Loading...
HomeMy WebLinkAbout2560451 - Final Grant 31/08/2026 To: Sragh Dismantlers Ltd Owen Cunningham Thornford Lodge Broomfield Castleblayney Co Monaghan A75HE16 File Number - 25/60451 Planning and Development Act 2000 (as amended) NOTIFICATION OF FINAL GRANT Monaghan County Council has by order dated 27/07/2026 granted the above named, for the development of land namely for:- Retention Permission and Permission consisting of the following: Retaining an as-constructed storage extension, incorporating ancillary covered canopy, attached to the rear of existing commercial property. Erecting a new single storey, portal framed storage extension, incorporating ancillary covered canopy to rear, attached to the side of existing commercial property. Creating a new a new site entrance onto public road replacing existing site entrance to be permanently closed. Creating a new permeable-surfaced storage area for the stacking of de-polluted end of life vehicles, together with all associated site works. [This site relates to an activity authorised under the waste management (Facility Permit & Registration) regulations 2007 S.I. No. 821/2007] Significant further info received included site layout plans, traffic impact report, noise impact assessment, and environment protection plan checklist , at Sra, Ballybay, Co. Monaghan, subject to the 14 condition(s) set out in the Schedule attached. Signed on behalf of MONAGHAN COUNTY COUNCIL. __________________________ ADMINISTRATIVE OFFICER __________________________ DATE I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities for homeowners under Safety, Health and Welfare at Work (Construction) Regulations 2013. 31/08/2026 p.p. 25/60451 Sragh Dismantlers Ltd, Sra, Ballybay, Co. Monaghan 1. a) The developer shall pay to Monaghan County Council a sum of €1,270.00 in accordance with the General Development Contribution Scheme 2021-2026, made by the Council under Section 48 of the Planning and Development Act 2000 (as amended), towards expenditure incurred or proposed to be incurred by the Council in the provision of community, recreation and amenity public infrastructure and facilities in the area. b) The sum attached to this condition shall be revised from the date of the grant of planning permission to the value pertaining at the time of payment in accordance with the Wholesale Price Index for Building and Construction (Materials and Wages). c) No works shall commence until payment of the development contribution is made in full, or until Monaghan County Council has agreed in writing to a schedule of phased payments of the sum. Reason: It is considered appropriate that the developer should contribute towards the expenditure incurred or proposed to be incurred by the Council in the provision of community, recreation and amenity infrastructure and facilities in the area. 2. a) Prior to commencement of development, the developer shall submit to the planning authority for approval in writing, detailed drawings and cross sections of the proposed car stacking area. b) The development shall be carried out in accordance with the agreed revised plans. Reason: In the interest of visual amenity and securing a satisfactory standard of development. 3. a) Prior to any other works commencing, visibility splays of 50m, measured to the nearside road edge in each direction, shall be provided from a point in the centre of the entrance 2.4m from the road edge at a height of between 1.05m and 2m above ground level to an object height of between 1.05m and 2m above ground level in both directions. The visibility splays shall be retained and kept clear from obstructions thereafter. b) Where it is necessary to remove hedges, fences, embankments or other obstructions in order to achieve the required visibility splays, they shall be reinstated behind the visibility splays. Any new trees or shrubs shall be planted back from the visibility splays to allow for future growth and some species will require additional set back. All existing planting shall be kept trimmed behind visibility splays. c) Where the existing roadside hedge/embankment is to be removed, the roadside verge shall be widened (by grading back or infilling where necessary using appropriate inert material) to include the entire area within the visibility splays, top soiled, and grassed to the satisfaction of the Planning Authority. d) The new entrance shall form a bellmouth of 8m radius with edge of new boundary. Recessed entrance shall be of sufficient dimensions to contain a stationary vehicle off the public road. Entrance gates shall open inwards only. e) The Area within the visibility splays shall be cleared to provide a level surface no higher than 250 mm above the level of the adjoining carriageway and shall be retained and kept clear thereafter. f) Entrance/access road shall be surfaced with concrete or bitmac from edge of public road for a minimum of 5m and the surface shall be graded back so that its level at 3m from the edge of the carriageway is a minimum of 100mm below road level. Gradient of access road shall be not greater than 1:20 (5%) for the first 5m from boundary and 1:10 (10%) thereafter. g) Cattlegrid/ACO Drain/gullies shall be installed at proposed entrance and constructed in such a manner as to prevent water from the entrance flowing onto the public road. Similarly measures shall be taken to prevent road surface water from flowing onto the entrance. The discharge from the above drainage shall be piped to an appropriate drainage pipeline or watercourse. h) Provision shall be made within the site for surface water drainage and no surface water shall be allowed flow onto the public roadway. The discharge of surface water from the public road onto the site through road surface drainage and road subsoil drainage shall remain unimpeded. i) No development exempt or otherwise shall be erected over the public sewer, drain or water-main, unless otherwise agreed in writing with the Planning Authority. j) Before any work is commenced on this development a security, by way of a cash deposit, in the sum of €2250, shall be paid to the Planning Authority by the developer to ensure the satisfactory completion of all surface water drainage/boundary work within and abutting the site area, to prevent runoff of surface water onto the public roadway and to ensure that no damage is caused to public roadway and any such damage is repaired satisfactorily. Failure to carry out all entrance works to a standard to the satisfaction of the Planning Authority will result in forfeiture of part or all of the cash security Reason: In the interest of traffic/road safety. 4. a) Prior to commencement of works onsite the applicant shall submit, for approval in writing, a revised site drainage plan (1:500) demonstrating the following: i. Existing and proposed foul water drainage systems (outlined in red). ii. Existing and proposed surface/storm water drainage (outlined in blue) with directional flow of all surface water pipelines. iii. Existing and new carparking served by an adequately sized interceptor onsite. b) Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Local Government (Waste Management) Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal at authorised treatment facilities. c) Prior to commencement of works onsite the applicant shall submit to the Planning Authority, for approval in writing: i. A Construction and Demolition Plan and By-Products Management Plan for the proposed development works shall be provided using “Best Practice Guidelines for the preparation of resource & waste management plans for construction and demolition projects” – EPA, 2021. d) If infilling material is required to be imported onsite the applicant shall conform to one of the following; i. Economic operator shall utilise EPA Article 27 notification in moving soil infill material from one site to another. Official correspondence from the EPA granting approval shall be submitted to the Planning Authority prior to commencement of development. or ii. If using waste material as infill and prior to acceptance of material a valid permit must be issued by Monaghan County Council in accordance with the Waste Management (Facility Permit and Registration) Regulations 2007 as amended. or iii. Buy topsoil material as a product for final landscaping purposes only. Documentation demonstrating purchases shall be submitted to Planning Authority. e) The developer shall ensure that adequate measures and precautions are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters discharging from the site to any watercourse. These measures shall take account of the Guidance produced by Inland Fisheries Ireland titled “Requirements for the Protection of Fisheries Habitat during Construction and Development Works at River Sites”. f) Monaghan County Council and Inland Fisheries Ireland shall be informed promptly of an accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may threaten the quality of any watercourse or groundwater body. g) Any fuels, oils, greases, hazardous liquid wastes and hydraulic fluids within the site area shall be stored on site, away from any watercourses in a bunded, leak-proof, and lockable storage area. Note that bunds are to be designed to contain 110% of the capacity of the largest storage container located within the bund. There shall be no overflow drain facility from any bunds on site and all filling and off-take points shall be located within a bund. h) The applicant shall ensure completely separate foul and surface water drainage systems are in place. i) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act 1996 as amended. Reason: In the interest of public health and environmental protection. 5. Stacking of vehicles or stored parts in external yard areas shall not exceed a height of 5 metres above existing ground levels, unless otherwise agreed in writing with the Planning Authority. Reason: In the interest of visual amenity. 6. During the Construction Phase, the following shall be fully complied with: a) Hours of construction shall be between the hours of 7.00am and 7.00pm Monday to Friday and between 8.00am and 2pm on Saturday. No activities to take place on Sundays or bank holidays. b) The activities on site shall not give rise to noise levels at the nearest noise sensitive receptor which exceed the following sound pressure limits, unless as otherwise agreed in writing with the planning authority: • Day time (07:00 am to 07:00 pm) 65dB (A) Leq (1 hour) • Night time (07:00 pm to 07:00 am) 45dB (A) Leq (1 hour) c) 95% of all noise levels measured shall comply with the specified limit value specified above. No individual noise measurement shall exceed the limit value(s) by more than 2dB(A). Reason: In the interest of public health and environmental protection. 7. During the Operational Phase, the following shall be fully complied with: a) The activities on site shall not give rise to noise levels at the nearest noise sensitive receptor which exceed the following sound pressure limits, unless as otherwise agreed in writing with the planning authority: • Day time (07:00 am to 08:00 pm) 55dB (A) Leq (1 hour) • Night time (08:00 pm to 07:00 am) 45dB (A) Leq (1 hour b) 95% of all noise levels measured shall comply with the specified limit value specified above. No individual noise measurement shall exceed the limit value(s) by more than 2dB(A). c) There shall be no tonal or impulsive noise at noise sensitive locations during night- time hours (08:00 pm to 07:00 am). Reason: In the interest of public health and environmental protection. 8. The mitigation measures contained within the Noise Impact Assessment submitted to the Planning Authority on 02/07/2026 shall be implemented in full so as not to give rise to any adverse noise or vibration impacts on the surrounding receiving environment. Reason: In the interest of public health. 9. Any external lighting shall be cowled away from the public road and not towards any neighbouring dwellings. Reason: In the interest of traffic safety and residential amenity. 10. a) The facility hereby approved shall operate between the following hours: i. 09.00am – 18.00pm (Monday to Friday) ii. 09.00am – 16.00pm (Saturday) b) There shall be no business operations within the site area on Sundays or Public Holidays. c) Operations as detailed under part (a) of this condition is hereby defined to include use of all machinery within the site, and deliveries to and from the site. The site shall not be open for any business purposes outside these hours. Reason: In the interest of orderly development and residential amenity. 11. a) The planting details and associated site works as indicated on plans as submitted to the Planning Authority on 12/11/2025, [as amended by additional information on 02/07/2026], shall be fully implemented prior to any commencement of operations hereby approved or in the first available planting season following commencement of building operations, whichever is the sooner. b) Landscaping works within the site area as detailed on plans as submitted to the Planning Authority on 12/11/2025, [as amended by additional information on 02/07/2026], shall be permanently retained thereafter being planted. Any plant which fails in the first planting season shall be replaced. c) Only that portion of the roadside hedgerow, which must be lowered or uprooted to provide adequate sight distances shall be removed. All other trees and hedgerows bounding this site shall be permanently retained in this development, shall be reinforced with additional planting and shall be protected from damage at all times, particularly during building operations. d) The line of the recessed entrance shall be planted with a double staggered row of trees (at maximum 3 metre centres) and a hedgerow of species native to the area to form a naturalised hedgerow similar to existing hedgerows in the vicinity. Species shall include thorn, beech, ash, oak, hazel, sycamore and holly. e) Notwithstanding the submitted landscaping proposal, the sites south eastern boundary (roadside) shall be supplemented with native tree species at irregular intervals. Species shall include, oak, sycamore and beech and shall be, at a minimum, 4.5m tall at time of planting. Trees shall be allowed to mature and shall not be topped when trimming hedgerows. f) The existing line of mature trees and hedgerow along the north western boundaries of the site shall be retained intact and protected from damage at all times, particularly during building operations. Reason: In the interest of visual amenity. 12. External wall and roof finishes of proposed extensions shall harmonise in colour and texture with those of the existing development, unless otherwise indicated on the submitted plans. Reason: In the interest of visual amenity. 13. No additional signs, flags, logos, other advertising material or illumination shall be erected or displayed on or adjacent to the development/property, other than those contained within the submitted plans. Reason: In the interest of visual amenity. 14. The development shall be carried out in accordance with plans and documentation submitted on 12/11/2025, as amended by additional information on 02/07/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of orderly development and to prevent unauthorised development. BUILDING CONTROL ADVICE NOTE Before Any Building Works Commence - Things you should check! 1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC); In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to commencement of a development and it must be submitted not less than 14 days and not more than 28 days before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the online national portal BCMS. Applicants are advised to register on this website in advance of submitting a commencement notice via the attached link: www.localgov.ie/en/bcms As the type of Commencement Notice required will vary depending on your proposed development, you are advised to seek advice from your agent or architect on what type of commencement notice is relevant to your proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice at 047-30521 or email: bcms@monaghancoco.ie Please be advised that works can not begin until the applicant has received a valid commencement notice from the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the works without a valid commencement notice and/or a valid FSC (if required for works/development). 2. Pre-Development Conditions; If there are any Pre-Development conditions on the schedule of conditions attached to your permission you should give your immediate attention to them prior to the commencement of your development. N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may result in the initiation of enforcement proceedings for compliance with same. 3. Construction Products Regulations (SI No 225 of 2013); You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with the requirements of the Construction Products Regulations. For more information, please see link provided below. https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/ 4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013; The regulations are to ensure that there is a safe working environment for all involved in the construction works, including dwellings. For more information; http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html