation of the CEMP, Soil and Surface Water Management Plan and the identified servicing measures, the residual built services effect during construction is assessed as neutral, not significant and short term. 18.5.1.2 Population and Human Health Construction works will require the protection and, where necessary, diversion of existing electricity and telecommunications infrastructure. Any planned interruption will be coordinated with the relevant service providers to minimise disruption to existing users. Following implementation of these measures, the residual interaction with Population and Human Health is assessed as neutral, not significant and short term. 18.5.1.3 Traffic and Transport Construction of the Linear Gas Grid Connection will require trenching within the public road corridor and will result in temporary traffic disruption. Following implementation of the recommended construction and traffic management measures, the residual effect is assessed as neutral, not significant and short term. 18.5.1.4 Noise and Vibration / Air Quality Utility diversion, connection and trenching works will generate temporary noise and dust, particularly during construction of the Linear Gas Grid Connection. These effects will be localised and temporary and, following implementation of the relevant mitigation measures, the residual interaction is assessed as neutral, not significant and short term. 18.5.2 Operational Phase During operation, the built services interactions arise from the servicing requirements of the Renewable Biogas Plant. The Linear Gas Grid Connection will form part of the operational gas infrastructure. RECEIVED: 28/08/2026 August 2026 |18-14 18.5.2.1 Water, Hydrology and Hydrogeology The Renewable Biogas Plant incorporates attenuation and treatment of surface water, on site treatment and reuse of foul water, and a water supply strategy prioritising harvested rainwater, supplemented by other available sources. The residual operational effects on surface water drainage, foul water management and water supply are assessed as neutral, imperceptible and long-term. 18.5.2.2 Electrical Infrastructure The Renewable Biogas Plant will meet its electricity requirements through on-site generation, with a connection to the local 10 kV network providing backup supply. The operational effect on electrical infrastructure is assessed as neutral, not significant and long-term. 18.5.2.3 Telecommunications Existing telecommunications infrastructure will largely be retained, with infrastructure at the site entrance undergrounded and a new connection provided to serve the Renewable Biogas Plant. The operational effect on telecommunications infrastructure is assessed as neutral, imperceptible and long-term. 18.5.2.4 Gas Infrastructure The Renewable Biogas Plant will connect to the national gas network through the Linear Gas Grid Connection, which will be delivered and operated by Gas Networks Ireland. The residual operational effect on built services associated with the Linear Gas Grid Connection is assessed as neutral, imperceptible and long-term. 18.6 Material Assets: Waste Waste generated during construction and operation of the Proposed Project has the potential to interact with Land and Soils, Traffic and Transport, Population and Human Health and Biodiversity. These interactions arise through excavation and material management, waste transport and the potential for inappropriate storage, handling or disposal to give rise to secondary environmental effects. 18.6.1 Construction Phase Chapter 8 assesses the overall residual construction waste effect as short term, imperceptible and neutral for the Renewable Biogas Plant and short term, not significant and neutral for the Linear Gas Grid Connection. 18.6.1.1 Land and Soils Construction of the Proposed Project will generate excavated soil, stone and other materials requiring classification, reuse, recovery or disposal. Implementation of the Resource Waste Management Plan and the mitigation measures identified in the Waste and Land and Soils Chapters will ensure that RECEIVED: 28/08/2026 August 2026 |18-15 excavated material is appropriately managed. The residual interaction is assessed as short term, imperceptible and neutral. 18.6.1.2 Traffic and Transport Removal of surplus excavated material and construction waste will generate additional vehicle movements, which are incorporated within the construction traffic assessment. Following implementation of the relevant waste and traffic management measures, the residual interaction is assessed as short term, imperceptible and neutral. 18.6.1.3 Population and Human Health Incorrect storage or management of construction waste could result in litter, localised pollution or the attraction of vermin, with potential effects on residential amenity and human health. Implementation of the Resource Waste Management Plan will minimise these pathways and the residual interaction is assessed as short term, imperceptible and neutral. 18.6.1.4 Biodiversity Inappropriate management of construction waste could result in litter, pollution or vermin affecting ecological receptors. Following implementation of the Resource Waste Management Plan and the mitigation measures identified in the Biodiversity Chapter, the residual interaction is assessed as short term, imperceptible and neutral. 18.6.2 Operational Phase No operational waste will arise from the Linear Gas Grid Connection. Operational waste interactions therefore relate to the Renewable Biogas Plant. 18.6.2.1 Traffic & Transportation Operational waste collections will generate vehicle movements; however, these will be imperceptible in the context of the overall operational traffic generated by the Renewable Biogas Plant. The residual interaction is assessed as long-term, imperceptible and neutral. 18.6.2.2 Population and Human Health Inappropriate storage or management of operational waste could result in litter, localised pollution or vermin, with potential effects on residential amenity and human health. Implementation of the Operational Waste Management Plan will minimise these pathways and the residual interaction is assessed as long-term, imperceptible and neutral. 18.6.2.3 Biodiversity Inappropriate operational waste management could similarly result in litter, pollution or vermin affecting ecological receptors. Following implementation of the Operational Waste Management Plan RECEIVED: 28/08/2026 August 2026 |18-16 and the identified biodiversity mitigation measures, the residual interaction is assessed as long-term, imperceptible and neutral. 18.7 Land and Soils Land and Soils effects associated with the Proposed Project have the potential to interact with Population and Human Health, Water, Biodiversity, Air Quality and Waste. These interactions arise through excavation, earthworks, soil handling and the potential for sediment mobilisation or accidental contamination. 18.7.1 Construction Phase 18.7.1.1 Population and Human Health Construction activities may affect soil quality through accidental releases of fuels, oils or other pollutants, creating a potential pathway for human exposure. Following implementation of the CEMP and identified pollution prevention measures, residual Land and Soils effects are assessed as neutral, imperceptible and short term. 18.7.1.2 Water (Hydrology & Hydrogeology) Excavation, dewatering and soil disturbance may generate sediment laden runoff or allow accidental pollutants to migrate through soils to surface water or groundwater. Following implementation of the Soil and Surface Water Management Plan and relevant mitigation measures, the interaction for both the Renewable Biogas Plant and Linear Gas Grid Connection is assessed as neutral, imperceptible and short term. 18.7.1.3 Biodiversity Soil disturbance, stockpiling and excavation may affect ecological receptors through dust, sediment runoff or accidental pollution. Following implementation of the identified mitigation measures, the interaction between Land and Soils and Biodiversity is assessed as neutral, imperceptible and short term for both elements of the Proposed Project. 18.7.1.4 Air Quality Excavation, soil stripping and stockpiling have the potential to generate fugitive dust. Following implementation of dust control measures, the interaction between Land and Soils and Air Quality is assessed as neutral, imperceptible and short term. No significant residual interaction is predicted for the Linear Gas Grid Connection. 18.7.1.5 Waste Excavated soil and stone will require appropriate classification, reuse, recovery or disposal. The Linear Gas Grid Connection will similarly generate excavated material during trenching. Following implementation of the Resource Waste Management Plan and relevant mitigation measures, the interaction between Land and Soils and Waste is assessed as neutral, imperceptible and short term. RECEIVED: 28/08/2026 August 2026 |18-17 18.7.2 Operational Phase Operational interactions relate to the Renewable Biogas Plant. No residual operational Land and Soils effect is identified for the Linear Gas Grid Connection once installed. 18.7.2.1 Population & Human Health The potential pathway during operation relates to accidental spills or releases affecting soil quality. Following implementation of the operational containment and pollution prevention measures, the residual effect is assessed as neutral, imperceptible and long-term. 18.7.2.2 Water (Hydrology & Hydrogeology) Land and Soils may interact with groundwater and surface water through surface water runoff and accidental releases of fuels or chemicals. Following implementation of the drainage, containment and pollution prevention measures, the residual interaction is assessed as neutral, imperceptible and long- term. No operational interaction arises from the Linear Gas Grid Connection. 18.7.2.3 Biodiversity No significant effect on designated sites or other ecological receptors is identified through the operational Land and Soils environment. The residual interaction is assessed as neutral, imperceptible and long-term. No operational interaction arises from the Linear Gas Grid Connection. 18.8 Water (Hydrology & Hydrogeology) Water effects associated with the Proposed Project have the potential to interact with Population and Human Health, Land and Soils, Biodiversity, Material Assets: Built Services, Traffic and Transport, Air Quality, Climate and Major Accidents and Disasters. 18.8.1 Construction Phase 18.8.1.1 Population and Human Health Construction activities may affect surface water or groundwater through accidental spillages, sediment laden runoff or other pollutants, creating a potential pathway to human receptors. Following implementation of the Soil and Surface Water Management Plan and identified pollution prevention measures, the residual interaction is assessed as neutral, imperceptible and short term. 18.8.1.2 Traffic and Transport Construction vehicles and plant present a potential pathway for accidental releases of fuels or oils to surface water or groundwater. Following implementation of the identified pollution prevention measures, the residual interaction is assessed as neutral, imperceptible and short term. 18.8.1.3 Material Assets: Built Services Construction will generate temporary requirements for water supply, foul water management and surface water drainage. Following implementation of the relevant construction and servicing RECEIVED: 28/08/2026 August 2026 |18-18 measures, the residual interaction with Built Services is assessed as neutral, not significant and short term. 18.8.1.4 Land and Soils Excavation and earthworks may result in sediment laden runoff or accidental contamination migrating between the soil and water environments. Following implementation of the Soil and Surface Water Management Plan and relevant mitigation measures, the interaction is assessed as neutral, imperceptible and short term for both elements of the Proposed Project. 18.8.1.5 Biodiversity Sediment laden or contaminated runoff has the potential to enter the drainage network and affect downstream aquatic and water dependent ecological receptors. Following implementation of the identified water management and ecological mitigation measures, the interaction is assessed as neutral, imperceptible and short term for both the Renewable Biogas Plant and Linear Gas Grid Connection. 18.8.1.6 Air Quality Dust generated by excavation, earthworks and stockpiling may deposit in nearby surface water features. Following implementation of dust control measures, the interaction between Air Quality and Water is assessed as neutral, imperceptible and short term. 18.8.2 Operational Phase Operational interactions relate to the Renewable Biogas Plant. No residual operational effect on the hydrological environment is identified for the Linear Gas Grid Connection once installed. 18.8.2.1 Population and Human Health Operational surface water will be collected, attenuated and treated, with captured water reused within the process where practicable. No hydrological connection exists between the Renewable Biogas Plant and Annaghmakerig Lough, from which the Drumgole Group Water Scheme abstracts. Following implementation of the operational water management measures, the residual interaction with Population and Human Health is assessed as neutral, imperceptible and long-term. 18.8.2.2 Material Assets: Built Services The operational drainage, wastewater and water supply systems are integral to management of the water environment at the Renewable Biogas Plant. Following implementation of the incorporated design and mitigation measures, the residual interaction is assessed as neutral, imperceptible and long-term. 18.8.2.3 Land and Soils Operational runoff will be collected and treated, while fuels and chemicals will be appropriately contained to prevent uncontrolled releases to soil or groundwater. The residual interaction between Water and Land and Soils is assessed as neutral, imperceptible and long-term. RECEIVED: 28/08/2026 August 2026 |18-19 No operational interaction arises from the Linear Gas Grid Connection. 18.8.2.4 Biodiversity The operational drainage strategy provides for the attenuation and treatment of surface water before reuse or discharge, reducing the potential for effects on aquatic and downstream ecological receptors. The residual interaction between Water and Biodiversity is assessed as neutral, imperceptible and long-term. No operational interaction arises from the Linear Gas Grid Connection. 18.8.2.5 Climate Climate change may increase rainfall intensity and associated runoff and flood risk. The Renewable Biogas Plant is located in Flood Zone C, and the drainage system incorporates attenuation for the 1 in 100-year event together with a 30% climate change allowance. The assessment concludes that no significant interaction between Climate and Water, Hydrology and Hydrogeology is predicted. 18.8.2.6 Major Accidents and Disasters A major accidental release of organic material, fuels or chemicals could create a pathway to surface water or groundwater. The engineered containment and drainage systems are designed to contain the identified worst case credible release. Accordingly, no significant residual interaction with the water environment is predicted. 18.9 Biodiversity Biodiversity effects associated with the Proposed Project have the potential to interact with Traffic and Transport, Land and Soils, Water, Noise and Vibration, Air Quality and Major Accidents and Disasters. These interactions arise through disturbance to fauna, sediment and pollution pathways, dust and emissions, and potential accidental releases. 18.9.1 Construction Phase 18.9.1.1 Traffic and Transport Construction traffic, plant movements and associated human activity may temporarily disturb or displace fauna, particularly birds and bats. Construction of the Linear Gas Grid Connection will be localised and short term within an existing road corridor. Following implementation of the CEMP and ecological mitigation measures, residual traffic related disturbance effects are assessed as neutral to imperceptible, short term and not significant. 18.9.1.2 Land and Soils Excavation, earthworks and soil handling may generate sediment laden runoff or accidental contamination capable of affecting adjacent habitats and surface waters. RECEIVED: 28/08/2026 August 2026 |18-20 Following implementation of the CEMP and Soil and Surface Water Management Plan, the residual interaction between Land and Soils and Biodiversity is assessed as neutral, imperceptible and short term for the Proposed Project. 18.9.1.3 Water and Hydrology Sediment laden runoff or accidental releases may enter the drainage network and affect aquatic or water dependent ecological receptors. Following implementation of the identified pollution prevention and water management measures, the residual interaction between Water and Biodiversity is assessed as neutral, imperceptible and short term. 18.9.1.4 Noise and Vibration Construction noise and vibration may temporarily disturb birds and bats using habitats within and adjoining the Proposed Project. This includes temporary disturbance associated with trenching works for the Linear Gas Grid Connection. Following implementation of the identified mitigation measures, residual disturbance effects on birds and bats are assessed as neutral to imperceptible, short term and not significant. 18.9.1.5 Air Quality Construction dust may temporarily affect vegetation and habitats through deposition. Following implementation of the dust control measures, the residual interaction between Air Quality and Biodiversity is assessed as direct, short term, negative, localised and not significant. 18.9.2 Operational Phase Operational interactions relate to the Renewable Biogas Plant. The Linear Gas Grid Connection will be located below ground and will not give rise to significant ongoing biodiversity effects. 18.9.2.1 Land and Soils Operational drainage, hardstanding and containment measures limit the potential for effects on soils capable of indirectly affecting ecological receptors. The residual interaction between Land and Soils and Biodiversity is assessed as neutral, imperceptible and long-term. No operational interaction arises from the Linear Gas Grid Connection. 18.9.2.2 Water and Hydrology Surface water will be attenuated and treated prior to discharge, while fuels and chemicals will be contained and there will be no routine discharge of trade effluent. The residual interaction between Water and Biodiversity is assessed as neutral, imperceptible and long-term. No operational interaction arises from the Linear Gas Grid Connection RECEIVED: 28/08/2026 August 2026 |18-21 18.9.2.3 Noise, Lighting and Faunal Disturbance Operational noise and artificial lighting have the potential to affect fauna, particularly bats using retained hedgerows and treelines. The lighting strategy and ecological design measures minimise this potential disturbance. The residual operational disturbance effect on bats is assessed as neutral and not significant. Separately, new hedgerow, woodland and tree planting will result in a beneficial, minor and long-term residual effect through increased foraging and commuting habitat. The Linear Gas Grid Connection will introduce no operational lighting or noise, and its residual effect is neutral, long-term and not significant. 18.9.2.4 Air Quality Operational emissions are not predicted to result in significant adverse effects on ecological receptors. Accordingly, the residual interaction between Air Quality and Biodiversity is assessed as not significant. 18.9.2.5 Major Accidents and Disasters Potential major accident pathways include releases of organic material or other pollutants, fire, explosion, flooding and ground instability. Having regard to the engineered containment, drainage and other embedded mitigation measures, no likely significant residual effects on Biodiversity arising from Major Accidents and Disasters are predicted. 18.10 Noise and Vibration Noise and vibration associated with the Proposed Project have the potential to interact with Population and Human Health, Traffic and Transport and Biodiversity. Construction effects arise from plant, earthworks, breaking, piling where required, construction traffic and installation of the Linear Gas Grid Connection. Operational effects arise from the Renewable Biogas Plant and associated traffic. 18.10.1 Construction Phase 18.10.1.1 Population and Human Health During Construction noise and vibration may temporarily affect residential amenity at nearby noise sensitive locations. Following implementation of the identified mitigation measures, residual construction noise effects are assessed as negative, not significant to moderate and temporary to short term. Residual vibration effects are assessed as negative, not significant and temporary to short term. RECEIVED: 28/08/2026 August 2026 |18-22 18.10.1.2 Traffic and Transport Additional construction traffic will increase road traffic noise on parts of the surrounding road network. The residual construction traffic noise effect is assessed as negative, imperceptible to slight and temporary to short term. 18.10.1.3 Biodiversity Construction noise and vibration may temporarily disturb or displace fauna, particularly birds and bats. The Linear Gas Grid Connection will also generate temporary disturbance during trenching works. Following implementation of the CEMP and ecological mitigation measures, residual effects on fauna are assessed as neutral to imperceptible, short term and not significant. 18.10.2 Operational Phase The Linear Gas Grid Connection will not generate operational noise or vibration once installed. Operational interactions therefore relate to the Renewable Biogas Plant. 18.10.2.1 Population and Human Health The Renewable Biogas Plant will operate continuously, and operational plant has the potential to affect nearby noise sensitive locations. The design has been assessed against a night time criterion of 35 dB LAeq,T, reflecting the area's low background noise environment. Following implementation of the operational noise controls, the residual noise effect is assessed as negative, slight and long-term. Operational vibration effects are neutral and not significant. 18.10.2.2 Traffic and Transport Operational traffic will increase road traffic noise on parts of the surrounding road network. The greatest calculated increase occurs on the short section of the L2280 between the site entrance and R189; however, there are no noise sensitive locations along that section. Having regard to the predicted changes and separation from receptors, the operational traffic noise effect is assessed as negative, imperceptible to slight and not significant. 18.10.2.3 Biodiversity Operational noise and lighting may affect fauna, particularly bats using retained hedgerows and treelines. These effects are addressed through the operational noise controls, lighting design and ecological mitigation. No significant residual interaction between operational Noise and Vibration and Biodiversity is predicted. The Linear Gas Grid Connection will introduce no operational noise or vibration. RECEIVED: 28/08/2026 August 2026 |18-23 18.11 Air Quality Air Quality effects associated with the Proposed Project have the potential to interact with Population and Human Health, Traffic and Transport, Land and Soils, Biodiversity and Climate. Construction effects arise from dust and vehicle emissions, while operational effects arise from process emissions, odour and traffic associated with the Renewable Biogas Plant. The construction assessment includes both elements of the Proposed Project; no significant operational emissions arise from the Linear Gas Grid Connection. 18.11.1 Construction Phase 18.11.1.1 Population and Human Health Construction activities may generate dust and vehicle emissions capable of affecting nearby sensitive receptors through dust nuisance and human health pathways. Following implementation of the identified dust control measures, the residual interaction with Population and Human Health is assessed as direct, short term, negative, localised and not significant. 18.11.1.2 Traffic and Transport Construction traffic may contribute to local air emissions through vehicle exhaust, dust generation and trackout. The residual interaction between Traffic and Transport and Air Quality is assessed as direct, short term, neutral, localised and not significant. 18.11.1.3 Land and Soils Excavation, soil handling and movement of construction vehicles may generate fugitive dust, creating an interaction between Land and Soils and Air Quality. Following implementation of dust suppression measures, the residual interaction is assessed as neutral, imperceptible and short term. 18.11.1.4 Biodiversity Construction dust may deposit on vegetation and habitats and, if uncontrolled, affect ecological receptors. Following implementation of the identified mitigation measures, the residual interaction is assessed as direct, short term, negative, localised and not significant. 18.11.1.5 Climate Air Quality and Climate share common emission sources, the combustion of fuels by construction plant and vehicles. Air quality does not itself result in an effect on climate; rather, emissions from these common sources are assessed separately under the respective disciplines. Accordingly, no additional significant interaction effect is identified. RECEIVED: 28/08/2026 August 2026 |18-24 18.11.2 Operational Phase Operational air quality interactions relate to the Renewable Biogas Plant. No significant operational emissions arise from the Linear Gas Grid Connection once installed. 18.11.2.1 Population and Human Health Operational process emissions have the potential to affect air quality at nearby sensitive receptors. Dispersion modelling confirms compliance with the applicable air quality standards and the residual effect is assessed as direct, long-term, negative and not significant. Odour also represents an interaction with residential amenity. Predicted concentrations at the worst case residential receptor are 0.9 to 1.0 OUE/m³, equivalent to a maximum of 68% of the applicable 1.5 OUE/m³ guideline value. The residual odour effect is assessed as direct, negative, long-term and slight. 18.11.2.2 Traffic & Transport Operational traffic will generate vehicle emissions; however, the increase in traffic does not trigger the applicable criteria for detailed air quality assessment. The residual interaction between operational Traffic and Transport and Air Quality is assessed as long- term, direct, neutral and not significant. 18.11.2.3 Climate Operational combustion sources generate both local air pollutants and greenhouse gas emissions. This represents a common source relationship rather than an additional environmental effect and is assessed separately within the Air Quality and Climate Chapters. No additional significant interaction effect is identified. 18.12 Climate Climate effects associated with the Proposed Project have the potential to interact with Land, Soils, Geology and Hydrology, Air Quality, Traffic and Transport and Waste. These interactions arise through climate resilience and surface water management, common combustion sources, vehicle emissions and the carbon implications of waste management. 18.12.1 Construction Phase 18.12.1.1 Land, Soils and Hydrology Climate and the land and water environments interact through rainfall, runoff and surface water management. The construction phase interaction is assessed as direct, short term, negative and imperceptible. RECEIVED: 28/08/2026 August 2026 |18-25 18.12.1.2 Air Quality Air quality does not itself affect climate; rather, the emission sources give rise to both local air pollutants and greenhouse gas emissions. Accordingly, no additional significant interaction effect is identified. 18.12.1.3 Traffic and Transport Construction vehicles will generate CO₂ emissions through fuel consumption. The interaction between Traffic and Transport and Climate is assessed as direct, short term, negative and not significant. 18.12.1.4 Waste Waste prevention, reuse and recycling will reduce the quantity of material requiring disposal to landfill and its associated embodied carbon emissions. The construction phase interaction between Waste and Climate is assessed as direct, short term, negative and not significant. 18.12.2 Operational Phase 18.12.2.1 Land, Soils, Geology and Hydrology Climate change may result in increased rainfall and associated runoff and flood risk. The surface water drainage system has therefore been designed to accommodate increased future rainfall. The operational interaction is assessed as direct, long-term, negative and imperceptible. 18.12.2.2 Air Quality Operational combustion sources generate both air pollutants and greenhouse gas emissions. This represents a common source relationship rather than a separate additional environmental effect. Accordingly, no additional significant interaction effect is identified. 18.12.2.3 Traffic and Transport Operational vehicle movements will generate CO₂ emissions. The interaction between Traffic and Transport and Climate is assessed as direct, long-term, negative and not significant. 18.12.2.4 Waste Operational waste management measures prioritise waste prevention, reuse and recycling, limiting disposal to landfill and the associated embodied carbon emissions. The operational interaction between Waste and Climate is assessed as direct, long-term, positive and not significant. 18.13 Cultural Heritage - Built Heritage Architectural and Archaeology Cultural Heritage has the potential to interact with Land and Soils during construction and Landscape and Visual during operation. These interactions arise through ground disturbance affecting archaeological remains and changes to the landscape setting of cultural heritage receptors. The RECEIVED: 28/08/2026 August 2026 |18-26 Cultural Heritage assessment concludes that no additional significant interactive effects arise beyond those assessed within the relevant technical chapters. 18.13.1 Construction Phase 18.13.1.1 Land & Soils Groundworks associated with construction of the Renewable Biogas Plant will directly affect the truncated remains of a probable fulacht fia (AA1) identified through archaeological investigation. In the absence of mitigation, the effect is assessed as significant, negative and long-term. The remains will be preserved by record through full licensed archaeological excavation in advance of construction. Following mitigation, the residual effect is assessed as negative, moderate and long- term. The Linear Gas Grid Connection intersects the Zone of Notification of recorded ringfort RMP MO022- 009, creating potential for ground disturbance to affect surviving below ground archaeological remains. A Section 12 notification and licensed archaeological monitoring of works within the Zone of Notification are proposed. Following implementation of the identified mitigation, no significant residual archaeological effect is predicted. 18.13.2 Operational Phase 18.13.2.1 Landscape & Visual The operational interaction relates to the setting and visual amenity of the recorded hilltop enclosure RMP MO022-008, approximately 110 m southwest of the Renewable Biogas Plant. The development will result in a change to views to the north-east from the monument; however, this change is limited to one direction only and does not alter the integrity of the monument. The Cultural Heritage assessment also confirms that the development will not interrupt any existing intervisibility or visual relationships between the hilltop enclosure and other recorded monuments in the surrounding landscape. In particular, there is no existing intervisibility between the hilltop enclosure and the nearby stone row RMP MO017-068. Following incorporated landscape and design mitigation, the residual effect on the setting and visual amenity of the monument is assessed as indirect, moderate, negative and long-term. The Renewable Biogas Plant is also located within the historic mapped extent of the former New Park estate. However, the area occupied by the development was historically in agricultural use rather than forming part of the designed parkland associated with New Park House and is no longer legible as part of a 19th-century designed landscape. The historic setting and outlook of New Park House are focused to the south and south-east, away from the Renewable Biogas Plant, and the development will not be visible from the house due to the intervening topography, mature vegetation and existing farm buildings. The area containing the Renewable Biogas Plant does not therefore contribute to the significance or historic setting of New Park House. The Cultural Heritage assessment identifies a slight, negative effect on the former estate area during operation, but no effect on the setting of New Park House itself. No operational Cultural Heritage effects are identified for the Linear Gas Grid Connection. RECEIVED: 28/08/2026 August 2026 |18-27 18.14 Major Accidents and Disasters Major Accidents and Disasters have the potential to interact with Population and Human Health, Land and Soils, Water, Hydrology and Hydrogeology and Biodiversity. Relevant pathways include fire and explosion, accidental loss of containment, extreme weather and flooding, ground instability and releases of pollutants to the receiving environment. Chapter 16 concludes that, taking account of the embedded design, safety systems, operational controls and emergency response measures, no likely significant effects arising from Major Accidents and Disasters are predicted. 18.14.1 Construction Phase 18.14.1.1 Population and Human Health Potential construction phase events include releases of environmentally harmful materials or compressed gas, extreme weather and a natural gas release associated with construction of the Linear Gas Grid Connection. Having regard to the CEMP, weather related suspension procedures, gas cylinder handling protocols and GNI procedures for works near gas infrastructure, the interaction between Major Accidents and Disasters and Population and Human Health is assessed as not significant. 18.14.1.2 Land and Soils Excavation, earthworks and stockpiling have the potential to interact with Major Accidents and Disasters through ground instability, subsidence or landslide. The site is identified as having low landslide susceptibility. A detailed geotechnical stability assessment, including factor of safety analysis for the berm adjacent to the public road, will be completed prior to construction. On this basis, Chapter 16 concludes that there is no credible pathway for a major accident or disaster to arise from berm construction. 18.14.1.3 Water and Biodiversity Extreme weather, accidental releases or storm events could result in contaminants entering surface water or groundwater, with consequent effects on ecological receptors. The construction phase assessment concludes that the likelihood of major accidents affecting off site receptors is extremely low. With the identified pollution prevention and water management measures in place, no significant interaction with Water or Biodiversity is predicted. RECEIVED: 28/08/2026 August 2026 |18-28 18.14.2 Operational Phase 18.14.2.1 Population and Human Health Potential operational scenarios include fire or explosion following loss of containment of gas or biogas, releases associated with the Gas Grid Entry Unit or Linear Gas Grid Connection, and accidental releases of CO₂. The Renewable Biogas Plant incorporates engineered safety systems, leak detection, shutdown and pressure relief systems, operational procedures and emergency response arrangements. Having regard to the likelihood and consequence assessment in Chapter 16, no likely significant effect on Population and Human Health is predicted. 18.14.2.2 Water, Hydrology and Hydrogeology Structural failure of a digester tank and release of organic material represents a potential pathway to surface water and groundwater. Chapter 16 assesses this as a credible major accident scenario; however, the tank farm containment system is designed to manage the worst case credible release. Accordingly, no significant interaction with the water environment is predicted. 18.14.2.3 Biodiversity Loss of containment, contaminated firewater, fire or explosion could affect habitats or fauna either directly or through the water environment. The engineered drainage containment system and bunding substantially limit the potential for effects beyond the Renewable Biogas Plant site. Any effects of fire or explosion on flora and fauna are predicted to be localised and not significant. Accordingly, no likely significant effect on Biodiversity arising from Major Accidents and Disasters is predicted. 18.15 Conclusion This chapter has considered the key interactions and interrelationships between the environmental factors assessed in the EIAR during the construction and operational phases of the Proposed Project, comprising the Renewable Biogas Plant and associated Linear Gas Grid Connection. The assessment demonstrates that the main interactions arise where a common receptor may be affected through more than one environmental pathway. These include interactions between traffic, noise, air quality, odour and landscape and visual effects in relation to Population and Human Health; interactions between Land and Soils, Water and Biodiversity; and interactions associated with waste management, climate, cultural heritage and Major Accidents and Disasters. The relevant interactions have informed the design of the Proposed Project and the mitigation measures identified within the individual technical chapters. These include construction environmental management and pollution prevention measures, surface water and drainage controls, dust and noise mitigation, ecological protection measures, archaeological mitigation, landscape RECEIVED: 28/08/2026 August 2026 |18-29 planting and screening, operational containment and process controls, and measures relating to accident prevention and emergency response. Certain residual effects remain following mitigation, as identified within the relevant technical chapters. These include temporary construction noise effects at the closest noise sensitive receptors, a moderate long-term archaeological effect associated with the preservation by record of the identified fulacht fia, and moderate effects on the setting of the recorded hilltop enclosure. These effects have been fully considered in the relevant assessments and in the interaction, assessment presented in this chapter. Having regard to the nature, scale and duration of the identified interactions and to the incorporated design and mitigation measures, no additional significant environmental effects are predicted to arise as a consequence of interactions between the environmental factors beyond those already identified and assessed within the individual technical chapters of the EIAR. Table 18.1 provides a consolidated summary of the interactions identified for the construction and operational phases of the Proposed Project. RECEIVED: 28/08/2026 August 2026 |18-30 Table 18-1 Summary of Interactions between Environmental Factors Key: C = Construction Phase; O = Operational Phase; C/O = Construction and Operational Phases; — = No material interaction identified. Environmental Factor P&HH L&V Traffic Built Services Waste Land & Soils Water Biodiversity Noise Air Quality Climate Cultural Heritage MA&D Population & Human Health — C/O C/O C C/O C/O C/O — C/O C/O — — C/O Landscape & Visual — — — — — — C/O — — — O — Traffic & Transport — C C/O C C C C/O C/O C/O — — Built Services — — — C/O — C C — — — Waste — C — C/O — — C/O — — Land & Soils — C/O C/O — C C/O C C Water — C/O — C C/O — C/O Biodiversity — C/O C/O — — C/O Noise & Vibration — — — — — Air Quality — C/O — — Climate — — — Cultural Heritage — — MA&D — Note: The table identifies the phases during which the key interactions considered in Chapter 18 arise. The identification of an interaction does not indicate that a significant effect will occur. The nature and significance of each interaction, including relevant mitigation and residual effects, are described in Sections 18.2 to 18.14. RECEIVED: 28/08/2026