Loading...
HomeMy WebLinkAbout2660167 - Final Grant21/09/2026 To: Klaine Childcare Limited Kieran O'Reilly Monaghan Road Castleblayney Co. Monaghan A75 EP84 File Number - 26/60167 Planning and Development Act 2000 (as amended) NOTIFICATION OF FINAL GRANT Monaghan County Council has by order dated 18/08/2026 granted the above named, for the development of land namely for:- permission for material change of use from an existing commercial building to a childcare facility, with internal reconfiguration, outdoor play area and installation of signage , at Drumillard Retail Park Drumillard Little, Castleblayney, Co. Monaghan., subject to the 7 condition(s) set out in the Schedule attached. Signed on behalf of MONAGHAN COUNTY COUNCIL. PP __________________________ ADMINISTRATIVE OFFICER ________________________ DATE 21/09/2026 26/60167 Klaine Childcare Limited Drumillard Retail Park, Drumillard Little, Castleblayney, Co. Monaghan. 1. The use hereby permitted shall cease and the premises shall revert to an authorised use within five years from the date of the final grant of permission, unless prior to the expiry of that period planning permission for its retention has been granted. Reason: Having regard to the temporary nature of the proposed use and in the interests of the proper planning and sustainable development of the area. 2. (a) The car parking spaces, set-down/pick-up areas, road markings, pedestrian routes and one-way circulation system indicated on the approved drawings shall be provided prior to the commencement of the childcare use and shall thereafter be retained for the lifetime of the development. (b) The proposed pedestrian guard rails shown on the approved drawings shall be installed prior to the commencement of the childcare use and shall thereafter be retained and maintained. Reason: In the interests of orderly development and pedestrian safety. 3. (a) Notwithstanding the details submitted, the permitted signage shall not be externally or internally illuminated. (b) No additional signs, flags, logos, other advertising material or illumination shall be erected or displayed on or adjacent to the development without prior permission from the Planning Authority. Reason: In the interests of visual amenity and the proper planning and sustainable development of the area. 4. As indicated, the childcare facility shall operate only between the hours of 08:00 and 18:30 Monday to Friday. Reason: In the interests of clarity and orderly development. 5. All waste and surface water arising from the development shall be discharged via the existing authorised drainage infrastructure serving the site. Reason: In the interest of public health and environmental protection. 6. Applicable development within the site in respect of water services shall be to standards as required by Uisce Éireann. Reason: In the interests of orderly development, public health and securing a satisfactory standard of development. 7. The development shall be carried out strictly in accordance with the plans and documents submitted on the 29/04/2026 as amended on the 27/07/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of proper planning and sustainable development. BUILDING CONTROL ADVICE NOTE Before Any Building Works Commence - Things you should check! 1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC); In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to commencement of a development and it must be submitted not less than 14 days and not more than 28 days before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the online national portal BCMS. Applicants are advised to register on this website in advance of submitting a commencement notice via the attached link: www.localgov.ie/en/bcms As the type of Commencement Notice required will vary depending on your proposed development, you are advised to seek advice from your agent or architect on what type of commencement notice is relevant to your proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice at 047-30521 or email: bcms@monaghancoco.ie Please be advised that works can not begin until the applicant has received a valid commencement notice from the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the works without a valid commencement notice and/or a valid FSC (if required for works/development). 2. Pre-Development Conditions; If there are any Pre-Development conditions on the schedule of conditions attached to your permission you should give your immediate attention to them prior to the commencement of your development. N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may result in the initiation of enforcement proceedings for compliance with same. 3. Construction Products Regulations (SI No 225 of 2013); You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with the requirements of the Construction Products Regulations. For more information, please see link provided below. https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/ 4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013; The regulations are to ensure that there is a safe working environment for all involved in the construction works, including dwellings. For more information; http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html