Loading...
HomeMy WebLinkAbout2660018 - Notice of FI received to PB and Submitters 09/09/2026 Geoffrey John Paley, Rainbow Cottage,, Dernamoyle,, Dartry,, Co Monaghan. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Theresa Anne Paley, Rainbow Cottage,, Dernamoyle,, Dartry,, Co Monaghan. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Eoghan Corr, EC Agri Services, Tiernahinch, Clones, Co. Monaghan. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] Department of Housing, Local Government and Heritage, Custom House,, Dublin,, Ireland, D01 W6X0. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp Type text here 09/09/2026 Pauline & Roisin Carney, Drumcall, Drum, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp Type text here 09/09/2026 Blackesh Biogas Plant Concern Group, C/O Darren Connolly, Drumanny, Drum,, Co. Monaghan. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Mr Michael Briody, Silverhill Ducks, Emyvale, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Mc Caul Family, Drumcall, Drum, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Orla Mc Caul, Drumcall, Drum, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Patrick & Mari Markey, Maghernakelly, Drum, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] Brona Connolly, Drumaney, Drum, Monaghan, H16 NN59. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] EPA EPA, EPA Headquarters, Johnstown Castle Estate,, County Wexford, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Grainne O Connor, The Lawn, Drumanny, Drum, Co. Monaghan. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Finbar Mc Caul, Kilcrow, Dartry, Cootehill, Co. Monaghan. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Michele Nic Bhloscaidh, Cootehill, Co. Cavan, , . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] Darren Connolly, Drumaney, Drum, Co Monaghan, H16NN59. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] Kelley Crowe, Kilmore west, Newbliss, Co monaghan, H18EN25. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 MR Hugh Birt, Claragh, Cootehill, co Cavan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 James Johnston, On Behalf of the Growers (Listed), Cregganbragh, Churchfield, Co. Mayo, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Churchfield Farm Producers Ltd., Cregganbragh, Churchfield, Knock, Co. Mayo, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Wesley Reilly, Tonytallagh, Drum, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] diarmaid kirby, Glendarragh, Barna cross, newcastlewest, V42EV24. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Stanley Carleton, Dernamoyle, Dartrey, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 J Kenneth Crowe, Drumcall, Drum, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Maxine Crowe, Drumcall, Drum, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Kieran O Connor, The Lawn, Drumanny, Drum, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 Anne Matthews, Drumgole, Rockcorry, Co. Monaghan, . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] An Taisce An Taisce, 5 Fosters Place, Dublin 2, D02 V0P9, D02 V0P9. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] Uisce Eireann, PO Box 6000,, Dublin 1, Ireland., . Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp 09/09/2026 [E] Seán Finan, DCU Alpha, Old Finglas Road, Glasnevin, Dublin 11, Dublin, D11KXN4. Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60018 - permission for the proposed development consisting of : i. A 10-year permission for a Renewable Biogas Plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the R189 Road and south of the L2280 Road, on lands in the townlands of Maghernakelly and Drumcall, Co. Monaghan. The proposed Plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) Buildings and associated Structures: Administration Building (432sq.m GFA and approx. 5.94m High (h); Main Process Building (9,104sq.m GFA and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; Digestate Dryer Building (972sq.m GFA and approx. 16.54m h); Pellet Storage & Distribution Building (875sq.m GFA and approx. 12.34m h); a Combined Heat and Power Building (368.5sq.m GFA and approx. 10.01m h); Control Building (183.1sq.m GFA and approx. 5.57m h); Containerised Boiler (approx. 5.44m h); a Combined Dryer/Boiler/CHP dispersion stack approx. 20m h); and a Plant Room (22sq.m GFA and approx. 4.75m h). (b) Bunded Tank Farm: including a Digestate Treatment Plant (approx. 20m h); 6 no. Digester Tanks (approx. 27.86m h); a Sludge Buffer Tank (approx. 18.1m h); an Evaporator Feed Tank (approx. 12.1m h); a Condensate Tank (approx. 10.6m h); a Concentrate Tank (approx. 10.6m h); a Hot Water Tank (approx. 5.6m h); 2 no. Ammonia Strippers (approx. 9m h); 2 no. Desulphurisation Units (approx. 14m h); 2 no. Activated Carbon Units (approx. 5m h); a Gas Holder (approx. 10.65m h) with 4 no. approx. 13m high lightning rods. (c) A CO2 Liquefaction Plant (approx. 14.6m h); a Biogas Upgrade Plant (approx. 10.85m h); 4 no. Fan Coolers (approx. 2.2m H); a Flare Unit (approx. 10.1m H); a Fuel Storage Tank (approx. 1.85m h); a Gas Grid Entry Unit (approx. 5.1m h); a Firewater Tank (approx. 10.1m h); 3 no. LPG Tanks (approx. 3.8m h); 5 no. Feedstock Storage Tanks (approx. 9.5m h); an undergrounded Water Tank; a backup generator (approx. 2.6m h). (d) Provision of 35 car parking spaces and a covered cycle parking area. (e) A new vehicular access to the biogas facility from the northern site boundary, connecting to the L2280, designed to provide safe and efficient access for all vehicle types. (f) Local road improvement works to the L2280, (continued on site notice) at this site of approximately 8.8 hectares in the townlands of Maghernakelly, Drumcall and Drumgole Drum Co. Monaghan. _______________________________________________________ A Chara, I wish to advise you that significant further information was received by the Planning Authority on 07/09/2026 and you can view this information at the link below. I also wish to inform you that this application is now due for decision on or before 01/11/2026. Please find below a link to the planning application online: https://eplanning.ie/ePlan/AppFileRefDetails/2660018/22?localAuthorityId=22 Mise le Meas, _________________________ ADMINISTRATIVE OFFICER pp