Loading...
HomeMy WebLinkAbout2660303 - F.I. Request Letter 04/09/2026 Uisce Éireann Paul Iliffe Jacobs Engineering Termini Building 3 Arkle Road, Sandyford D18 C9C5 Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60303 - permission for a ten-year planning permission for the rationalisation and upgrading of wastewater infrastructure serving Oram village, County Monaghan comprising: (1) The decommissioning of the existing Oram Wastewater Treatment Plant (WwTP), including the decommissioning, removal, abandonment or making safe of wastewater treatment infrastructure, site restoration, boundary treatment works and landscaping; (2) The upgrading of the existing Church Wastewater Pumping Stations (WwPS), including the provision a control kiosk (2.88m3) and below ground flowmeter and value chamber, associated pipework, drainage, electrical infrastructure, lighting and 2.4m high security fencing; (3) The 440m2 extension and upgrading of the existing Sruth an Luir Wastewater Pumping Station (WwPS), including the provision of a wet kiosk (0.22m3), control kiosk including welfare facilities (20.59m3), emergency shower (5.38m3), chemical dosing infrastructure consisting of storage tank (7.2m3) and dosing kiosk (2.08m3), upgraded access arrangements, drainage, electrical infrastructure, area of hardstanding, lighting and 2.4m high security fencing; (4) The construction of new below ground wastewater transfer infrastructure, comprising approximately 3.8km of rising main and approximately 400m of gravity sewer together with associated chambers and air management infrastructure, located within the existing L76003, R182, and R181 public road corridor, extending from the existing Church WwPS to the extended Sruth an Luir WwPS and onward to connect with the existing Castleblayney wastewater network; and (5) All associated ancillary works at Oram Village and townlands of Formil, Oram, Lisdoony, Lurganmore, Annyart, Drumaliss, Killygola, Derrycreevy, Drumillard Big and Drumillard Little Castleblayney, Co. Monaghan. _______________________________________________________ Dear Sir/Madam, With reference to the above application, I am to inform you that the information submitted is not adequate to enable a decision to be made. In accordance with the provisions of Article 33 of the Planning and Development Regulations 2001 (as amended) you are hereby requested to submit further information as set out on the attached page. Article 33(3) states that “where a requirement under sub-article (1) or sub-article (2) (Clarification) is not complied with within the period of 6 months from the date of the requirement for further information, or such additional period, not exceeding 3 months, as may be agreed by the Planning Authority, the planning application shall be declared to be withdrawn”. It should be noted that you will be required to give notice in an approved newspaper under article 35(1)(a) and erect a site notice in accordance with Article 35 (1)(b) of the Planning and Development Regulations 2001 (as amended) if the further information received is considered to contain significant additional data. Please Note: 4 copies of Additional Information to be submitted. In the case of Significantly Different Information, 6 copies of additional information to be submitted. Yours faithfully, __________________________ ADMINISTRATIVE OFFICER p.p. 26/60303 Uisce Éireann Oram Village and townlands of, Formil, Oram, Lisdoony, Lurganmore, Annyart, Drumaliss, Killygola, Derrycreevy, Drumillard Big and Drumillard Little, Castleblayney, Co. Monaghan ADDITIONAL INFORMATION 1. The Planning Authority notes that the applicant seeks to create a new access onto the public road (L76003) adjacent Sruth an Luir as part of the proposed development. The site layout plan(s) submitted is insufficient with regards demonstrating adequate access details. In this regard, the applicant is requested to submit: a) A revised site layout plan (1:500 scale) indicating how a clear and unobstructed visibility splay of 49m can be achieved at the proposed entry/exit point onto the public road. The required visibility splays should be provided from a point in the centre of the entrance, 2.4 metres from the road edge at a height of 1.05 metre to 2.0 metres above ground level. Sight distances to be measures to the nearest road edge in both directions. The submitted revised site layout plan should demonstrate all necessary site work, including the extent of any front boundary hedge and trees which would be required to be removed/trimmed, re-grading of side banks etc to achieve the required sight distances. The road edge boundaries should be clearly delineated. b) The area within the visibility splays shall be cleared to provide a level surface no higher than 250mm above the level of the adjoining carriageway and shall be retained and kept clear thereafter. c) Where the sight distances are not achievable within the applicant’s ownership, the applicant should submit legal agreements with adjoining landowners giving their consent for all necessary works to facilitate the required 50m sight distances, including removal/trimming of hedgerow/hedges, re-grading of side banks etc. The Applicant should note that legal agreements should be submitted using the Appendix 13 template as contained in the Monaghan County Development Plan 2025-2031. 2. The following environmental information shall be provided: a) Submit a fully completed Water Protection Plan checklist. b) Provide an assessment of the potential impact of the proposed development on Muckno Mill Lough the Drinking Water Supply Source for the Churchill Oram Group Water Scheme. c) Provide details of any proposed storm overflow or emergency overflow to waters associated with the upgraded pump stations to include the discharge location and discharge route to nearby surface waters. Details shall be sufficient to demonstrate that the proposed development will not negatively impact on the receiving watercourse. d) Provide details of future monitoring to be carried out on any storm/emergency overflow emission points (if any) to waters. e) Submit a revised site layout plan for each pump station clearly showing the following: existing surface water drainage on the site; proposed surface water drainage; and the location of any proposed overflow(s) and the hydrological connection and discharge point to the receiving waters. The planner dealing with this application is Darragh McAdam