HomeMy WebLinkAbout2688 - Site Assessment ReportANTHONY GREENAN,
CROSSES,
MILLTOWN,
MONAGHAN,
CO MONAGHAN.
MON. CO. CO.
PLANNING SECTION
,,Ub
REG. NO
PLANNING DEPARTMENT
REF. NO.
26/88
MONAGHAN CO. COUNCIL
SITE CHARACTERISATION FORM
COMPLETING THE FORM
Note: This form requires the latest version of Adobe Acrobat Reader
and on PC's Windows 7 or later. Windows XP produces errors
in calculations
Step 1:
Goto Menu Item File, Save As and save the file under a reference relating to the
client or the planning application reference if available.
Clear Form Use the Clear Form button to clear all information fields.
Notes:
All calculations in this form are automatic.
Where possible information is presented in the form of drop down selection lists to
eliminate potential errors.
Variable elements are recorded by tick boxes. In all cases only one tick box should be
activated.
All time record fields must be entered in twenty four hour format as follows: HH:MM
All date formats are DD-MM-YYYY.
All other data fields are in text entry format.
This form can be printed out fully populated for submission with related documents and
for your files. It can also be submitted by email.
Section 3.2 In this section use an underline across all six columns to indicate the depth
at which changes in classification / characteristics occur.
Section 3.4 Lists supporting documentation required.
Section 4 Select the treatment systems suitable for this site and the discharge route.
Section 5 Indicate the system type that it is proposed to install.
Section 6 Provide details, as required, on the proposed treatment system.
APPENDIX A: SITE CHARACTERISATION FORM
File Reference: Anthony Greenan, Crosses, Milltown, Monaghan
Prefix: Mr First Name: Anthony Surname: Greenan
Address: Site Location and Townland:
Number of Bedrooms: I4 Maximum Number of Residents:
Comments on population equivalent
There are 4 double bedrooms which will equate to six adults.
Proposed Water Supply:
Mains Private Well/Borehole
Soil Type, (Specify Type): AminDW - Deep well drained mineral (Mainly acidic) soil
Limestone till. TLs
Subsoil, (Specify Type):
Group Well/Borehole LII
Bedrock Type: DPBL
Aquifer Category: Regionally Important Rf I Locally Important Poor
Vulnerability: Extreme ❑ High Moderate ❑✓ Low
Groundwater Body: Monaghan town Status Good
Name of Public/Group Scheme Water Supply within 1 km: Tydavnet GWS
Source Protection Area: ZOC SI SO ❑✓ Groundwater Protection Response: R23
Presence of Significant Sites
(Archaeological, Natural & Historical):
Past experience in the area:
None
"lone.
Comments:
(Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions).
The site is potentially suitable as there appears to be no restrictions to the on -site treatment of domestic effluent. Surface
water and ground water could be targets at risk. This site has an R23 response which basically means that the council are
satisfied that there is not too much of a build-up of houses to cause a significant rise in nitrate and microbiological
contaminants in the ground.
Note: Only information available at the desk study stage should be used in this section.
3.1 Visual Assessment
Landscape Position: Elevated on a South -Easterly facing slope.
Slope: Steep (>1:5) Shallow (1:5-1:20) ❑✓ Relatively Flat (<1:20) ❑
Slope Comment ABOUT 1:12
Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres)
Houses:
Dwelling house 30m East, 49m South-west and 55m South. House under construction at the site for which this report is for.
Existing Land Use:
Agricultural grassland.
Vegetation Indicators:
Grass.and tall Rosebay willowherb weeds.
Groundwater Flow Direction: Expected South -East.
Ground Condition:
Firm during a spell of wet unsettled weather.
Site Boundaries:
Mature hedges all around.
3.1 Visual Assessment (contd.)
Hioacls:
Local road 56m East
Outcrops (Bedrock And/Or Subsoil):
None
Surface Water Ponding:
(None
Lambe lake1.09km East North-East.
Beaches/Shellfish Areas:
None
Wetlands:
None
Karst Features:
None
Watercourses/Streams:*
Blackwater river 275m West
*Note and record water level
3.1 Visual Assessment (contd.)
None within 50m
Spring listed 88m East
Well listed 88m East
The site was in good condition underfoot with the assessment being carried out during a period of unsettle(
occasional showers.
3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers))
2.2
1.7
0.5 1 I —
25 -Sep -2025 L 11:00 27 -Sep -2025 1 10:00
_
ri
SS _-
SILT / CLAY
TOP SOIL
SILT / CLAY subsoil
Water table table 1.3m
Base of trial hole 2.2m
3 threads —70mm
ribbons — dilatant
3 threads - 80mm
ribbons - dilatant
I<.1.1111 1�
BLOCKY
SOFT
UNCOMPACT
BROWN
GRASS ROOTS
NONE
3.2 Trial Hole (contd.)
The trial hole was 2.2m deep with two distinct layers. Top -soil that was crumb in nature and below that sub -soil that was
blocky in nature and contained about 20% cobbles. The water table was at 1.7m.
3.3(a) Subsurface Percolation Test for Subsoil
Step 1:
400 400 400
800 800 800
L L400 400 400
300 300 290 290 280
Step 2:
25 -Sep -2025 25 -Sep -2025 25 -Sep -2025
15:00 15:00 15:00
26 -Sep -2025 26 -Sep -2025 26 -Sep -2025
11:30 11:30 11:30
Step 3:
27-09-2025 27-09-2025 27-09-2025
09:30 09:30 09:30
10:301 10:20 I 10:20
• 60.00 50.00 50.00
53.33
I, 1i Lll .-
Step 4:
10:3J 11:40 70
10:20 11:25 65
10:20 11:25]65j
11:25 1310]10J
I114iofi 1350 130
1125 1320 IJ
13:50 17:10 200
13:1 16:20 190
13:20 16:4 200
133.33
126.67
=120.00
33.33
31.67
30.00
31.666666666666668
The T test was a pass but I will be recommending that the percolation area be built up level as it is on a 1:12 slope.
Step 5:
0.00
C-100 0 ___I
0.00 0
CO� 0.00I=O
F]0 0.00 00
0.00
000 0.00 =_
0 =0 0.00 F�
0=0 0.00]=
=0 0.001 I 0
0.00
0.00
Step 1:
290 . 290 290 300L 290 290
25 -Sep -2025
15:05
26 -Sep -2025
11:35
Step 3:
25 -Sep -2025
15:05
26 -Sep -2025
11 _35
25 -Sep -2025
15:05
26 -Sep -2025
11:35
51.67
Step 4:
10:25 11:2560.0j
10:25M11:30 65.00
L 10:30 11:50 80.001
1150 13:30 100.00
1125]i25[9000 90.00
11:30 �13_ 10 100.00
13:30 15:5545.00
12:55 15:20 145.00
13:10 IJ 150.0
98.33
105.00
108.33
24.5J
26.25
0
The topsoil at this site is of good quality and may be used to raise the soil percolation area up level.
Step 5:
II II 0.00 lII
U II 0.00 lI0
0.00 JILLL
II II II 0.0011 II
0.00
0.00
3.4 The following associated Maps, Drawings and Photographs should be appended to this site
characterisation form.
Groundwater
Yes
Yes
• Secondary Treatment System and soil polishing filter Eu
Ground Water
0.60
Mechanical aeration system and a soil polishing filter to be installed and constructed to EPA 2021 specifications. The
percolation area shall be made level using the insitu topsoil. I recommend 50m of percolation trench in the soil polishing filter
consisting of 5 lengths of trench each measuring 10m. The invert of the percolation trenches should be at 0.6m with 0.9m
pervious unsaturated soil below to ensure proper polishing of the final effluent. The percolation area shall measure 12m x 13m
Ensure that the final effluent from the mechanical aeration system is distributed evenly to each of the five percolation trenches.
It is important to ensure that the percolation trenches and related pipe work are put in at the correct slope. A surface water
drain measuring 1 m deep shall be employed (min 2m away) up -slope from the raised mound soil polishing filter to divert
surface water away from the percolation area.
NOTE: It is very important to ensure that the aeration pump remains on at all times on the mechanical aeration system or
otherwise the system will revert to septic conditions causing odors and poorer quality effluent which may lead to clogging of
the percolation trenches.
LI
LII 36.00
0.04j
5.00
10.00
0.60
25.00
System to be signed off by a suitably qualified person and recommendations in section 5.0 to be adhered to. Package
treatment system must conform to EN 12566-3 standard. Package treatment system to be properly installed and certified by
company supplying the system in accordance with the EPA 2021 code of practice. Keep records of desludging for five years.
Desludge tank as recommended by manufacturer and periodically inspect the system for damage or surface ponding.
Maintenance contract to be agreed by company supplying the package treatment system and contract must be adhered to so
as to ensure that the system continues to function properly.
Biolabs
Mr Q Michael Holohan
ITERERA, SCOTSTOWN, CO. MONAGHAN
GSI / EPA CERTIFIED
28 -Sep -2025
08681691621 biolabsirl@outlook.com
AP10002262
WELLS AND BOREHOLES ADJACENT TO THE SITE (WELL 88M)
?ublic Supply Source Protection Areas
SI-Inner Protection Area
SO -Outer Protection Area
SOURCE PROTECTION DATA (S/O)
RIVERS AND LAKES
AQUIFER CATEGORY Rk
VULNERABILITY MODERATE
11 =
--- '\ /
� � I
i
II
BEDROCK DPBL
$
•� z
r f
� a
:4?'1 \
AERIAL VIEW OF PERCOLATION SITE
MON.CO.CO.
PLANNING SECTION
2726
REG. NO
�'L.ANNING DEPARTMENT
REF. NO.
26/88
MONAGHAN CO, COUNCIL
N
SKETCH OF PERCOLATION AREA INCLUDING SITE SURROUNDS
ft• tz�
t +r
}1t��1rY /kra i _
S i�Vi4'ai'
ei
r i
•
VIEWS OF PERCOLATION SITE
VIEWS OF PERCOLATION SITE
VIEW OF PERCOLATION SITE
.dis �"�"�:='`4a`�See4T�i!" !.y at`,`ak �a, t::! ,•�1i� 4 .:::. � :� — _ —_—---,....��
fr-
:_: _____
TRIAL HOLE ON DAY OF EXCAVATION
,..•w � � . � n. - - ,� � " 'i.. y .lam•. "wiz" �'.S . *
- 4 - I_ii
•
L
.
} t a L A
CIF l °
t o 11 Ifr. �_ s, 7
Ssyf't I:� ^ 'h f.. r t ' \ ry.. _ c�P• ♦� �`t''.�L't'47 �`+�� 't G',C.� `t.:R
^6u & \ 4 `L� 'Af6��Jj s } r
j' ... Yi d ' 1!
C"
h,,RR -'----ax-'
r• .
'
/4.
r
' ` p
4.# / C.t' JJ
�
ir }y.•, f. S
.f
%>!.fit
i..F i r SVAF
.'.p
TRIAL HOLE TWO DAYS AFTER EXCAVATION
V,'1• .°
�.,Y,ti
� r i '•�
��°'YS�
-,A Ar rTr�Yy �' I'
��
j
Y
J
V
�
r:. y 6�Y 1 � rij� , ��
h�
;:1
____
lr`At �� •�A y
t
M �bM "il
Ti
MON. CO. CO.
PLANNING SECTION
2016
REG. NO
T2
T3
T TEST HOLES
PLANNING DEPART NT
PER NO.
26/88
MONAGHAN CO. COUNCIL
P1 P2
P3
it
P TEST HOLES
GROUND LEVEL
TOPSOIL
100MM
GEOTEXTILE LAYER
150MM WASHED
STONE ABOVE PIPE
0.6M
O 100MM PIPE
250MM WASHED
STONE BELOW PIPE
INVERT OF TRENCH
SUBSOIL MIN 0.9M
WATER TABLE
EACH TRENCH 500MM WIDE
SECTION THROUGH SUBSOIL PERCOLATION SYSTEM
OUTLINE SPECIFICATIONS FOR MOUNDED SOIL POLISHING FILTER
1. Treated effluent from the mechanical aeration sump unit shall be pumped
intermittently up to the distribution chamber on the percolation area feeding
the 5 percolation trenches. The percolation area shall be made level using the
topsoil from the site. The percolation area shall measure 12m x 13m and may
be landscaped into the contours of the site.
2. The slope of the percolation trenches from the distribution chamber shall be 1
in 200.
3. The length of each of the 5 percolation trenches shall be 10m. Total length
50m.
4. The separation distance between the percolation trenches shall be 2m (ie
2.5m centre to centre)
5. Percolation pipes shall be 100mm diameter smooth wall uPVC sewer pipes,
perforated at 4, 6 and 8 o'clock. Perforations shall be 8mm diameter, at
75mm centre's along the pipe. Holes shall be checked before installation to
ensure they are free from debris.
6. The width of each percolation trench shall be 500mm.
7. The depth of each percolation trench shall be 600mm below the mound
surface.
8. Percolation pipes shall be laid on a 250mm bed of washed gravel, having
particles in the range of 8 - 32mm.
9. Pipe surround shall be washed gravel, having particle size in the range 8 -
32mm.
10. Pipe cover shall be 150mm depth of washed gravel, having particle size in
the range of 8 - 32mm.
11. Geotextile layer to be placed on top of this followed by 100mm topsoil to
top of mound.
12. Geotextile shall be in accordance with EN ISO 10319.
Access / inspection points and vents shall be provided for the ends of the
percolation pipes. Covers shall be visible and installed to prevent the
ingress of water. They shall be suitable for rodding and scouring purposes.
13. A surface land drain 1m deep shall be employed upslope of the raised mound
soil polishing filter and not closer than 2m to divert surface water away
from it and prevent the water table rising in wet weather.
SCHEDULE OF SITE SEPARATION DISTANCES
PACKAGE TREATMENT SYSTEM
. Minimum distance to any dwelling = 7m
. Minimum distance to site boundary = 3m
. Minimum distance to trees = 3m
. Minimum distance to roads = 4m
. Minimum distance to slope breaks = 10m
. Minimum distance to watercourse / streams = 10m
. Minimum distance to soakaway =10m
. Minimum distance to open drain = 10m
. Minimum distance to lake or foreshore = 50m
able 6.3 EPA Code of Practice 2021
POLISHING FILTER
. Minimum distance to any dwelling = 10m
. Minimum distance to site boundary = 3m
. Minimum distance to trees = 3m
. Minimum distance to roads = 4m
. Minimum distance to slope breaks = 10m
. Minimum distance to water course / stream = 10m
. Minimum distance to soakaway = 10m
. Minimum distance to open drain = 10m
. Minimum distance to lake or foreshore = 50m
. Minimum distance to up gradient well = 15m
. Minimum distance well on same level = 30m
. Minimum distance to down gradient well = 40m
able 6.1 EPA Code of Practice 2021 unless stated otherwise