Loading...
HomeMy WebLinkAbout2660018 - F.I. Received Doc. - Response to Submissions STR010/0001-#9436218v1 Response to RFI Question 10 Item 10 of the Request for Further Information requires the Applicant to review the 26 third-party submissions received in respect of the proposed development and to provide a detailed and comprehensive response to each of the matters raised. The Applicant has reviewed each submission in full and has identifled the individual planning, environmental, technical and community matters contained within them. A number of the submissions raise the same or closely related concerns. To avoid unnecessary repetition and to provide a clear and coherent response, the substantive responses below are grouped under the following principal themes: • Traffic, transportation and road safety; • Odour; • Air quality and population and human health; • Noise and vibration; • Landscape and visual impact; • Lighting; • Water quality, hydrology and hydrogeology; • Biodiversity; • Archaeology, architectural heritage and cultural heritage; • Site selection, location and planning policy; and • Other matters, including public consultation and activities on adjoining lands. The Applicant acknowledges the time and effort taken by local residents, community representatives and other interested parties in preparing their submissions. The concerns raised have been considered alongside the environmental assessments and technical information submitted with the application. References in this response to mitigation, monitoring and operational controls summarise the measures contained in the revised EIAR and supporting application documentation. The deflnitive mitigation and monitoring commitments are those set out in the revised EIAR, oCEMP and associated technical documents submitted with the Further Information response. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Supportive Submissions A total of eight supportive submissions were received in respect of the proposed development, comprising submissions from local farmers and agricultural contractors, poultry growers and producer groups, poultry processing and agri-food businesses, and the Irish Bioenergy Association (IrBEA) (bioenergy sector representative body). These submissions identify signiflcant beneflts that the proposed scheme can deliver, including the provision of a local and sustainable outlet for poultry manure and other agricultural organic materials; assistance to farmers in relation to nutrient management, manure storage and regulatory compliance; the production of renewable energy and organic fertiliser within a circular economy model; reductions in long-distance haulage, fuel consumption and associated carbon emissions; and the creation of direct and indirect employment and wider economic activity within County Monaghan. The submissions also highlight the suitability of the proposed location within an established centre of poultry and agricultural production, the contribution of the development to national renewable energy and climate objectives, and its potential to support the long-term viability, competitiveness and resilience of the farming, poultry and wider agri-food sectors in the county. The main themes raised in the supportive submissions are reviewed below. Agricultural Benefits The supportive third-party submissions place particular emphasis on the beneflt that the proposed Renewable Biogas Plant will provide to County Monaghan’s farming sector, especially its signiflcant poultry industry. They describe the management of poultry manure and other agricultural organic materials as an increasingly pressing issue, given the quantities generated and the difficulty of securing suitable outlets while meeting storage, spreading and nutrient-management requirements. The submissions therefore regard the development as important agricultural infrastructure that will provide a local, structured and sustainable outlet for materials already arising within the county. A consistent point in the submissions is reference to constraints associated with on-farm storage, closed spreading periods, land-application requirements and increasing regulatory obligations, including under the Nitrates Directive. They also highlight the present need to transport signiflcant quantities of poultry litter outside County Monaghan. In their view, the facility will help farmers manage these materials more effectively while maintaining viable, productive and environmentally responsible farm enterprises. The submissions also identify improved nutrient management as a major beneflt. They support a more controlled and traceable pathway through which the nutrients in poultry manure can be recovered and returned to productive use. As detailed in the application, RECEIVED: 28/08/2026 STR010/0001-#9436218v1 the proposed biogas plant will produce renewable biomethane and stabilised, nutrient- rich digestate that could be used by farmers in accordance with nutrient-management plans or supplied to the horticulture sector, rather than continuing to contribute to local nutrient-management pressures. The submissions further point to the value that can be recovered from material currently presenting a management challenge. The application estimates production of approximately 76,000 tonnes per annum of sustainable fertilisers, with a nutrient value capable of avoiding up to approximately €3 million of imported inorganic fertiliser. This supports the submissions’ view that an indigenous supply of clean fertiliser with quantifled nutrient values will beneflt agriculture and horticulture and improve resilience to volatility in international fertiliser markets. Supportive submissions also associate the project with reduced pressure from excess manure, improved protection of soils and water, reduced nutrient emissions and a cleaner means of managing agricultural residues as digestate fertiliser produced by biogas plants provides better nutrient availability for crop uptake and reduced leaching risks. Overall, the submissions present the proposal as a practical response to a speciflc agricultural need in County Monaghan that will support the long-term resilience and sustainable development of the poultry and wider agri-food sectors. Circular Economy and Renewable Energy Benefits A strong theme throughout the supportive submissions is that the development represents a circular-economy solution rather than simply a means of disposing of agricultural waste. The submissions support the recovery of energy, nutrient and carbon value from poultry manure and other locally generated organic materials. This is refiected in the proposed production of renewable biomethane, sustainable biofertiliser and biogenic CO₂: biomethane would displace fossil-derived natural gas, digestate would recycle nutrients as sustainable fertiliser, and biogenic CO₂ would be captured for industrial use. The project is therefore supported for converting an existing agricultural residue into useful products while retaining value within the economy. Local farmers and poultry-sector interests repeatedly identify the conversion of agricultural organic materials into renewable energy as a key project beneflt. Their submissions describe the proposal as a responsible and sustainable solution that will address an agricultural residue-management issue while contributing to Ireland’s renewable-energy and climate objectives. The renewable-energy element is presented as integral to the circular model: locally arising materials would be converted into indigenous energy and useful by-products rather than treated solely as waste. IrBEA’s submission places particular emphasis on the national energy context. It refers to the National Biomethane Strategy and the target of 5.7 TWh of biomethane production by 2030, noting that a substantial number of large-scale biogas facilities will be required. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 IrBEA considers projects of this nature important for reducing dependence on imported fossil fuels, cutting emissions and decarbonising the gas network. It also highlights biomethane’s role in difficult-to-electrify sectors such as heavy transport and industry and its ability to complement wind and solar generation as a reliable, dispatchable renewable-energy source. The application quantifles the scale of the renewable-energy and climate beneflts identifled in the submissions. The plant could produce up to 120 GWh of renewable gas annually, stated to be sufficient for approximately 11,000 homes, and could reduce greenhouse-gas emissions by up to approximately 42,000 tonnes of CO₂ equivalent per annum, comparable to removing around 9,000 cars from public roads. These flgures reinforce the submissions’ view that the development will make a meaningful contribution to indigenous renewable-energy production and decarbonisation. Supportive submissions also connect the circular-economy case with wider environmental gains, including better manure management, reduced nutrient emissions to air and water, lower transport emissions and replacement of fossil-based energy and fertiliser inputs. The application supports those points through a facility design incorporating sealed handling of organic materials, digestate treatment, SuDS-based drainage, process-water reuse and measures to protect surface and groundwater. The submissions therefore present the proposal as recovering useful energy and nutrients while reducing the environmental pressures associated with existing manure- management practices. Economic Benefits The supportive submissions place substantial emphasis on the economic beneflts that the development would bring to County Monaghan and the wider rural economy. The project will deliver capital investment, direct and indirect employment, local expenditure, opportunities for farmers and agricultural businesses, and increased demand in sectors such as haulage, contracting, maintenance and agricultural supply chains. Several submissions regard investment of this type as important to sustaining the economic vitality of rural communities and supporting the established farming, poultry and agri-food sectors. The submissions also emphasise that the project will generate wider beneflts through its local supply-chain relationships. By creating a new outlet for agricultural materials and demand for associated services, it is seen as capable of sustaining existing employment and supporting future growth. IrBEA similarly highlights opportunities in feedstock supply, logistics, plant maintenance and associated services, together with additional economic beneflt for farmers supplying sustainable agricultural feedstocks. Its submission stresses the value of retaining this activity and economic value within rural areas. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The Economic Impact Assessment quantifles the scale of the beneflts identifled in the submissions. The proposed development represents an investment of approximately €120 million. During the anticipated two -year construction period, it is estimated to support around 100 direct jobs and up to 140 indirect jobs, with a GVA uplift of approximately €43 million, including approximately €7 million within County Monaghan. This will provide a signiflcant temporary stimulus for contractors, engineering and professional services, transport, accommodation and other businesses supplying the project. During operation, the plant will support approximately 30 direct jobs and 75 indirect supply-chain jobs, including employment in haulage, contracting, administration and other services. Annual GVA uplift is estimated at approximately €23 million, of which approximately €7 million per annum will beneflt County Monaghan, supporting the submissions’ case for long-term employment linked to the green and bioeconomy sectors. The submissions’ emphasis on local economic beneflt is further supported by recurring operational expenditure. Annual expenditure is estimated at approximately €3.5–€4.5 million, with a substantial proportion expected to be spent locally, while commercial rates could contribute up to approximately €400,000 per annum to Monaghan County Council. Taken together, these flgures reinforce the submissions’ view that the project will deliver rural investment and economic activity extending beyond the plant itself through farmers, hauliers, contractors, suppliers and service providers. Site Location Support A number of supportive third-party submissions speciflcally identify the proposed location as a signiflcant advantage. They emphasise that the site lies within one of the country’s principal poultry-producing areas and is therefore close to the agricultural feedstocks that the facility is intended to process. In their view, locating the plant within the main poultry-growing area makes practical and logistical sense by placing treatment infrastructure close to the farms generating the material, reducing unnecessary transport distances and associated emissions, and providing a locally accessible outlet for poultry manure. The location arguments made in the submissions align with the site-selection rationale in the EIAR, which sought proximity to the principal poultry-manure resource together with feasible access to the national gas transmission network. County Monaghan was identifled because of its exceptionally high concentration of poultry production and availability of agricultural residues, while the Maghernakelly site is approximately 3.5 km from the existing gas transmission network. These characteristics support the submissions’ view that the site is appropriately located in relation to both its agricultural inputs and renewable-energy output. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Accordingly, the supportive submissions reinforce the conclusion that the selected site has a strong functional relationship with the purpose of the development. It is located where the agricultural need and feedstock resource are concentrated, can minimise avoidable transport of poultry manure and can facilitate connection of renewable biomethane to the national gas network. The submissions therefore support Maghernakelly as a location particularly suited to infrastructure intended to provide a sustainable local solution for poultry-manure management while supporting the agricultural sector in County Monaghan. Observations Traffic & Transportation The third-party submissions raise a range of concerns in relation to traffic and road safety. The local road network is described as comprising narrow rural roads which are considered unsuitable for sustained HGV movements, with particular concerns regarding road width, dangerous bends, restricted visibility, junction geometry, unstable verges and the absence of footpaths, lay-bys and other pedestrian infrastructure. Concerns are also raised regarding the potential interaction of increased HGV traffic with school buses and children at roadside collection points, pedestrians, cyclists, walkers, elderly and vulnerable road users, agricultural vehicles and other local traffic. Blackkesh Crossroads is speciflcally identifled as a school bus stopping point and a location where road safety concerns and previous accidents have arisen. A number of submissions question whether the projected HGV movements accurately refiect the likely traffic generated by the Proposed Development, including by reference to traffic levels observed at other comparable facilities, and raise concerns regarding additional traffic associated with the removal of excavated material and the potential diversion of vehicles onto unsuitable local side roads. Related concerns include possible deterioration of the road network, increased noise, dust and vibration, potential damage to underground services adjacent to the roads, including infrastructure associated with the Drumgole Group Water Scheme, and the ability of the site to accommodate HGVs in the event of vehicles arriving concurrently or a temporary backlog occurring. Submissions also raise the absence, at the time of the original application, of a Traffic and Transport Assessment, Road Safety Audit and structural assessment of proposed haul routes, and refer to the setback requirements for development adjoining roads contained in the Monaghan County Development Plan. Response RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Observations received in relation to traffic, transportation and road safety have been reviewed. These matters were comprehensively assessed within the EIAR and are further addressed below. Suitability of Local Roads A comprehensive Traffic and Transport Assessment forms part of Chapter 6 Material Assets: Traffic & Transport of the EIAR, which was prepared by suitably qualifled transportation specialists in accordance with the Transport Infrastructure Ireland (TII) Traffic and Transport Assessment Guidelines. The assessment included: • Baseline traffic surveys, including classifled turning counts and automatic traffic counts. • Assessment of existing traffic conditions and road network operation. • Forecast construction and operational traffic generation. • Assessment of the receiving road network. • Assessment of junction operation and vehicle swept paths. • Identiflcation of appropriate mitigation measures and road improvement works. The Applicant proposes speciflc improvement works to approximately 220 metres of the L2280 between the site access and the R189. These works include widening of the carriageway, strengthening and resurfacing where required, verge improvements, improved visibility and associated drainage works. The R189/L2280 junction will also be realigned and improved to accommodate the swept paths of the largest HGVs expected to serve the development. The road and junction improvements will be completed before the commencement of operational HGV traffic associated with the proposed development. Routine construction and operational HGV traffic will access the site by way of the improved L2280 and the R189, with onward distribution principally via the R188 and R189 Regional Roads. The L2320 Drumgole/Dernamoyle Road will not form part of the approved HGV route and its use by development-related HGV traffic will be expressly prohibited through the Construction and Operational Traffic Management Plans. The approved routes will be communicated to all suppliers, contractors and hauliers through contractual routing requirements, driver instructions and route maps. Deliveries will also be controlled through the site booking and scheduling system. Procedures governing road closures, emergencies and any proposed temporary route diversion will be set out in the relevant Traffic Management Plan, and development-related HGVs will not use unapproved local roads. The assessment forecasts an average of approximately 27 HGV vehicle visits per working day. Each vehicle visit comprises an arrival at and subsequent departure from the site. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The assessment found that forecast traffic increases are relatively modest when considered against existing traffic volumes on the adjacent regional road network. Traffic will be distributed throughout the day and managed through operational procedures and delivery scheduling. The effect of this traffic varies across the receiving road network. The forecast increases on the R188 and R189 Regional Roads are relatively modest when considered against existing traffic volumes. A greater percentage increase is forecast on the short section of the L2280 between the proposed site access and the R189 because existing traffic levels on that road are low. It was concluded that the R188 and R189 Regional Roads are suitable principal haul routes for the proposed development. In addition, speciflc road improvement works are proposed along the L2280 and at the R189/L2280 junction to facilitate safe HGV access to the site. These works over approximately 220 metres, include localised widening, verge improvements, improved visibility to accommodate HGV swept paths. The proposed improvements have been designed in accordance with the requirements of TII Rural Road Link Design and Geometric Design of Junctions standards and will ensure that the development traffic can be safely accommodated. The R189/L2280 junction will also be realigned and improved to accommodate the swept paths of the largest HGVs expected to serve the development. The road and junction improvements will be completed before the commencement of operational HGV traffic associated with the proposed development. Subject to completion of the proposed road and junction works and implementation of the identifled traffic-management measures, the assessment concludes that the forecast development traffic can be accommodated without giving rise to likely signiflcant adverse effects on the capacity or operation of the receiving road network. Road Safety, Visibility, Junctions and Vulnerable Road Users An independent Stage 1 Road Safety Audit has been undertaken as part of the project design process and was submitted as part of the planning application. This Audit was undertaken by Traffico in accordance with TII Publication GE-STY-01024 Road Safety Audit procedures by a team of independent, qualifled Road Safety Auditors. The audit examined visibility, junction operation, vehicle manoeuvring, traffic generation and interaction with existing road users. All matters raised by the audit were reviewed by the project design team and have been incorporated in the proposed design. These include: • The proposed widening of the L2280 to a 6.5 metre carriageway and the realignment of the R189/L2280 junction have been conflrmed by swept-path analysis as capable of safely accommodating the largest HGVs permitted on public roads. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 • The proposed junction upgrade incorporates measures to ensure that roadside furniture, vegetation and boundary treatments do not obstruct visibility at the R189/L2280 junction. • Positive drainage infrastructure and channel drains are proposed to prevent surface water discharging from the development onto the public road. • The access geometry will be further reflned during detailed design in consultation with Monaghan County Council while maintaining safe HGV access requirements. The swept-path assessment demonstrates that the largest vehicles can enter and leave the L2280 and negotiate the R189/L2280 junction within the proposed road geometry. Any detailed design reflnements will be agreed with Monaghan County Council and will not reduce the proposed carriageway width, visibility or vehicle-manoeuvring requirements. The Traffic and Transport Assessment concludes that, subject to completion of the proposed road and junction improvements and implementation of the identifled traffic- management measures, the forecast development traffic can be accommodated without giving rise to likely signiflcant adverse effects on the operation of the receiving road network. The Stage 1 Road Safety Audit provides a separate independent review of the road-safety implications of the proposed design. No road safety issues have been identifled that would preclude the development. Accordingly, the independent Road Safety Audit conflrms that the proposed development can be accommodated safely on the receiving road network subject to the implementation of the recommended design measures, all of which have been accepted by the Applicant and design team. On-Site Vehicle Holding and Queue Management The assessment separately considers the possibility of several HGVs arriving within a short period. Based on the forecast hourly delivery proflle, approximately six HGV arrivals may occur during the initial hour of feedstock acceptance, reducing to approximately three or fewer arrivals per hour during the remainder of routine operations. The proposed internal layout provides holding capacity for up to three articulated HGVs between the site entrance and the inbound weighbridge. Where several vehicles arrive in close succession, additional vehicles can be directed past the weighbridge and held within the internal yard until they can be processed. Typical weighbridge processing is expected to take approximately three to flve minutes per vehicle. Deliveries will also be controlled through the site booking and scheduling system. These measures are intended to ensure that arriving vehicles can be held within the site boundary and do not queue on the L2280. School Buses and Vulnerable Road Users RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The Applicant acknowledges concerns relating to school bus routes, pedestrians, cyclists, walkers, agricultural vehicles and other vulnerable road users. However, the assessment concluded that the forecast traffic levels are not of a magnitude that would materially alter the character or safety of the receiving road network. The Construction and Operational Traffic Management Plans will require development- related HGVs to use only the approved routes. Driver induction will include route maps, compliance with applicable speed limits, appropriate driving behaviour on rural roads and particular care when encountering pedestrians, cyclists, school buses, agricultural machinery and other vulnerable road users. Route deviation and unsafe driving behaviour will be subject to investigation and corrective action. Building Lines and Road Setbacks A number of submissions refer to the general 18-metre building-line guideline applicable to County Roads in rural areas under the Monaghan County Development Plan 2025– 2031. A detailed assessment of this matter is provided in Section 8.4.9 of the Planning Statement. That assessment considers the proposed development having regard to Section 15.27 and Policy BLP 1 of the Development Plan, the rural context of the site, the proposed road-improvement works, the submitted Road Safety Audit and sightline drawings, and the design rationale set out in the Design Statement and Chapter 3 of the EIAR. The main process building is set back approximately 39.4 metres from the near edge of the surfaced carriageway of the R189, exceeding the general 30 -metre guideline applicable to Regional Roads. Buildings addressing the L2280 and L22802 have setbacks ranging from approximately 9.4 metres to 28.9 metres. While certain ancillary and operational buildings are therefore located within the general 18-metre guideline applicable to County Roads, Section 15.27 expresses the relevant setback distances as general guidelines rather than absolute requirements and allows the particular circumstances of a site to be considered. As explained in Section 8.4.9 of the Planning Statement: • Deflned widening and improvement works are proposed along the L2280 between the site entrance and the R189; • The positioning of the buildings does not interfere with the visibility splays shown on the submitted drawings; • The proposed setbacks do not prejudice the road-safety measures identifled through the Road Safety Audit process; • There is no identifled policy objective or proposal to widen or strategically upgrade the L22802; RECEIVED: 28/08/2026 STR010/0001-#9436218v1 • The development is not located within an identifled urban growth corridor or strategic development area requiring additional future road capacity; and • The flnal layout resulted from an iterative design process balancing road and visual amenity, infrastructure requirements, internal circulation and the operational needs of the facility. The planning assessment therefore concludes that the proposed development generally complies with the purpose and intent of Section 15.27 and Policy BLP 1. Although certain buildings are located within the general 18-metre guideline, the departures have been speciflcally assessed and justifled and do not prejudice road safety, sightlines or the future functioning of the adjoining public-road network. Furthermore, the development has been demonstrated, through the Traffic and Transport Assessment and Road Safety Audit, to provide a safe and satisfactory relationship with the adjoining public roads. Forecast Traffic Volumes The operational traffic assessment forecasts an average of approximately 27 HGV vehicle visits per 12-hour working day. Each vehicle visit comprises an arrival at and subsequent departure from the site. However it should be noted that, as a conservative approach, the traffic assessment considered a ‘high-value’ traffic generation rate of 32 HGV vehicle movements per day which is the 85th percentile of the data sample. This robust scenario captures higher than average traffic days, refiecting variability due to seasonal peaks, operational scheduling, or exceptional daily loads. This higher value type of assessment is recognised in industry guidelines including TII ‘Traffic and Transport Assessment Guidelines’ (2014) and is accepted good practice as a prudent planning metric. The reference in the assessment to approximately two HGV visits per hour relates speciflcally to the receiving road network’s morning and evening commuter peak hours. It is not presented as the maximum number of HGVs that may arrive during any hour of the working day. The assessment separately considers the hourly delivery pattern associated with the operation of the facility. Based on operational records from the Applicants Tully Plant in Ballymena, approximately 20% of daily deliveries typically occur during the initial hour of feedstock acceptance. Applying this proflle to an average of 27 daily HGV visits gives an anticipated opening-hour arrival rate of approximately six HGVs, reducing to approximately three or fewer arrivals per hour during the remainder of routine daily operations. Local residents reported observing flve HGVs entering the Tully facility during a 50-minute period on 30 December 2025. This observation is consistent with the opening-hour delivery proflle already considered in the Traffic and Transport Assessment and does not, RECEIVED: 28/08/2026 STR010/0001-#9436218v1 in itself, indicate that the forecast daily or hourly traffic volumes for the proposed development have been underestimated. Deliveries will be managed through a booking and scheduling system, and the proposed internal layout provides vehicle holding capacity within the site to prevent arriving vehicles from queueing on the public road. The forecast traffic volumes presented in the Monaghan EIAR were not derived from theoretical assumptions alone. The assessment was informed by detailed operational data from the Ballymena facility, which was adjusted to take account of the differences in digestate treatment at the back end of the AD process. This provides a robust evidence base for forecasting future traffic generation for the Monaghan facility. Accordingly, the Applicant considers that the projected traffic flgures are realistic, evidence-based and representative of the likely operational characteristics of the proposed facility. Road Condition, Noise, Dust and Vibration Potential effects associated with road condition, traffic noise, dust and vibration have been considered in Chapter 6, Material Assets: Traffic and Transport, Chapter 12, Noise and Vibration, and Chapter 13, Air Quality, of the EIAR. The EIAR concludes that, subject to implementation of the mitigation measures already identifled in Chapters 6, 12 and 13, development-related traffic will not give rise to likely signiflcant adverse dust, air-quality or vibration effects. Traffic-noise effects are assessed in detail in Chapter 12, including the greater calculated change on the short section of the L2280 where existing traffic levels are low. Construction Traffic, Dust and Road Cleanliness Construction traffic will be managed through the Construction Traffic Management Plan. The measures identifled in Chapter 6 include the use of designated haul routes, scheduling of construction deliveries to avoid local network peak hours where possible, and the use of wheel-wash facilities where necessary to prevent mud or debris being deposited on the public road. Chapter 13 identifles a range of construction dust control measures, including dust suppression where required, management of exposed soils and stockpiles, covering of vehicles carrying loose materials where appropriate, inspection of nearby roads and other receptors, and cleaning where necessary. Construction dust monitoring will include regular inspections and monthly dust-deposition monitoring. With the identifled mitigation measures in place, the residual construction dust effect is assessed as short- term, localised and not signiflcant. Construction and operational traffic emissions were also screened against the applicable TII criteria. The forecast traffic changes do not exceed the thresholds requiring RECEIVED: 28/08/2026 STR010/0001-#9436218v1 a detailed traffic-emissions assessment, and Chapter 13 concludes that no signiflcant traffic related air quality effects are predicted. Traffic Noise Traffic noise associated with the construction and operational phases has been assessed in Chapter 12 using the traffic flgures provided in Chapter 6. During construction, predicted traffic-noise changes on the surrounding regional roads range generally from 0.0 dB to 1.3 dB and are assessed as imperceptible to slight. A larger increase of approximately 4.6 dB is calculated on the short section of the L2280 between the proposed access and the R189 because the existing traffic volume on that section is low. Chapter 12 notes that there are no noise -sensitive locations along this section of road and that the closest noise-sensitive locations are approximately 250 metres away. The predicted traffic-noise contribution at those locations is below 45 dB LAeq, and the resulting construction traffic-noise effect is assessed as not signiflcant to slight and short term. During operation, the assessment predicts a change of less than 1 dB along the majority of the surrounding road network and an increase of approximately 1.2 dB on the R189 south of the L2280 junction. An increase of approximately 5.1 dB is calculated on the short section of the L2280 between the proposed access and the R189, refiecting the low existing traffic fiows on that section. The detailed assessment of operational traffic noise and its effect at nearby noise-sensitive locations is set out in Section 12.8.2.3 and Table 12-22 of Chapter 12. Vibration Potential construction vibration was assessed in Chapter 12 having regard to the relevant guidance criteria for building response and human perception. Following implementation of the construction mitigation measures identifled in the EIAR, construction vibration effects are assessed as not signiflcant and temporary to short term. The operational development does not include activities that would normally generate signiflcant vibration. Operational vibration effects are therefore assessed in Chapter 12 as not signiflcant. Underground Services and Water Infrastructure The Applicant notes concern regarding potential impacts on underground services adjacent to the site during construction, including pipework associated with the Drumgole Group Water Scheme. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Chapter 7, Material Assets: Built Services, conflrms that watermains are present along the roads surrounding the proposed development to the north, east and west. These watermains form part of the Drumgole Group Water Scheme. Available service records, the topographical survey and site inspections have identifled associated infrastructure along the local road network, including scour valves, sluice valves, a bulk water meter, flre hydrants and service-access manholes. As set out in Section 7.9.2 of Chapter 7, before construction commences, the works contractor will be required to establish the location of existing underground services. Exclusion zones will be established around identifled services where construction activities are restricted or subject to speciflc safety procedures. Any planned service interruptions will be coordinated and agreed in advance with the relevant utility provider. Works in the vicinity of existing watermains or other services will be undertaken in accordance with the requirements of the relevant service provider and the construction-management measures identifled in the EIAR. All construction works affecting public roads will be undertaken in accordance with the requirements of Monaghan County Council and relevant utility providers. Existing services will be identifled and protected during construction, and any crossings or works in proximity to services will be carried out in accordance with agreed engineering standards and statutory requirements. On this basis, Chapter 7 concludes that, following implementation of the identifled construction measures, effects on existing built-service infrastructure will be not signiflcant and short term. Excavated Material Movements Traffic associated with the transport of excavated material during construction was assessed within the EIAR and included within the construction traffic assessment. Excavated material will no longer be deposited in the Soil Relocation area but instead will be removed off site by suitably authorised contractors for appropriate reuse, recovery or disposal at an appropriately authorised receiving facility or facilities. The EIAR has been updated to refiect this. Chapter 6, Material Assets: Traffic and Transport, has been updated to assess the traffic associated with the off-site transport of this material. The assessment estimates that approximately 18,600 m³ of excavated material will require removal from the site. Based on an average load of approximately 20 m³, this is estimated to result in approximately 930 loaded outbound HGV movements / loads over the relevant earthworks period. Vehicles transporting excavated material will access and leave the site by way of the L2280 and the R189, with onward travel via the regional road network to the authorised receiving location. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The earthworks traffic forms part of the construction traffic assessment presented in Chapter 6. Traffic associated with the removal of excavated material will be managed through the Construction Traffic Management Plan, including the use of designated construction routes, management of vehicle arrivals and departures, and measures to avoid vehicle queueing on the public road. Chapter 6 concludes that construction traffic effects will be temporary to short term. While mitigation will reduce those effects, the assessment acknowledges that traffic effects may remain temporarily signiflcant during brief periods of relatively intensive construction activity. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Odour The third-party submissions raise concerns regarding the potential for odour emissions associated with the handling and processing of manure, slurry, digestate and other organic materials at the Proposed Development. Submissions refer to reported or observed odour issues at the Applicant’s existing facility at Tully and question the reliability of statements that the proposed facility would not give rise to odour problems. Concerns are also expressed regarding the potential effect of odour on nearby residential properties, including gardens, outdoor activities and the general enjoyment of residential amenity, having regard in particular to the proximity of nearby dwellings and prevailing wind conditions. Some submissions further contend that the application does not demonstrate the presence of enforceable measures capable of completely preventing odour emissions from occurring. Response The Applicant has reviewed submissions regarding potential odour emissions from the plant. Management of air emissions and potential odour is of critical importance to Stream and is a key aspect in the design of the proposed Monaghan plant. Potential operational odour effects were assessed in Chapter 13, Air Quality, of the EIAR. The assessment was prepared by AWN Consulting in accordance with relevant guidance, including the EPA Odour Emissions Guidance Note (AG9). The assessment considered the proposed odour emission sources, the location and height of the emission points, surrounding buildings, nearby sensitive residential receptors and meteorological conditions. The modelling was undertaken using flve meteorological years and assessed the maximum predicted odour concentration at the worst case sensitive residential receptor. The modelling predicts 98th-percentile hourly mean odour concentrations of between 0.9 and 1.0 OUE/m³ at the worst-case sensitive receptor, compared with the relevant guideline value of 1.5 OUE/m³. The highest predicted result is therefore approximately 68% of the guideline value. Chapter 13 consequently assesses the operational odour effect as direct, negative, permanent and slight, which is not signiflcant. Stream has extensive experience in air and odour containment and our similar facility in Northern Ireland has an excellent compliance record with the Northern Ireland Environment Agency (NIEA) and is widely considered to be the standard bearer for environmental containment and performance in the sector. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The experience from the commissioning and successful operation of that plant affords a high level of knowledge and expertise with regard to management of air emissions and odour containment. This expertise will be applied to the proposed Monaghan plant, which will be a state-of-the-art development utilising best available technologies and operating systems. Odour Containment & Design Odour control has been incorporated into the design of the proposed development. The measures include: • Delivery of feedstock in covered or sealed HGVs; • Unloading and handling of feedstock within the enclosed main process building – no handling or storage of feedstock or any organic material outdoors; • Undertaking feedstock and digestate-processing activities within enclosed buildings; • Ventilation and extraction system will create negative pressure within the building thereby prevent release of potential odour; • Provision of fast-acting roller-shutter doors to limit fugitive emissions from building entry points; • Containment of external process stages within sealed pipes and tanks; and • Treatment of extracted air through the proposed multi-stage odour-control system before discharge through 40m tall odour-control stack. The design of the plant incorporates a robust multi-stage odour control system that has been tailored to cater for the input material and the size of the plant. This system utilises technology that is well established and proven at a wide range of industrial facilities worldwide (including the Stream Tully Biogas Plant) and will be continuously monitored to ensure optimal performance. The proposed odour-control system comprises three stages: 1. Scrubber treatment; 2. Biofllter treatment; and 3. Carbon treatment as a flnal polishing stage. Following treatment, the air will be discharged through the proposed 40m odour-control stack. The system will be monitored through the site’s Supervisory Control and Data Acquisition (SCADA) system and will include alarms to identify deviations in performance. The air-dispersion modelling conservatively assumes continuous operation of the odour- control emission source for 24 hours per day and 365 days per year. The assessment RECEIVED: 28/08/2026 STR010/0001-#9436218v1 therefore considers a continuous operational scenario rather than relying only on limited delivery or processing periods. End-products from the process, including digestate, will also be stored within enclosed buildings prior to being exported from site to markets with a demand for the valuable nutrients they contain. In summary, detailed odour assessment and modelling completed as part of the EIA for the project concluded that predicted effects of the proposed development in terms of odour are not signiflcant. It should be further noted that the proposed facility will be licensed by the EPA under Industrial Emissions Regulations. This means the plant will be required to comply with speciflc odour limits and monitoring requirements to ensure that there is no impact to local residential amenity. Prevailing Winds and Nearby Residences The infiuence of wind direction and meteorological conditions is incorporated directly into the dispersion modelling. The assessment uses meteorological data from Ballyhaise and assesses flve separate meteorological years. Nearby residential receptors were expressly included in the modelling, with the reported result representing the maximum predicted concentration at the worst-case sensitive residential receptor. The assessment therefore takes account of the relationship between the proposed emission sources, prevailing meteorological conditions and nearby homes rather than assuming that odour will disperse uniformly in all directions. Regulation and Enforceability The proposed development will require an Industrial Emissions Licence from the EPA before operation. The licence will regulate process emissions and will include applicable monitoring, compliance, reporting and incident-response requirements. The EPA licensing process is separate from the planning process, and the precise licence conditions will be determined by the EPA. The Applicant will be required to operate the facility in accordance with both the planning permission and the conditions of the Industrial Emissions Licence. The EIAR demonstrates that the proposed containment, extraction and treatment systems have been incorporated into the design and that the predicted odour concentrations at sensitive residential receptors are below the applicable guideline value. On that basis, the predicted operational odour effect is assessed as slight and not signiflcant in EIA terms. Comments Relating to Tully Biogas Plant RECEIVED: 28/08/2026 STR010/0001-#9436218v1 A number of submissions refer to reported odour observations in the vicinity of the Applicant’s existing Tully Biogas Plant in Ballymena. The Applicant refutes these comments. While it is acknowledged that technical issues arose with the odour control system at the Tully Plant when it was flrst commissioned in 2017, corrective measures were subsequently implemented and the plant has since operated with an excellent compliance record under its Northern Ireland Environment Agency (NIEA) Pollution Prevention and Control Permit, including in relation to the applicable odour-management requirements. This was explained to residents at the public consultation event in December 2025. The comment suggesting that Stream employ someone to monitor odours in the local areas only because there are odours from the plant is entirely misleading. It is a requirement of the NIEA permit and Odour Management Plan to carry out regular odour monitoring around the site boundary, which is the purpose of this activity. Furthermore, the Applicant is proactive in informing local residents of proposed maintenance activities at the plant, which is considered good practice and encouraged by the NIEA. The operational experience gained at Tully, including the experience arising during commissioning, has informed the design and proposed management of the Monaghan facility. However, the environmental acceptability of the proposed Monaghan development has been assessed on the basis of its own site-speciflc circumstances rather than solely by reference to the operating history of the Tully facility. Chapter 13 of the EIAR assesses the proposed Monaghan facility having regard to its speciflc process design, odour-containment and treatment systems, stack characteristics, local meteorological conditions and nearby sensitive residential receptors. That assessment concludes that the predicted operational odour effect will not be signiflcant. The proposed development will also require an Industrial Emissions Licence from the EPA, under which its emissions, monitoring, reporting and compliance obligations will be regulated. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Air Quality and Public Health The third-party submissions raise concerns regarding potential effects on air quality, human health and residential amenity arising from the Proposed Development. Matters identifled include emissions from the process and associated stacks, methane, ammonia, sulphur compounds and nitrogen oxides, emissions from generators and HGV traffic, as well as dust, insects, flre and explosion risk and the operation of the gas fiare. Concerns are also expressed regarding the proximity of the Proposed Development to nearby homes and the potential for these effects, individually and in combination, to adversely affect family life, outdoor recreation, the use and enjoyment of homes and gardens, rural tranquillity, residents’ wellbeing and property values. Particular concern is expressed in relation to potentially vulnerable members of the local community, including children, elderly residents and people with serious medical conditions or disabilities. Some submissions contend that the combined environmental and operational effects of the Proposed Development could result in an unacceptable loss of residential amenity. Response The potential effects of the proposed development on air quality, human health and residential amenity have been comprehensively assessed within the EIAR. The assessments conclude that, following implementation of the embedded design measures and mitigation identifled in the EIAR, the proposed development will not give rise to signiflcant adverse effects on air quality, human health or residential amenity. These conclusions are based on recognised assessment methodologies, detailed atmospheric dispersion modelling and consideration of all relevant sensitive receptors. The proposed plant will be a state-of-the-art development utilising best available technologies and operating systems and will be managed in strict accordance with health, safety and environmental legislative requirements. It will also be stringently regulated by Monaghan County Council, the EPA, the Department of Agriculture, Food and the Marine (DAFM) and the Health and Safety Authority (HSA), with standards and controls applied by the authorities that are designed to protect air quality and human health. Matters associated with air quality and public health were fully addressed throughout the EIAR, including in the following chapters: • Chapter 4 – Population and Human Health; • Chapter 6 – Material Assets: Traffic and Transport; • Chapter 13 – Air Quality; and • Chapter 16 – Major Accidents and Disasters RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The Population and Human Health Chapter speciflcally considers the combined infiuence of these environmental factors on nearby residents rather than considering each topic in isolation. Air Emissions and Human Health Observations submitted raise concerns regarding potential emissions from the proposed facility, including methane, ammonia, sulphur compounds, nitrogen oxides, combustion emissions, HGV emissions and dust. These matters were comprehensively assessed within the Air Quality Chapter of the EIAR using recognised atmospheric dispersion modelling techniques and accepted assessment methodologies. Several observations refer to methane emissions. Biomethane is the principal product of the process, and the plant has been speciflcally designed to maximise gas capture and utilisation. The facility will operate under a comprehensive preventative maintenance and inspection programme speciflcally designed to minimise the potential for fugitive methane emissions. Further details on inspection procedures are provided in response to RFI Question 9 (An Taisce response). The assessment considered all relevant operational emission sources associated with the proposed development, including combustion plant, process emissions, traffic emissions and construction dust. Atmospheric dispersion modelling speciflcally considers stack location, height, emission characteristics, local meteorological conditions and receptor locations in order to predict pollutant concentrations at nearby residential properties. Modelling was undertaken using recognised regulatory methodology and incorporated the proposed stack location and height, emission characteristics, local meteorological conditions and nearby sensitive receptors. The modelling demonstrates that predicted ground-level concentrations of all relevant pollutants, including nitrogen oxides (NOx), sulphur dioxide (SO₂), ammonia (NH₃) and particulate matter, comply with the applicable ambient air quality standards and health-based guideline values at all residential receptors. Accordingly, no signiflcant adverse effects on human health are predicted. Furthermore, the proposed development will operate under an EPA Industrial Emissions Licence. As part of that licensing process, air emissions will be independently regulated by the EPA through legally enforceable emission limit values, monitoring requirements and compliance obligations throughout the operational life of the facility. Dust Concerns have been raised regarding dust emissions during construction. Potential temporary dust emissions associated with earthworks and construction activities will be controlled through a range of standard mitigation measures, including: RECEIVED: 28/08/2026 STR010/0001-#9436218v1 • Dust suppression using water where necessary; • Wheel washing facilities; • Management of exposed soils; • Covering of loaded vehicles where appropriate; • Regular road cleaning where required; and • Implementation of a Construction Environmental Management Plan. Taking account of the short-term nature of the construction works and the implementation of these measures, the EIAR concludes that signiflcant adverse dust impacts at nearby residential properties are not predicted. Construction of the associated gas grid connection will be undertaken as a rolling linear operation within the public road corridor, meaning that dust-generating activities will only occur over short sections of the route at any one time before progressing. Consequently, any potential dust effects associated with the pipeline works will be localised and temporary. Vehicle Emissions Observations have also been raised regarding emissions associated with HGV traffic. Traffic emissions were considered within the Air Quality Assessment using the forecast traffic generation presented in the Traffic and Transport Assessment. The predicted increase in traffic associated with the proposed development is relatively modest in the context of existing traffic volumes on the receiving road network. Consequently, predicted changes in pollutant concentrations at nearby residential receptors are negligible and comply with the relevant ambient air quality standards and health-based assessment criteria. Accordingly, the Proposed Development is not predicted to give rise to signiflcant adverse effects on local air quality or human health as a result of traffic-related emissions. Fire, Explosion and Major Accident Risk Some submissions express concern regarding potential flres, explosions and other potential industrial hazards. These matters have been speciflcally considered within Chapter 16 of the EIAR (Major Accidents and Disasters). The proposed development will be designed in accordance with recognised engineering standards applicable to anaerobic digestion facilities and several robust safety systems have been incorporated into the design of the plant including mitigation for flre and explosion risk, meaning that the chances of this happening are extremely low. The volumes of biogas / biomethane stored on site at any one time will be very low as the gas will be immediately removed off site via direct injection to the gas grid. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The enclosed fiare is not part of normal plant operation. It functions solely as a safety device during commissioning, maintenance or exceptional operational circumstances when gas cannot be exported. Accordingly, fiare operation is expected to be infrequent (expected maximum operational time of less than 2% of the year) and of short duration. The facility will also be subject to ongoing regulation under applicable health and safety legislation. The Applicant notes that the proposed development is not a Seveso establishment and is not located within the consultation distance of any Upper or Lower Tier Seveso facility. The Major Accidents and Disasters assessment concludes that the proposed plant incorporates multiple engineered and operational safeguards including automatic shutdown systems, SCADA monitoring, gas detection, pressure relief systems, bunded storage, emergency response procedures and flre protection infrastructure. The plant will operate in accordance with Best Available Techniques (BAT) and Industrial Emissions Directive requirements. The assessment concludes that while the possibility of a major accident can never be entirely eliminated, the likelihood of such an event is very low and signiflcant off-site consequences are not predicted. Residential Amenity Several submissions refer to potential impacts to residential amenity from the proposed development. The Population and Human Health Chapter speciflcally considers these matters by reviewing the combined effects of air quality, odour, noise, traffic, visual impact and other environmental factors on nearby residents. The assessment identifles the principal nearby sensitive receptors and conflrms that the surrounding area comprises a dispersed rural population with relatively few dwellings in close proximity to the site. Within 500 metres of the site there are 14 dwellings, with the nearest dwellings located to the south and south-east being associated with the landholding for which consent has been provided. Observations speciflcally refer to potentially vulnerable members of the community, including children, elderly residents and persons with disabilities or underlying medical conditions. The Population and Human Health Chapter speciflcally considers the demographic proflle of the local population, including age proflle, health status, deprivation and disability, in accordance with recognised Health Impact Assessment guidance. Particular concern has been expressed regarding potentially vulnerable members of the community, including children, older persons and those with existing medical conditions. These groups were considered within the Population and Human Health assessment through the identiflcation of sensitive receptors and review of the local RECEIVED: 28/08/2026 STR010/0001-#9436218v1 demographic proflle. As the specialist environmental assessments conclude that no signiflcant residual effects are predicted, no signiflcant adverse effects on these population groups are anticipated. Following assessment of the available demographic and health data, the surrounding population is assessed as having an overall low to medium sensitivity to environmental change. Importantly, this sensitivity assessment is combined with the conclusions of the specialist environmental assessments contained within the EIAR. Residential amenity has been assessed by considering the combined effects of the proposed development, including air quality, odour, noise, traffic, visual effects and lighting. This integrated assessment concludes that, following implementation of the embedded mitigation measures, the proposed development will not result in signiflcant adverse effects on the amenity of nearby residents or on human health. A number of submissions refer to potential impacts on property values. Property values are not an environmental factor requiring assessment under the Environmental Impact Assessment Directive and therefore do not form part of the EIAR. The assessment instead considers the potential environmental effects of the proposed development on human health and residential amenity. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Noise & Vibration Impact The third-party submissions raise concerns regarding potential noise and vibration effects arising from the operation of the Proposed Development, including noise from plant and machinery, pumps, generators and HGV movements, with particular concern expressed in relation to early morning and nighttime activity. Speciflc reference is also made to the possible continuous operation of a 2 MW generator. Submissions contend that these sources of noise and vibration could be incompatible with the existing quiet rural character of the area and could adversely affect nearby residential properties, residents’ quality of life and the enjoyment of their homes. Response The Applicant has considered submissions relating to noise and vibration. The proposed development has been subject to a detailed Noise and Vibration Assessment undertaken by suitably qualifled specialists (AWN) in accordance with recognised national and international guidance, including EPA Guidance Note for Noise (NG4), BS 4142, BS 8233, ISO 1996 and the Institute of Environmental Management and Assessment (IEMA) Guidelines. The assessment considered all signiflcant construction and operational noise sources associated with the proposed facility, including mechanical plant, vehicle activity, CHP engines, process equipment and ancillary infrastructure, and the assessment flndings are outlined in Chapter 12 of the EIAR. The proposed development incorporates a range of noise control measures including: • Location of principal plant and equipment within purpose-designed buildings and structures. • Selection of low-noise equipment where practicable. • Acoustic treatment of speciflc items of plant where required. • Regular maintenance of mechanical equipment to ensure continued efficient operation. • Site management procedures to minimise unnecessary noise generation. Construction activities will generally be undertaken during normal working hours, with any limited out-of-hours works restricted to exceptional circumstances and managed through the Construction Environmental Management Plan. Detailed modelling of potential noise effects was carried out, which allow the examination of predicted operational noise levels at nearby noise-sensitive receptors, including existing residential houses in the vicinity of the site. Although the process will operate on a continuous basis, the noise assessment speciflcally assessed daytime, evening and night-time operational scenarios. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The assessment concluded that, with the incorporation of the proposed mitigation measures and plant speciflcation requirements, the facility can operate in compliance with the applicable noise criteria and without giving rise to signiflcant adverse noise effects at nearby residential properties. The assessment therefore explicitly considered the principal continuous plant associated with the facility and demonstrated that, with the proposed mitigation and plant speciflcation, operational noise levels will comply with the applicable noise criteria at nearby residential receptors. Traffic noise was also assessed as part of the EIAR. The operational traffic assessment considered development-related vehicle movements on the surrounding road network and assessed the signiflcance of any changes in traffic noise levels. The assessment concluded that the proposed traffic generation would not result in signiflcant adverse traffic noise effects. The assessment recognised that the receiving environment is rural and that nearby dwellings represent noise-sensitive receptors. Baseline monitoring was undertaken to characterise the existing acoustic environment, and operational noise limits were derived accordingly. The assessment demonstrates that construction and operational noise from the facility will not result in unacceptable impacts on residential amenity. In terms of potential vibration, the proposed development does not involve blasting, quarrying, piling, rock breaking or other activities typically associated with signiflcant vibration generation. Operational activities consist primarily of enclosed industrial processes and normal vehicle movements. Accordingly, signiflcant operational vibration impacts are not anticipated. Temporary construction vibration may arise from the use of conventional construction plant and equipment during site preparation and building works. Such effects will be temporary, localised and managed in accordance with recognised standards, including BS 5228 and BS 7385, through the implementation of the Construction Environmental Management Plan. The EIAR concludes that signiflcant vibration effects are not anticipated. In conclusion, the detailed noise modelling and assessment work completed demonstrates that the proposed development can operate in compliance with the applicable noise criteria and will not give rise to signiflcant adverse noise or vibration effects at nearby residential properties. As with odour, the plant will be subject to regulation under the EPA Industrial Emissions licensing regime, which will impose operational environmental controls, including noise emission requirements, providing ongoing environmental oversight throughout the lifetime of the facility. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Landscape and Visual The third-party submissions raise concerns regarding the potential landscape and visual effects of the Proposed Development. Submissions refer to the extent of excavation required and contend that the works would substantially alter the existing drumlin landform and natural topography, including through the removal of trees and hedgerows, with resulting irreversible effects on the rural landscape and scenic views. Concerns are also expressed that the elevated position of the site would increase the visibility of the development and that the scale and form of the proposed tanks, buildings and chimney would be out of character with the surrounding rural landscape and established residential community. Reference is made to the site's location within a sensitive ribbed moraine landscape and to the potential implications for the cultural and scenic value of the wider area, including Dartry Forest, Bellamont House, the Dawson Monument, the Tyrone Guthrie Centre and the area's tourism potential. A number of submissions also question the effectiveness of the proposed landscape planting in screening the development and raise concerns regarding the representativeness of the submitted photomontages, including the seasonal conditions in which they were prepared, the absence of sufficiently close viewpoints and the representation of views from Blackkesh Crossroads. Response The Proposed Development is intrinsically linked to the surrounding agricultural landscape through its function of processing agricultural and agri-food feedstocks into renewable biomethane, sustainable fertiliser products and recoverable biogenic carbon dioxide. While industrial in appearance, the facility is directly associated with the agricultural economy that characterises the receiving landscape. The Applicant has carefully considered the observations received in relation to landscape and visual impact. The potential for landscape and visual impact from the proposed development was comprehensively assessed in Chapter 5 of the EIAR, which was prepared by Macro Works in accordance with the Guidelines for Landscape and Visual Impact Assessment (GLVIA3). Character of the Proposed Development The proposed development includes process buildings, tanks and associated infrastructure which have been designed to meet the operational requirements of a modern renewable biomethane facility. The siting, layout, flnished levels and landscape proposals have been developed to minimise visual prominence and integrate the facility into the surrounding landscape.. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 However, the Landscape and Visual Impact Assessment (LVIA) completed for the development notes that the surrounding landscape is already characterised as a productive working rural landscape containing agriculture, commercial activity, forestry, regional roads and existing industrial and agricultural development. Existing industrial facilities, including the Carleton Cake Factory and the Abbott Ireland complex, form part of the wider landscape context. The LVIA concludes that while the development represents a noticeable change within the immediate landscape, it relates directly to the agricultural economy and does not fundamentally alter the productive rural character of the wider landscape. The scale of the wider drumlin landscape assists in assimilating the development into its surroundings. Alteration of Topography and the Drumlin Landscape Some submissions express concern that the proposed development will substantially alter the existing drumlin landform through excavation and earthworks. The Applicant acknowledges that excavation and regrading are required to facilitate the proposed development. These earthworks have been deliberately incorporated into the design in order to partially recess elements of the development into the existing landform, thereby reducing the overall visual proflle of the buildings and tanks. The LVIA completed recognises that the site is located within the wider drumlin landscape. The assessment speciflcally assesses this landscape context and concludes that the landscape is an actively managed agricultural landscape which has evolved through long-standing farming, forestry and associated rural enterprise. While it possesses local landscape character, it is not subject to any national or county landscape designation. The overall landscape sensitivity of the site and surrounding area is assessed as Medium, refiecting the existing agricultural, forestry and commercial land uses that already infiuence the character of the area. Submissions refer to the geological character of the wider drumlin/ribbed moraine landscape. The LVIA recognises this broader landscape context in assessing landscape character and visual effects. While localised earthworks are required within the application site, these are conflned to the site itself and do not alter the wider drumlin landform or geological landscape character of the surrounding area. In addition, the surrounding drumlin topography is a signiflcant factor in reducing visibility of the proposed development by providing natural screening throughout much of the surrounding landscape. Visibility of the Project RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Several submissions suggest that the elevated position of the site will result in widespread visibility. This conclusion is not supported by the flndings of the LVIA. A detailed Digital Surface Model (DSM) Zone of Theoretical Visibility (ZTV) analysis was undertaken which incorporates existing topography together with hedgerows, woodland, tree belts and buildings. The assessment demonstrates that: • There is no theoretical visibility across most of the 3 km study area; • There is no theoretical visibility from the principal lakes within the study area; • There is very limited theoretical visibility from the village of Drum; and • Visibility is primarily conflned to the immediate vicinity of the site, generally within approximately 1 km, where views are intermittent due to the screening provided by drumlin topography and vegetation. The LVIA therefore concludes that the existing drumlin landform and dense hedgerow network provide signiflcant natural screening throughout the surrounding landscape. Photomontages and Representative Viewpoints Observations have suggested that the photomontages were prepared during full leaf conditions, that insufficient close-range viewpoints were selected and that Blackkesh Crossroads was not speciflcally represented. Photomontages are intended to illustrate representative views and are supported by fleld survey, ZTV mapping and professional landscape assessment; they are not relied upon in isolation. The Applicant notes that the LVIA includes a comprehensive assessment based on a combination of DSM visibility mapping, fleld survey, photography, photomontages and ten representative viewpoints selected to refiect a range of receptor types, viewing directions and distances, including local community views and views from the regional road network. Representative viewpoints are selected to assess the range of likely visual effects rather than every possible viewing location. This is standard LVIA methodology in accordance with GLVIA3 and is expressly recognised within the assessment. Proposed Landscape Planting Comments have questioned whether the proposed planting will provide adequate screening. The proposed landscape scheme has been developed as an integral part of the project design and is intended to supplement the substantial existing screening already provided by mature hedgerows, trees and the drumlin landform. While newly planted vegetation requires time to establish, the LVIA assessment has not relied solely upon future planting to conclude that impacts are acceptable. The RECEIVED: 28/08/2026 STR010/0001-#9436218v1 landscape proposals are therefore supplementary to the existing landscape structure rather than being relied upon to mitigate otherwise unacceptable visual effects. The assessment is based primarily upon the existing topography and vegetation which already provide extensive screening across the study area. As the proposed planting matures, the level of visual integration and screening will further improve over time. Removal of Trees and Hedgerows The Applicant acknowledges that limited sections of existing hedgerow will require removal to facilitate the development. However, the proposed design seeks to retain the majority of the existing boundary vegetation wherever practicable. During construction, retained trees and hedgerows will be protected in accordance with BS 5837:2012 "Trees in Relation to Design, Demolition and Construction". The landscape proposals also include substantial new structural planting designed to reinforce existing fleld boundaries, strengthen landscape integration and provide additional long-term screening. As this planting matures, the effectiveness of screening will increase over time. Tourism and Scenic Amenity Some submissions suggest that the development could adversely affect tourism. The LVIA speciflcally considers tourism, recreation and heritage assets within the study area, including Dartrey Forest Recreation Area, Temple Loop, Dromore Lough, Inner Lough and Annaghmakerrig Lough and concluded that the Proposed Development would not give rise to signiflcant adverse landscape or visual effects in relation to these receptors. The separate Cultural Heritage Assessment (Chapter 15 of the EIAR) also concluded that no signiflcant adverse effects on cultural heritage assets or their setting are anticipated. The ZTV assessment demonstrates that these recreational and tourism assets generally have no theoretical visibility of the proposed development due to the intervening landform and vegetation. Accordingly, signiflcant adverse effects on the visual amenity of these tourism and recreational resources are not anticipated. In conclusion, assessment work completed in relation to potential landscape and visual impact demonstrates that the proposed development has been carefully designed to respond to its landscape setting through the use of inset construction, retention of existing vegetation, additional structural planting and careful site layout. Although some localised landscape and visual effects will occur within the immediate vicinity of the site, these effects reduce rapidly with distance due to the natural screening provided by the drumlin landform, mature hedgerows and woodland. The assessment concludes that the wider landscape, designated amenity areas, tourism RECEIVED: 28/08/2026 STR010/0001-#9436218v1 resources and the majority of visual receptors will experience little or no signiflcant adverse due to intervening landform and vegetation. Conclusion The LVIA concludes that while the Proposed Development will introduce a noticeable new feature within its immediate setting, the combination of site design, existing drumlin landform, mature vegetation and proposed structural planting ensures that landscape and visual effects are largely conflned to the immediate vicinity of the site. Signiflcant adverse effects are not predicted for the wider landscape, designated scenic areas, heritage assets or principal tourism receptors. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Light Spill The third-party submissions raise concerns regarding potential light spill associated with the 24-hour operation of the Proposed Development. Residents, including those occupying more elevated properties, refer to the potential for direct glare and sky glow from external and operational lighting and the consequent effects on nearby homes, residential amenity and the existing rural dark-sky environment. Concerns are also expressed regarding potential effects on wildlife, with particular reference to illuminated walkways and the potential for artiflcial lighting to affect bats. Response The facility has been designed to ensure that light spill from the plant is kept to a minimum and will not impact on the surrounding area. While the anaerobic digestion process operates continuously, this does not mean that the site will be fully illuminated throughout the night. The majority of the operational process takes place within enclosed buildings and process tanks and does not require extensive external lighting. External lighting will be provided only where necessary for operational safety, security and maintenance purposes. Accordingly, the proposed development will not involve continuous high-intensity illumination of the site. A Light Impact Assessment has been completed as part of the survey works to assess the potential effects of artiflcial lighting associated with the Proposed Development. The assessment concluded that the proposed lighting design complies with the applicable obtrusive lighting limits for a rural Environmental Zone (E2). The assessment also conflrmed that the predicted vertical illuminance at each of the four nearest assessed dwellings is 0.0 lux, that the calculated average surrounding light spill is only 0.32 lux, and that the nearest residential receptors are located outside this limited spill area. The assessment further conflrmed compliance with both the applicable pre- curfew and post-curfew lighting limits and concluded that there is no potential for nuisance arising from obtrusive light Where external lighting is required, it will be designed in accordance with: • ILP Guidance Notes for the Reduction of Obtrusive Light; • SLL LG1 Industrial Environment 2018; • BS EN 12464 (2024); • Environmental Zone E2 criteria; and • CIE 150 obtrusive light limits. The design will seek to minimise light spill beyond the site boundary and incorporated design principles will include: • Use of the minimum lighting levels necessary to ensure safe operation; RECEIVED: 28/08/2026 STR010/0001-#9436218v1 • External lighting will be switched off from 9pm in the evening and will operate on motion sensors; • Anti-glare luminaires, downward-directed lighting with aiming angles below 70 degrees, and lighting columns and wall-mounted flttings positioned to minimise glare and obtrusive light beyond the site; • Full cut-off or fiat-glass flttings to minimise upward light spill; • Careful orientation of lighting away from nearby dwellings; • Avoidance of unnecessary lighting of buildings or open areas; and • Use of modern LED lighting with appropriate beam control. The proposed development also beneflts from existing topography, retained boundary hedgerows and proposed perimeter landscaping which will provide additional screening. These measures will substantially reduce the potential for glare or sky glow affecting nearby properties. The potential effect of lighting on bat roosts was considered in Chapter 11 (Biodiversity) of the EIAR and concluded that the site supports negligible bat activity and therefore would not be sensitive to potential light impact. The proposed lighting design for the site will have regard to current ecological guidance and will seek to avoid unnecessary illumination of existing hedgerows, woodland edges and other habitats that may be used by bats or other nocturnal fauna. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Water Pollution The third-party submissions raise concerns regarding the potential for water pollution arising from leaks, spills, runoff, seepage or accidental discharges associated with the Proposed Development. Particular reference is made to the storage and handling of slurry, digestate and other organic materials and the potential for polluting or noxious substances to affect groundwater, private wells, soils, agricultural land, wetlands, bogland and local watercourses. Concerns are also expressed having regard to the proximity of the site to bogland, wetland areas and associated drainage or water features. Some submissions refer to reported pollution incidents at other anaerobic digestion facilities and contend that accidental releases from the Proposed Development could adversely affect local water quality and the wider receiving environment. Response Observations submitted in response to the planning application raised concern regarding the potential for leaks, spills, run-off, seepage or accidental discharges of digestate, slurry, organic feedstocks, fuels or other potentially polluting materials to affect local watercourses, groundwater, private water supplies, soils, farmland and wetland habitats. These matters have been assessed principally in Chapter 9, Land and Soils, and Chapter 10, Water (Hydrology and Hydrogeology), of the EIAR. Chapter 10 assesses the potential effects of the Proposed Development on both surface water and groundwater and identifles the measures incorporated into the project design to prevent, contain and manage potentially polluting releases. The assessment was prepared by appropriately qualifled hydrology and hydrogeology specialists (AWN) in accordance with relevant EPA, TII and Institute of Geologists Ireland (IGI) guidelines and concludes that, subject to implementation of the incorporated design and mitigation measures, the Proposed Development will not give rise to signiflcant adverse effects on the water environment. Construction The assessment recognises that the short-term construction activities represent the period of greatest potential risk to surface water and groundwater. Potential sources include sediment-laden run-off, fuels and oils, and concrete and cement products. Chapter 10 identifles that, in the absence of mitigation, these materials could affect surface-water quality or inflltrate the underlying soils and groundwater. The Construction Environmental Management Plan and Soil and Surface Water Management Plan therefore provide for a comprehensive range of water protection measures, including: RECEIVED: 28/08/2026 STR010/0001-#9436218v1 • Designated fuel and chemical storage areas located away from watercourses; • Immediate containment and clean-up of any accidental spillages; • Appropriate handling and removal of contaminated soils from site where necessary; • Storage of waste oils and hydraulic fiuids within double-skinned tanks or bunded containers; • Sealed containment and appropriate off-site treatment of foul drainage from temporary site facilities; • Erosion and sediment control measures including silt traps and silt fences where necessary; • Controlled refuelling and concrete-management procedures; and • Emergency spill response procedures. The implementation and maintenance of these measures will be monitored throughout the construction phase, including regular inspection of refuelling, concrete pouring, sediment control and surface water management arrangements. Operational Design In relation to the operational phase of the plant, the proposed development has been designed to prevent releases at source and strict operational management. Operational areas of the site will beneflt from an engineered containment system comprising impermeable surfaces and bunds, meaning containment will be provided for all liquid storage areas. The anaerobic-digestion tanks are located within a bunded tank farm, and the assessment of major accidental releases concludes that organic material would be retained within the bunded containment area. Therefore, in the unlikely event of a spill on the site, all materials will be contained and reused in the process, preventing any potential impact to local watercourses or groundwater. Rainwater harvesting will form an integral part of the site drainage strategy, with stormwater run-off from impermeable surfaces collected and reused within the plant process. Under normal operating conditions, harvested rainwater will be reused on site and based on the Applicant's experience of operating similar plants, routine discharge of surface water is not anticipated. However, the drainage system has been conservatively designed to accommodate periods of prolonged or exceptional rainfall. In such circumstances, surplus treated surface water may be discharged in a controlled manner via the engineered drainage system at a restricted fiow rate equivalent to the existing greenfleld run-off rate. Only clean, treated surface water would be discharged, and monitoring would be undertaken in accordance with the requirements of the EPA Industrial Emissions Licence. Potential Off-Site Impact RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Observations also outlined that the proposed development could alter local drainage patterns and adversely affect nearby wetlands, and public water supplies. It is noted that the Soil Relocation Area is no longer part of the proposed development and a hydrological and hydrogeological assessment prepared by Hydro Environmental Services submitted as part the RFI response concluded that there is no hydrogeological linkage between the proposed biogas plant site and local water receptors that would alter the hydrological balance of Drumintin Wetland or any other surrounding wetland feature. It further concluded that the Proposed Development would not result in deterioration of any Water Framework Directive quality element or compromise the achievement of Water Framework Directive objectives. Reports of incidents at other anaerobic-digestion facilities do not demonstrate that comparable effects would occur at the Proposed Development. The environmental effects of this project have been assessed having regard to its particular location, drainage design, process arrangements, containment infrastructure and proposed operating controls. In summary, the proposed development has been designed to incorporate modern containment systems, enclosed processing, sealed drainage infrastructure, comprehensive quality assurance procedures and multiple environmental protection measures. Therefore, while potential accidental releases have been identifled and assessed as credible risks, the Proposed Development incorporates multiple levels of prevention, containment, drainage control, water treatment and monitoring. On that basis, the EIAR concludes that no signiflcant adverse effects on surrounding surface waters, groundwater, water supplies or associated wetland receptors are predicted. Furthermore, the facility will operate under an EPA Industrial Emissions Licence, which will regulate all aspects of environmental performance, including water protection, storage systems, inspections, monitoring and reporting. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Biodiversity The third-party submissions raise concerns regarding potential effects on biodiversity arising from the Proposed Development. Species speciflcally identifled include bats, red squirrels, otters, badgers, hedgehogs, frogs, smooth newts, common lizards and nesting birds. Concerns are expressed regarding habitat loss and fragmentation associated with hedgerow removal, vegetation clearance, drainage and changes in ground levels, together with the potential for runoff and other construction or operational effects to affect nearby habitats. Particular reference is made to bogland adjoining the L2320, which is described in submissions as an important frog-spawning habitat, and to the ecological and landscape value of existing hedgerows, including those along the L2280, as habitat corridors. A number of submissions question whether the ecological assessment has adequately considered the combined effects of lighting, noise, traffic, vegetation removal and changes to habitat connectivity. Speciflc concerns are also raised regarding the timing and adequacy of bat surveys, the assessment of red squirrel, the extent of proposed hedgerow removal and whether replacement planting would adequately compensate for the ecological function and maturity of existing hedgerows. Response Potential effects on biodiversity from the proposed development have been comprehensively assessed in Chapter 11 (Biodiversity) of the EIAR, prepared by Veon Ecology in accordance with the CIEEM Guidelines for Ecological Impact Assessment in the UK and Ireland (2024) and relevant Irish legislation and guidance. The assessment considered the potential direct, indirect and cumulative effects of the Proposed Development on habitats, fiora and fauna and identifled appropriate avoidance, mitigation and enhancement measures where required. The assessment included extensive desktop studies and appropriately timed fleld surveys for habitats, mammals (including bats and badgers), breeding and wintering birds, amphibians and other ecological receptors. The Biodiversity Chapter also considered the potential infiuence of lighting, noise, air quality, traffic, drainage, landscaping and hydrology on ecological receptors, rather than assessing biodiversity in isolation. The biodiversity surveys concluded that: • No Annex I habitats or Annex II species were recorded within the site; • No bat roosts were identifled within the site; • No badger setts or evidence of badger activity were recorded within the development footprint; • No otter holts or other signiflcant evidence of otter use was identifled within the site; • Existing habitats are predominantly improved agricultural grassland with common hedgerows and treelines; and RECEIVED: 28/08/2026 STR010/0001-#9436218v1 • The ecological value of the site is generally low to moderate at a local level. Hedgerow Removal In relation to hedgerow removal, the design has sought to retain existing boundary hedgerows wherever practicable, with removal limited to those sections necessary to facilitate the development and road improvements. Where removal is unavoidable, replacement native planting, hedgerow reinforcement and long-term management are proposed to maintain and strengthen ecological connectivity. It is noted that many of the trees requiring removal are classifled as Category U under BS 5837:2012, with a signiflcant proportion affected by ash dieback disease. The proposed development will enhance existing biodiversity by strengthening retained hedgerows, creating new woodland and broadleaved planting, establishing new wildlife habitat and implementing long-term ecological management. As such, it is in line with and supportive of the recent Hare’s Corner initiative launched by Monaghan County Council. Consequently, while some localised habitat loss will occur, the operational phase includes signiflcant enhancement of existing habitats. Lighting and Other Considerations A number of submissions suggest that the ecological assessment did not adequately consider lighting, noise, traffic or vegetation removal. This is not correct as the Biodiversity Chapter speciflcally identifles lighting, traffic, noise, surface water management and landscaping as integral components of the ecological assessment and considers their infiuence on habitats and species throughout the Zone of Infiuence. With respect to lighting, a dedicated Light Impact Assessment informed the project design. The lighting system incorporates anti-glare luminaires approved by the International Dark Sky Association, minimises upward light spill and illumination of boundary vegetation, complies with the Institution of Lighting Professionals Guidance on Obtrusive Light, and incorporates time-clock controls to switch off unnecessary lighting after 9pm wherever operationally practicable. The ecological assessment concludes that, with implementation of this lighting strategy, there will be no signiflcant residual effects on bats. Similarly, the assessment considers construction noise, vibration, traffic and water quality effects, together with the mitigation measures contained within the relevant chapters of the EIAR, before determining the overall ecological effects. Bat Surveys It was suggested that bat surveys were undertaken outside the recognised survey season, which is not correct. Bat surveys were undertaken during the months of July RECEIVED: 28/08/2026 STR010/0001-#9436218v1 and August 2024 under suitable weather conditions and within the recognised optimal survey season of April to September in accordance with the Bat Surveys for Professional Ecologists – Good Practice Guidelines (Collins, 2016). The surveys included daytime roost assessments together with dusk acoustic monitoring using automated bat detectors. No bat roosts were identifled, and no bat activity was recorded within the development footprint. Red Squirrels and Other Mammals Observations refer to the absence of a dedicated red squirrel assessment. The Biodiversity Chapter assessed the habitats within the Zone of Infiuence and their suitability for protected mammals, together with the potential effects of the Proposed Development on those habitats. The Proposed Development site consists predominantly of improved agricultural grassland with fragmented hedgerows and limited woodland habitat. Having regard to the nature of the habitats present and the proposed mitigation measures, the Biodiversity Chapter concludes that no signiflcant adverse effects on protected mammals are anticipated. Frogs, Smooth Newts, Common Lizards and Wetlands Concerns have been raised regarding nearby wetlands and the suggestion that it provides important frog spawning habitat. The assessment completed included surveys for amphibians undertaken during the recognised activity season. No permanent waterbodies suitable for amphibian breeding occur within the proposed development site. Surveys nevertheless examined drainage features and adjacent habitats on a precautionary basis. Potential indirect effects through changes in water quality were assessed in conjunction with Chapter 10 (Water). The proposed development incorporates comprehensive surface water management measures, pollution prevention measures and construction controls. The Biodiversity Chapter concludes that, following implementation of these measures, no signiflcant adverse effects on downstream aquatic habitats or amphibian populations are anticipated. Furthermore, the previously proposed Soil Relocation Area no longer forms part of the Proposed Development. The hydrological and hydrogeological assessment submitted in response to the Further Information Request concluded that there is no identifled hydrogeological linkage by which the Proposed Development could alter the hydrological balance of Drumintin Wetland or any other surrounding wetland feature. Ecological Connectivity A number of observations suggested that the Proposed Development would fragment ecological corridors and reduce habitat connectivity. These matters were speciflcally RECEIVED: 28/08/2026 STR010/0001-#9436218v1 considered in Chapter 11 of the EIAR. The design retains the majority of existing boundary hedgerows and treelines, with additional native planting proposed to reinforce retained corridors and reconnect sections where localised removal is required. Consequently, while some localised habitat loss will occur, ecological connectivity within the wider landscape will be maintained and strengthened over the longer term through the proposed enhancement planting and management measures. Conclusion Overall, the proposed development has been designed to avoid and minimise impacts on biodiversity through the retention of existing habitats wherever practicable, implementation of a Construction Environmental Management Plan, appointment of an Ecological Clerk of Works, pre-construction ecological inspections, sensitive lighting design, protection of water quality and the creation of substantial new native planting and wildlife habitat. The detailed ecological assessment concludes that, following implementation of these measures, the proposed development will not result in signiflcant adverse effects on biodiversity, protected species or ecological connectivity. In several respects, particularly through the creation and long-term management of native woodland and hedgerows, the project will provide a net enhancement of habitat within the site. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Cultural Heritage Points Raised The third-party submissions raise concerns regarding potential effects on archaeology, architectural heritage and the wider cultural landscape. A range of archaeological monuments, historic sites and cultural heritage receptors are identifled, including Black Pig’s Dyke, the Maghernakelly hilltop enclosure, ringforts and other enclosures, Edergole Giant’s Grave, the Drumgole Grey Stones, Drumgole crannog, Drumanny souterrain, New Park House, Dartry Forest, the Dawson Monument and Dawson Demesne, Freame Mount Demesne, Bellamont House and the Tyrone Guthrie Centre. Some submissions contend that archaeological or heritage features have been omitted from, or inaccurately described in, the application documentation and raise concerns regarding potential direct and indirect effects on archaeological remains, historic landscapes, the setting of heritage assets and the wider cultural heritage value of the area. It is also contended that the Proposed Development would be inconsistent with relevant heritage protection policies of the Monaghan County Development Plan. Response Matters relating to cultural heritage have been assessed within Chapter 15 Cultural Heritage of the EIAR. The assessment was prepared by suitably qualifled archaeological and built heritage specialists (Courtney Deery) in accordance with the National Monuments Acts, the Planning and Development Act 2000 (as amended), the EPA Guidelines on the Information to be Contained in Environmental Impact Assessment Reports (2022), the Transport Infrastructure Ireland Guidelines for Cultural Heritage Impact Assessment (2024), and other recognised national and international guidance. The assessment was also undertaken having regard to the heritage objectives of the Monaghan County Development Plan 2025–2031. The assessment comprised: • Comprehensive desk-based assessment; • Consultation of the National Monuments Service, National Inventory of Architectural Heritage (NIAH), Record of Protected Structures (RPS), historic mapping, aerial photography and published archaeological sources; • Site inspections; • Geophysical survey of the development site; and • Targeted archaeological test excavation undertaken under licence. Further assessment is also provided in Sections 2.3 to 2.5 of the RFI response, which addresses a request for further archaeological trenching and queries raised around the RECEIVED: 28/08/2026 STR010/0001-#9436218v1 relationship between the nearby hilltop enclosure and Drumgole Grey Stones, and the nearby New Park landed estate. Proximity to Archaeological and Cultural Heritage Sites A number of submissions refer to the proximity of the proposed development to archaeological monuments and cultural heritage sites. Importantly: • There are no recorded monuments within the proposed development; • There are no national monuments or sites under preservation order within 1 km of the site; • There are no protected structures within 1 km of the site; and • There are no architectural conservation areas within 1 km of the site. The EIAR speciflcally identifled and assessed all designated archaeological and architectural heritage assets within an appropriate study area surrounding the proposed development, including: • Maghernakelly Hilltop Enclosure (RMP MO022-008); • Drumgole Grey Stones (MO017-068); • Ringforts and associated souterrains at Drumanny and Maghernakelly; • Crannog sites within the wider landscape; • New Park House and the former New Park Estate; • Dartrey Estate and associated built heritage features; • Dawson Grove Demesne and Freame Mount Demesne; • Other heritage assets identifled through NIAH, RPS, RMP and historic mapping reviews. Several of the features referenced in submissions are located considerable distances from the proposed development. For example: • The Black Pig's Dyke is approximately 10 km from the site. (there is no recorded section of the Black Pig’s Dyke within the application site). • The Edergole Court Tomb ("Giant's Grave") is approximately 4.2 km from the site. • The Drumanny ringfort and souterrain are approximately 935 m from the proposed biogas plant. • The Drumgole stone row ("Grey Stones") is approximately 795 m from the proposed biogas plant. Given these distances and the intervening drumlin topography, no direct effects on these monuments will arise. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 The EIAR concluded that the only recorded monument likely to experience a potential setting effect is the Maghernakelly Hilltop Enclosure (MO022-008), located approximately 185 m southwest of the proposed biogas plant at its closest point. This effect is limited to a change in views toward the northeast and does not affect the monument itself, its physical fabric, archaeological integrity, or any known intervisibility with other monuments. The resulting residual effect was assessed as an indirect moderate visual and setting impact only. Further assessment work was undertaken in response to RFI Point 4 to address potential for intervisibility between the hilltop enclosure and the stone row (RMP MO017-068). This included a site visit and preparation of a photomontage which demonstrated that the existing fleld boundary adjacent to the stone row, even without summer foliage, will largely obscure the proposed development from view at the stone row. There will be no impact on the setting of the stone row. It was also noted that there is no reason to assume that any such connection would have been important in the context of these two monuments in the past. While both are may be prehistoric, there is no evidence that they are contemporary. Archaeological Remains Some submissions suggest that archaeological features have been omitted or inadequately assessed, which is not correct. The Cultural Heritage assessment was prepared following consultation of the relevant statutory datasets, including the National Monuments Service Record of Monuments and Places, the National Inventory of Architectural Heritage, the Record of Protected Structures, historic mapping, aerial photography and other published archaeological sources. These desk-based studies were supplemented by fleld inspection and archaeological investigations undertaken speciflcally for the proposed development. Accordingly, the assessment provides a comprehensive evaluation of the known archaeological and cultural heritage resource within the study area. Prior to the submission of the planning application, the Applicant commissioned a detailed programme of archaeological investigation which included: • Geophysical survey across the development footprint (September 2024); • Initial archaeological test excavation comprising nine trenches totalling approximately 232 linear metres (June / July 2025); and • Follow-up archaeological test excavation comprising eleven trenches totalling approximately 360 linear metres (June 2026) (refer to RFI Point 3 response) The investigations demonstrated that the majority of the geophysical anomalies represented former fleld boundaries or modern agricultural activity. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 One archaeological feature was identifled during the initial test excavation works, comprising the truncated remains of a prehistoric fulacht fladh (burnt mound and trough), a relatively common Bronze Age archaeological feature. This feature was further deflned and its extents conflrmed during the follow-up test excavations (3m x 2.8m, 0.1m deep). The EIAR recognises that construction will directly affect the identifled fulacht fladh within the application site and, rather than avoiding this issue, the assessment explicitly identifles the impact and assesses its signiflcance in accordance with the EPA and TII guidance. Appropriate archaeological mitigation comprising preservation by record through full licensed archaeological excavation of this feature (AA1) prior to relevant works, with archaeological monitoring of initial ground disturbance elsewhere, will be implemented. Apart from this identifled archaeological feature, the detailed assessments concluded that no recorded monuments (including Black Pig’s Dyke) occur within the application site and no direct impacts on designated archaeological monuments are predicted. Historic Landscape Observations suggest that the development would adversely affect the setting of nearby monuments, particularly the Maghernakelly Hilltop Enclosure. The EIAR speciflcally assessed the setting of this monument using fleld surveys together with dedicated cultural heritage photomontages prepared for that purpose. The assessment concludes that the proposed development will be visible from the hilltop enclosure and will alter views towards the north-east. However, the monument will retain its elevated position, its principal archaeological characteristics, and its wider relationship with the surrounding landscape. Importantly, the development will not interrupt intervisibility between the hilltop enclosure and other archaeological monuments within the surrounding landscape. It is also noted that the location of the proposed development at the base of the drumlin landform limits its wider visibility within the landscape. In relation to New Park House and the former New Park Demesne (refer to RFI Point 5 response), the assessment concludes that the proposed development site occupies agricultural flelds to the rear of the former estate rather than the historic designed parkland associated with the house. The area containing the proposed development does not contribute to the signiflcance of the house or its setting, and given the absence of any landscape design features or historic landscape character in this part of the estate, it is considered that there would be a slight direct negative effect on this low sensitivity receptor. The surviving designed RECEIVED: 28/08/2026 STR010/0001-#9436218v1 southward facing landscape associated with New Park House will therefore be unaffected by the proposed development. Conclusion In summary, the assessments completed conflrm that there are no Recorded Monuments within the application site and identifled one previously unknown prehistoric archaeological feature, allowing appropriate mitigation to be incorporated into the project before development commences. The EIAR concludes that, following implementation of the proposed archaeological mitigation, the proposed development will not result in signiflcant adverse effects on the wider archaeological, architectural or cultural heritage resource, and has been designed in a manner that is consistent with the heritage objectives of the Monaghan County Development Plan. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Site Selection and Location The third-party submissions raise concerns regarding the suitability of the site selected for the Proposed Development. A number of submissions refer to the proximity of existing residential properties and public roads and contend that anaerobic digestion or biogas facilities should be subject to minimum separation distances from sensitive receptors, with some submissions referring to suggested distances of 300–500 m. It is argued that facilities of this nature would be more appropriately located on zoned industrial or brownfleld lands and that alternative sites are available. Concerns are also raised regarding the absence of speciflc national siting guidance and mandatory setback requirements for biogas development, with some submissions contending that determination of such proposals in advance of anticipated further guidance is premature. Reference is made to the IrBEA Planning Guidance Recommendations for Bioenergy Projects in Ireland, with submissions asserting that the site does not satisfy the locational criteria identifled in that guidance. Other observations question the extent of the site-selection exercise, including whether locations closer to potential users of digestate were considered, and contend that the Proposed Development has not demonstrated consistency with the National Planning Framework or relevant Monaghan County Development Plan policies concerning the location of such facilities, including policies relating to settlement boundaries and proximity to a flxed resource. Response The location of the proposed biogas plant was not selected arbitrarily. A comprehensive alternatives assessment was undertaken and documented in Chapter 3 (Alternatives) of the EIAR. The assessment was prepared in accordance with the requirements of the EIA Directive and EPA Guidelines and considered alternative regions, search areas and individual sites before identifying the preferred site. While technical and operational feasibility formed part of the overall assessment, environmental effects were the primary differentiator in selecting the preferred site. Separation Distances from Residential Properties An observation was received stating that European standards require biogas plants to be located between 300 m and 500 m from residential properties. There are no prescribed mandatory separation distances of this nature for biogas plants. The current National Waste Management Plan for a Circular Economy (2024–2030), which contains speciflc siting guidance for biological treatment facilities including biogas plants, recognises that residential properties may be located within 100 metres of a plant where appropriate mitigation demonstrates that there will be no unacceptable impacts in relation to air quality, odour, noise, visual amenity or human health. The proposed development has been accompanied by detailed specialist assessments of air quality and odour, noise and vibration, traffic and transport, landscape and visual RECEIVED: 28/08/2026 STR010/0001-#9436218v1 impact, biodiversity, water quality and population and human health. Each of these assessments concludes that, following implementation of the proposed mitigation measures, no signiflcant adverse residual effects are predicted. Accordingly, the acceptability of the proposed location falls to be determined on the basis of the detailed technical assessments submitted with the application and the relevant planning policy framework, rather than by reference to arbitrary setback distances that do not form part of Irish planning policy or legislation. Suitability of the Rural Location Several observations suggest that biogas facilities should only be located on industrially zoned land or brownfleld sites. The Applicant respectfully disagrees with this assertion. Anaerobic digestion facilities processing agricultural feedstocks are fundamentally different from general industrial development, as their location is driven by the need to remain close to feedstock sources, digestate end users and gas infrastructure, consistent with the proximity principle. The National Waste Management Plan expressly recognises that biogas plants serving the agricultural sector are appropriately located in rural areas and on agricultural land, close to their principal feedstock source, the gas network and areas where digestate can be beneflcially reused. The Plan also incorporates the Proximity Principle, requiring biological treatment facilities to be located as close as practicable to the waste streams they process in order to minimise transport-related environmental effects. The proposed development has been speciflcally designed to process poultry manure, cattle slurry and agri-food by-products generated within County Monaghan and the surrounding area. The selected location is close to the principal feedstock resource, adjacent to the regional road network and within an appropriate distance of the existing Gas Networks Ireland infrastructure, thereby satisfying these key national siting principles. Consideration of Alternative Sites A comprehensive site selection exercise was carried out to identify the chosen site. The site selection process comprised four stages: • Identiflcation of the most appropriate region based on feedstock availability; • Identiflcation of suitable search areas having regard to the existing gas network; • Assessment of a number of alternative sites; and • Detailed comparative environmental assessment of the preferred sites. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 County Monaghan was identifled as the preferred region because it contains the highest concentration of poultry production in Ireland and therefore the largest available supply of poultry manure, which forms the principal feedstock for the proposed facility. The search was then reflned to areas close to the existing gas network because direct gas grid injection was identifled as the most sustainable and environmentally beneflcial method of exporting biomethane. Potential sites in both the Lough Egish and Cootehill areas were considered. Lough Egish was discounted due to the presence of environmental constraints including designated landscape and ecological sensitivities together with the absence of a commercially available site. Within the Cootehill search area, a number of potential sites were assessed. Several were rejected because of longer transport distances, the need for HGV traffic to travel through Cootehill town, heritage constraints or greater environmental impacts. Following detailed environmental assessment, the proposed site emerged as the preferred location because it demonstrated the lowest overall environmental constraints. Consistent with the EIA Directive and EPA guidance, the alternatives assessment considered the full range of reasonable alternatives available to the Applicant at the time of site selection. The assessment was necessarily limited to sites that could realistically be secured, as landowner agreement is an essential prerequisite to delivery of any project. One submission suggested that sites further south should have been considered to reduce transport of digestate. However, site selection requires a balanced consideration of feedstock availability, proximity to the gas network, transport infrastructure and areas where digestate can be beneflcially reused. The selected location refiects this balance rather than optimising a single factor in isolation. Compliance with Policy Observations suggest that the proposed development confiicts with the Monaghan County Development Plan in terms of the proposed location. This is not supported by the Development Plan. The Alternatives Assessment speciflcally reviewed the relevant policies of the Monaghan County Development Plan and notes that the Plan recognises the signiflcant contribution bioenergy can make towards renewable energy generation, climate action, rural development and environmental improvement. The Plan also states that bioenergy developments will be considered on a case-by-case basis having regard to planning and environmental considerations and supports renewable energy proposals RECEIVED: 28/08/2026 STR010/0001-#9436218v1 where it is demonstrated that they will not give rise to unacceptable impacts on residential amenity or other environmental receptors. In addition to complying with Monaghan County Council policy, the proposed development also directly supports the objectives of the National Planning Framework, the National Development Plan, the Climate Action Plan, the National Biomethane Strategy and the National Waste Management Plan by: • Supporting the transition to renewable energy; • Promoting the circular economy; • Reducing greenhouse gas emissions; • Providing sustainable management of agricultural organic materials; • Supporting rural enterprise; and • Reducing reliance on imported fossil fuels. Accordingly, the Alternatives Chapter provides clear evidence that the chosen site was selected after comparing reasonable alternatives against environmental criteria, which is exactly what both the EIA Directive and National and local policy require. Confiict with IrBEA Guidance A number of submissions contend that the proposed development does not comply with the Irish Bioenergy Association (IrBEA) publication Planning Guidance Recommendations for Bioenergy Projects in Ireland. The Applicant does not agree with this interpretation of the IrBEA guidance. In this regard we note the formal submission to Monaghan County Council by the CEO of IrBEA in support of the proposed development. The submission explains that the guidance merely provides examples of sites which may be "open to consideration" for large-scale projects and that these examples are not recommendations. Furthermore, the examples are not exhaustive and do not represent every suitable site option. IrBEA further conflrms that biogas plants have been successfully developed on both greenfleld and brownfleld sites throughout Ireland and Europe. Accordingly, the IrBEA guidance does not require, or even recommend, that all biogas developments should be located on brownfleld or industrial sites. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 Other Matters Raised The third-party submissions also raise a number of procedural and ancillary concerns. It is alleged that works associated with, or connected to, the Proposed Development were undertaken on adjoining agricultural lands prior to submission of the planning application, including hedgerow removal and drainage works in an area described in submissions as bogland. Concerns are also expressed regarding the extent and timing of pre-application engagement with the local community. A number of residents contend that meaningful consultation did not take place and that they received only approximately two weeks’ notice before the planning application was lodged, which they state gave rise to upset and frustration within the local community. Response Activity on Adjacent Site Prior to Submission of Application The Applicant conflrms that the works referred to in observations were undertaken on lands outside the application site and do not form part of the Proposed Development. These works were unrelated to the planning application and did not inform, facilitate or prejudice the environmental assessments undertaken as part of the EIAR. Accordingly, they have no bearing on the planning merits of the Proposed Development.. Public Consultation The Applicant respectfully disagrees with the suggestion that meaningful consultation did not take place prior to submission of the planning application.. Prior to submission of the application, the Applicant implemented a structured programme of stakeholder and community engagement designed to provide information on the Proposed Development, facilitate questions and allow residents to engage directly with the Applicant and specialist consultants. This included: • Meeting with Ballybay-Clones Municipal District Councillors on 17 November 2025 to inform members of key elements of the proposal. • Direct resident Notification: Residents within 1 km of the proposed Renewable Biogas Plant were contacted directly by the landowner over the days following the Municipal District brieflng. Each household received an information leafiet outlining the nature and purpose of the project, the key design elements, and the anticipated planning timeline. The leafiet also provided a dedicated project email address to allow residents to contact the Applicant directly with questions or requests for further information. • Visits to Tully Plant: Local residents were invited to attend study visits to the Applicant’s operational Tully Biogas Plant in Ballymena, Co. Antrim. This facility RECEIVED: 28/08/2026 STR010/0001-#9436218v1 processes similar feedstocks to those proposed for the subject project and provided an opportunity for residents to observe an established plant in operation, meet facility operators, and discuss aspects such as odour control, traffic, noise, and overall site management. Two visits were arranged in December 2025 and January 2026 to ensure as many residents could visit as possible. • Local Information Event: The Applicant organised a local public information evening. Hand-delivered invitations were issued to each household within 1km on 3rd December 2025, setting out the date, time, and location of the event. The information evening took place on 9th December 2025 and was attended by 62 local residents and interested stakeholders. The event was run as an informal drop-in session, allowing attendees to view display boards, maps, and explanatory material at their own pace. Members of the project team from Stream and their environmental and technical consultants were present throughout to answer questions and discuss the proposal in detail. Following the information event, the Applicant remained available to respond to queries from residents, facilitate meetings where requested and provide clariflcations when requested. • Project Website: To support ongoing access to information, a dedicated project website was established: www.monaghanbiogas.com. The website provides an overview of the project, frequently asked questions, explanatory material on anaerobic digestion, and a contact facility for residents and interested stakeholders. This platform has remained active throughout the planning process to ensure continued transparency and ease of access to project information. The purpose of consultation is to provide information, listen to concerns and enable informed participation in the planning process. The Applicant considers that the programme of engagement undertaken prior to and during the application process provided multiple opportunities for local residents to obtain information, raise issues directly with the project team and enabled concerns raised by residents to be considered by the Applicant and project team during the application and Further Information processes. While observations refer to the period between notiflcation and submission of the application, there is no statutory minimum period for pre-application community consultation for developments of this nature. Nevertheless, the Applicant undertook voluntary engagement in advance of the application, provided opportunities for residents to obtain information and ask questions, and maintained communication channels throughout the process. RECEIVED: 28/08/2026 STR010/0001-#9436218v1 RECEIVED: 28/08/2026