Loading...
HomeMy WebLinkAbout2660236 - F.I. Received Doc. - Site assessment reportSITE CHARACTERISATION FORM COMPLETING THE FORM Section 3.2 In this section use an underline _____ across all six columns to indicate the depth at which changes in classification / characteristics occur. Section 3.4 Lists supporting documentation required. Section 4 Select the treatment systems suitable for this site and the discharge route. Section 5 Indicate the system type that it is proposed to install. Section 6 Provide details, as required, on the proposed treatment system. Notes: All calculations in this form are automatic. Where possible information is presented in the form of drop down selection lists to eliminate potential errors. Variable elements are recorded by tick boxes. In all cases only one tick box should be activated. All time record fields must be entered in twenty four hour format as follows: HH:MM All date formats are DD-MM-YYYY. All other data fields are in text entry format. This form can be printed out fully populated for submission with related documents and for your files. It can also be submitted by email. Step 1: Goto Menu Item File, Save As and save the file under a reference relating to the client or the planning application reference if available. Use the Clear Form button to clear all information fields. Note: This form requires the latest version of Adobe Acrobat Reader and on PC’s Windows 7 or later. Windows XP produces errors in calculations. Note: To secure your work prior to forwarding to third parties please select Print, select Printer “print to PDF” and name and save document.RECEIVED: 31/08/2026 2.0 GENERAL DETAILS (From planning application) Soil Type, (Specify Type): Subsoil, (Specify Type): Bedrock Type: Aquifer Category: Regionally Important Locally Important Poor Vulnerability: Extreme High Moderate Low Groundwater Body: Status Name of Public/Group Scheme Water Supply within 1 km: Source Protection Area: ZOC SI SO Groundwater Protection Response: Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions). Note: Only information available at the desk study stage should be used in this section. APPENDIX A: SITE CHARACTERISATION FORM File Reference: 1.0 GENERAL DETAILS (From planning application) Prefix: First Name: Surname: Address: Site Location and Townland: Number of Bedrooms: Maximum Number of Residents: Comments on population equivalent Proposed Water Supply: Mains Private Well/Borehole Group Well/Borehole Declan Gartlan Shanrah, Carrickmacross, Co. Monaghan Shanrah, Carrickmacross, Co. Monaghan 6 N/A Soil Association 14 Acid Brown Earths (75%), Gleys (15%), Brown Podzolics(10% Silt/Clay SMV-Silurian Metasediments and Volcanics 4 IEGBNI_NB_G_019 None evident within the locality Pl 4 R1 = Acceptable subject to normal good practice. Site may be suitable for discharge to ground, if the minimum depths are met on the site and if there exists suitable percolation. As the soil type in the area is Acid Brown Earths (75% of the land area), and as the area is mapped as `High' Vulnerability. Groundwater as a resource will be at risk if the minimum depths required are not achieved on the site, or if the percolation rate is too rapid. Older wells in the area may also be at risk, if the minimum separation distances are not adhered to. Groundwater and wells are therefore the main targets, following the desk study. Given the response and the aquifer type, the site is potentially suitable for a conventional septic tank system if the minimum depths required are met on the site, if the minimum separation distances can be met, and if the percolation rate is adequate Variable percolation characteristics of the topsoil and subsoil materials. Killanny & Reaghstown GWS R1 Good 4 RECEIVED: 31/08/2026 3.0 ON-SITE ASSESSMENT 3.1 Visual Assessment Landscape Position: Slope: Steep (>1:5) Shallow (1:5-1:20) Relatively Flat (<1:20) Slope Comment Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres) Houses: Existing Land Use: Vegetation Indicators: Groundwater Flow Direction: Ground Condition: Site Boundaries: Relatively Flat 4 Existing dwelling house to the North of proposed site. Agricultural Grazing field Grass is the predominant vegetation in the ppa and throughout the site. South West Ground conditions are best described as dry and firm in the ppa and throughout the site. Existing Dwelling house is located to north of the ppa. Existing mature hedges are on all four sides of proposed site.RECEIVED: 31/08/2026 3.0 ON-SITE ASSESSMENT 3.1 Visual Assessment (contd.) Roads: Outcrops (Bedrock And/Or Subsoil): Surface Water Ponding: Lakes: Beaches/Shellfish Areas: Wetlands: Karst Features: Watercourses/Streams:* *Note and record water level Existing local laneway to the south west of existing dwelling house None Identified or Evident within the locality. No surface water ponding was evident in the ppa when examined on 26.07.24. It must be noted that weather conditions prior to the site assessment taking place was generally dry and mild conditions. Two number lakes are within 200m of the ppa. None occur within 200m of the ppa None occur within 200m of the ppa. None occur within 200m of the ppa. None occur within 50m of the ppa.RECEIVED: 31/08/2026 Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). *Note and record water level 3.0 ON-SITE ASSESSMENT 3.1 Visual Assessment (contd.) Drainage Ditches:* Springs:* Wells:* None occur within 10m of the ppa. None occur within 50m from the ppa. If a well is to be bored onsite it should be located at least 30m up -gradient from the ppa; this will therefore be outside the minimum separation distances of the Groundwater Protection Responses of GSI/EPA/DoELG and the EPA Code of Practice (2021). As all the wells in the locality will therefore meet the required separation distances of the Groundwater Protection Responses of GSI/EPA/DoELG and the EPA Code of Practice (2021), none are deemed to be at risk from the proposed polishing filter’s installation. Integrate the information above in order to comment on: 1. The potential suitability of the site: The site still seems suitable for discharge to ground. 2. Potential targets at risk: Following the desk study surface water was thought not to be at risk; this was corroborated during the visual assessment. There appears to be few issues with respect to impermeability. From this, surface water does not seem to be a potential target, Groundwater is still a target following the visual assessment, unless the minimum depths required are met on the site and there exists adequate percolation. 3. The suitability of the site to treat the wastewater: Following the visual assessment it is seen that all appropriate separation distances can be met and the site seems well drained, and pending confirmation of the presence of adequate depths of unsaturated soil and subsoil within the percolation area, as well as sufficient percolation rates under the site, the site should be suitable for treating wastewater adequately. RECEIVED: 31/08/2026 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) Depth of trial hole (m): Depth from ground surface Depth from ground surface to bedrock (m) (if present): to water table (m) (if present): Depth of water ingress: Rock type (if present): Date and time of excavation: Date and time of examination: Depth of Surface and Subsurface Soil/Subsoil Percolation Texture & Plasticity and Soil Density/ Colour**** Preferential Tests Classification** dilatancy*** Structure Compactness flowpaths 0.1 m 0.2 m 0.3 m 0.4 m 0.5 m 0.6 m 0.7 m 0.8 m 0.9 m 1.0 m 1.1 m 1.2 m 1.3 m 1.4 m 1.5 m 1.6 m 1.7 m 1.8 m 1.9 m 2.0 m 2.1 m 2.2 m 2.3 m 2.4 m 2.5 m 2.6 m 2.7 m 2.8 m 2.9 m 3.0 m 3.1 m 3.2 m 3.3 m 3.4 m 3.5 m Likely Subsurface Percolation Value: Likely Surface Percolation Value: Note: *Depth of percolation test holes should be indicated on log above. (‘Enter Surface or Subsurface at depths as appropriate). ** See Appendix E for BS 5930 classification. *** 3 samples to be tested for each horizon and results should be entered above for each horizon. **** All signs of mottling should be recorded. To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. 2..0 2.0 None none large lime stone boulders Depth of surface test Silt/Clay Test _______________ Clay intermixed with stone and boulders Test __________________ _________________ Ribbons 20.20.20 1,1,1Threads _______________ Ribbons 20.30.30 1,1,1Threads Crumb _____________ Crumb _____________ Low ____________________ Low <40.00 <40.00 09:4508:50 Brown ____________ Brown ____________ 25-Jun-2025 26-Jun-2025RECEIVED: 31/08/2026 3.3(a) Subsurface Percolation Test for Subsoil x x x 3.2 Trial Hole (contd.) Evaluation: Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) (A) Depth from ground surface to base of hole (mm) (B) Depth of hole (mm) [B - A] Dimensions of hole [length x breadth (mm)] Step 2: Pre-Soaking Test Holes Pre-soak start Date Time 2nd pre-soak Date start Time 2 3 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T10 0 Percolation Test Hole No. 1 Date of test Time filled to 400 mm Time water level at 300 mm Time (min.) to drop 100 mm (T100 ) Average T100 If T100 > 480 minutes then Subsurface Percolation value >120 – site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; Dry & Mild According To The Flowchart For Describing Subsoil’s based on BS5930:1999, the subsoil is best described as Clay intermixed with stone Groundwater / Winter Groundwater was not encountered in the trail hole. Bedrock was not encountered in the trial hole. 400 400 400 800 800 800 400 400 400 300 300 300300 300300 06-Aug-2026 06-Aug-2026 06-Aug-2026 10:17 10:21 10:25 08-08-2026 08:40 10:20 08-08-2026 08-08-2026 08:45 10:21 10:31 08:51 3 100.00 96.00 100.00 98.67RECEIVED: 31/08/2026 Result of Test: Subsurface Percolation Value = (min/25 mm) Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish ∆t (min) Start Finish ∆t (min) Start Finish ∆t (min) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm)mm)mm)mm)mm)mm) 1 2 3 Average ∆t Value Average ∆t/4 = Average ∆t/4 = Average ∆t/4 = [Hole No.1](t1) [Hole No.2](t2) [Hole No.3](t3) Result of Test: Subsurface Percolation Value = (min/25 mm) Comments: Comments: Percolation Test Hole No.1 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 1 = (T1 ) Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No.2 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 2 = (T2 ) Percolation Test Hole No.3 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Tim§e of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 3 = (T2) 10:21 12:28 127 12:28 15:12 164 15:12 18:16 184 158.33 10:21 12:37 136 12:37 15:45 188 15:45 19:17 212 178.67 10:31 13:07 156 13:07 16:51 224.00 16:51 21:07 256 212.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 3 45.75 39.58 44.67 53.00 0.00 0.00 RECEIVED: 31/08/2026 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) Depth from ground surface to base of hole (mm) Depth of hole (mm) Dimensions of hole [length x breadth (mm)] Step 2: Pre-Soaking Test Holes Pre-soak start Date Time 2nd pre-soak Date start Time Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 Percolation Test Hole No. 1 2 3 Date of test Time filled to 400 mm Time water level at 300 mm Time to drop 100 mm (T100 ) Average T100 If T100 > 480 minutes then Surface Percolation value >90 – site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; x x x 0 400 400 0 400 400 600 400 -200 300 300 300 300 300 300 06-Aug-2026 10:30 08-Aug-2026 06-Aug-2026 10:36 08-Aug-2026 06-Aug-2026 10:41 08-Aug-2026 08-Aug-26 08:55 10:59 08-Aug-26 08:57 11:01 08-Aug-2026 08:59 10:31 3 124.00 124.00 92.00 113.33RECEIVED: 31/08/2026 Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish ∆T (min) Start Finish ∆T (min) Start Finish ∆T (min) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm)mm)mm)mm)mm)mm) 1 2 3 Average ∆T Value Average ∆T/4 = Average ∆T/4 = Average ∆T/4 = [Hole No.1](T1 ) [Hole No.2](T2 ) [Hole No.3](T3 ) Result of Test: Surface Percolation Value = (min/25 mm) Comments: (min/25 mm) Comments: Percolation Test Hole No.1 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 1 = (T1 ) Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No.2 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 2 = (T2 ) Result of Test: Surface Percolation Value = Percolation Test Hole No.3 Fall of water Time Start Finish Time Kfs T – in hole (mm) Factor Time Time of fall = Tf Value = Tf hh:mm hh:mm (mins) / Tm = 4.45 = Tm / Kfs 300 - 250 8.1 250 - 200 9.7 200 - 150 11.9 150 - 100 14.1 Average T- Value T- Value Hole 3 = (T2) Result of Surface Percolation: 12.97 min/25mm. Good Percolation Characteristics of the Surface Material. 13:31 152.00 13:31 16:43 192.00 16:43 20:39 236.00 193.33 11:01 13:49 168.00 13:49 17:25 216.00 17:25 21:29 244.00 209.33 10:31 12:51 140.00 12:51 15:51 180.00 15:51 18:59 188.00 169.33 10:59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 2 48.33 52.33 42.33 47.67 0.00 0.00 0.00 0.00RECEIVED: 31/08/2026 3.4 The following associated Maps, Drawings and Photographs should be appended to this site characterisation form. 1 The calculated percolation area or polishing filter area should be set out accurately on the site layout drawing in accordance with the code of practice’s requirements. 1. Discovery Series 1:50,000 Map indicating overall drainage, groundwater flow direction and housing density in the area. 2. Supporting maps for vulnerability, aquifer classification, soil, subsoil, bedrock. 3. North point should always be included. 4.(a) Scaled sketch of site showing measurements to Trial Hole location and (b)Percolation Test Hole locations, (c) wells and (d) direction of groundwater flow (if known), (e) proposed house (incl. distances from boundaries) (f)adjacent houses, (g)watercourses, (h)significant sites (i)and other relevant features. 5. Site specific cross sectional drawing of the site and the proposed layout1 should be submitted. 6. Photographs of the trial hole, test holes and site including landmarks (date and time referenced). 7. Pumped design must be designed by a suitably qualified person.RECEIVED: 31/08/2026 Integrate the information from the desk study and on-site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: Are all minimum separation distances met? Depth of unsaturated soil and/or subsoil beneath invert of gravel (or drip tubing in the case of drip dispersal system) Percolation test result: Surface: Sub-surface: Not Suitable for Development Suitable for Development Identify all suitable options Discharge Route 1 1.Septic tank system (septic tank and percolation area) (Chapter 7) 2.Secondary Treatment System (Chapters 8 and 9) and soil polishing filter (Section 10.1) 3.Tertiary Treatment System and Infiltration / treatment area (Section 10.2) 4.0 CONCLUSION of SITE CHARACTERISATION 5.0 SELECTED DWWTS Propose to install: and discharge to: Invert level of the trench/bed gravel or drip tubing (m) Site Specific Conditions (e.g. special works, site improvement works testing etc. 1 A discharge of sewage effluent to “waters” (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. 45.78 Ground Water -0.40 The tests showed that the site has a Sub-surface value rating indicating good percolation characteristics of the Sub-surface. A surface value rating of 47 min/25mm was attained indicating good percolation characteristics of the surface. Groundwater/Winter groundwater was not encountered in the trial hole Bedrock was not encountered in the trial hole. A purpose-built percolation area should be constructed to ensure that there is a minimum of 1.20m of suitable percolating material between the base of the lowest part of the percolation area and Groundwater / Bedrock at all times. The distribution pipes used in this system will be smooth walled, have a diameter of 100mm, have 8mm holes drilled in them 75mm apart, and each pipe should be spaced parallel and 2500mm apart centre to centre. also recommends that the O’ Reilly Oakstown Waster Water treatment system be Installed and a soil polishing filter area construction is overseen by a suitable qualified and accredited person. 0 4 1.20 4 Secondary Treatment System and soil polishing filter Ground Water No Yes Yes 47.67 RECEIVED: 31/08/2026 SYSTEM TYPE: Septic Tank Systems (Chapter 7) Tank Capacity (m3) Percolation Area Mounded Percolation Area No. of Trenches No. of Trenches Length of Trenches (m) Length of Trenches (m) Invert Level (m) Invert Level (m) SYSTEM TYPE: Secondary Treatment System (Chapters 8 and 9) and polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent Packaged Secondary (Chapter 8) Treatment Systems receiving raw wastewater (Chapter 9) Media Type Area (m2)* Depth of Filter Invert Level Type Sand/Soil Soil Capacity PE Constructed Wetland Sizing of Primary Compartment Other m3 Polishing Filter*: (Section 10.1) Surface Area (m2)* Option 1 - Direct Discharge Surface area (m2) Option 2 - Pumped Discharge Surface area (m2) DISCHARGE ROUTE: Groundwater Hydraulic Loading Rate * (l/m2.d) Surface area (m2) Surface Water ** Discharge Rate (m3/hr) 6.0 TREATMENT SYSTEM DETAILS * Hydraulic loading rate is determined by the percolation rate of subsoil ** Water Pollution Act discharge licence required Identify purpose of tertiary treatment Option 3 - Gravity Discharge Trench length (m) Option 4 - Low Pressure Pipe Distribution Trench length (m) Option 5 - Drip Dispersal Surface area (m2) SYSTEM TYPE: Tertiary Treatment System and infiltration / treatment area (Section 10.2) Provide performance information demonstrating system will provide required treatment levels Provide design information 4.00 4 14.00 N/A N/A N/A N/A O'Reillys Oakstown BAF 6 PE 6 4 5.00 180.00 0.30 N/A N/A N/A N/A N/A N/AN/A N/A 180.00 Polishing Soil Polishing EPA Code of Practice 2021RECEIVED: 31/08/2026 Company: Prefix: First Name: Surname: Address: Qualifications/Experience: Date of Report: Phone: E-mail Indemnity Insurance Number: Signature: ________________________________________ 7.0 SITE ASSESSOR DETAILS 6.0 TREATMENT SYSTEM DETAILS QUALITY ASSURANCE: Installation & Commissioning On-going Maintenance To secure your work prior to forwarding to third parties please select Print, select Printer “print to PDF” and name and save document. NOTE: Recommend to be overseen by plant supplier. Maintain and de-sludge annually R & J Engineering John Butler Dromard, Killanny, Carrickmacross, Co. Monaghan. Building Surveyor 20 Yrs Experience 087 7960967 richiecivil@yahoo.ie RPI-IE00992-00 08-Aug-2026 Mr RECEIVED: 31/08/2026