Loading...
HomeMy WebLinkAbout2660236 - F.I. Received Doc. - Wastewater treatmeant2. Wastewater Treatment system description: The Oakstown BAF 8 PE is designed to provide proven, cost effective primary and secondary wastewater treatment in robust steel reinforced concrete tanks. The primary sedimentation chamber has substantial capacity (4m³) to allow anaerobic digestion to occur naturally while letting sludge settle on the tank floor. Once primary treatment has taken place the effluent is further degraded in the aeration chamber where oxygen enriched wastewater provides ideal conditions for aerobic bacteria to thrive. Before pumping to the percolation area the clear water is left to fu rther settle in the clarifier chamber to eliminate any remaining settle able solids. 3. Guarantee and warrantees: systems from date of first occupation. We provide a 24 month warranty on all parts. 4. Percolation: The percolation area designed must conform to the requirements of Table 10.1 of EPA Code of Practice 2021 Wastewater Treatment and Disposal System serving single houses. The percolation area requirements are as follows: Sub Surface value 46.28 as per Site Characterisation Form. Surface value: 38.38 as per Site Characterisation Form. Depth from ground surface to water table: None Encountered Depth from ground surface to winter groundwater level: None Encountered Depth from ground surface to bed rock: None Encountered Percolation Area: As per Traynor Env Report . RECEIVED: 31/08/2026 5. Client Responsibilities unless included in our quotation: Excavation and backfill. Construction of the percolation / polishing filter as recommended by the site engineer on the Site Characterisation report and/or drawing. Provision of access for delivery by hi-ab truck to within 3 metres of the excavation. Provision of a power ducting from the tanks to the house/garage. Mounting and connection of control panel to mains power in the house/garage. 6. Operation and Maintenance: The client is responsible for the operation and maintenance of the wastewater Oakstown. Please do not hesitate to contact us if there are any further queries. Yours sincerely, RECEIVED: 31/08/2026 RECEIVED: 31/08/2026 RECEIVED: 31/08/2026 RECEIVED: 31/08/2026 RECEIVED: 31/08/2026 This document was created with Win2PDF available at http://www.daneprairie.com. The unregistered version of Win2PDF is for evaluation or non-commercial use only.RECEIVED: 31/08/2026