Loading...
HomeMy WebLinkAbout2660380 - Visual Assessment ReportINSPECTION PLAN PROJECT DETAILS: DESIGNERS INVOLVED: da architects ltd Unit 6 Armagh Business Park Hamiltonsbawn Road, Armagh, Northern Ireland t . 02837 522271 f . 02837 517590 e . info @d aarchitectsltd.com Project: Structural Engineer (SEng): PM Engineering & Design Civil Engineer (CEng): N/A Client: Mr T & B Shanahan Mechanical Engineer (MEng): N/A Project Ref. No.: 2526 Electrical Engineer (EEng): N/A Status: CONSTRUCTION STAGE Date March 2026 Landscape designer (LAd): N/A For: Cooltaragh Dwelling Carried out by (Assigned Certifier AssC): Sam Nicholson Other: Bronagh Curry Note: Read in conjunction with Engineer’s Inspection plans. REF: WORKSTAGE: ITEMS OF WORK: NOTIFICATION PERIOD REQUIRED: TO BE INSPECTE D BY: DATES: REPEAT INSPEC TION IF APPLIC ABLE: SIGN OFF DATE: NOTE/COM MENT/ CERTIFICATI ON/ TEST/ SAMPLES/ STANDARDS OPEN CLOSED ACTION: 1 Commencement Review/examine topography, services, party structures, setting out 5 days Architect 2 Excavations Excavations, ground remediation, u/g services diversion. 5 days S. Engineer Architect 3 Covering foundations Foundations before block laying or covering in. 5 days S. Engineer Architect Cert Hardcore 5 days Architect Cert Blockwork 5 days Architect 4 Rising walls to DPC level Hardcore compacted and blinded prior to Installation of radon barrier. Rising wall penetrations. Dimensional check ground floor level 5 days Architect cert Compliance cert for waterproofing systems 5 days Architect 5 Underground services Drains, ducts, underground pipes before covering-in. 5 days Architect 6 GF sub floor poured Sub floor poured 5 days Architect 7 Radon barrier Installation of radon barrier complete. Drainage pop-ups. 5 days Architect 8 Steel Steel beams and bearings 5 days S. Engineer REC E I V E D : 1 0 / 0 9 / 2 0 2 6 Architect submission Fabrication drawings 10 days cert CE mark for all steelwork 9 Superstructure External masonry walls . Wall ties, ventilation and cavity barriers and soffit Dimensional check – first floor 5 days Architect 1st Floor Posi Joists Cert Cares mark or similar for reinforcement Cert Ancillary design cert for design of steelwork connections submission Layout general arrangement drawings for all precast concrete elements 10 days Cert Capacity of all precast concrete elements cert Ancillary design cert for design of precast concrete elements test Cube tests on all concrete test Cube tests on mortars 10 Roof level Dimensional check Natural slate, bracing, tie down and associated fasias, gutters etc.. Dimensional check ridge 5 days Architect cert Insulated panel 11 Floor insulation Floor insulation complete Prior to concrete screeds 5 days Architect 12 Wall preparation For cladding Membrane finish to wall and window installation. 5 days Architect 13 Wall insulation Full – fill cavity insulation 5 days Architect Test Air-tightness (Air leakage test to En13829) 14 Superstructure completions Timber joists Firestopping Cavity barriers Internal walls 5 days Architect S. Engineer 15 First fix 1st fix electrical 1st fix mechanical Internal drainage Completed roof before removal of scaffolding Dimensional check - ridge First fix joinery Stairs Prior to plasterboarding 5 days Architect Services Engineer. Test Pressure test mech. pipework. Above- ground drainage. Architect 16 Plasterboarding Completed plasterboarding prior to plastering. Fire and acoustic seals. Completed insulations prior to covering up. 5 days Architect 17 Second fix Plastering Fire doors Electrical 2nd fix. Fire detection and alarm system 5 days Architect REC E I V E D : 1 0 / 0 9 / 2 0 2 6 Mechanical 2nd fix. Heating system and controls. 2nd fix joinery Services Engineer. 18 Fire doors Inspection of fully completed fire door assemblies 5 days Architect cert Completed fire door assemblies 19 Completions Commissioning and certification of electrical and Mechanical services. 5 days Architect Services Engineer. Test L2 Fire detection and alarm system Architect Services Engineer. 20 Site Works Road construction, Pipework and manhole construction. Landscape 5 days Civil Engineer. Landscape designer Test CBR’s, Test Concrete cubes Test Pipework pressure test (water) Test Pipework pressure test (air) Cert pipes Cert Blocks, Cert concrete Cert Manhole covers Cert Road and filling materials Cert Fall arrest system Cert Balustrade glazing REC E I V E D : 1 0 / 0 9 / 2 0 2 6