Loading...
HomeMy WebLinkAbout2660280 - F.I. Maps - Site layout planExisting Public Road Carriage Level (Varies) CROSSFALL 5% Top of beveled kerb shall be a maximum of 20mm above existing public road carriageway surface 40mm of 10mm nominal size close graded wearing course bitumen macadam to comply with BS 4987. 60mm of 20mm nominal size dense basecourse bitumen macadam to comply with BS 4987. 100mm dense bitumen macadam roadbase. 150mm minimum of sub-base material comprising type B granular material in accordance with clause 804 of the specification for roadworks laid to crossfalls. 300mm minimum of capping layer comprising crushed rock on a layer of terram. Road 2 3. 4 0 0 20 . 0 0 0 27 . 9 8 4 40 . 6 5 4 10 . 0 0 0 30 . 0 0 0 40 . 6 5 4 0. 0 0 0 CHAINAGE ON CENTRELINE (m) 11 0 . 8 3 1 11 0 . 0 0 1 10 9 . 2 0 3 10 7 . 8 6 9 I. P . I. P . I. P . 11 0 . 5 0 1 10 8 . 9 9 0 10 7 . 8 0 1 11 0 . 9 1 6 LEVELS ON CENTRELINE OF CARRIAGEWAY (m) 11 0 . 0 0 1 10 9 . 2 0 2 10 7 . 8 6 9 11 0 . 5 0 4 10 8 . 9 9 0 10 7 . 8 6 9 LEVELS ON LEFT HAND CHANNEL (m) 10 9 . 8 7 6 10 9 . 0 7 8 10 7 . 7 4 4 11 0 . 3 9 4 10 8 . 8 6 5 10 7 . 7 4 4 LEVELS ON RIGHT HAND CHANNEL (m) GRADIENT -5.000% (-1 in 20.000) LENGTH = 16.600m GRADIENT -10.000% L = 7.984m -10.526% (-1 in 9.500) GRADIENT LENGTH = 12.670m VERTICAL DESIGN ON CARRIAGEWAY CENTRELINE CURVE R = 164.000 L = 17.459 STRAIGHT LENGTH = 19.168m HORIZONTAL DESIGN ON CARRIAGEWAY CENTRELINE 11 0 . 8 0 3 11 0 . 7 2 3 11 0 . 6 2 1 11 0 . 4 5 7 11 0 . 3 6 5 11 0 . 2 7 2 11 0 . 1 1 3 10 9 . 3 0 0 10 9 . 0 8 6 10 8 . 9 4 7 10 8 . 8 0 8 10 8 . 6 6 9 10 7 . 9 0 2 10 7 . 2 2 4 10 7 . 0 8 5 EXISTING LEVELS (m) Datum: 101.000M AOD Ro a d 1 MH MHSV 110.09 110.25 SC SCSCSCSC LP 10 5 MH 104.95 Cable ht=113.37 FL 104.26 Top of Tree=123.48 111.21 MH 111.61 MH 111.56 MH 111.86 MH MH 111.05 LP 10 8 10 5 FL FL 104.48 104.45 104.53 FL MH MH 104.24 10 6 Utility Cover 10 7 10 4 10 3 10 5 102 104.20105Utility Cover 104 10 4 10 4 Top of Tree=121.99 Road 1 H. P . 1 1 0 . 7 4 5 L.P. 107.061 L.P. 107.173 L. P . 1 0 5 . 6 5 2 R=6.0m R=10.00m R=6.0m 110.870 110.531 110.419 109.683 108.829 1 0 8 . 6 1 0 5.0 [10'-7"]R=6.0m 5.0 [10'-7 1/2"] 4.9 [10'-3 3/4"] 2.4 [5'-0 1/2"] 15.6 [33'-1"] R=10.00m 5.0 [10'-7"] Existing entrance gates and posts to be removed Existing hedgerow to be trimmed back to achieve and maintain visibility splay at entrance. Visibility splay at entrance shall be 49.00 x 2.40 x 1.05. Longitudinal gradient at entrance shall be -5.00% for initial 16.00m from public road edge. Refer to Longitudinal Section. Ro a d 2 New entrance gates and piers to be provided complete with timber post and rail fencing to be provided as shown. Dropped kerbs provided along edge of footpath and kerb radii on both sides of new entrance. R.G R.G R.G R.G NwSMH 225Ø uPVC P i p e t o t a k e S t o r m D r a i n a g e Runoff from New E n t r a n c e t o l o c a l L a k e . LOCATION OF SITE NOTICE Refer to Site Location Map (2603-ARC-003 for full extent of site boundary. Existing gate entrance to rear of residential property to be retained and used to provide vehicular entrance from proposed new entrance. Extent of proposed new entrance with pavement surface and kerbing shown shaded. Extent of 49.00m visibility splay from new entrance, at a setback of 2.40m from public road edge at entrance. Visibility splay is not impeded or obstructed along its entire length. Extent of 49.00m visibility splay from new entrance, at a setback of 2.40m from public road edge at entrance. In the event that the visibility splay is impeded or obstructed along its length by existing hedge rows or planting they shall be trimmed back and maintained so as not to affect the visibility from the entrance. Note Such hedgerows and/or planting fronts property in the ownership of the applicant. Proposed new entrance gates (2#) each 2.35m wide supported from 705x750x 2.10m high block/natural stone and capped piers. 5.0 [10'-7"] Existing 500x700x2.0m high block piers to be retained where new ornamental wrought iron gates (2#) each 2.20m wide shall be fitted in lieu of existing galvanised field gate. 4.6 [9'-9"] 5.0 [10'-6 1/2"] R=6.0m A North Sign& Gate Details Added July 2026 T.Finn PARTNERSHIP D E S I G N CREATIVE INNOVATIVE ARCHITECTURE CIVIL - STRUCTURAL ENGINEERING PROJECT MANAGEMENT t 041 6857200 f 041 6857201 e info@finn.ie w www.finn.ie Blakestown, Ardee, Co. Louth, Ireland NOTES 6. Sizes of proprietary items shall be checked with manufacturer. 2. Work to figured dimensions only. Do not scale drawing. 1. Copyright Reserved 2003 5. Proprietary items shall be fixed in strict accordance with manufacturers instructions. 7. The contractor shall be responsible for the coordination of structure, finishes and services. 4. Where appropriate, for details of r.c. structure, or mechanical and electrical details, see Engineers drawings 3. The contractor is responsible for checking all levels and dimensions on site and shall refer all discrepancies to the Architect AR C DRAWING. NO: JOB NO: c CLIENT: DATE: STATUS: SCALE: CHECKED: DRAWN: TITLE: PROJECT: REV. NO: REV. NO.DESCRIPTION DATE INITIALS B100 2603 Jack & Donna McDonnell As Shown @A2 June 2026 Planning Application Castleblaney, Co Monaghan T.Finn - Connabury N53 Roadway New Vehicular Entrance onto Longitudinal Section Site Layout Plan & Scale 1 : 400100 Site Layout Plan1 Vertical Scale 1 : 100 Horizontal Scale 1:500 100 Longitudinal Section2 N Scale 1 : 20100 Section @ Public - Entrance Rd Junction3 Existing drop-kerb, currently approximately 50 mm above the adjacent public-carriageway surface, shall be removed together with its existing bed, haunch and the affected entrance surfacing. A new precast beveled vehicular crossover kerb shall be installed with a target upstand of 20 mm, in accordance with TII Standard Construction Detail CC-SCD-05141. The private access shall be reconstructed to provide a smooth transition from the public carriageway where it shall be laid at a gradient of 5% from the public road along the new entrance for a distance of circa 16.00m as shown on the longitudinal section. The new entrance and access road shall be surfaced with bitmac as specified from the public-road edge. The interface with the existing public carriageway shall be formed by a neat saw-cut joint. Thin or feather-edged surfacing shall not be permitted. All disturbed pavement shall be reinstated using properly compacted bound materials, and the construction joint shall be sealed against water ingress. Surface-water drainage from new entrance area and access roadway shall not discharge onto the public road. Existing public-road surface drainage shall remain unimpeded. Final levels shall be confirmed by site survey before commencement, where a road opening license shall be obtained in advance of commencing any works within the public road and footpath areas. B Visibility Sighlines & Kerb Radii Altered Detail Added September 2026 T.Finn REC E I V E D : 1 0 / 0 9 / 2 0 2 6