Loading...
HomeMy WebLinkAbout2660395 - Other Assessments - Planning StatementGF.F.L FF.F.L 30 5 0 SI T E B O U N D A R Y SI T E B O U N D A R Y R E A R E L E A T I O N 84 3 3 S E C T I O N A A CRECE OCCUPANCY FF.F.L 30 5 0 GF.C.L FF.C.L 27 3 8 EISTING OICES NO CANGE O USE PROPOSED STOREALL GF.F.L FF.F.L 30 5 0 S I D E E L E A T I O N GF.C.L FF.C.L R.L S I D E E L E A T I O N GF.F.L FF.F.L 30 5 0 PROPOSED NEW DOOR TO PROVIDE MEANS OF ESCAPE PROPOSED EXTERNAL FIRE ESCAPE STAIR POSSIBLE REQUIREMENT TO CHANGE WINDOW TO FIRE RESISTANT TYPE (60MINS) GF.C.L FF.C.L R.L 6 Plantation Terrace Monaghan Co.Monaghan © copyright of mcguigan architects ltd M c G U I G A N ARCITECTS +353 47 77823 info@mcguiganarchitects.com www.mcguiganarchitects.com Project Address Client Scale Format Status Drawn By Date Drawing Title Drawing Number All dimensions to be taken on site - no dimensions to be scaled from this drawing. This drawing to be read in conjunction with all other relevant drawings, specifications etc. Any discrepancies to be reported to the Architect for clarification. This drawing may not be copied or reproduced without written consent. PLEASE NOTE THAT THIS IS A PLANNING DRAWING ONLY AND IS THEREFORE LIMITED IN ITS CAPACITY TO CONVEY THE TOTAL INFORMATION, DETAILS & SPECIFICATIONS NECESSARY TO COMPLETE THE WORKS. ANY WORK CARRIED OUT THAT IS NOT SPECIFIED OR DETAILED HERE WILL BE THE RESPONSIBILITY OF THE PERSONS CARRYING THEM OUT. IF ANY SITUATION ARISES WHICH WOULD CAUSE A CONTRAVENTION OF THE BUILDING REGULATIONS, THEN THE ARCHITECT SHOULD BE CONSULTED, OTHERWISE THE ARCHITECT CANNOT BE HELD RESPONSIBLE. ALL WORK AND MATERIALS ARE TO BE IN ACCORDANCE WITH CURRENT BUILDING REGULATIONS WHETHER DETAILED ON THIS DRAWING OR NOT. NOTES MRIAI RIBA Chartered Architects PassivHaus Designers Energy Consultants FOUNDED 1839THEROYAL THEOF OF IN N STTT IU E ARCHIT T EC S D ALERI ALL DIMENSIONS TO BE TAKEN ON SITE - NO DIMENSIONS TO BE SCALED FROM THIS DRAWING. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, SPECIFICATIONS ETC. ANY DISCREPANCIES TO BE REPORTED TO THE ARCHITECT FOR CLARIFICATION. THIS DRAWING MAY NOT BE COPIED OR REPRODUCED WITHOUT WRITTEN CONSENT. NO WORKS SHOULD BE CARRIED OUT WITHOUT PRIOR CONSENT FROM THE LOCAL PLANNING AUTHORITY. - SCHEDULE OF FINISHES: EXTERNAL WALLS TO MATCH EXISTING WINDOWS TO MATCH EXISTING DOORS TO MATCH EXISTING CILLS PRECAST CONCRETE ROOF TO REMAIN UNALTERED RWG TO MATCH EXISTING MONTESSORI MULLACH GLAS, MULLAGHMONAGHAN, CO. MONAGHAN GLENPARK MONTESSORI & NURSERY SCHOOL 1:100 A1 PLANNING ONLY PMcG / TA SEPTEMBER 2026 ELEVATIONS & SECTION MGA_26_0156_PL103 P L A N N I N G O N L Y DRAWING KEY EISTING CRECE PROPOSED CANGE O USE REC E I V E D : 1 5 / 0 9 / 2 0 2 6