Loading...
HomeMy WebLinkAbout2660320 - Chief Executives OrderMONAGHAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: P907-26 Reference Number: 26/60320 Name of Applicant: Seamus Mc Kenna Address: Aidan Sherlock Dawson St Monaghan Town Monaghan H18 A257 Nature of Application: Permission for the construction of an agricultural entrance and all associated site works Location of Development: Feebaghbane Scotstown Co. Monaghan. ORDER: I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001 (as amended) to grant permission for the above development in accordance with documents submitted, subject to the 2 condition(s) set out in the Schedule attached hereto. I further decide that PERMISSION be granted subject to the same conditions on the expiration of the period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no appeal before An Coimisiun Pleanala. Toirleach Gourley A/SENIOR PLANNER Date 26/60320 Seamus Mc Kenna Feebaghbane, Scotstown, Co. Monaghan. 1. a) Prior to any other works commencing, visibility splays of 50 metres, measured to the nearside road edge in each direction, shall be provided from a point in the centre of the entrance 2.4 metres from the road edge at a height of 1.05 metre to 2.0 metres above ground level to an object height of 1.05 metres to 2.0 metres above ground level in both directions. The visibility splays shall be retained and kept clear thereafter. b) Where it is necessary to remove hedges, fences, embankments or other obstructions in order to achieve the required visibility splays, they shall be reinstated behind the visibility splays. It is recommended that any new trees or shrubs are planted back from the visibility splays to allow for future growth and some species will require additional set back. All existing planting must be kept trimmed behind visibility splays. c) Where the existing roadside hedge/embankment is to be removed, the roadside verge shall be widened (by grading back or infilling where necessary using appropriate inert material) to include the entire area within the visibility splays, top soiled, and grassed to the satisfaction of the planning authority. d) The new entrance shall form a bellmouth of 4.0 metres radius with edge of new boundary. Recessed entrance shall be of sufficient dimensions to contain a stationary vehicle off the public road. Entrance gates shall open inwards only. e) Entrance/access road shall be surfaced with concrete or bitmac from edge of public road for a minimum of 5 metres and the surface shall be graded back so that its level at 3.0 metres from the edge of the carriageway is a minimum of 100 mm below road level. Gradient of access road shall be not greater than 1:20 (5.0%) for the first 5 metres from boundary and 1:10 (10.0%) thereafter. f) Cattlegrid/ACO Drain/Gullies shall be installed at proposed entrance to the public road and constructed in such a manner as to prevent water from the entrance flowing onto the public road. Similarly, measures shall be taken to prevent road surface water from flowing onto the entrance. The discharge from the above drainage shall be piped to an appropriate drainage pipeline or watercourse. g) Provision shall be made within the site for surface water drainage and no surface water to be allowed flow onto the public roadway. The discharge of surface water from the public road onto the site through road surface drainage and road subsoil drainage to remain unimpeded. h) No development exempt or otherwise shall be erected over the public sewer, drain or water -main, unless otherwise agreed in writing with the planning authority. i) Before any work is commenced on this development a security, by way of a cash deposit, in the sum of €2250, shall be paid to the planning authority by the developer to ensure the satisfactory completion of all surface water drainage/boundary work within and abutting the site area, to prevent runoff of surface water onto the public roadway and to ensure that no damage is caused to public roadway and any such damage is repaired satisfactorily. Failure to carry out all entrance works to a standard to the satisfaction of the planning authority will result in forfeiture of part or all of the cash security. Reason: In the interest of traffic/road safety. I The development shall be carried out in accordance with plans and documentation submitted to the Planning Authority on 26/07/2026, except as may otherwise be required in order to comply with the above conditions. Reason: To ensure a satisfactory standard of development. Toirleach Gourley A/Senior Planner •L -C — Z-- i Date