Loading...
HomeMy WebLinkAbout2660018 - F.I. Received Doc. - McCutcheon Halley Chartered Planning Consultants Response Response to Further Information Request Proposed Development of Renewable Biogas Plant at the site in the townlands of Maghernakelly & Drumcall, Drum, Co. Monaghan on behalf of Stream BioEnergy Ireland Limited August 2026 RECEIVED: 28/08/2026 1 August 2026 | Response to Further Information Request Document Control Sheet Client Stream BioEnergy Ireland Limited Project Title Monaghan Renewable Biogas Plant Document Title Response to Further Information Request Document Comprises Volumes - Pages (Including Cover) 33 Appendices 2 Prepared by Ignatius Lo Checked by Paula Glavin Office of Issue Dublin Document Information Revision A Status Final Issue Date August 2026 DUBLIN Kreston House Arran Court Arran Quay Dublin 7 D07 K271 T. +353 (0)1 804 4477 CORK 6 Joyce House Barrack Square Ballincollig Cork P31 YX97 T. +353 (0)21 420 8710 www.mhplanning.ie RECEIVED: 28/08/2026 2 August 2026 | Response to Further Information Request Contents 1. Introduction ............................................................................................... 3 1.1 Consultation with Monaghan County Council .................................. 4 1.2 Effect of Removal of the Soil Relocation Area on the FI .................. 4 1.3 Additional archaeological investigation ............................................ 5 1.4 Scope of Revised Documentation ...................................................... 5 1.4.2 Environmental Impact Assessment Report .................................. 6 1.4.3 Appropriate Assessment Screening Report ................................. 7 1.4.4 Other Supporting Documentation ................................................ 8 1.4.5 Drawings ........................................................................................... 8 1.5 Planning Statement .............................................................................. 9 2. Response to Further Information Request .......................................... 10 2.1 Further Information Request Point 1 .............................................. 10 2.2 Further Information Request Point 2 .............................................. 11 2.2.6 DAFM Screening ............................................................................. 11 2.2.7 Agriculture ...................................................................................... 12 2.2.8 Hydrology/Bog ............................................................................... 12 2.2.9 Fill volumes ..................................................................................... 13 2.3 Further Information Request Point 3 .............................................. 14 2.4 Further Information Request Point 4 .............................................. 17 2.5 Further Information Request Point 5 .............................................. 19 2.6 Further Information Request Point 6 .............................................. 21 2.7 Further Information Request Point 7 .............................................. 22 2.8 Further Information Request Point 8 .............................................. 23 2.8.10 Car Parking ................................................................................. 23 2.8.11 Vehicle Swept Path Assessments ............................................ 27 2.8.12 EIAR clarity .................................................................................. 28 2.9 Further Information Request Point 9 .............................................. 28 2.10 Further Information Request Point 10 ............................................ 30 3. Conclusion ............................................................................................... 31 RECEIVED: 28/08/2026 3 August 2026 | Response to Further Information Request 1. Introduction This Further Information submission has been prepared by McCutcheon Halley Chartered Planning Consultants (MHP) on behalf of Stream BioEnergy Ireland Limited in response to the Request for Further Information issued by Monaghan County Council on 24 March 2026 in respect of Planning Reg. Ref. 26/60018. The Further Information request raised a range of matters relating to the environmental assessment of the Proposed Project, and specifically, the proposed Soil Relocation Area, archaeology and cultural heritage, landscape, access and traffic, parking, and the matters raised in submissions received on the application. In issuing the request, the Planning Authority specifically advised the Applicant to consult with the relevant sections of Monaghan County Council prior to making its formal response. The Applicant has taken that opportunity to undertake a comprehensive review of the application rather than respond to the individual Further Information items in isolation. Since receipt of the request, the project team has engaged directly with the Planning Authority and relevant Council representatives, undertaken additional field investigation and specialist assessment, reviewed the design and construction methodology, and updated the EIAR and supporting application documentation to ensure that the Further Information response is based upon a single, consistent and fully assessed revised proposal. The main amendment arising from this process is the removal of the approximately 2.6 hectare Soil Relocation Area previously proposed east of the R189. The application proposed the reprofiling of that agricultural field using surplus excavated soil and stone generated during construction of the Renewable Biogas Plant. Following consideration of Item 2 of the Further Information request and engagement with the Planning Authority, the Applicant reviewed the need to retain this element of the application. The Soil Relocation Area is not required for the operation or functioning of the Renewable Biogas Plant. An alternative means of managing the surplus excavated material is available through its removal by suitably authorised contractors for appropriate reuse, recovery or disposal at an appropriately authorised receiving facility. The Applicant therefore elected to omit the separate land reprofiling element from the application. This approach simplifies the physical extent of the Proposed Development and removes the separate construction activity and access associated with the eastern agricultural field. For clarity, the decision to remove the Soil Relocation Area does not arise from any conclusion that the eastern field is environmentally unsuitable for the works originally proposed or that unacceptable environmental effects had been established. Rather, it represents a refinement of the application whereby an ancillary element that is not necessary to the functioning of the Renewable Biogas Plant has been omitted and the surplus material will RECEIVED: 28/08/2026 4 August 2026 | Response to Further Information Request instead be managed through the established authorised waste /resource- management system. The revised Proposed Development is consequently confined to the Renewable Biogas Plant and associated works for which planning permission is sought. The eastern field is no longer part of the proposed development for which consent is sought. 1.1 Consultation with Monaghan County Council Following receipt of the Further Information request, the Applicant and project team commenced direct engagement with Monaghan County Council in accordance with the Planning Authority's invitation to consult with the relevant Council sections. An initial meeting was held on the 27th of April 2026 to discuss the Further Information request and the appropriate approach to the matters raised. The meeting was attended by representatives of the Council's Planning, Environment, Heritage and Roads sections, as relevant to the individual Further Information items. The Planning Authority subsequently confirmed that, where no development was proposed within the Soil Relocation Area, the eastern field should be removed from the red line boundary so that the application clearly reflected the revised proposal. The Council also confirmed that the amendment would likely constitute Significant Further Information and that the revised development description should therefore be reflected in the Significant Further Information site and newspaper notices. The Council further noted that the requirements of Items 2(a) and 2(b), which related specifically to DAFM EIA screening and preparation of an Agricultural Improvement Plan for the former Soil Relocation Area, would no longer arise where the reprofiling proposal was omitted. A further meeting was held in August 2026 with representatives from the Planning Authority and Heritage, together with relevant members of the project team, at which progress on the Further Information response, the revised proposal and the additional technical work were discussed. This engagement has informed the scope and presentation of the Further Information response; the Applicant nevertheless recognises that the application falls to be determined by the Planning Authority having regard to the full planning and environmental assessment now submitted. 1.2 Effect of Removal of the Soil Relocation Area on the FI The removal of the Soil Relocation Area has a direct bearing on a number of the matters raised in the Further Information request. Items 2(a) and 2(b), concerning DAFM screening and an Agricultural Improvement Plan for the RECEIVED: 28/08/2026 5 August 2026 | Response to Further Information Request proposed reprofiling works, no longer arise. The aspects of Item 2(c) directed specifically to the hydrological relationship between the former Soil Relocation Area, cutover peat and surrounding bog lands similarly no longer arise from the revised proposal, although the hydrological and hydrogeological assessment of the Renewable Biogas Plant itself has been reviewed and updated. Item 2(d), concerning the quantity and derivation of surplus excavated material, remains relevant and is addressed in full. Item 6 of the Further Information request related exclusively to the proposed construction access from the L2320 serving the former Soil Relocation Area. As that element has been removed, no development related traffic will use that access and the requirement for visibility splays and associated third - party agreements no longer arises. The remaining Further Information items continue to apply and have been addressed through additional information, further field investigation, specialist assessment and/or revisions to the EIAR and supporting documents. 1.3 Additional archaeological investigation A substantial programme of additional archaeological investigation has been undertaken in response to Item 3. Following consultation with the National Monuments Service, further archaeological testing was undertaken under Licence No. 26E0370. Eleven additional trenches, totalling approximately 360 linear metres, were excavated across Fields 1 and 2, including areas where no archaeological anomalies had previously been identified. The previously excavated Trench 6 was also extended to establish the full extent and character of Archaeological Area AA1. The additional testing confirmed AA1 as a small and already truncated burnt mound/fulacht fia deposit with a possible associated trough. The burnt mound spread was defined as approximately 3m by 2.8 m and approximately 0.10m in average depth and had been truncated by a modern linear ditch. Importantly, no additional archaeological features or finds were identified elsewhere within the Proposed Development site. The archaeological resource within the site is therefore now substantially better understood than at the time of the original application. The updated Cultural Heritage assessment provides for preservation by record of AA1 through licensed archaeological excavation prior to the relevant construction works, together with archaeological monitoring of topsoil stripping and initial ground disturbance across the remainder of the Renewable Biogas Plant site. 1.4 Scope of Revised Documentation The Further Information submission comprises a coordinated suite of revised and additional documentation. Documents have been revised where the RECEIVED: 28/08/2026 6 August 2026 | Response to Further Information Request removal of the Soil Relocation Area, additional fieldwork, further technical analysis or the specific matters raised by the Planning Authority necessitate an amendment. Documents which remain technically valid have not been unnecessarily reproduced. 1.4.2 Environmental Impact Assessment Report The EIAR has been comprehensively reviewed to ensure that the project description, assessment assumptions, mitigation, monitoring, interactions and residual effect conclusions consistently relate to the revised Proposed Project. Amendments arising from the Further Information process are identified within the revised EIAR for ease of review. • Volume I - updated Non-Technical Summary • Volume II - updated Chapters 1-17 and new Chapter 18 o revised Chapter 1 Introduction, including explanation of the FI process and updated EIAR; o revised Chapter 2 Project Description, including removal of the SRA and revised soil management arrangements; o revised Chapter 3 Alternatives, recording the design evolution associated with off site management of surplus material; o revised Chapter 4-16: updated specialist chapters; o revised Chapter 17 Summary of Mitigation and Monitoring; o Chapter 18: Interactions, dealing expressly with FI Item 1. The original EIAR considered interactions between environmental factors within the individual specialist chapters. In response to Item 1 of the Further Information request, these assessments have now been brought together in a dedicated Chapter 18 – Interactions. This provides a consolidated assessment of the relevant interrelationships, their significance and the associated direct, indirect, cumulative and residual effects during construction and operation. The exercise has also included a further cross disciplinary review to ensure that the interaction assessment reflects the revised Proposed Project and the updated specialist assessments prepared following the Further Information request. The EIAR appendices (Volume III) have been reviewed as part of the Further Information process having regard to the revised Proposed Project and the additional technical assessment undertaken. Not all appendices required revision. Where an appendix remains applicable and its findings are unaffected by the changes to the Proposed Development, the originally submitted appendix continues to be relied upon. Volume III therefore comprises a combination of new and updated appendices, together with the original appendices that remain unchanged RECEIVED: 28/08/2026 7 August 2026 | Response to Further Information Request and continue to form part of the EIAR. For clarity, where an appendix has been revised or replaced as part of this Further Information response, the updated version supersedes the corresponding appendix originally submitted. The principal new and updated appendices submitted as part of this Further Information response include: • Appendix 2-1: Updated Outline Construction Environmental Management Plan, including the Soil and Surface Water Management Plan • Appendix 8-1: Updated Resource Waste Management Plan • Appendix 10-2: Updated Flood Risk Assessment • Appendix 10-3: Updated Water Framework Directive Assessment Appendix 15-6: New Additional Archaeological Testing Report In conclusion, the EIAR has been reviewed and updated having regard to the revised Proposed Project and the additional technical information prepared in response to the Further Information request. The updated assessments do not identify any new or materially different significant environmental effects beyond those identified and assessed in the revised EIAR. 1.4.3 Appropriate Assessment Screening Report The Appropriate Assessment Screening Report submitted with the application has been reviewed and updated as part of the Further Information process to ensure that the assessment reflects the revised Proposed Project. In particular, the assessment has been revised to reflect the removal of the former Soil Relocation Area, the final project definition comprising the Renewable Biogas Plant together with the separately delivered Linear Gas Grid Connection and the findings of the updated Water, Water Framework Directive, Air Quality, Biodiversity and other relevant technical assessments. The updated screening has also revisited the potential source–pathway– receptor relationships between the Proposed Project and European Sites. The assessment confirms that there is no credible pathway capable of giving rise to likely significant effects on Kilroosky Lough Cluster Special Area of Conservation (SAC). A downstream hydrological pathway to Lough Oughter and Associated Loughs SAC is acknowledged and has been assessed having regard to the nature and scale of the potential sources, the approximately 38 km hydrological separation, the intervening receiving water network and the findings of the updated Water Framework Directive and Water assessments. The screening also considers potential atmospheric, disturbance and other pathways, together with potential in-combination effects. The assessment RECEIVED: 28/08/2026 8 August 2026 | Response to Further Information Request undertaken concludes that likely significant effects can be excluded on the basis of objective scientific information. In undertaking the updated screening, particular care has been taken to distinguish between standard inherent characteristics of the Proposed Project and generally applicable construction practices, which would form part of the development irrespective of the presence of a European Site, and any measure introduced specifically for the purpose of avoiding or reducing an effect on a European Site. The Stage 1 conclusion does not rely upon specific Natura 2000 mitigation. Accordingly, the review undertaken as part of the Further Information process does not alter the conclusion of the Appropriate Assessment Screening Report. It can be excluded, on the basis of objective scientific information, that the Proposed Project, either alone or in combination with other plans or projects, will have a likely significant effect on a European Site. The Proposed Project therefore does not require progression to Stage 2 Appropriate Assessment and a Natura Impact Statement is not required. 1.4.4 Other Supporting Documentation Other supporting information included with this Further Information • Hydrogeological Risk Assessment – Hydro Environmental Services (Attachment A) • Landscape Management & Maintenance Schedule - Macroworks (Attachment B) • Revised Engineering Services Report including swept-path drawings as requested (Attachment C) • Revised Photomontages with additional CHVP2 - Stone Row (MO017- 068) in Drumgole as requested (Attachment D) • Revised Appropriate Assessmetn Screening Report (Attachment E) • Revised Water Protection Plan Checklist (Attachment F) 1.4.5 Revised Drawings Architectural – Revised Drawings Drawing No. Drawing Title Scale Page Size 4192 - PL01 Revision B Site Location Map 1:2500 A3 4192 - PL02 Revision B Existing Site Layout Plan 1:500 A0 4192 - PL03 Revision B Proposed Site Layout Plan 1:500 A0 4192 - PL04 Revision B Contextual Site Plan - Sections 1:1000 A0 4192 - PL06 Revision A Existing & Proposed Site Sections D-D, E-E 1:500 A0 RECEIVED: 28/08/2026 9 August 2026 | Response to Further Information Request Engineering – Revised Drawings Drawing No. Drawing Title Scale Page Size 1102-P11 Proposed Retaining Structures 1:500 A1 1200-P04 Site Cross Section - Proposed Retaining Structures 1:500 A1 2001-P05 Proposed Storm Drainage Layout 1:500 A1 2002-P05 Proposed Foul Drainage Layout 1:500 A1 2101-P04 Proposed Watermains 1:500 A1 Transport – Revised Drawings Drawing No. Drawing Title Scale Page Size 03208/PL01 Revision A Proposed Road Improvement & Access - Proposed Junction Upgrade 1:500 A1 03208/PL02 Revision A Proposed Road Improvement & Access - Swept Path Assessment 1:200 A1 Landscape – Revised Drawings Drawing No. Drawing Title Scale Page Size LD.DRM 1.1 Landscape Mitigation Plan 1:1000 A1 1.5 Planning Statement The Planning Statement submitted with the original application has not been reissued as part of this Further Information response. The planning policy assessment contained within that document remains applicable to the revised Proposed Development. The removal of the Soil Relocation Area does not alter the nature, scale, capacity or function of the Renewable Biogas Plant, the principle of the proposed use, the planning policy framework applicable to the plant, or the strategic planning considerations supporting the development. The revised proposal is narrower in physical extent by virtue of the omission of an ancillary agricultural land reprofiling element. Where the original Planning Statement refers specifically to the Soil Relocation Area, those references should now be read as superseded by the revised development description, EIAR and this Further Information response. The planning matters arising directly from the Further Information request, including compliance with Policies PMP 1, DLP 1, DLP 2, CP 1 and the relevant development-management provisions, are addressed expressly within this Further Information Response Report. Accordingly, it was not considered necessary or helpful to reproduce the full Planning Statement where the substantive policy assessment of the RECEIVED: 28/08/2026 10 August 2026 | Response to Further Information Request Renewable Biogas Plant remains unchanged. The original Planning Statement should instead be read together with, and subject to, the revised application documentation and this Further Information response. For the avoidance of doubt, where there is any inconsistency between the originally submitted documentation and the revised documents forming part of this Significant Further Information response, the revised documentation submitted with this response shall prevail. 2. Response to Further Information Request 2.1 Further Information Request Point 1 EU Directive 2014/52/EU requires that Environmental Impact Assessment Reports (EIAR’s) shall identify, describe and assess in an appropriate manner, in the light of each individual case, the direct and indirect significant effects of a project on the following factors: a) Population and human health b) Biodiversity with particular attention to species and habitats protected under Directive 92/42/EEC and Directive 2009/147/EC c) Land, soil, water and climate d) Material assets, cultural heritage and the landscape e) The interaction between the factors referred to in points (a) to(d) Notwithstanding the information provided, in order for the Planning Authority to fully understand the full range of potential environmental impacts arising from the proposed development, the applicant is requested to provide additional information which clearly demonstrates how the submitted EIAR complies with item (e) above i.e. ‘The interaction between the factors referred to in points (a) to (d)’. The information submitted shall list all identified interactions/interrelationships anticipated between the various specialist topic headings (i.e. Chapter 4 to Chapter 16 of the EIAR) and the associated significance of each effect/impact. The information shall include all direct, indirect, cumulative, and residual impacts/effects caused as result of these inter actions at both the construction and operational stage of the proposed development. Response This response should be read in conjunction with Chapter 18 Interactions in the EIAR (Volume II). The potential for interactions between environmental factors was considered in the EIAR originally submitted with the application through the individual specialist assessments contained in Chapters 4 to 16. Each specialist author considered, as relevant to their respective topic, the relationship between that environmental factor and other environmental disciplines, including the RECEIVED: 28/08/2026 11 August 2026 | Response to Further Information Request potential for effects arising in one environmental topic to influence or interact with effects identified in another. In response to the Planning Authority's request, this assessment has now been brought together and presented in a single consolidated chapter, Chapter 18, Interactions. The chapter identifies the relevant interactions between the specialist environmental topics, describes the nature of those interactions and sets out the significance of the associated effects, including direct, indirect, cumulative and residual effects during both the construction and operational phases. Importantly, the preparation of the consolidated Interactions chapter has also provided an opportunity to undertake a further project wide review of the EIAR following the refinement of the Proposed Development through the Further Information process. The assessment therefore reflects the revised Proposed Project, including the removal of the former Soil Relocation Area and the technical assessments submitted as part of this Further Information response. The revised specialist chapters have been reviewed together to ensure that the assumptions, impact assessments, mitigation measures, monitoring requirements and residual effect conclusions are consistent across disciplines and that any changes arising from the revised proposal have been appropriately reflected in the assessment of interactions. Chapter 18 should therefore be read as a consolidation and further development of the interaction assessments undertaken by the individual specialists, rather than as a separate environmental assessment undertaken in isolation from the specialist chapters. It provides the Planning Authority with a single, transparent overview of the environmental interactions associated with the Proposed Project and their significance. Having undertaken this review, no new or materially different significant environmental effects have been identified as a consequence of the interactions between environmental factors beyond those assessed in the revised EIAR. The residual effects arising from relevant interactions are identified and assessed in Chapter 18. 2.2 Further Information Request Point 2 In the interests of environmental protection, the applicant is requested to provide the following information; 2.2.6 DAFM Screening a) Confirmation of Environmental Impact Assessment screening from the Department of Agriculture Food & the Marine (DAFM) for the recontouring an area of 2.6 hectares with soil from the Renewable Energy Development construction site. RECEIVED: 28/08/2026 12 August 2026 | Response to Further Information Request Response Following receipt of the Further Information request and subsequent review of the proposal, the Applicant has removed the previously proposed Soil Relocation Area from the Proposed Development. No recontouring, infilling or other development is now proposed within the approximately 2.6 hectare agricultural field east of the R189. Suitable excavated soil and stone arising from construction of the Renewable Biogas Plant will be reused within the development site where appropriate, with the remaining surplus material removed off site by suitably authorised contractors for appropriate reuse, recovery or disposal at an appropriately authorised receiving facility. Accordingly, as the agricultural land recontouring works which gave rise to this item are no longer proposed, DAFM EIA screening in respect of those works is no longer applicable to the revised Proposed Development. The revised development description and arrangements for the management of excavated soil and stone are set out in Chapter 2 Project Description of the revised EIAR. 2.2.7 Agriculture b) An agricultural improvement plan, prepared by a suitably qualified agricultural advisor, detailing how the land will benefit from infilling in terms of agricultural use and how it will improve upon current farm management requirements. Response As outlined above, the previously proposed Soil Relocation Area has been removed from the Proposed Development. The approximately 2.6 hectare agricultural field will not be reprofiled or infilled as part of this application and will remain in its existing agricultural use. The Agricultural Improvement Plan requested under this item related specifically to the justification and agricultural benefits of the proposed land reprofiling works. As those works no longer form part of the revised Proposed Development, an Agricultural Improvement Plan is no longer required or relevant to the determination of the application. The revised development description and arrangements for management of surplus excavated soil and stone are set out in Chapter 2 Project Description of the revised EIAR. 2.2.8 Hydrology/Bog c) A hydrogeological risk assessment to demonstrate how the hydrological balance of surrounding, higher-quality intact bog areas may, or may not RECEIVED: 28/08/2026 13 August 2026 | Response to Further Information Request be affected. The submitted assessment shall have particular regard to areas of cutover peat at the soil relocation site. Response This response should be read in conjunction with the report prepared by Hydro Environmental Services (Attachment A) and Chapter 10 Water in the EIAR (Volume II) together with its relevant appendices (Volume III) Following removal of the Soil Relocation Area from the Proposed Development, the aspects of this Further Information item relating specifically to the proposed placement of soil within the former relocation area and associated cutover peat no longer arise. Notwithstanding this, the Applicant commissioned Hydro Environmental Services (HES) to undertake a specific hydrological and hydrogeological assessment of the retained Renewable Biogas Plant site , in order to establish whether construction or operation of the revised Proposed Development has the potential to affect the hydrological or hydrogeological regime of nearby wetland areas. The assessment was prepared expressly in the context of the revised proposal and omission of the Soil Relocation Area. The assessment included a review of the geological, hydrological and hydrogeological conditions of the site and surrounding area and specifically considered the nearby Drumintin wetland, identified by HES as the only surrounding bog or wetland feature with the potential to contain higher- quality intact bog habitat. The assessment also considered the existing local drainage network and potential surface water and groundwater connectivity between the Renewable Biogas Plant site and the wetland. HES concludes that, following removal of the Soil Relocation Area, there is no identified hydrogeological linkage by which the revised Proposed Development would alter the hydrological balance of Drumintin Wetland or any other wetland feature in the surrounding area. The assessment further concludes that the Proposed Development will not result in deterioration of any Water Framework Directive quality element or compromise achievement of the relevant WFD objectives. The Hydrological and Hydrogeological Response to Further Information Item 2(c), prepared by Hydro-Environmental Services, is enclosed with this Further Information response and should be read in conjunction with the revised Chapter 10 – Water (Hydrology and Hydrogeology) and the updated Water Framework Directive Assessment. 2.2.9 Fill volumes d) Confirmation that 18,600m3 of fill (m3) is the maximum amount of fill to be relocated from the construction site. The applicant shall also provide clarification on how this figure has been arrived at and confirmation of the equivalent amounts in tonnes. RECEIVED: 28/08/2026 14 August 2026 | Response to Further Information Request Response The earthworks quantities for the revised Proposed Development have been reviewed and confirmed by the project Consulting Engineers, McAdam Design, using the project earthworks model. The model is based on the detailed topographical survey of the Renewable Biogas Plant site and the proposed finished formation levels. The earthworks model identifies approximately 98,420 m³ of excavated material arising from site formation, foundations and associated construction works. Of this material, approximately 79,900 m³ will be reused within the Renewable Biogas Plant site for engineering fill, landscaping and the formation of screening berms. This results in a calculated net surplus of approximately 18,520 m³ of excavated soil and stone. For the purposes of the environmental assessments and construction planning, this quantity has been conservatively rounded to approximately 18,600 m³. Accordingly, approximately 18,600 m³ represents the assessed quantity of surplus excavated soil and stone requiring removal from the Renewable Biogas Plant site. Following removal of the previously proposed Soil Relocation Area from the Proposed Development, this surplus material will no longer be transferred to the adjoining agricultural field. It will instead be removed off site by suitably authorised contractors for appropriate reuse, recovery or disposal at an appropriately authorised receiving facility or facilities, to be identified by the appointed Contractor having regard to the relevant authorisation, available capacity and material acceptance criteria. Using a conservative indicative conversion factor of 1.8 tonnes per cubic metre, approximately 18,600 m³ equates to 33,480 tonnes of surplus material. The revised earthworks quantities and arrangements for management of the surplus excavated soil and stone are set out in Chapter 2 Project Description, Chapter 9 Land, Soils and Geology, and the Resource and Waste Management Plan submitted as part of this Further Information response. 2.3 Further Information Request Point 3 Policy PMP 1 of Section 6.18.1 ‘Record of Monuments and Place’ of the Monaghan County Development Plan 2025-2031 states that ‘development adjacent to an archaeological monument or site will only be acceptable where it is sited in a manner which minimises the impact on the monument and its setting. Development which is likely to have an adverse impact upon an archaeological monument or site, or its setting shall be resisted’. Planning Authority notes the submission of an Archaeological Testing Report (24E1224), including the results a Geophysical Survey (24R0379) (EIAR Vol II Ch.15). The Department of Housing Local Government and Heritage (DHLGH) have reviewed same and note that the geophysical survey revealed an area of RECEIVED: 28/08/2026 15 August 2026 | Response to Further Information Request prehistoric activity suggesting there is a high potential for further unknown sub - surface archaeological remains within the application site. Having regard to same, DHLGH recommends that a programme of further archaeological testing, including full excavation of the feature identified in archaeological testing, be carried out. In particular, with regard to previously unrecorded Archaeological Areas, DHLGH recommends ‘that the archaeological areas ‘Area (AA)1 Trench 6’ be extended and cleaned back to reveal the full extent of all archaeological feature on the site. These features shall be fully archaeologically recorded, planned, photographed and excavated prior to the commencement of works, and in keeping with Best Archaeological Practice under licence and agreement with the Department’. DHLGH also requests that the applicant to comply with the following; • ‘Engage the services of a suitably qualified archaeologist (licensed under the National Monuments Acts 1930–2004) to carry out pre-development testing over the entire site. No sub-surface work shall be undertaken in the absence of the archaeologist without his/her express consent. • The archaeologist is required to notify the Department of Housing, Local Government and Heritage in writing at least four weeks prior to the commencement of site preparations. This will allow the archaeologist sufficient time to obtain a licence/consent to carry out the work. • The archaeologist shall carry out any relevant documentary research and may excavate test trenches at locations chosen by the archaeologist, having consulted the proposed development plans. • Archaeological testing shall be informed and supplemented by licensed metal detection survey. • Having completed the work, the archaeologist should submit a written report to the Planning Authority and to the Department of Housing, Local Government and Heritage in advance of the planning decision. Where archaeological material/features are shown to be present, preservation in situ, preservation by record (excavation) or monitoring may be required. It should be borne in mind that, if significant archaeological remains are found, refusal might still be recommended, and/or further monitoring or excavation required’. The applicant is requested to review the full content of the DHLGH submission and respond accordingly to the issues raised. Response This response should be read in conjunction with Chapter 15 of the EIAR (Volume II) together with Appendix 15.6 (Volume III). The submission of the Department of Housing, Local Government and Heritage (DHLGH) has been reviewed in full, and a programme of additional archaeological investigation has been undertaken in direct response to the matters raised. Consultation took place with the National Monuments Service (NMS), including Senior Archaeologist Hugh Carey, on 20 March 2026 to agree an appropriate strategy for the further archaeological investigation of the Proposed Development site. Having regard to the nature of the archaeology RECEIVED: 28/08/2026 16 August 2026 | Response to Further Information Request identified during the first phase of testing, the potential for the recovery of metal artefacts was considered to be low. Accordingly, licensed metal detection was not proposed as part of the Phase 2 methodology. The proposed methodology was submitted to and agreed by the NMS and the further archaeological testing was subsequently undertaken under Licence No. 26E0370. The further programme comprised 11 no. test trenches extending to approximately 360 linear metres across Fields 1 and 2 of the Renewable Biogas Plant site. The testing was deliberately extended into areas where no archaeological anomalies had been identified during the earlier geophysical survey in order to test and verify the robustness of those results. In addition, the previously excavated Trench 6, within which Archaeological Area AA1 had been identified during the first phase of testing, was extended as part of the Phase 2 works to reveal and define the full extent of the archaeological feature. The additional investigation confirmed AA1 as a spread of burnt mound material with a possible associated trough, both of which had been truncated by a modern linear ditch. The burnt mound spread was defined as approximately 3 m east-west by 2.8 m north-south and approximately 0.10 m in average depth. Importantly, no additional archaeological features or finds were identified elsewhere within the Proposed Development site as a result of this further programme of investigation. The additional testing therefore provides a substantially more comprehensive understanding of the archaeological resource within the site and confirms that the identified archaeological interest is confined to AA1. The results of the further archaeological investigation are set out in the Archaeological Testing Report prepared under Licence No. 26E0370, which is presented in Appendix 15-6 of the EIAR (Volume III). The findings have also been incorporated into the revised Chapter 15 Cultural Heritage of the EIAR. Having regard to the confirmed presence and extent of AA1, the feature will be subject to preservation by record through full licensed archaeological excavation prior to commencement of the relevant construction works, in accordance with the requirements of the National Monuments Service. Following completion of the licensed excavation of AA1, topsoil stripping and other initial ground disturbance across the remainder of the Renewable Biogas Plant site will be subject to archaeological monitoring by a suitably qualified archaeologist under the appropriate licence. Should any previously unidentified archaeological material be encountered, works in the affected area will cease pending assessment and consultation with the National Monuments Service. Accordingly, the Applicant has undertaken the additional pre-development investigation requested by DHLGH, has established the nature and extent of the archaeological resource within the Proposed Development site, and has incorporated appropriate provision for the preservation by record of AA1 and archaeological monitoring of the remaining site within the revised EIAR and construction environmental management documentation. RECEIVED: 28/08/2026 17 August 2026 | Response to Further Information Request 2.4 Further Information Request Point 4 In addition to item 3 above, Monaghan County Council Heritage Section have reviewed the proposal and have raised concerns about the potential impact the proposal would have on the setting of Recorded Monument MO022-008, (Hilltop enclosure). In particular, Heritage Section notes the following; ‘Given the monument’s high cultural significance and sensitivity, the proximity of the proposed development, combined with its considerable scale, height, and massing, would independently and cumulatively generate a substantial negative impact on its setting. The new structures would compete visually with the hillfort, obscuring or overwhelming views from various directions and appearing incongruous within the historic rural context. Tree planting or earthen berms cannot be relied upon as mitigation, as deciduous planting offers no screening in winter and may fail or be removed through weather events or maintenance practices.’ Heritage Section also notes that ‘The proposed development would significantly disrupt the intervisibility between this important prehistoric monument and the prehistoric stone row at Drumgole (Droim Gabhla), known locally as the “Grey Stones.” Introducing an industrial-scale development into what is currently an unspoilt rural landscape would cause a profound adverse impact on the monument’s setting, character, and legibility. It would also interrupt established visual relationships between several recorded monuments in the surrounding landscape.’ The applicant is requested to respond to the comments made by Heritage Section and seek to demonstrate how the proposal fully complies with aforementioned Policy PMP 1 and Section 6.18.1 ‘Record of Monuments and Places’ of the Monaghan County Development Plan 2025-2031. Response This response should be read in conjunction with Chapter 15 of the EIAR (Volume II) together with Appendix 15.6 (Volume III). The concerns raised by Monaghan County Council Heritage Section have been reviewed in detail and the assessment of the setting of the hilltop enclosure RMP MO022-008 has been revisited as part of the Further Information response. The setting of the monument was also discussed during consultation with the National Monuments Service on the 20th of March 2026. During that consultation, the predicted degree of effect identified in the Cultural Heritage assessment was discussed and NMS Senior Archaeologist Hugh Carey indicated agreement with the assessment of the effect as presented in the EIAR (i.e. moderate indirect negative impact). The updated Cultural Heritage assessment has been undertaken in accordance with the approach and definitions of significance contained in the RECEIVED: 28/08/2026 18 August 2026 | Response to Further Information Request EPA Guidelines on the Information to be Contained in Environmental Impact Assessment Reports, together with relevant best-practice guidance concerning the assessment of effects on the setting of heritage assets. The assessment recognises that the Proposed Development will introduce a substantial new built form into the landscape and that it will alter and restrict views to the north-east from the hilltop enclosure. This change has not been understated. The resulting effect on the visual amenity and setting of RMP MO022-008 is assessed as a moderate negative residual effect. The specialist assessment does not, however, support characterising the effect as a substantial or profound adverse impact on the monument or its setting. The reasons for this conclusion are set out in detail in revised Chapter 15 – Cultural Heritage. In particular, the identified visual change affects one directional component of what is otherwise a broad and panoramic setting. The Proposed Development will not result in any direct physical effect on the monument, will not alter its archaeological fabric or principal characteristics, and will not prevent its continued appreciation or understanding within the wider landscape. The greater part of its wider landscape setting will remain unchanged. The final Cultural Heritage assessment accordingly predicts a moderate negative residual effect on its setting. Importantly, the assessment does not rely on landscaping or earthen berms to reduce the effect below this level. The proposed landscape treatment will assist in the longer-term integration of the development into the receiving landscape, but the Cultural Heritage assessment conservatively retains the predicted residual effect on RMP MO022-008 at moderate negative notwithstanding that planting. This directly addresses the concern of the Heritage Section that planting or berms should not be relied upon as the basis for avoiding an adverse setting effect. With regard to the specific concern raised regarding intervisibility between RMP MO022-008 and the stone row at Drumgole, RMP MO017-068, additional field assessment and photographic analysis have been undertaken. The stone row is located approximately 1.5 km north-east of the hilltop enclosure. The further assessment confirms that there is currently no intervisibility between the two monuments, due principally to intervening topography and field boundaries. There is also no archaeological evidence to demonstrate that the two monuments are contemporary or that an intervisible relationship between them formed part of their cultural significance. The additional assessment further demonstrates that the existing field boundary adjoining the stone row substantially limits views towards the Proposed Development, including under winter conditions, when trees are not in leaf. The Proposed Development will therefore not interrupt an RECEIVED: 28/08/2026 19 August 2026 | Response to Further Information Request existing visual relationship between RMP MO022-008 and RMP MO017-068, as no such visual relationship presently exists. Please refer to the Photomontage Book, specifically CHVP2. Having regard to the above, it is submitted that the Proposed Development is consistent with Policy PMP 1 of the Monaghan County Development Plan 2025–2031. The development has been assessed having specific regard to the significance and setting of RMP MO022-008; there will be no direct physical impact on the monument; the identified effect is limited to a directional change within its wider setting; established relationships with other recorded monuments will not be interrupted; and the residual effect has been assessed as moderate negative rather than the substantial effect suggested in the Heritage Section submission. Accordingly, while a change to the north-eastern aspect of the monument’s setting is acknowledged, the detailed assessment demonstrates that the integrity, legibility and principal archaeological characteristics of RMP MO022-008 will be retained and that the Proposed Development does not give rise to an effect of such magnitude as would warrant resistance under Policy PMP 1. 2.5 Further Information Request Point 5 Policy DLP 1 of the Monaghan County Development Plan 2025-2031 states “To ensure that any new development will not adversely affect the site, setting or views to and from historic houses, gardens and designed landscapes”. Furthermore, Policy DLP 2 states “To require that any proposals for new development in the vicinity of historic houses or demesnes landscapes are accompanied by an evaluation of the impact of the development on the landscape, designed views and vistas to /from such a site.” Having reviewed the proposed development, Monaghan County Council Heritage Section, having regard to these policies and also Policy PMP1 has responded as follows:-...In terms of built heritage, the remnants of the post medieval New Park landed estate is located directly to the south of the proposed development site. On early OS maps it is clear that there was an extensive designed landscape surrounding this big house. The extent of survival of features within the house and farm cluster which still exists on the site is not clear from the EIAR. Nevertheless, the proposed development would have a very significant impact on any surviving remnants of this estate.’ The applicant is requested to respond to the comments made by Heritage Section and seek to demonstrate how the proposal fully complies with aforementioned Policies PMP 1, DLP 1 and DLP 2 of the Monaghan County Development Plan 2025- 2031. RECEIVED: 28/08/2026 20 August 2026 | Response to Further Information Request Response This response should be read in conjunction with Chapter 15 of the EIAR (Volume II). The concerns raised by Monaghan County Council Heritage Section in relation to the former New Park estate have been reviewed and the Cultural Heritage assessment has been expanded as part of the Further Information response to provide a more detailed evaluation of the surviving estate, its historic development, designed landscape, views and setting. New Park estate is included in the NIAH Garden Survey. Neither New Park House nor any other element of the former estate is included in the NIAH Building Survey or the Record of Protected Structures. The historic mapping and surviving landscape features have nevertheless been assessed in detail having regard to Policies DLP 1 and DLP 2 of the Monaghan County Development Plan 2025–2031. The assessment confirms that relatively little of the designed landscape depicted on the First Edition six-inch Ordnance Survey map of 1834 now survives. The surviving elements relevant to the historic setting of New Park House comprise the former parkland to the south/front of the house, together with the associated southward view, and a curved line of trees associated with the former estate layout. The trees and observatory formerly located within the southern parkland were removed during the nineteenth century, although the broad form of the open area in front of the house remains. Importantly, the Proposed Development will not affect the surviving designed view from New Park House. The house was orientated southwards towards the former parkland, and the historic designed setting of the house is focused in that direction. The Proposed Development is located to the north, to the rear of the house, and will not be visible from New Park House. The lands to the north of the house, within which the Proposed Development is located, are not identified as parkland on the historic mapping. They historically formed part of the agricultural or working lands to the rear of the estate rather than part of a designed vista. The nineteenth-century courtyard buildings and associated semi-circular tree copse also served to visually separate the working portion of the estate from the house and parkland. Those northern lands are now in agricultural use and are no longer legible as part of a nineteenth-century designed landscape. No estate boundary walls, specimen trees or other designed landscape features survive within the area proposed for development. Modern agricultural buildings have also been introduced within the former estate immediately to the rear of New Park House. The updated Cultural Heritage assessment therefore concludes that this part of the former estate has a low sensitivity and does not materially contribute to the significance of New Park House or its principal historic setting. Having regard to these findings, the detailed specialist assessment does not support the characterisation of the effect as a “very significant impact” on New RECEIVED: 28/08/2026 21 August 2026 | Response to Further Information Request Park estate. Applying the significance methodology used in Chapter 15 of the EIAR, the magnitude of change is assessed as medium against a receptor of low sensitivity, resulting in a slight direct negative effect on the former estate during the operational phase. The revised Chapter 15 confirms that this slight negative effect remains as the residual effect. A slight effect is acknowledged because the Proposed Development introduces new development within land that historically fell within the wider ownership of the estate. It does not, however, adversely affect the surviving designed landscape features, the historic southward view from New Park House, the appreciation of the house within that setting, or any surviving designed vista to or from the house. Accordingly, it is submitted that the Proposed Development is consistent with the objectives of Policies DLP 1 and DLP 2. A detailed evaluation of the historic house, former demesne, surviving landscape features, designed views and vistas has been undertaken, as expressly required by DLP 2. That assessment demonstrates that the principal historic setting and designed views associated with New Park House will be retained and unaffected, and that the effect on the less sensitive and substantially altered agri cultural lands forming the rear portion of the former estate is limited to slight negative. The assessment is set out in the revised Chapter 15 Cultural Heritage of the EIAR, which should be read in conjunction with the response to Item 4 above in respect of Policy PMP 1. 2.6 Further Information Request Point 6 The Planning Authority notes that the applicant proposes to utilise an existing farm entrance onto the Local Primary Road L-2320 to access the proposed soil relocation area. It has not been demonstrated however, how this existing entrance meets the minimum visibility standards for the intensification of an existing access onto a non-urban road. In the interests of road safety, the applicant is required to submit the following information in accordance with section 15.23 ‘Road Access Standards’ and 15.23.2 ‘Minimum Visibility Standards for Non-Urban Roads’ of the Monaghan County Development Plan 2025 -2031; a) A site layout plan (1:500 scale) indicating how a clear and unobstructed visibility splay of 70 metres can be achieved at the proposed entry/exit point onto the adjoining public road from the soil relocation area. The required visibility splays should be provided from a point in the centre of the entrance, 2.4 metres from the road edge at a height of 1.05 metre to 2.0 metres above ground level to an object height of 1.05 metres to 2.0 metres above ground level in both directions. The submitted site layout plan should demonstrate all necessary site work, including the extent of the front boundary hedge and trees which would be required to be removed/trimmed, regrading of side banks etc to achieve the required sight distances. b) Where the sight distances are not achievable within the applicant’s ownership, the applicant should submit legal agreements with adjoining RECEIVED: 28/08/2026 22 August 2026 | Response to Further Information Request landowners giving their consent for all necessary works to facilitate the required 70 metres sight distances, including removal/trimming of hedgerow/hedges, re-grading of side banks etc. The Applicant should note that legal agreements should be submitted using the Appendix 13 template ‘Form of Agreement in respect of forward and rear visibility’ Appendix 13 and that the legal agreement and accompanying maps shall be signed by all parties and witnessed by a Solicitor. Response The previously proposed Soil Relocation Area has been removed from the Proposed Development. Accordingly, no land reprofiling or associated construction activity is now proposed on the agricultural field adjoining the L2320. As a consequence, the existing gated agricultural access onto the L2320 will not be used for any construction traffic associated with the Proposed Development. No intensification of that access is proposed, and no works are required to facilitate development traffic at that location. The requirements of Items 6(a) and 6(b), relating to the provision of 70 m visibility splays and, where necessary, third-party legal agreements to facilitate those splays, therefore no longer arise in respect of the revised Proposed Development. Surplus excavated soil and stone arising from construction of the Renewable Biogas Plant will instead be removed from the site via the L2280 and R189 and thereafter transported via the appropriate regional road network to an appropriately authorised receiving facility or facilities. The revised construction traffic associated with this arrangement has been assessed in the updated Chapter 6 Traffic and Transport of the EIAR. The revised assessment confirms that the removal of the Soil Relocation Area does not give rise to any new significant traffic or transportation effects. The change associated with the revised soil management approach is the greater haulage distance travelled by vehicles transporting the surplus material, rather than a material increase in the quantity of material requiring transport. Accordingly, the specific road safety concern raised in Item 6 in relation to intensification of the L2320 agricultural access has been removed from the Proposed Development. 2.7 Further Information Request Point 7 Criterion (g) of section 15.22.4 ‘Landscaping and Boundary Treatment’ of the Monaghan County Development Plan 2025-2031 stipulates that ‘Where removal of extensive hedgerow and trees is proposed, existing site boundaries shall be supplemented, where new site boundaries need to be created, or where landscape mounds are proposed, a costed landscape plan, prepared by a suitably qualified, competent, technical professional with landscaping expertise shall be submitted where appropriate. A bond may be applied in the event of a grant of permission to ensure the satisfactory completion of the landscaping.’ Having regard to the RECEIVED: 28/08/2026 23 August 2026 | Response to Further Information Request significant hedgerow removal and the extensive earth berms proposed, the applicant is requested to submit a costed landscaping plan for the proposed development. Response A Landscape Plan and Landscape Management and Maintenance Schedule, including a detailed costing for the proposed landscape works, has been prepared by the project landscape consultant and is submitted with this Further Information response, see Attachment B. The Applicant is committed to the full implementation and ongoing maintenance of the landscape scheme. In the event of a grant of permission, the Applicant would have no objection to a condition requiring the landscape works to be implemented in accordance with the approved plans and programme and, if considered necessary by the Planning Authority, to the provision of an appropriate landscape bond or other financial security prior to the commencement of development to secure satisfactory completion and establishment of the works in accordance with Section 15.22.4 of the Monaghan County Development Plan 2025–2031. Accordingly, the requirements of this Further Information item are considered to have been fully addressed. 2.8 Further Information Request Point 8 2.8.10 Car Parking a) Policy CP 1 Monaghan County Development Plan 2025-2031 requires car parking proposals for all development proposal to comply with Section 15.24 ‘Car Parking Standards’ of the Monaghan County Development Plan 2025-2031. Whilst it is acknowledged Table 15.5 does not include a specific standard for the type of development proposed, the applicant is requested to provide additional information to justify the quantum of parking proposed, having regard to the parking standards relative to similar types of development listed under Table 15.5. Submitted details should also include specific carparking data in respect of similar facilities to that being proposed. Response Policy CP 1 of the Monaghan County Development Plan 2025–2031 requires car parking provision to be considered having regard to the standards set out in Section 15.24 and Table 15.5 of the Development Plan. The Applicant acknowledges that Table 15.5 does not prescribe a specific parking standard for an anaerobic digestion or renewable biogas facility. The closest general land-use category is ‘Industry’, for which a maximum provision of 1 no. car parking space per 50 sq.m gross floor area is identified. The direct application of a floor area based industrial parking standard to the Proposed Development would not, however, provide an appropriate measure of actual parking demand. The Renewable Biogas Plant is a highly RECEIVED: 28/08/2026 24 August 2026 | Response to Further Information Request automated process facility in which staffing levels are low relative to the overall building footprint. A substantial proportion of the built floor area accommodates process equipment, feedstock reception, storage and treatment infrastructure rather than employment-generating floorspace of the type associated with a conventional industrial or manufacturing facility. Parking demand is therefore determined by the number of personnel on site, shift arrangements, visitor requirements and occasional service and maintenance personnel rather than by gross floor area. The Proposed Development is expected to employ approximately 30 no. personnel operating across two shifts, with the larger shift comprising approximately 22 no. personnel. A total of 35 no. car parking spaces is proposed, comprising: • 30 no. standard parking spaces; • 2 no. accessible parking spaces; and • 3 no. electric vehicle charging spaces. The proposed parking provision is therefore capable of accommodating the anticipated operational workforce, including staff present during shift changeover, together with reasonable capacity for visitors and occasional service and maintenance personnel attending the facility. Importantly, the use of a demand led approach to parking provision at renewable bioenergy is supported by experience at comparable permitted and operational developments. A particularly relevant comparator is the Applicant's Renewable Bioenergy Plant at Little Island, Co. Cork. The Cork County Development Plan 2022–2028 similarly provides a maximum parking standard of 1 no. space per 50 sq.m for light and general industry. Application of that standard to the waste reception area alone would have indicated a maximum provision of approximately 75 no. spaces. The Little Island facility is likewise a highly automated renewable bioenergy development with relatively low staffing requirements in comparison with its overall floorspace. The planning application initially proposed 31 no. parking spaces. In determining the application, Cork County Council specifically required the quantum of parking to be reduced in line with the objectives of the Cork County Development Plan. In compliance with that requirement, the parking provision was reduced from 31 no. spaces to 24 no. spaces, comprising: Parking Type Originally Proposed Revised Provision Staff parking 15 9 Accessible parking 1 1 EV parking 2 2 Motorcycle parking 2 4 RECEIVED: 28/08/2026 25 August 2026 | Response to Further Information Request Visitor parking 11 8 Total car parking 31 24 The Little Island example is particularly instructive in the context of the present application. Little Island is located within an established industrial area with a substantially greater level of surrounding employment, transport infrastructure and potential for alternative travel modes than the rural location of the Proposed Development. Notwithstanding that more connected context, Cork County Council considered that the originally proposed parking provision should be reduced and required the final provision to be more closely aligned with the actual staffing and operational requirements of the renewable bioenergy facility rather than with a generic industrial floor area standard. The Applicant does not suggest that the same numerical provision should be applied directly to the Proposed Development at Monaghan. The rural location of the Renewable Biogas Plant, the limited availability of public transport and the greater likelihood of staff travelling by private car have appropriately been considered in determining the parking provision. This is reflected in the proposed 35 no. spaces, which represents a materially greater level of provision than at Little Island and provides appropriate capacity for the anticipated workforce, shift changeover, visitors and occasional service and maintenance personnel. The relevance of Little Island is therefore that it demonstrates, in the case of a directly comparable renewable bioenergy facility, that gross floor area is not an appropriate proxy for parking demand. The appropriate approach is to assess parking having regard to the actual operational characteristics of the facility and its locational context. Applying that same principle at Monaghan supports a higher provision than at Little Island because of the rural location, while still demonstrating that application of the generic industrial maximum would result in substantial and unnecessary over- provision. This approach is further supported by a number of other permitted and operational anaerobic digestion, waste processing and process-led facilities: Development Indicative Provision Applying Generic Industrial Standard Actual / Permitted Parking Provision Little Island Renewable Bioenergy Plant, Co. Cork Approx. 75 spaces based on waste reception area alone 24 spaces following PA- required reduction RECEIVED: 28/08/2026 26 August 2026 | Response to Further Information Request Huntstown Renewable Bioenergy Plant, Fingal – Reg. Ref. FW13A/0089 Approx. 191 spaces 20 spaces Gorteen Lower AD Facility, Nurney, Co. Kildare – Reg. Ref. 201117 Approx. 270 spaces 11 spaces Huntstown/Coldwinters Materials Recovery Facility – Reg. Ref. FW23A/0111 Approx. 200 spaces 58 spaces Thorntons Recycling, Cappogue – ABP Ref. 315257-22 In excess of 217 spaces 44 spaces Waste Processing and Recovery Facility, Cootehill, Co. Cavan – Reg. Ref. 16136, as modified by 2460647 Approx. 70 spaces 13 staff spaces plus 10 lorry spaces Of particular relevance are the operational anaerobic digestion facilities at Huntstown and Nurney. The Huntstown Renewable Bioenergy Plant was permitted to process approximately 90,000 tonnes of biodegradable material per annum and is served by 20 no. car parking spaces, notwithstanding that application of the relevant industrial floor-area standard would have indicated approximately 191 no. spaces. Similarly, the operational anaerobic digestion facility at Nurney, which processes approximately 48,000 tonn es per annum, is served by 11 no. car parking spaces notwithstanding that the applicable generic industrial standard would have indicated a substantially greater provision. The evidence from these comparable facilities demonstrates that gross floor area is not an appropriate standalone basis for determining parking demand at highly automated renewable bioenergy facilities. Parking provision has instead appropriately been related to the actual staffing profile and operational requirements of the particular development. In the present case, the proposed 35 no. spaces have been determined having regard to the anticipated workforce of approximately 30 no. personnel across two shifts, including provision for shift changeover, visitors and occasional service and maintenance personnel. The provision is therefore considered appropriately calibrated to the reasonable operational demand of the Renewable Biogas Plant. Provision of parking substantially in excess of this level solely to approach the generic maximum industrial standard would serve no identified operational requirement and would result in unnecessary additional hardstanding and land take. Accordingly, it is submitted that the proposed parking provision is appropriately justified having regard to the operational characteristics of the Renewable Biogas Plant, the maximum standards contained in Table 15.5 and the evidence from comparable permitted and operational facilities. The proposed 35 no. spaces will satisfactorily accommodate the parking demand generated by the Proposed Development and are considered consistent with RECEIVED: 28/08/2026 27 August 2026 | Response to Further Information Request Policy CP 1 and Section 15.24 of the Monaghan County Development Plan 2025–2031. 2.8.11 Vehicle Swept Path Assessments b) Section 6.8.1.3, Chapter 6 ‘Traffic and Transport’ of the submitted EIAR notes that swept path turning assessments have been undertaken which demonstrate that the internal circulation route will ‘function satisfactorily for the volume of traffic likely to be generated by the development’. Planning authority notes that this statement is not supported by way of complementary maps. The applicant is therefore requested to provide a swept path assessment site layout plan to demonstrate same. Submitted details should have regard to Fire and Building Control requirements in respect of Fire Brigade Vehicle access (please see Clause 5.4 of Technical Guidance Document Part B Fire Safety 2024) Response The Planning Authority notes that the conclusions of Section 6.8.1.3 of the EIAR are not accompanied by swept path drawings demonstrating the vehicle movements referred to in the assessment. Swept Path assessments for the upgraded junction of the R189/L2280 and the development access from L2280 are shown in Trafficwise Ltd. Drawing 03208/PL02 ‘Proposed Road Improvement & Access – Swept Path Assessment’, which shows various turning manoeuvres undertaken by a Freight Transport Association Design Articulated Vehicle (2016) In respect of internal circulation at the development the swept path analyses are provided in McAdam Drawing No. 1700-P09 and McAdam Drawing No. 1701-P06 enclosed in the Engineering Services Report which accompany the original planning submission. Drawing No. 1700-P09 demonstrates the manoeuvrability of a 16.5m articulated HGV throughout the internal road network, including circulation to the north-western operational area and the various service yards located east of the internal spine road. Drawing No. 1701-P06 demonstrates that a 400-tonne mobile crane, required periodically for major maintenance operations, can safely access the north-western process area and the tank farm. The swept path assessment design vehicles represent the largest and least manoeuvrable vehicles expected to access the site during its operational life. The successful accommodation of these vehicles demonstrates that the internal road geometry, junction radii, manoeuvring areas and service yards can accommodate all routine operational traffic associated with the proposed development. With regard to the Planning Authority's request concerning emergency vehicle access, it is considered that the swept path assessments already RECEIVED: 28/08/2026 28 August 2026 | Response to Further Information Request undertaken inherently demonstrate that a standard fire appliance can access all operational areas of the site. A fire tender is substantially shorter and more manoeuvrable than either a 16.5 m articulated HGV or the 400-tonne mobile crane assessed as part of the design. Accordingly, any route capable of accommodating these larger design vehicles is, by definition, capable of accommodating a standard long wheelbase fire appliance. The requirements of Clause 5.4 of Technical Guidance Document Part B (Fire Safety) 2024 are therefore inherently satisfied by the more onerous swept path assessments already completed. Notwithstanding the above, and in direct response to the Planning Authority's request, a separate swept path assessment has been undertaken using a standard long wheelbase fire appliance. This assessment is enclosed as McAdam Drawing No. 1701_P06 & 1700_P09 within the revised Engineering Services Report (Attachment C) and confirms that the fire appliance can access all areas of the site requiring emergency vehicle access without conflict. The assessment vehicle used is representative of the type of fire appliance operated by Monaghan Fire and Civil Protection Services from the nearest fire stations located at Ballybay, Carrigmacross, Castleblaney, Clone and Monaghan Town. 2.8.12 EIAR clarity c) Planning Authority notes that the Chapter 6 ‘Traffic and Transport’ of the submitted EIAR incorrectly refers to ‘Appendix 16.1’ and ‘Appendix 16.2’ which do not exist. The applicant is requested to provide clarification with regard to same. Response The Planning Authority’s comment is noted. The references to Appendix 16.1 and Appendix 16.2 in the originally submitted Chapter 6 Traffic and Transport were incorrect appendix references arising from a numbering error. A revised Chapter 6 Traffic and Transport is included within the updated EIAR submitted as part of this Further Information response. The appendix references have been corrected, and the relevant supporting and assessments are now identified consistently within the Chapter 6 appendix series. For clarity, the revised traffic appendices are numbered Appendix 6-1 onwards, and the revised Chapter 6 should be read in conjunction with those appendices. Accordingly, the numbering error identified by the Planning Authority has been corrected in the revised EIAR documentation. 2.9 Further Information Request Point 9 An Taisce have commented on the proposed development and have raised several concerns under the headings of; RECEIVED: 28/08/2026 29 August 2026 | Response to Further Information Request i. Feedstocks ii. Methane Leakage iii. End- Use of Digestate iv. Fossil Gas Lock-in v. Wetland proximity vi. Traffic Impact Assessment The applicant is requested to review the full content of An Taisce’s submission and provide a detailed and comprehensive response to each issue raised. Response The Applicant has reviewed the An Taisce submission. A detailed, response addressing each of the matters identified above is provided at Appendix A Response to An Taisce Submission. In summary, the response confirms that the Renewable Biogas Plant will process a maximum of 99,000 tonnes of feedstock per annum, comprising poultry manure, cattle manure and agri-food organic wastes arising from the existing agricultural and agri-food sector. The detailed response addresses the concern regarding potential upstream agricultural intensification and explains the basis upon which the environmental effects of the Proposed Project have been assessed. The wider EIAR likewise confirms the overall maximum annual feedstock throughput of 99,000 tonnes. Potential methane leakage has been considered having regard to the design and proposed operation of the plant. The facility incorporates enclosed gas- handling systems, process monitoring through the SCADA system, automatic gas detection, preventative inspection and maintenance, leak detection and repair procedures and associated operational controls. In relation to digestate, the Proposed Development incorporates dedicated treatment processes to produce stable and marketable fertiliser products, including fibre digestate, dried fertiliser/pellets and ammonium sulphate. The response explains the regulatory framework applicable to the subsequent use of these products and the distinction between the development for which permission is sought and subsequent agricultural application. The response also addresses the suggestion that injection of renewable biomethane into the gas network would create fossil fuel lock-in. The Proposed Project instead provides for the production of renewable biomethane for injection into the existing gas network, thereby enabling renewable gas to substitute for fossil natural gas and facilitating its use across the wider energy system. The concern raised regarding proximity to Drumintin wetland has also been reconsidered in the context of the revised Proposed Development. The Soil Relocation Area which formed the basis of An Taisce's concern has been removed from the application. In addition, the retained Renewable Biogas Plant site and surrounding wetland environment have been subject to specific hydrological and hydrogeological assessment as part of the Further Information response. RECEIVED: 28/08/2026 30 August 2026 | Response to Further Information Request Finally, the traffic and climate implications of transporting feedstocks and products to and from the facility have been considered within the updated EIAR. Transport-related greenhouse gas emissions are incorporated into the Climate assessment, while the revised Chapter 6 Traffic and Transport provides the detailed assessment of operational HGV generation, distribution and effects on the receiving road network. The operational assessment forecasts an average of approximately 27 HGV loads/visits per operating day, with an 85th percentile high value of approximately 32. Accordingly, the matters raised by An Taisce have been considered both individually and as part of the wider review and updating of the EIAR undertaken in response to the Further Information request. Appendix B should be read together with the revised EIAR and supporting technical assessments submitted as part of this Further Information response. 2.10 Further Information Request Point 10 A significant number of third-party submissions (26 No.) have been received with respect to the development proposed. The applicant is requested to review the content of same and provide a detailed and comprehensive response to each of the matters contained within each submission. Response The Applicant has reviewed all of the third-party submissions received in respect of the Proposed Development. A detailed response is provided at Appendix B Response to Third-Party Submissions. Given that a number of submissions raise the same or closely related matters, the detailed response groups the issues thematically in order to avoid unnecessary repetition while ensuring that all substantive matters raised are addressed. The key matters considered include traffic and road safety; odour; air quality and human health; noise and vibration; landscape and visual effects; lighting; water quality, hydrology and hydrogeology; biodiversity; archaeology and cultural heritage; site selection and planning policy; public consultation; and activities on adjoining lands. The response also acknowledges the supportive submissions received from representatives of the farming, poultry and agri-food sectors and the bioenergy sector. These submissions identify, amongst other matters, the need for sustainable management of agricultural organic materials, nutrient- management benefits, renewable energy generation, circular-economy benefits and support for the rural economy. The matters raised in the third-party submissions have not been considered in isolation. They have been reviewed alongside the Further Information request and the additional technical work undertaken during the Further Information process. A number of the matters raised by third parties overlap directly with issues addressed through the revised EIAR and supporting assessments, including the updated traffic assessment, additional archaeological investigation, hydrological and hydrogeological assessment, RECEIVED: 28/08/2026 31 August 2026 | Response to Further Information Request revised landscape and cultural heritage assessment and the removal of the former Soil Relocation Area. Accordingly, Appendix B should be read together with the revised EIAR and the additional technical documentation submitted as part of this Further Information response. 3. Conclusion This Further Information response represents a comprehensive reassessment and refinement of the application undertaken following the Request for Further Information issued by Monaghan County Council and subsequent direct engagement with the Planning Authority and relevant Council representatives. The main amendment arising from that process is the removal of the previously proposed Soil Relocation Area from the Proposed Development. The Renewable Biogas Plant remains the development for which planning permission is sought, while the omission of the ancillary land-reprofiling element results in a narrower proposal with a reduced physical development footprint. Surplus excavated soil and stone arising during construction will instead be managed off site through appropriately authorised reuse, recovery or disposal arrangements. The Further Information process has also resulted in a substantial body of additional investigation and technical assessment. This has included further archaeological testing and definition of Archaeological Area AA1; additional assessment of the setting of the Maghernakelly Hilltop Enclosure and the former New Park estate; hydrological and hydrogeological assessment of the retained Renewable Biogas Plant site and surrounding wetland environment; further consideration of traffic, access, parking and emergency vehicle movements; revised landscape information; and detailed responses to the submissions received from An Taisce and the 26 no. third parties. The EIAR has been reviewed and updated to reflect the revised proposal and the additional information prepared through the Further Information process. The interaction between environmental factors, which was already considered within the individual specialist chapters, has also been brought together within a dedicated interactions chapter. The updated assessment does not identify any new or materially different significant environmental effects beyond those identified and assessed in the original EIAR. The Appropriate Assessment Screening has similarly been reviewed having regard to the revised Proposed Project and updated technical evidence. That review does not alter the Stage 1 conclusion that likely significant effects on European Sites can be excluded on the basis of objective scientific RECEIVED: 28/08/2026 32 August 2026 | Response to Further Information Request information and that progression to Stage 2 Appropriate Assessment is not required. The Applicant has therefore used the Further Information process not simply to respond individually to the matters raised by the Planning Authority, but to review, test and bring the planning and environmental assessment documentation into alignment with the revised proposal. The issues identified through the Further Information request and third-party consultation have been examined and are addressed through the revised EIAR, supporting technical reports, drawings and this Response Report. To conclude, the main Renewable Biogas Plant remains the development for which permission is sought; the ancillary Soil Relocation Area has been removed; the technical issues raised have been examined and assessed; and the environmental assessment and supporting application documentation have been comprehensively reviewed and brought into alignment with the revised proposal. Having regard to the information now submitted, the findings of the revised EIAR and supporting technical assessments, and the mitigation and monitoring measures incorporated into the Proposed Development, it is respectfully submitted that the matters raised in the Request for Further Information have been satisfactorily addressed and that the Proposed Development can be accommodated at this location without giving rise to unacceptable effects on the environment, residential amenity, cultural heritage or the safe and efficient operation of the receiving road network. The Applicant therefore respectfully requests that Monaghan County Council proceed to determine the application favourably. RECEIVED: 28/08/2026 33 August 2026 | Response to Further Information Request Appendix A – Response to An Taisce Submission RECEIVED: 28/08/2026 34 August 2026 | Response to Further Information Request Appendix B – Response to Third-Party Submissions RECEIVED: 28/08/2026 35 August 2026 | Response to Further Information Request Attachment A – Hydrogeological Risk Assessment RECEIVED: 28/08/2026 36 August 2026 | Response to Further Information Request Attachment B – Landscape Management & Maintenance Schedule RECEIVED: 28/08/2026 37 August 2026 | Response to Further Information Request Attachment C – Revised Engineering Services Report RECEIVED: 28/08/2026 38 August 2026 | Response to Further Information Request Attachment D – Revised Photomontages RECEIVED: 28/08/2026 39 August 2026 | Response to Further Information Request Attachment E – Revised Appropriate Assessment Screening Report RECEIVED: 28/08/2026 40 August 2026 | Response to Further Information Request Attachment F – Water Protection Plan Checklist RECEIVED: 28/08/2026