Loading...
HomeMy WebLinkAbout2660288 - F.I. Maps.GSPublisherVersion 2181.0.81.99 OES Office of Elliott Swetak 502 P-02 Scale: Drawn by:Elliott Swetak ISSUE APPDDATEDESCRIPTION As indicated @ A1 06/09/2026 Issue: PROJECT DETAILS Proposed Two Storey dwelling with single storey domestic garage and all ancillary site works at Kilcorran Smithborough, Co. Monaghan for James Morrow & Michaela Bonner Drawing No. Document Name: Project Orginator Volume Level Type Role Project Number: Date: CLIENT NAME PROJECT STAGE PROJECT NORTH Unless otherwise specified NOTES ALL DIMMESNIONS TO BE TAKEN ON SITE NO DIMENSIONS TO BE SCALED FROM THIS DRAWING ANY DISCREPANCIES TO BE REPORTED TO THE ARCHITECT FOR CLARIFICATION. THIS DRAWING MAY NOT BE COPIED OR REPRODUCED WITHOUT WRITTEN CONSENT. NO WORKS SHOULD BE CARRIED OUT WITHOUT PRIOR CONSENT FROM THE LOCAL PLANNING AUTHORITY PLEASE NOTE THAT THIS IS A PLANNING DRAWING ONLY AND THEREFORE LIMITED IN ITS CAPACITY TO CONVEY THE TOTAL INFORMATION, DETAILS & SPECIFICATIONS NECESSARY TO COMPLETE THE WORKS. ANY WORK CARRIED OUT THAT IS NOT SPECIFIED OR DETAILED HERE WILL BE THE RESPONSIBILITY OF THE PERSONS CARRYING THEM OUT. IF AMY SITUATION ARISES WHCIH WOULD CAUSE A CONTRAVENTION OF THE BUILDING REGUALTIONS, THEN THE ARCHITECT SHOULD BE CONSULTED. OTHERWISE THE ARCHITECT CANNOT BE HELD RESPONSIBLE. ALL WORK AND MATERIALS ARE TO BE IN ACCORDANCE WITH CURRENT BUILDING REGULATIONS WHETHER DETAILED ON THIS DRAWING OR NOT. Skervan, Smithborough, Monaghan Co. Monaghan Ireland w: officeofelliottswetak.com e: elliottswetak@gmail.com n: 00353863165351 MAZ-OES-00-ZZ-DR-A 26003- without underground services Species Common Girth Planting Height Maturity Height Maturity Quercus Robur English Oak 12- 14cm 2m 12- 16m 20-50 years Prunus Cherry Cherry 12- 14cm 2m 5-8 m 10-20 years Betula Pendula Silver Birch 10- 12cm 2m 12- 16m 20-50 years Existing Mature Boundary Line to remain 74.00 73.00 72.00 71.00 75.00 76.00 77.00 78.00 79.00 80.00 81.00 82.00 83.00 84.00 85.00 86.00 87.00 88.00 SITE BOUNDARYSITE BOUNDARYFFL: 76.00 RL: 84.80 RL: 82.00 76.5 76.5 76.5 76.576.576.572.5 72.5 72.5 72.5 72.572.5 72.572.5 72.5 74.5 74.5 74.5 74.574.574.574. 5 74.5 74. 7 5 74.75 75 75 75 757575 75 75.25 75.5 75.5 75.5 75.575.575.575.5 69 75.7 5 76 76 76 76767676 69.5 69.5 69.5 70 70 70 77 77 77 77777777.5 77.5 77.577.571 71 71 71 7171 71 78 7871.5 71.5 71.5 71.5 71.5 71.5 71.571.5 71.7 5 72.75 72.75 72 72 72 72 7272 7272 72 73 73 73 73 7373 7373 73 73.25 73.25 72.25 72.25 73.5 73.5 73.5 73.5 73.573.5 73.5 73.5 73.75 73.75 74 74 74 74 747474 74 74. 2 5 74.25 70.5 70.5 70.5 70.5 70.5 70.5 70.665 70.682 69.369 69.185 69.443 70.399 71.737 74.465 73.861 73.109 72.013 70.554 69.830 68.998 70.135 71.717 72.875 73.105 73.241 73.378 73.501 73.799 74.368 75.004 75.979 77.141 77.379 76.566 75.429 74.464 73.884 73.349 72.889 72.220 71.178 69.435 71.198 72.567 73.277 73.920 74.581 75.375 76.435 77.584 TR 77.980 77.271 76.203 75.126 74.045 73.253 72.031 70.19970.102 72.251 73.391 74.344 75.474 76.780 77.557 76.993 75.990 74.890 73.774 73.086 72.252 72.762 73.880 74.957 75.673 76.377 77.109 77.345 77.601 77.875 78.27778.30078.29 8 77.70 3 77.32 6 TR 78.79678.495 78.322 78.152 78.011 77.703 77.372 76.88176.947 77.23 1 77.55 1 77.69277.975 78.023 77.29977.153 76.745 76.14076.161 74.999 74.531 74.420 74.045 73.734 73.278 72.714 72.332 72.370 72.444 72.274 71.241 70.959 70.880 71.588 71.55671.722 71.848 72.057 72.247 72.136 72.108 71.761 71.792 70.90771.31471.55870.99271.26071.70471.786TR LP71.77171.56070.91171.61271.89671.84671.625GY72.235 TR TR TR 78.20177.97277.52177.11676.76675.37674.88678.67178.23077.63876.19279.06078.52477.96377.64377.06876.94679.18978.67578.08377.77377.16977.130EPEP POST 76.711 77. 3 5 3 77. 4 0 3 76.6 9 477.22777.99676.63676.62176.34576.66876.70476.66 2 76.60 0 TR TR TR TR TR TR TR TR GY REC74.818 74.08674.45974.96577.64976.551 76.05 1 73 . 3 7 6 74. 4 1 2 TR Water TR 73.514 74.19973.336 71.757 73.681 73.278 GY71.790 71.971GY71.904 Cattle grid71.87272.070 72.09472.09671.97572.001TR TR GY72.176 72.459 72.135 73.914 73.679 73.18873.46872.30472.10971.98672.10872.117 TR EP 72.623 72.55773.274 72.937 72.817 72.59572.409 72.325 72.371 72.62 4 72.8 1 2 73. 2 8 4 73 . 7 7 1 7 3 . 9 0 6 7 3 . 9 7 274.22774.76075.14276.71377.14273.265 73.179 72.915 72.649 72.300 72.388 72.375 72.69 6 72.7 2 1 73. 4 2 5 73 . 9 5 5 7 4 . 0 6 074.37374.98975.38175.56976.64276.949Pier Height Wall Height Vegetation Line 3 phase power line Vegetation Line Wooden Fence Open Drain Vegetation Line Tree Trunk 50,0 0 050,0009,4338,1 1 011,25026,58439,54816,1399,4185,505Percolation area to be installed as per Environmental engineers report Site Boundary in red Proposed waste water treatment system as per engineers report Proposed dwelling Finished Floor Level: 76.00 Ridge Level: 86.360 New Hedgerow to be placed to South East boundary as per Landscape schedule Blue Lines indiacte Sight visibility splays of 50m in each direction - Minimum Existing Pier to remain - be cleaned down and reused - pier on far side of entrance to be moved and reconstructed to form upgrade works Proposed Garage Finished Floor Level: 76.00 Ridge Level: 81.980 Summer Sunset Summer Sunrise SITE NOTES: 1. All surface water to watercourse as indicated. 2. Foul water to sewerage treatment unit as specified by Enviromental Engineer (see enclosed report) 3. Water supply: deep bore well. 4. All sound trees to remain, be retained, bar those require removal to facilitate the development 5. Any eircom and ESB or public utlity poles which shall be exposed by the removal of any boundary shall be resited in a position along the boundary. W SS - AASS - AASite Notice Marked 'X' Proposed location of well Existing Native hedgerow to be kept to Northern Boundary of site All native hedgerow and trees to be retained oustide of site boundary Light Green aea to be graded from natural boundary to new FFL Winter Sunset Winter Sunrise K I L C O R R A N, S M I T H B O R O U G H CO. M O N A G H A N sunsetsu n ris e 6 am 8am10am12pm 2pm 4 pm6pm8pm su n s e t 2pm 12pm 10am sunriseN SITE AREA = 0.374 HA 'X' FFL. 76.00 FFL. 76.00 Site Section A-A 1:250 Site layout 1:500 Alterations to garage location and size along with alterations to main dwelling location to be closer to existing mature northern boundary as per FI Request point 1 04-07-20260 Issued to Planning department OES James Morrow & Michaela Bonner LANDSCAPE SCHEDULE Native Hedgerow A native hedgerow is proposed to the new site boundary in order to create a natural screen of planting. The hedgerow will contain native species to Ireland, Please see the proposed planting list below: Species Common % Crataegus Monogyna Whitethorn 40 Prunus spinosa Blackthorn 30 Viburnum opulus Guelder Rose 10 Rosa canina Dog-Rose 5 Malus sylvestris Wild apple 5 Approximately 140m of hedgerow is to be planted in a staggered double row 400mm between plants and 250mm between rows. Base of hedge to be muclhed with 75mm chipped bark mulch to control weeds and allow establishment. Existing Hedge is to be retaoned where possible and stems thinned as appropriate. Grass Lawn Areas Lawn seed mix sown at 35g per meter. Minimum of 200mm depth multipuprose topsoil to BS3882. Grass mix as below Botanical % Creeping Red Fescue 45 Dwarf Ryegrass 50 Chewings Fescue 5 Tree Planting Within the proposed open lawns, the follwoing trees planting proposal will provide additional screening at height. The proposed tree planting will compensate any tree removal of the existing trees throughout the site. Trees to be planted as per specification. Rootball stock, to be double stacked in a minimum 2m3 tree pit with tree root barrier embrane near service routes or paving where requried. All planting to be provided with min 300mm septh general purpose grade topsoil to BS3882 and a surface dressing layer of 75mm depth medium-grade bark mulch to restrict weed growth and reduce future maintenance requirements. All trees to be sacked and tied adequately to support. Existing Entrance to be upgraded Ground to be cut - regraded Ground to be filled - regraded 06-09-20261 Issued to Planning department OES REV 01 - includes altered location of dwelling and garage along with alterations to garage area. Also included in raising house FFL to better suit the site topography of the final location. RECEIVED: 06/09/2026