HomeMy WebLinkAbout2660018 - Notice of FI received to PB and Submitters
09/09/2026
Geoffrey John Paley,
Rainbow Cottage,,
Dernamoyle,,
Dartry,,
Co Monaghan.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Theresa Anne Paley,
Rainbow Cottage,,
Dernamoyle,,
Dartry,,
Co Monaghan.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Eoghan Corr,
EC Agri Services,
Tiernahinch,
Clones,
Co. Monaghan.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] Department of Housing, Local Government and Heritage,
Custom House,,
Dublin,,
Ireland,
D01 W6X0.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
Type text here
09/09/2026
Pauline & Roisin Carney,
Drumcall,
Drum,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp Type text here
09/09/2026
Blackesh Biogas Plant Concern Group,
C/O Darren Connolly,
Drumanny,
Drum,,
Co. Monaghan.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Mr Michael Briody,
Silverhill Ducks,
Emyvale,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Mc Caul Family,
Drumcall,
Drum,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Orla Mc Caul,
Drumcall,
Drum,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Patrick & Mari Markey,
Maghernakelly,
Drum,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] Brona Connolly,
Drumaney,
Drum,
Monaghan,
H16 NN59.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] EPA EPA,
EPA Headquarters,
Johnstown Castle Estate,,
County Wexford,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Grainne O Connor,
The Lawn,
Drumanny,
Drum,
Co. Monaghan.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Finbar Mc Caul,
Kilcrow,
Dartry,
Cootehill,
Co. Monaghan.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Michele Nic Bhloscaidh,
Cootehill,
Co. Cavan,
,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] Darren Connolly,
Drumaney,
Drum,
Co Monaghan,
H16NN59.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] Kelley Crowe,
Kilmore west,
Newbliss,
Co monaghan,
H18EN25.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
MR Hugh Birt,
Claragh,
Cootehill,
co Cavan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
James Johnston,
On Behalf of the Growers (Listed),
Cregganbragh, Churchfield,
Co. Mayo,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Churchfield Farm Producers Ltd.,
Cregganbragh,
Churchfield, Knock,
Co. Mayo,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Wesley Reilly,
Tonytallagh,
Drum,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] diarmaid kirby,
Glendarragh,
Barna cross,
newcastlewest,
V42EV24.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Stanley Carleton,
Dernamoyle,
Dartrey,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
J Kenneth Crowe,
Drumcall,
Drum,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Maxine Crowe,
Drumcall,
Drum,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Kieran O Connor,
The Lawn,
Drumanny, Drum,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
Anne Matthews,
Drumgole,
Rockcorry,
Co. Monaghan,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] An Taisce An Taisce,
5 Fosters Place,
Dublin 2,
D02 V0P9,
D02 V0P9.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] Uisce Eireann,
PO Box 6000,,
Dublin 1,
Ireland.,
.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that further information was received by the Planning Authority on 07/09/2026
and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp
09/09/2026
[E] Seán Finan,
DCU Alpha,
Old Finglas Road, Glasnevin, Dublin 11,
Dublin,
D11KXN4.
Re: Planning and Development Act 2000 (as amended).
Planning and Development Regulations 2001 (as amended).
26/60018 - permission for the proposed development consisting of : i. A 10-year permission
for a Renewable Biogas Plant and associated road improvements, on a site of approximately
6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on
lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant
will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with
other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion
technology. The development will consist of: (a) Buildings and associated Structures:
Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building
(9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated
dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m
h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined
Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m
GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined
Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx.
4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no.
Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator
Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank
(approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m
h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h);
a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2
Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan
Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m
h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks
(approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water
Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a
covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern
site boundary, connecting to the L2280, designed to provide safe and efficient access for all
vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this
site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole
Drum Co. Monaghan.
_______________________________________________________
A Chara,
I wish to advise you that significant further information was received by the Planning Authority on
07/09/2026 and you can view this information at the link below.
I also wish to inform you that this application is now due for decision on or before 01/11/2026.
Please find below a link to the planning application online:
https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22
Mise le Meas,
_________________________
ADMINISTRATIVE OFFICER
pp