Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60303 - permission for a ten-year planning permission for the rationalisation and upgrading of
wastewater infrastructure serving Oram village, County Monaghan comprising: (1) The
decommissioning of the existing Oram Wastewater Treatment Plant (WwTP), including the
decommissioning, removal, abandonment or making safe of wastewater treatment infrastructure,
site restoration, boundary treatment works and landscaping; (2) The upgrading of the existing
Church Wastewater Pumping Stations (WwPS), including the provision a control kiosk (2.88m3) and
below ground flowmeter and value chamber, associated pipework, drainage, electrical
infrastructure, lighting and 2.4m high security fencing; (3) The 440m2 extension and upgrading of
the existing Sruth an Luir Wastewater Pumping Station (WwPS), including the provision of a wet
kiosk (0.22m3), control kiosk including welfare facilities (20.59m3), emergency shower (5.38m3),
chemical dosing infrastructure consisting of storage tank (7.2m3) and dosing kiosk (2.08m3),
upgraded access arrangements, drainage, electrical infrastructure, area of hardstanding, lighting
and 2.4m high security fencing; (4) The construction of new below ground wastewater transfer
infrastructure, comprising approximately 3.8km of rising main and approximately 400m of gravity
sewer together with associated chambers and air management infrastructure, located within the
existing L76003, R182, and R181 public road corridor, extending from the existing Church WwPS to
the extended Sruth an Luir WwPS and onward to connect with the existing Castleblayney
wastewater network; and (5) All associated ancillary works at Oram Village and townlands of Formil,
Oram, Lisdoony, Lurganmore, Annyart, Drumaliss, Killygola, Derrycreevy, Drumillard Big and
Drumillard Little Castleblayney, Co. Monaghan.
_______________________________________________________
Dear Sir/Madam,
With reference to the above application, I am to inform you that the information submitted is not
adequate to enable a decision to be made.
In accordance with the provisions of Article 33 of the Planning and Development Regulations 2001
(as amended) you are hereby requested to submit further information as set out on the attached
page.
Article 33(3) states that “where a requirement under sub-article (1) or sub-article (2) (Clarification)
is not complied with within the period of 6 months from the date of the requirement for further
information, or such additional period, not exceeding 3 months, as may be agreed by the Planning
Authority, the planning application shall be declared to be withdrawn”.
It should be noted that you will be required to give notice in an approved newspaper under article
35(1)(a) and erect a site notice in accordance with Article 35 (1)(b) of the Planning and Development
Regulations 2001 (as amended) if the further information received is considered to contain
significant additional data.
Please Note: 4 copies of Additional Information to be submitted. In the case of Significantly
Different Information, 6 copies of additional information to be submitted.
Yours faithfully,
__________________________
ADMINISTRATIVE OFFICER
p.p.
26/60303 Uisce Éireann Oram Village and townlands of, Formil, Oram, Lisdoony, Lurganmore,
Annyart, Drumaliss, Killygola, Derrycreevy, Drumillard Big and
Drumillard Little, Castleblayney, Co. Monaghan
ADDITIONAL INFORMATION
1. The Planning Authority notes that the applicant seeks to create a new access onto the public road
(L76003) adjacent Sruth an Luir as part of the proposed development. The site layout plan(s)
submitted is insufficient with regards demonstrating adequate access details. In this regard, the
applicant is requested to submit:
a) A revised site layout plan (1:500 scale) indicating how a clear and unobstructed visibility
splay of 49m can be achieved at the proposed entry/exit point onto the public road. The
required visibility splays should be provided from a point in the centre of the entrance, 2.4
metres from the road edge at a height of 1.05 metre to 2.0 metres above ground level. Sight
distances to be measures to the nearest road edge in both directions. The submitted revised
site layout plan should demonstrate all necessary site work, including the extent of any front
boundary hedge and trees which would be required to be removed/trimmed, re-grading of
side banks etc to achieve the required sight distances. The road edge boundaries should be
clearly delineated.
b) The area within the visibility splays shall be cleared to provide a level surface no higher than
250mm above the level of the adjoining carriageway and shall be retained and kept clear
thereafter.
c) Where the sight distances are not achievable within the applicant’s ownership, the applicant
should submit legal agreements with adjoining landowners giving their consent for all
necessary works to facilitate the required 50m sight distances, including removal/trimming
of hedgerow/hedges, re-grading of side banks etc. The Applicant should note that legal
agreements should be submitted using the Appendix 13 template as contained in the
Monaghan County Development Plan 2025-2031.
2. The following environmental information shall be provided:
a) Submit a fully completed Water Protection Plan checklist.
b) Provide an assessment of the potential impact of the proposed development on Muckno
Mill Lough the Drinking Water Supply Source for the Churchill Oram Group Water Scheme.
c) Provide details of any proposed storm overflow or emergency overflow to waters associated
with the upgraded pump stations to include the discharge location and discharge route to
nearby surface waters. Details shall be sufficient to demonstrate that the proposed
development will not negatively impact on the receiving watercourse.
d) Provide details of future monitoring to be carried out on any storm/emergency overflow
emission points (if any) to waters.
e) Submit a revised site layout plan for each pump station clearly showing the following:
existing surface water drainage on the site; proposed surface water drainage; and the
location of any proposed overflow(s) and the hydrological connection and discharge point
to the receiving waters.
The planner dealing with this application is Darragh McAdam