Loading...
HomeMy WebLinkAbout2560400 - F.I. Received Doc. - Screening Report for Appropriate Assessment Screening Report for Appropriate Assessment Single Wind Turbine Carney’s Island, Clones, Co. Monaghan Doherty Environmental Consultants Ltd. August 2026 RECEIVED: 04/09/2026 Contents 1.0 INTRODUCTION.................................................................................................................... 1 1.1 LEGISLATIVE CONTEXT ......................................................................................................... 1 1.1.1 Requirement for an Assessment under Article 6 of the Habitats Directive ................................ 1 1.2 SCREENING METHODOLOGY.................................................................................................. 2 1.3 SCIENTIFIC INVESTIGATIONS ................................................................................................. 3 2.0 PROJECT DESCRIPTION .................................................................................................... 6 2.1 KEY COMPONENTS ................................................................................................................ 6 2.2 WIND TURBINE ...................................................................................................................... 7 2.3 TURBINE HARDSTAND ............................................................................................................ 8 2.4 SUBSTATION .......................................................................................................................... 9 2.5 GRID CONNECTION .............................................................................................................. 11 2.6 TURBINE DELIVERY ROUTE ................................................................................................. 11 2.7 SITE DRAINAGE ................................................................................................................... 13 2.7.1 Watercourse / Drainage Crossings .......................................................................................... 16 2.8 PROPOSED CONSTRUCTION SCHEDULE ............................................................................... 17 2.9 WASTE GENERATED DURING CONSTRUCTION .................................................................... 18 2.10 MATERIAL & DISPOSAL OF EXCAVATED MATERIAL .......................................................... 19 2.11 CONSTRUCTION TRAFFIC ..................................................................................................... 20 3.0 PROJECT SITE DESCRIPTION ........................................................................................ 21 3.1 OVERVIEW OF THE PROJECT SITE ......................................................................................... 21 3.2 DESIGNATED CONSERVATION AREAS ................................................................................... 22 3.3 BIODIVERSITY AT THE PROJECT SITE .................................................................................... 24 3.3.1 Proposed Turbine Location ..................................................................................................... 24 RECEIVED: 04/09/2026 3.4 HYDROLOGY ........................................................................................................................ 26 4.0 IS THE PROJECT NECESSARY FOR THE CONSERVATION MANAGEMENT OF EUROPEAN SITES ............................................................................................................................ 26 5.0 EUROPEAN SITES ............................................................................................................... 27 5.1 WITHIN/ADJOINING EUROPEAN SITES ................................................................................. 27 5.2 SOURCE-PATHWAY-RECEPTOR MODEL ................................................................................ 27 5.2.1 SPR Model Pathways ............................................................................................................... 28 6.0 EXAMINATION OF LIKELY SIGNIFICANT EFFECTS .............................................. 32 7.0 SCREENING CONCLUSION: FINDING OF NO SIGNIFICANT EFFECTS ............. 34 8.0 REFERENCES ....................................................................................................................... 35 RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 1 24/06/2024 1.0 INTRODUCTION Doherty Environmental Consultants Ltd. have been commissioned by ART Generation Ltd. to undertake a Stage 1 Habitats Directive Assessment Screening for Appropriate Assessment for the proposed development of a single wind turbine (the project) at Carney’s Island, Clones, Co. Monaghan (see Figure 1.1 for location, and Figure 1.2 for an aerial image of the project location). This Screening Report for Appropriate Assessment forms Stage 1 of the Habitats Directive Assessment process and is being undertaken in order to comply with the requirements of the Habitats Directive Article 6(3). The function of this Screening Report is to identify the potential for the project to result in likely significant effects to European Sites and to provide information so that the competent authority can determine whether a Stage 2 Appropriate Assessment is required for the project. 1.1 LEGISLATIVE CONTEXT Legislative protection for habitats and species is provided within the European Union by the Habitats Directive. The Habitats Directive has been implemented in Ireland and throughout Europe through the establishment of a network of designated conservation areas known as the Natura 2000 (N2K) network. The N2K network includes sites designated as Special Areas of Conservation (SACs), under the EU Habitats Directive and Special Protection Areas (SPAs) designated under the EU Birds Directive 2009/147/EC (as amended). SACs are designated in areas that support habitats listed on Annex I and/or species listed on Annex II of the Habitats Directive. SPAs are designated in areas that support: 1% or more of the all -Ireland population of bird species listed on Annex I of the EU Birds Directive; 1% or more of the population of a migratory species; and more than 20,000 waterfowl. This Screening Report for Appropriate Assessment is being prepared in order to enable the competent authority to comply with Article 6(3) of Council Directive 92/43/EEC (The Habitats Directive). It is prepared to assess whether or not the project alone or in combination with other plans and projects is likely to have a significant effect on any European Site in view of best scientific knowledge and in view of the conservation objectives of the European Sites and specifically on the habitats and species for which the sites have been designated. Measures intended to avoid or reduce the harmful effects of the proposed project on European sites (i.e. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 2 24/06/2024 RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 3 24/06/2024 RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: July 2025 Document Issue: Final DEC Ltd. 1 24/06/2024 “mitigation measures”) have not been taken into account in this screening stage appraisal of the project. It is noted that, as per the EC (2021) Guidelines, design and generic measures can be taken into account at the screening stage. Furthermore it is noted that European legal precedent1 has established that account may be taken of features of a project which involve the removal of contaminants and which therefore may have the effect of reducing the harmful effects of the project on a European Site, where those features have been incorporated into that project as standard features, inherent in such a project, irrespective of any effect on the site. 1.1.1 Requirement for an Assessment under Article 6 of the Habitats Directive According to section 177U(1) of the Planning and Development Act 2000 (as amended) the competent authority has a duty to: • Determine whether the proposed Project is directly connected to or necessary for the management of one of more European Sites; and, if not, • Determine if the Project, either individually or in combination with other plans or projects, would be likely to have a significant effect on the European Site(s) in view of best scientific knowledge and the Conservation Objectives of the site(s). This report contains information to support a Screening for Appropriate Assessment and is intended to provide information that assists the competent authority when assessing and addressing all issues regarding the construction, operation and decommissioning of the Project and to allow the competent authority to comply with the Habitats Directive. Article 6(3) of the Habitats Directive defines the requirements for assessment of projects and plans for which likely significant effects on European Sites may arise. The Birds Directive and the Habitats Directive together list habitats and species that are of international importance for conservation and require protection. The Habitats Directive requires competent authorities, to carry out a Screening for Appropriate Assessment of plans and projects that are not directly connected to or necessary for the management of a European Site, to assess whether the plan or project alone 1 ECJ Judgement C-721/21 of the 15th June 2023 RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: July 2025 Document Issue: Final DEC Ltd. 2 24/06/2024 or in combination with other plans or projects, would be likely to have significant effects on European Sites in view of best scientific knowledge and the Site’s conservation objectives. This requirement is transposed into Irish Law by, inter alia, Part XAB of the Planning and Development Act, 2000 (as amended). Section 177U(4) of Part XAB of the Planning and Development Act states: "The competent authority shall determine that an appropriate assessment of a draft Land use plan or a proposed development, as the case may be, is required if it cannot be excluded, on the basis of objective information, that the draft Land use plan or proposed development, individually or in combination with other plans or projects, will have a significant effect on a European site. " 1.2 SCREENING METHODOLOGY This Screening Report has been prepared in order to comply with the legislative requirements outlined in Section 1.1 above and aims to establish whether or not the proposed project, alone or in combination with other plans or projects, would be likely to h ave significant effects on European Sites in view of best scientific knowledge and the Site’s conservation objectives. In this context “likely” means a risk or possibility of effects occurring that cannot be ruled out based on objective information and “significant” means an effect that would undermine the conservation objectives of the European sites, either alone or in-combination with other plans and projects (Office of the Planning Regulator (OPR), 2021). The nature of the likely interactions between the Plan and the Conservation Objectives of European Sites will depend upon the: • the ecological characteristics of the species or habitat, including their structure, function, conservation status and sensitivity to change; and/or • the character, magnitude, duration, consequences and probability of the impacts arising from land use activities associated with the plan, in combination with other plans and projects. • This Screening Report for Appropriate Assessment has been undertaken in accordance with respective National and European guidance documents: Appropriate Assessment RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: July 2025 Document Issue: Final DEC Ltd. 3 24/06/2024 of Plans and Projects in Ireland: Guidance for Planning Authorities (DEHLG 2010); Assessment of Plans and Projects Significantly Affecting Natura 2000 sites – Methodological Guidance of the Provisions of Article 6(3) and (4) of the Habitats Directive 92/43/EEC; and Office of the Planning Regulator – OPR Practice Note PN01: Appropriate Assessment Screening for Development Management (2021), and recent European and National case law. The guidance document Managing Natura 2000 Sites – The provisions of Article 6 of the Habitats Directive 92/43/EEC. European Commission (2018) was also of relevance during the preparation of this Screening Report. The EC (2021) guidelines outline the stages involved in undertaking a Screening Report for Appropriate Assessment for projects. The methodology adopted during the preparation of this Screening Report is informed by these guidelines and was undertaken in the following stages: • Describe the project and determine whether it is necessary for the conservation management of European Sites; • Identify European Sites that could be influenced by the project; • Where European Sites are identified as occurring within the zone of influence of the project identify potential effects arising from the project and screen the potential for such effects to negatively affect European Sites identified under Point 2 above; and • Identify other plans or projects that, in combination with the project, have the potential to affect European Sites. 1.3 SCIENTIFIC INVESTIGATIONS Field surveys were completed at the project site to inform this screening report for Appropriate Assessment. The field surveys included targeted vantage point surveys and winter and breeding bird season transect surveys. Habitat surveys were also completed and particularly attention was given to recording the presence of surface water pathways in the form of watercourses or surface drains . . RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: July 2025 Document Issue: Final DEC Ltd. 4 24/06/2024 The vantage point surveys comprised watches from a vantage point that provides a view of the proposed turbine location and the wider surrounding area. The vantage points were completed during the 2023 and 2024 breeding season, and the 2023/2024 non-breeding season on the 26th April 2023; 14th June 2023; 12th October 2024; 7th February 2024; 1st May 2024; 9th May 2024;. A watch of 3.5 hours was completed during each of the vantage point surveys amounting to a total of 21 hours vantage point surveying of the proposed turbine location and wider surrounding area. Subsequent to the termination of each vantage point watch, walked transect surveys were completed within the fields at and adjacent to the proposed turbine location and access track. The location of the vantage point and the bird transects are shown on Figure 1.3. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 5 24/06/2024 RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 6 17/07/2023 2.0 PROJECT DESCRIPTION The Clones Wind Farm development will include the following:- The development will consist of the construction of a Single Turbine Wind Farm development on a 7.64-hectare site consisting of:- a) A single 4.8-megawatt (MW) wind turbine with an overall tip height of 143.8 metres, comprising a rotor diameter of 133.2m and a hub height 78m; b) Wind turbine foundation, crane hardstanding and assembly area; c) Temporary Construction Compound; d) Upgrade of an existing field entrance to new wind farm site entrance; e) Upgrading and widening of existing access tracks; f) New access tracks; g) A new 10.5m clear span bridge crossing an existing stream; h) Demolition of the ruinous remains of two old stone buildings; i) An on-site 20kV electrical substation; j) Electrical and communication cabling within private lands; k) Underground 20kV grid connection within private lands and within the R183 public road connecting to the existing ESB Clones 38kV Substation; l) Tree felling, landscaping and reinstatement works; and m) All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. 2.1 KEY COMPONENTS The development proposed by the applicant, is a 1 No. turbine wind farm in the townland of Carney’s Island, Altartate Glebe, Legarhill and Clonavilla and all associated infrastructure including a connection to the National Electricity Grid. The proposed development will consist of the following elements: • Construction and operation of 1No. wind turbine, with an overall tip height of up to 143.8m; • Construction of a crane hardstanding area for the wind turbine erection; RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 7 17/07/2023 • Approximately 1.1km of new internal access road; • An on-site 20kV electrical substation; • Underground electrical and communications cabling connecting the turbine to the site substation; • Approximately 1.9 kilometres of underground cabling connecting the 20kv wind farm substation to the existing • Clones 38kV Substation; • 1 No. site entrance onto the R183 regional road; • 1 No. temporary on-site construction compound; • Associated surface water management systems; • All associated ancillary infrastructure and preparatory works. The proposed project will have a lifespan of 35-years. 2.2 WIND TURBINE The proposed wind turbines will have a 78m tower and will have a maximum tip height of 143.8m. A drawing of the proposed wind turbine is shown on Drawing No. 22790-200 & 201. The turbine installed on the site will be the conventional three-bladed, tubular tower model with horizontal axis. The rotor blades are bolted to the central rotor hub, which is connected to the nacelle. The nacelle contains the following turbine components:- • Generator • Electrical components RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 8 17/07/2023 • Aviation lighting to Irish Aviation Authority (IAA) specifications. The entire nacelle and rotor are designed to rotate, or ‘yaw’, in order to face the prevailing wind. A wind vane located on the nacelle of the turbine controls the yaw mechanism. A control unit is typically located at the base of the turbine and an internal lift or ladder leads up to the nacelle where the shaft, generator and gearbox are located. The turbine tower is a conical steel tube with multiple layer paint finish. Towers comprise a steel ring at the base of the tower which is assembled on top of the concrete foundations. The tower will be delivered to site in three sections. The base of the tower is approximately 4.3m in diameter, tapering to approximately 3.2m where it is attached to the nacelle. The tower is accessed by a galvanised steel hatch door, which will be kept locked except during maintenance. The blades of the turbine are typically made of fibreglass or carbon fibre reinforced polyester and are aerodynamically shaped to improve efficiency and lower noise production. The turbine are multi-ply coated to protect against corrosion. It is proposed that the turbines will be of an off-white or light grey colour to blend into the sky background 2.3 TURBINE HARDSTAND The crane Hardstand will be constructed to accommodate and support the Wind Turbine components, cranes and other plant during delivery and Turbine erection. Hardstands will also be used for maintenance activities while the Wind Turbines are in operation. The dimension of a single Hardstand is circa 91 metres in length and 35 metres in width. There will also be smaller temporary stoned areas constructed to store the Wind Turbine parts and components prior to erection, these will be removed, and the areas reinstated on completion of the Wind Turbine erection. See Planning Drawing 22790-202 for details on the Hardstand. The crane Hardstands will be constructed to support the significant loads imposed by the outriggers of the main lifting crane during the Wind Turbine installation process on site. Hardstand construction will include the following:- RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 9 17/07/2023 1. The excavation process will involve hydraulic excavators moving excavated material to on-site repository areas using articulated dumper trucks or tractor and trailers. 2. Topsoil will be excavated in the presence of the Archaeologist and removed to the temporary topsoil repository area for use in the permanent reinstatement works. 3. The Hardstand formation will be formed by excavating subsoil to a suitable bearing stratum in accordance with the requirements of the Design Engineer. 4. The Hardstand will be constructed using imported stone aggregate rolled in layers and tested in accordance with the requirements of the Design Engineer. 5. Temporary set down areas will be created at each crane Hardstand to store Wind Turbine components such as the rotor hub assembly, turbine blades, turbine towers, and nacelle. These areas will be made of compacted stone aggregate, these will be removed and the areas reinstated on completion of the Wind Turbine deliveries. 6. Plate bearing tests will be conducted on the completed Hardstand surface to verify if the Hardstand bearing strengths meet the crane outrigger load requirements. 7. The main crane outrigger areas are subjected to the highest levels of stress and as such strict minimum requirements are put in place to ensure safety during the works. This includes but is not limited to: a. Surface Evenness of equal or less than 0.25% slope. b. Minimum Bearing Capacity of 220kN/m2. 2.4 SUBSTATION It is proposed to construct a 20kV electricity Substation within the site boundary as shown on Drawing No. 22790-203. This Substation will provide a connection to the national grid via an underground 20kV transmission cable connection. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 10 17/07/2023 The construction and electrical components of the on-site Substation will be to ESB, Electrical Designer and Wind Turbine Supplier specifications. The Substation compound will have an area of approximately 225m2 and will include one Substation building and electrical components. The Substation and compound will be surrounded by stockproof fencing. Prior to construction beginning, interception drains will be placed uphill from the planned Substation area to catch any current overland water flows and direct them downhill to minimise water contact with the construction site. The clean water will be rel eased through a level spreader downhill from the construction site, flowing over the current vegetation. The construction will include the following:- 1. The Substation compound's area will be outlined using ranging rods or wooden posts. 2. Perimeter drains will be installed or upgraded to collect surface water run-off from the Substation compound. This will involve the installation of check dams, silt traps and level spreaders to manage surface run-off effectively. 3. Topsoil will be stripped and carefully stockpiled for future landscaping use. 4. Subsoil will be excavated and retained on site by incorporated it into the perimeter of the compound area. 5. The Substation compound will be formed by constructing compacted layers of suitable hardcore; 6. The foundations for both Substation buildings will be excavated down to the level indicated by the designer and appropriately shuttered; 7. Steel reinforcement will be laid in place and concrete foundations will be poured; 8. The Substation building will be constructed on top of the concrete foundations. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 11 17/07/2023 9. Construction of underground cable ducts and trenches within the Substation compound will be carried out; 10. On completion of the ground works the area will be re-topsoiled and landscaped; 11. Stockproof fencing and gates will be installed around the compound perimeter on completion of the landscaping works. 2.5 GRID CONNECTION The turbine will connect directly to the national electrical grid network at the approved substation. The grid connection route is included as part of this planning application and is assessed as part of the Planning and Environmental Report. The grid connection is via circa 1.9km of underground 20kV electrical cabling connecting to Clones 38kV Substation in the townland of Clones, County Monaghan. The majority of the grid connection will be constructed in public road verges and footpaths. 2.6 TURBINE DELIVERY ROUTE The components for the Wind Turbine will be delivered by cargo ships to the Port of Waterford, which is also known as Belview Port, and is actually located in County Kilkenny. The components for the Wind Turbine will be delivered in separate loads, some of which are abnormal in terms of their width and length. The components will be transported from Belview to the site along the motorway, national, regional and local road network. Several junction locations along the national road and both bends and junctions on the regional road network require temporary works to accommodate these deliveries of Wind Turbine components to the site, as well as construction works at the site access on the R183. These works will include the temporary alterations at locations on the N54 and the R183. This will include the temporary hardstanding’s, making signposts, lighting columns and kerbs demountable / hinged, utility diversions, minor drainage works (i.e. temporary relocated interceptor ditches) hedgerow / vegetation cutting for oversail. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 12 17/07/2023 At construction stage a transportation plan will be prepared by the Wind Turbine component delivery company. Permits for moving the abnormal loads on the public roads to the Wind Farm site will be obtained from An Garda Síochána and the applicable local authorities on the selected haulage route. The selected haulage route is detailed below: • Starting at Belview Port; • Turn Left, then the next right onto the N29; • Merge onto the N29; • At the Slieverue Roundabout, exit to stay on N29 going Northbound; • At the Luffany Roundabout, exit onto the N25, Waterford City Bypass; • Continue onto the N25; • After 6km take the third exit onto the N9, continue to Quarry Roundabout, exiting onto the M9 going Northbound; • Merge onto the M7; • Merge onto the M50 via slip road to Northbound/Dublin Port Toll Road; • At junction 3, take the M1 exit; • At junction 14, take the N33 exit to N2/Ardee/Derry; • At the Castleblaney bypass roundabout, take the 1st exit onto N33; • At the roundabout, take the 2nd exit and stay on N33; • At Dundalk Rd Roundabout, take the 2nd exit and stay on N33; RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 13 17/07/2023 • At Carrickmacross Rd Roundabout, take the 2nd exit onto N2; • At the roundabout, take the 2nd exit and stay on N2; • At the roundabout, take the 2nd exit and stay on N2; • At the roundabout, take the 2nd exit and stay on N2; • At Corlat Roundabout, take the 1st exit onto Dublin Rd/R937; • At the roundabout, take the 1st exit onto Old Cross Square; • Continue Onto Broad Rd; • Continue Onto Market Rd/N54; • Turn Left Onto O'duffy St/R183; • Continue To Follow R183; • Turn Left Onto Analore St/R183; And • Continue On R183 To Site Entrance. 2.7 SITE DRAINAGE Clean water cut-off drainage will be installed up-hill or up-stream around the perimeter of the proposed work areas as part of the Enabling Works. This drainage “cuts-off” existing drainage runs from entering the proposed work areas thus reducing site surface water run-off, prevent soil erosion, and protect the water quality downstream. This drainage will be temporary and on completion of the site works it will be removed or altered and incorporated into the permanent works drainage. Permanent drainage will be constructed during construction of the Access Roads, Hardstands, Turbine Foundations, Substation. While construction works are being carried out, this drainage RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 14 17/07/2023 tends to pick-up a suspended solids – and is often known as “dirty water”. During the construction stage, this dirty water drainage is directed to a number of sediment control measures such as check dams and settlement ponds. The permanent drainage during the construction stage is therefore often referred to “dirty water cut-off drainage”. Plate 2.1 below shows a typical check dam arrangement. The site's proposed drainage system is detailed in Planning Drawings 22790-102 to 22790-103, provided under separate cover with the planning application documentation. Plate 2.1: Check Dam The drainage design will incorporate the following:- 1. Check dams strategically positioned at regular intervals along all drains to slow down flow, encourage settlement, prevent scour and ditch erosion, and prevent silt from reaching adjoining drainage channels. 2. Low gradient drains will be installed. These slow down the flow rate in the drains, which decreases soil and subsoil erosion and reduces the amount of water entering watercourses. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 15 17/07/2023 3. Existing drains will be preserved where applicable. 4. Regular buffered outfalls will be installed. These are composed of several minor drains branching from the main drain and terminating by spreading out into the nearby vegetation through tapered drains. The drain will have hardcore material to capture suspended sediment. 5. Construction site runoff will be redirected into settlement ponds to encourage sediment deposition and decrease hydraulic loading by lowering flow velocities, enabling sediment to settle. The settlement ponds are structured as a three-stage tiered pond system. The settlement pond system design for the site is outlined in Planning Drawing 22790-102 & 103. 6. Water from the settlement ponds will flow into the sediment traps for additional cleaning through a sequence of graded gravel filters. 7. Drainage ditch outfalls from silt traps will release water periodically to imitate natural hydrology, promoting percolation and reducing hydraulic loadings at discharge sites. The drainage ditches will discharge onto the ground by spreading out over the surrounding vegetation through tapered drains. 8. The Access Roads will be graded to ensure that all runoff is channelled towards the dirty water drains. A small embankment will be built between the road and clean water drains to prevent runoff from the road from entering the clean water system. 9. Where possible the natural vegetative barrier will not be disturbed. Protective barriers and fences will be installed to prevent access to protected areas. 10. All drainage and silt control measures will be regularly inspected during the construction works to ensure they are performing correctly. When necessary, silt will be cleaned out from silt control measures and disposed of on site, initially by stockpiling to allow drying out, and then incorporating into groundwork finishing works. Plate 2.2 below shows a typical check dam arrangement with several dams strategically positioned at regular intervals along an open drain. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 16 17/07/2023 The design of site drainage has been undertaken in accordance with the requirements of the Monaghan County Development Plan 2025 – 2031 as set out in Section 15.22.7 and Policy SWDP 1 of the County Development Plan. Plate 2.2: Multiple Check Dams as Silt Control Measure 2.7.1 Watercourse / Drainage Crossings As part of the upgrade to the existing road and new road construction there will be one drain and stream surface water drainage crossing. This will include the construction of new drainage crossings. The sizing, layout and works methodology of drainage crossings will be agreed with Monaghan Co. Co. and, where required, with the OPW, prior to construction. In general drainage crossings will be constructed of concrete precast concrete or High-Density Polyethylene (HDPE) pipes and will cater for a minimum 1 in 100-year return rainfall event with an additional 30% allowance for climate change. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 17 17/07/2023 • The invert of the pipe will be submerged approximately 1/4 of its diameter below the original drainage bed. Where natural gradients allow, a nominal back fall in the pipe will be incorporated to prevent scour and promote the settling of natural material along the invert of the pipe 2.8 PROPOSED CONSTRUCTION SCHEDULE It is anticipated that the overall construction of the development will take approximately 12 months from starting on-site to final commissioning of the Wind Turbine. All vegetation clearance that is required for the construction works will be carried outside the bird breeding season, which runs from the 1st of March to the 31st of August. To comply with this requirement a section of the initial Civil Engineering Works may be carried out as advance enabling works in the months from September to February. Error! Reference source not found. below details the works in a number of key phases, some of these phases will run in parallel. Table 2.1: Proposed Development Construction Stage Duration and Phasing Phase Activity Phase 1 Site Preparation, Pre-construction activities, Site entrance Construction Phase 2 Access Road Construction + Drainage Plan Implementation Phase 3 Crane Hardstand Construction Phase 4 Turbine Foundation Construction RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 18 17/07/2023 Phase 5 Substation Construction Phase 6 Internal Trenching and Ducting Phase 7 Turbine Delivery Phase 8 Turbine Erection Phase 9 Grid Connection Construction Phase 10 Wind Farm Commissioning 2.9 WASTE GENERATED DURING CONSTRUCTION The wastes likely to be generated during the construction phase will include the following: • Excavated material from road cuts and foundations. The material will be stored in a centralised area to minimise environmental impact and will be used on-site for hardstanding and embankments; • Cut-offs from building material. This material will be taken off-site for re-use, recycling, or taken to a licensed landfill facility; • Domestic type waste by contractors. This material will be collected on-site, stored in an enclosed skip and disposed of at a licensed landfill facility RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 19 17/07/2023 2.10 MATERIAL & DISPOSAL OF EXCAVATED MATERIAL Where necessary, excavated soil material will be stored, out of the path of trafficking machinery. Where the topsoil layer must be temporarily held in the spoil storage areas, the contractor will divide the storage areas to ensure that the topsoil layer is not mixed with the underlying soils. This will facilitate adequate site reinstatement and ensure re-vegetation of the land occurs as quickly as possible. Site inspections indicate that the soil conditions at the site will facilitate material being stockpiled to a height of no greater than 2.0m. Depending on geotechnical considerations, the maximum gradient of side slopes in the spoil storage areas should be 30-40 degrees to ensure safe storage of materials and reduce the overall erosion potential at the site. The top of the soil mound is to be profiled gently to facilitate surface water and therefore prevent ponding and saturation of the soil. All stockpiling will be temporary and subject to receipt of planning permission for this application, specific site locations for stockpiling will be determined by the appointed site engineer and will form part of a Construction Environmental Management Plan for the entire development. Drainage channels at the uphill side will intercept clean water runoff and will be directed away from the spoil storage areas to prevent sedimentation. Runoff from the storage areas will pass through a sediment basin to ensure suspended particles are settled out. The vegetated top soil layer (300-500mm depth typically) removed from the surface will be side-cast where feasible and used to resurface ground adjacent to road edges, the turbine base and other disturbed areas to assist in the recovery vegetation. Re-seeding of the areas will also be carried out at this stage providing it is the appropriate time of year. Re -instatement will be carried out as soon as possible after excavation to ensure vegetation recovers without delay. This will ensure that, as well as restoring the natural environment, the erosion potential for the soil will be minimised thus reducing the risk of sediment entering watercourses. The majority of the excavated material (typically clay) underlying the topsoil will be brought to storage areas. At certain locations along the access road it may be possible to side cast this material adjacent to the road and place topsoil over it. The topsoil will be graded to reflect the surrounding landscape. The maximum depth of any side cast material will be 500mm. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 20 17/07/2023 In an effort to reduce the storage time of excavated material, a sequential ('rolling') extraction restoration programme will be employed where feasible i.e. where topsoil and overburden from one location can be used for the restoration of the previous location. 2.11 CONSTRUCTION TRAFFIC As with any construction development project, the transport of materials onto the site will give rise to increased traffic. It is considered that the proximity of the site to the regional route R183, (the primary access road to the site) will reduce the degree of traffic impact that would otherwise be associated with third class or minor roads. Public perception of the construction phase will be influenced primarily from the impact of traffic movements. The degree of traffic disturbance caused by the construction phase of a wind farm depends on the number of turbines (in this instance a single wind turbine), the associated civil engineering requirements and the length of the construction period. The traffic movements to be expected will involve: • Vehicles bringing concrete (for foundations) to the site; • Articulated vehicles bringing turbine components to the site; • Private vehicles of those employed on site for the construction phase; and • Cranes to erect the turbine. The largest number of traffic movements will be with the delivery of concrete to the site for construction of the turbine foundations. In order to assist with logistics for delivery of turbines the selection of final delivery times and routes will be subject to detailed consultation with the Planning Authority and the Garda Siochána. The site has good accessibility with close proximity to a National Road. This will greatly assist the logistics of delivering components on site, compared to more remote and inaccessible locations. Once the turbine is in operation, traffic movements to and from the sight will be very light, probably averaging one visit a week by a light commercial vehicle or car. The potential need RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 21 17/07/2023 to replace machine components may generate heavier commercial vehicle movements, but these are likely to be infrequent. Subject to receipt of planning permission of this application a detailed Traffic Management Plan will be completed and will form part of the Construction & Environmental Management Plan (CEMP). 2.12 CEMP A CEMP has been prepared for the project and is provided under separate cover with the planning application documentation. The CEMP sets out measures that will provide safeguards for receiving waters downstream of the project so that these waters are protected from contamination during the construction phase of the project. The CEMP has been prepared in order to satisfy the requirements set out in Section 15.22.6; 15.30 and Policy CEMP 1 of the Monaghan County Development Plan. The measures set out in the CEMP, including measures to control and manage silts and other pollutants entering the water, are based on best practice measures to manage and control waters during the construction phase of a project. 3.0 PROJECT SITE DESCRIPTION 3.1 OVERVIEW OF THE PROJECT SITE The project site is located in the townlands of Carney’s Island, approximately 1.7km to the east of Clones. The proposed turbine within a farmed landscape with improved agricultural grassland being the dominant land cover occurring at and surrounding the project. An area of recently felled conifer plantation occurs within the project site at the northern end of the turbine hardstand. The proposed grid connection route runs along the R183 and connects the proposed turbine location to the existing substation at Clones. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 22 17/07/2023 3.2 DESIGNATED CONSERVATION AREAS The nearest European Site to the project site is the Kilroosky Lough Cluster SAC (Site Code: 001786), which is located approximately 1.5km to the northwest of the project site. There are no pathways connecting the project site to this SAC. The nearest SPA to the project site is the Slaibh Beagh SPA, located approximately 13km to the north/northeast of the project site. Lough Oughter and Associated Loughs SAC is located approximately 20km downstream of the project site. The Finn River drains into this SAC and as such there is a hydrological pathway connecting the project site to this SAC. Kilroosky Lough Cluster SAC is designated for it role in supporting the following Annex 1 habitat and Annex 2 species: Hard oligo-mesotrophic waters with benthic vegetation of Chara spp. [3140] Calcareous fens with Cladium mariscus and species of the Caricion davallianae [7210] Alkaline fens [7230] Austropotamobius pallipes (White-clawed Crayfish) [1092]. Lough Oughter And Associated Loughs SAC is designated for it role in supporting the following Annex 1 habitat and Annex 2 species: Natural eutrophic lakes with Magnopotamion or Hydrocharition - type vegetation [3150] Bog woodland [91D0] Lutra lutra (Otter) [1355] Slieve Beagh SPA is designated for it role in supporting a breeding population of hen harrier. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 23 17/07/2023 RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 24 17/07/2023 3.3 BIODIVERSITY AT THE PROJECT SITE 3.3.1 Proposed Turbine Location A habitat map of the project site and the proposed development footprint is provided as Figure 3.1 below. The footprint of the proposed development is dominated by improved agricultural grassland. The proposed access track and the proposed turbine hardstand are situated within this habitat. Hedgerow s form the boundary to agricultural fields within and adjacent to the project. Approximately 125m of hedgerow will lost to the footprint of the project. A small area of recently felled conifer plantation occurs to the north of the proposed hardstanding with the redline boundary. . The Legarhill Stream is crossed twice by the proposed access track and once by the R183 along the proposed grid connection route. Bird species recorded during bird surveys completed for the proposed turbine include Buzzard, Chaffinch, Robin, Wren, Gold crest, Linnet, Chiffchaff, Pied Wagtail, Great Tit, Mute Swan, Wood Pigeon, Great crested Grebe, Hooded Crow, Jackdaw, Grey Heron, Herring Gull and Mallard. No non-volant mammals were recorded within the boundary of the project site. The Legarhill Stream provides suitable foraging habitat for otters. No field signs for otters or other protected non-volant mammals species such as badgers were recorded during field signs completed for the project. Bat species recorded in the vicinity of the proposed turbine location comprise Leisler's bat, Common pipistrelle and Soprano pipistrelle . These three species were recorded consistently during bat monitoring with median levels of activity during monitoring reflecting high levels of activity . Very low levels of activity were recorded for Myotis species, whilst no activity for Nathusius pipistrelle, brown long-eared bat were recorded. the project site is located outside the geographic range of lesser horseshoe bats in Ireland. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 25 17/07/2023 RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 26 03/09/2026 3.4 HYDROLOGY Environmental Protection Agency (EPA) WFD dataset boundaries show that the proposed development site and grid connection route lie within the Finn[Monaghan]_SC_020 WFD river sub-catchment, part of the larger Erne East catchment, ultimately discharging into Lough Erne approximately 30 km downstream of the project site. The significant water features in proximity to the project site (i.e., the water feature assigned a WFD status on EPA mapping) is the Legarhill Stream which is crossed by the proposed access track and the R183; Bishops Lough, which is located approximately 100m to the southeast of the proposed substation; and Altartate Lough and the associated substation, located approximately 150m to the south of the proposed access track. The Legarhill Stream is a tributary of the River Finn, the confluence of which is located approximately 1.7km downstream of the project site. No water quality monitoring of the Legarhill Stream is undertaken by the EPA. Water quality monitoring of the River Finn is completed by the EPA, with monitoring completed in 2023 from the Cumber Bridge monitoring station downstream of the Legarhill Stream and River Finn confluence assigns a status of Good water quality to this section of the River Finn. Water quality monitoring from the Scarvey Bridge monitoring station along the River Finn, upstream of its confluence with the Legarhill Stream, in 2022 assigned a status of Moderate (Q3-4) to the River Finn. This status is indicative of some pollution to this river. 4.0 IS THE PROJECT NECESSARY FOR THE CONSERVATION MANAGEMENT OF EUROPEAN SITES The project has been described in Section 2 of this Screening Report and it is clear from the description provided that the project is not directly connected with or necessary for the future conservation management of any European Sites. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 27 03/09/2026 5.0 EUROPEAN SITES 5.1 WITHIN/ADJOINING EUROPEAN SITES Current guidance (OPR, 2021) informing the approach to screening for Appropriate Assessment defines the zone of influence of a proposed development as the geographical area over which it could affect the receiving environment in a way that could have significant effects on the Qualifying Interests of a European site. It is recommended that this is established on a case-by-case basis. In order to identify European Sites that could potentially be located within the zone of influence of the project, the current digital mapping (shapefile) of European Sites in Ireland2, as published by the NPWS, was reviewed to identify the European Sites that could conceivably be connected to the project site via pathways. The OPR guidelines recommend that for projects that are located within or immediately adjacent to European Sites, the relevant European Site should be automatically selected for consideration in the screening exercise. Given that no element of the project occurs within or adjoining a European Sites, the automatic selection of European Sites for further consideration is not triggered. In view of this, this screening exercise will turn its attention to identifying the European Sites that fall within the zone of influence of the project by virtue of pathway connections between the project and European Sites. A Source-Pathway-Receptor model is used to identify the European Sites within the zone of influence of the project. 5.2 SOURCE-PATHWAY-RECEPTOR MODEL Current guidance informing the approach to screening for Appropriate Assessment defines the zone of influence of a project as the geographical area over which it could affect the receiving environment in a way that could have significant effects on the Qua lifying Interests of a European site. It is recommended that this is established on a case-by-case basis using the Source-Pathway-Receptor (SPR) model. 2 Current SAC shapefile layer dated January 2024; current SPA shapefile layer dated December 2024 RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 28 03/09/2026 Under the SPR model the project, the works associated with the construction and decommissioning phase and the operation of the project represent the source of potential impacts. Pathways are represented by vectors that could potentially convey impacts from the project site to European Sites and features of interest. The receptors are European Sites and their features of interest. The type of pathways that could represent vectors for the conveyance of impacts are considered in Section 5.2.1 below. 5.2.1 SPR Model Pathways Pathways that can arise as a result of development projects and lead to offsite/downstream impacts are listed below and an appraisal of the potential for these pathways to connect the project to European Sites and their qualifying features of interest are also listed below and each are examined for their potential to function as pathways connecting the project to European Sites. 5.2.1.1 Emissions to Surface water As detailed in Section 3.2 above a hydrological pathway connects the project to the Lough Oughter And Associated Loughs SAC. This SAC is located a significant distance downstream from the project site at circa 20km along the Legarhill Stream and the Finn River. The approach to the management of surface water runoff during the construction phase of the project is set out in Section 2.7 above. Aside from crossings of the Legarhill Stream the proposed turbine hardstand and access track are located at remote distance from the nearest watercourse. For instance the hardstand is situated circa 200m to the east of Legarhill Stream. The management of drainage waters for the project are representative of typical best practice construction measures that will eliminate the potential for the discharge of contaminated surface water during the construction phase. These measures are set out in the CEMP prepared for the project and provided under separate cover with the planning application documentation. These measures will be implemented in accordance with the requirements of the Monaghan County Development Plan 2025 – 2031 as described in Section 2.12 above. It is noted that these measures are required to be implemented as part of the project, irrespective of a hydrological connection to any European Sites, and as such are representative of inherent construction phase measures. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 29 03/09/2026 Given the separation distance between the proposed turbine hardstand and the Legarhill Stream the operation phase of the turbine will no pose a risk of contaminated surface water runoff to the Legarhill Stream. It is further noted that the activity associated with the operation phase will be representative of low pollution risk activities. In view of the above it is considered that the distant hydrological pathway connecting the project site to the Lough Oughter And Associated Loughs SAC will not have the potential to function as an impact pathway between the project site and this SAC. In view of this finding and the absence of any hydrological connection between the project site and any other European Sites, no hydrological impact pathway is identified. 5.2.1.2 Noise & Vibration Emissions Noise and vibration emissions are considered to have the potential to result in negative impacts to biodiversity up to a 300m distance from the emission source. This distance is based on the maximum noise disturbance zone of 300m for wetland bird species, as specified by Cutts et al. (2013)3. Noise and vibration effects for other qualifying species as well as qualifying habitats of European Sites are less than 300m. For mammal species listed as qualifying features of interest for SACs in the surrounding area this distance is set at 150m, as p er the NRA (2009). For qualifying aquatic species, a potential noise and vibration impact pathway will only arise where works such as piling or blasting are proposed at instream or bankside locations within adjoining SACs. No such proposals form part of the project. No European Sites occur within such distances of the project and the potential for works associated with the project to result in 3 It is noted Nature Scotland (2022) published disturbances zones for bird species at a greater distance than 300m. However, unlike Cutt et al. (2013) who specifically examined disturbance effects generated by noise stimuli, the potential disturbance stimuli set out in the Nature Scotland publication are not concerned specifically with noise stimuli. As such the Cutts et al. (2013) publication and maximum noise disturbance distance is relied upon. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 30 03/09/2026 disturbance to qualifying features of interest of European Sites as a result of noise or vibration emission will not arise. In view of this a noise and vibration pathway is screened out. 5.2.1.3 Emissions to Air Air emissions that have been identified as arising from the project relate to the generation of dust emissions during the construction phase. Dust emissions can have the potential to result in negative impacts to biodiversity up to 50m from the source of the emission. This is supported by the guidance outlined by Holman et al. (2014), which provides a risk assessment for ecological impacts arising from dust deposition. European Sites are ranked as highly sensitive sites and the risk to high sensitive sites ranges from high (at less than 20m from source) and medium (at less than 50m from source), while low risks, representative of insignificant and de- minimis effects, arise at distances greater than 50m from source. No European Sites occur within such distances of the project and the potential for works associated with the project to result in disturbance to qualifying features of interest of European Sites as a result of air emission will not arise. In view of this an air emission pathway is screened out. 5.2.1.4 Light Emissions The project will include for the provision of nighttime beacon lights on turbines. Special conservation interest/qualifying species of European Sites that are considered to be potentially sensitive to beacon lighting provided at the turbine nacelle are bird species and lesser horseshoe bats in the event that the beacon should act as an attractant to such species. Given that no special conservation interest bird populations of SPAs occur at or in the vicinity of the proposed wind turbine, there will be no potential for light emissions from the turbines to influence such populations. As such this pathway is not considered further in this screening exercise. 5.2.1.5 Visual Emissions Certain qualifying species of European Sites can be sensitive to visual changes in the landscape and visual disturbance as a result of new structures. Species that are sensitive to such disturbance are wildfowl in the form of geese and swans. The proposed turbine will represent the only prominent structures in the landscape. The potential zone of sensitivity arising from turbines for geese and swans is 1km and 600m (as per McGuinness et al., 2015; Goodship & Furness 2022). Given that no special conservation interest bird populations of surrounding SPAs, or indeed potential visually sensitive species such as whooper swan or Greenland white-RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 31 03/09/2026 fronted geese, were recorded at or in the vicinity (i.e. within 500m) of the project site during baseline surveys, there will be no potential for a visual emission pathway to result in disturbance to special conservation interest bird species populations of any SPAs. As such this pathway is not considered further in this screening exercise. 5.2.1.6 Mobile Species Pathways The mobiles species associated with the European Sites occurring in the wider surrounding area, as shown on Figure 3.1, are otters and hen harrier. For reasons set out under Section 5.2.1.1 above and given the distance of c. 20km separating the project site from the Lough Oughter And Associated Loughs SAC, and the absence of any field signs indicating the presence of otters along the Legarhill Stream during field surveys, no mobile species pathway established by the otter population of this SAC and the project site is considered to occur. The Slieve Beagh SPA is designated for a population of breeding hen harrier. This SPA is located c. 13km from the project site and the project site is located well outside the core and maximum foraging range for the hen harrier population associated with this SPA. It is further noted that no suitable habitat for hen harrier occurs at the project and this species was not observed at the project site during bird surveys. 5.2.1.7 Summary of Pathway Following the above consideration of pathways that could conceivably connect the project site to European Sites in the wider surrounding area it has been found that no impact pathways connect the project to European Sites in the wider surrounding area. As such the Source-Pathway-Receptor model has not identified the presence of an impact pathway linking the project site to European Sites in the wider surrounding area. Hydrological and groundwater pathways with potential to connect the project to the Lough Corrib SAC; RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 32 03/09/2026 Mobile species pathway, due to the potential for watercourses, at and in the vicinity of the project site (that are outside of but draining to the Lough Corrib SAC) to support otters and Annex 2 qualifying fish species of the Lough Corrib SAC. In view of the above the only European Site identified as occurring within the zone of influence of the project is the Lough Corrib SAC. 6.0 EXAMINATION OF LIKELY SIGNIFICANT EFFECTS The absence of any potential impact pathways eliminates the potential for this project to result in likely significant effects to European Sites. A Screening Matrix, in line with European Commission (2021) guidelines is provided below in Table 5.2. Table 6.1: Screening Matrix for Project Activities associated with the Project Brief description of the project or plan The project and associated activities are described in Section 2 above. Brief description of the European Sites The European Sites occurring in the wider surrounding area are identified in Section 3.2 and shown on Figure 3.1. Describe the individual elements of the project (either alone or in combination with other plans or projects) likely to give rise to impacts on the European Sites. Given the distance separating the project site from the nearest European Site (i.e. 1.5km) and the absence of impact pathways connecting the project site to European Sites no elements of the project will have the potential to give rise to impacts to European Sites. Describe any likely direct, indirect or secondary impacts of the project (either alone or in combination with other plans or projects) on the European Sites site by virtue of: • size and scale; The project will not have the potential to result in direct, indirect or secondary impacts to European Sites. As there are no pathways connecting the project site to surrounding European Sites it will not have the potential, alone or in-RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 33 03/09/2026 • land-take; • distance from the Natura 2000 site or key features of the site; • resource requirements (water abstraction etc.); • emissions (disposal to land, water or air); • excavation requirements; • transportation requirements; • duration of construction, operation, decommissioning, etc.; combination with other plans or projects, to result in cumulative significant effects to European Sites occurring in the wider surrounding area. Describe any likely changes to the site arising as a result of: • reduction of habitat area: • disturbance to key species; • habitat or species fragmentation; • reduction in species density; • changes in key indicators of conservation value • (water quality etc.); • climate change. As there are no impact pathways between the project site and surrounding European Sites it will not have the potential to result in changes to qualifying habitats or qualifying species of European Sites occurring in the wider surrounding area. Bird surveys completed for the project did not record the presence of special conservation interest bird species of SPAs in the wider surrounding area and these species are not considered to rely on the area at or surrounding the proposed turbine. Given their absence there will be no potential for the project to result in disturbance, fragmentation or other interactions, such as collision, with such bird species. Describe any likely impacts on the European Sites site as a whole in terms of: For reasons set out above the project will not have the potential to interfere RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 34 03/09/2026 interference with the key relationships that define the structure of the site; interference with key relationships that define the function of the site with key relationships that define the structure and function of European Sites. Provide indicators of significance as a result of the identification of effects set out above in terms of: • loss; • fragmentation; • disruption; • disturbance; • change to key elements of the site (e.g. water quality etc.). For reasons set out above the project will not have the potential to result in such effects to European Sites. Describe from the above those elements of the project or plan, or combination of elements, where the above impacts are likely to be significant or where the scale or magnitude of impacts is not known. The project will not have the potential to result in likely significant effects to European Sites. 7.0 SCREENING CONCLUSION: FINDING OF NO SIGNIFICANT EFFECTS During the Screening of the proposed Single Wind Turbine project it was found that 3 European Sites occur within the wider area surrounding the project site. The nearest European Site to the project site is located approximately 1.5km to the northwest. All of the European Sites (and their associated qualifying features of interest) are adjudged to be located outside the zone of influence of the project. No impact pathways were identified linking the project to the surrounding European Sites. As stated in Section 5.2 above, there will be no potential for impact pathways to connect the project site and European Sites occurring in the wider surrounding RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 35 03/09/2026 area. As such, there will be no potential for the project, alone or in-combination with other plans or projects, to result in likely significant effects to the conservation status or integrity of European Sites. In light of the findings of this report, it is the considered view of the author of this Screening Report for Appropriate Assessment that it can be concluded by the competent authority that the project is not likely, alone or in-combination with other plans or projects, to have a significant effect on any European Sites in view of their Conservation Objectives and on the basis of best scientific evidence and there is no reasonable scientific doubt as to that conclusion. This Screening has resulted in a Finding of No Significant Effects and as such a Stage II Appropriate Assessment is not required. 8.0 REFERENCES Department of the Environment Heritage and Local Government (DEHLG) (2008) Circular letter SEA 1/08 & NPWS 1/08. Department of the Environment Heritage and Local Government (DEHLG) (2010). Appropriate Assessment of Plans and Projects. Guidance for Local Authorities. English Nature (1999). Habitats regulations guidance note no. 3 (HRGN No. 3). Determination of Likely Significant Effect under The Conservation (Natural Habitats &c) Regulations 1994. European Commission (2018). Managing Natura 2000 sites. The provisions of Article 6 of the Habitats Directive 92/43/EEC. Luxembourg. European Commission (2021). Assessment of plans and projects significantly affecting Natura 2000 sites. Methodological guidance on the provisions of Article 6(3) and (4) of the Habitats Directive 92/43/EEC. Luxembourg. European Commission (1992). EU Habitats Directive. RECEIVED: 04/09/2026 Client: ART Generation Ltd. Project Title: Clones SWT Document Title: Screening Report for Appropriate Assessment Date: Aug. 2026 Document Issue: Final DEC Ltd. 36 03/09/2026 Office of the Planning Regulator (OPR) (2021). Appropriate Assessment Screening for Development Management. OPR Practice Note PN01. RECEIVED: 04/09/2026