HomeMy WebLinkAbout2660251 - Notification of Decision
02/09/2026
Ref No: 26/60251
TO: Declan Fay
Patrick Ruxton
Corgreagh
Shercock
County Monaghan
A81 PW32
Re: Planning and Development Act 2000 (as amended)
NOTIFICATION OF DECISION
Monaghan County Council has by order dated 02/09/2026 decided to GRANT permission to the above
named for development of land, in accordance with the documents submitted namely for:- retention
permission for change of use of school to detached single storey dwelling and detached domestic shed
with existing entrance, septic tank, percolation area and all associated site works. and entrance gates
and all associated site works at Drumsheeny, Threemilehouse, Co. Monaghan, subject to the 4
condition(s) set out in the Schedule attached.
Signed on behalf of Monaghan County Council
________________________________________
ADMINISTRATIVE OFFICER
___________________________
DATE
Provided there is no appeal against this DECISION a grant of planning permission will issue at the
end of four weeks (see footnote).
NO WORKS CAN COMMENCE ON FOOT OF A ‘NOTIFICATION OF DECISION’ ON AN APPLICATION.
THE DEVELOPMENT IS ONLY AUTHORISED WHEN A ‘NOTIFICATION OF FINAL GRANT’ IS ISSUED.
02/09/2026
p.p.
Footnote:
An appeal against a decision of a Planning Authority under the Planning and Development Act 2000 (as
amended) may be made to An Coimisiún Pleanála, 64 Marlborough Street, Dublin 1, D01 V902. (Tel.
(01) 8588100) during office hours.
1. You have four weeks beginning on the date the planning authority makes its decision which
was 02/09/2026. This is a strict time limit.
2. You must put your appeal in writing (either typed or handwritten).
3. You must clearly state your own name and address. If someone is acting for you, like a planning
agent they must clearly state their own name and address as well as your name and address.
4. You must give enough details to allow An Coimisiún Pleanála to identify the application you
wish to appeal.
5. You must provide your planning grounds of appeal (reasons and arguments) for your appeal
and any items you wish to support your grounds of appeal.
6. If you are a third party, you must include the written acknowledgement given to you by the
planning authority to confirm it received your submission at planning application stage.
7. You must pay the correct fee.
For more information on how to make an appeal see www.pleanala.ie
26/60251 Declan Fay Drumsheeny, Threemilehouse, Co. Monaghan.
1.
a) The septic tank drainage system and percolation area shall be constructed in accordance with the
details submitted to the planning authority on the 16/06/2026 and in accordance with the
requirements of the document entitled The Environmental Protection Agency Code of Practice
Domestic Waste Water Treatment Systems (Population Equivalent <= 10) 2021.
b) Within two months of the first occupation of the dwelling, the developer shall submit a report
from a suitably qualified person with professional indemnity insurance certifying that the
proposed septic tank drainage system and percolation area has been constructed in accordance
with the standards set out in the EPA document and installed and commissioned in accordance
with the approved details.
Reason: In the interest of public health and environmental protection.
2. Visibility splays of 70 metres, measured to the nearside road edge in each direction, shall be maintained
from a point in the centre of the entrance 2.4 metres from the road edge at a height of 1.05 metre to
2.0 metres above ground level to an object height of 1.05 metres to 2.0 metres above ground level in
both directions. The visibility splays shall be retained and kept clear from obstructions.
Reason: In the interest of traffic safety and to ensure a satisfactory standard of development.
3. The existing trees and hedgerow defining the application site boundaries shall be permanently
retained in this development.
Reason: In the Interests of visual amenity.
4. The development shall be retained accordance with plans and documentation submitted on
16/06/2026, as amended by additional information on 24/08/2026, except as may otherwise be
required in order to comply with the above conditions.
Reason: To ensure a satisfactory standard of development.