HomeMy WebLinkAbout2660264 - Final Grant
21/09/2026
To: Darragh McKenna & Neasa Kelly
Owen Cunningham
Thornford Lodge
Broomfield
Castleblayney
A75HE16
File Number - 26/60264
Planning and Development Act 2000 (as amended)
NOTIFICATION OF FINAL GRANT
Monaghan County Council has by order dated 18/08/2026 granted the above named, for
the development of land namely for:- permission to construct a Two Storey style dwelling
house, Detached domestic garage, new Foul wastewater treatment system & percolation
area, new entrance onto public road and all associated site development works , at
Aghadreenan, Castleblayney, Co. Monaghan, subject to the 6 condition(s) set out in the
Schedule attached.
Signed on behalf of MONAGHAN COUNTY COUNCIL.
__________________________
ADMINISTRATIVE OFFICER
__________________________
DATE
I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities
for homeowners under Safety, Health and Welfare at Work (Construction) Regulations
2013.
21/09/2026
pp
26/60264 Darragh McKenna & Neasa Kelly, Aghadreenan, Castleblayney, Co. Monaghan
1. (a) The developer shall pay to Monaghan County Council a sum of €2052 in accordance
with the General Development Contribution Scheme 2021-2026 made by the Council
under Section 48 of the Planning and Development Act 2000 (as amended), towards
expenditure incurred or proposed to be incurred by the Council in the provision of
community, recreation and amenity public infrastructure and facilities in the area.
(b) The sum attached to this condition shall be revised from the date of the grant of
planning permission to the value pertaining at the time of payment in accordance with
the Wholesale Price Index for Building and Construction (Materials and Wages).
(c) No works shall commence until payment of the development contribution is made in
full, or until Monaghan County Council has agreed in writing to a schedule of phased
payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the
expenditure incurred or proposed to be incurred by the Council in the provision of
community, recreation and amenity infrastructure and facilities in the area.
2. (a) Only that applicable portion of the roadside hedgerow, which must be lowered or
uprooted to provide adequate sight distances, shall be removed. Remaining mature
trees and hedgerow defining the site boundary shall be permanently retained in this
development, and shall be protected from damage at all times, particularly during
building operations.
(b) Any new site and roadside boundaries shall be planted with native hedgerow species
so as to ultimately form naturalised hedgerows similar to existing hedgerows in the
vicinity. Predominant species shall be whitethorn, with blackthorn, hazel and holly also
included. Planting shall be in a double staggered row with eight 2-3 year old plants per
metre; 250mm apart, with 300mm between rows.
(c) Hedgerow planting, as required, shall be supplemented with native tree species at
irregular intervals. Species shall include oak, sycamore and beech.
(d) Planting as required shall be carried out in the first planting season following
commencement of building operations and shall be permanently retained thereafter.
Any plant which fails shall be replaced. Trees shall be allowed to mature and shall not
be topped when trimming hedgerows.
(e) Any boundary fencing shall be of stained wood.
Reason: In the interest of visual amenity.
3. (a) Prior to any other works commencing, visibility splays of 70m, measured to the
nearside road edge in each direction, shall be provided from a point in the centre of
the entrance 2.4m from the road edge at a height of between 1.05m and 2m above
ground level to an object height of between 1.05m and 2m above ground level in both
directions. The visibility splays shall be retained and kept clear from obstructions
thereafter.
(b) Where it is necessary to remove hedges, fences, embankments or other obstructions
in order to achieve the required visibility splays, they shall be reinstated behind the
visibility splays. Any new trees or shrubs shall be planted back from the visibility splays
to allow for future growth and some species will require additional set back. All
existing planting shall be kept trimmed behind visibility splays.
(c) Where the existing roadside hedge/embankment is to be removed, the roadside verge
shall be widened (by grading back or infilling where necessary using appropriate inert
material) to include the entire area within the visibility splays, top soiled, and grassed
to the satisfaction of the Planning Authority.
(d) The new entrance shall form a bellmouth of 4m radius with edge of new boundary.
Recessed entrance shall be of sufficient dimensions to contain a stationary vehicle off
the public road. Entrance gates shall open inwards only.
(e) Entrance/access road shall be surfaced with concrete or bitmac from edge of public
road for a minimum of 5m and the surface shall be graded back so that its level at 3m
from the edge of the carriageway is a minimum of 100mm below road level. Gradient
of access road shall be not greater than 1:20 (5%) for the first 5m from boundary and
1:10 (10%) thereafter.
(f) French drain consisting of 300mm diameter concrete pipes backfilled to ground level
with suitable granular filter material shall be placed along full site frontage. Drain shall
discharge to the nearest appropriate watercourse or drainage pipeline. Suitable gullies
shall be placed at start, end and intersection of other drains and at not greater than
40m intervals. Separate application shall be made to Monaghan County Council if this
requires a road opening licence.
(g) Cattlegrid/ACO Drain/gullies shall be installed at proposed entrance and constructed
in such a manner as to prevent water from the entrance flowing onto the public road.
Similarly, measures shall be taken to prevent road surface water from flowing onto the
entrance. The discharge from the above drainage shall be piped to an appropriate
drainage pipeline or watercourse.
(h) Provision shall be made within the site for surface water drainage and no surface
water shall be allowed flow onto the public roadway. The discharge of surface water
from the public road onto the site through road surface drainage and road subsoil
drainage shall remain unimpeded.
(i) No development exempt or otherwise shall be erected over the public sewer, drain or
water-main, unless otherwise agreed in writing with the Planning Authority.
(j) Before any work is commenced on this development a security, by way of a cash
deposit, in the sum of €2250, shall be paid to the Planning Authority by the developer
to ensure the satisfactory completion of all surface water drainage/boundary work
within and abutting the site area, to prevent runoff of surface water onto the public
roadway and to ensure that no damage is caused to public roadway and any such
damage is repaired satisfactorily. Failure to carry out all entrance works to a standard
to the satisfaction of the Planning Authority will result in forfeiture of part or all of the
cash security.
Reason: In the interest of traffic/road safety.
4. (a) The proposed effluent treatment and disposal system shall be located, constructed
and maintained in accordance with the details submitted and in accordance with the
requirements of the document entitled Environmental Protection Agency Code of
Practice - Domestic Wastewater Treatment Systems (population equivalent ≤ 10),
2021. No system other than the type proposed in the application shall be installed
without the prior written agreement of the Planning Authority.
(b) A maintenance contract for the effluent treatment and disposal system shall be
entered into from the first date of occupancy of the dwelling and permanently
maintained thereafter. Signed and dated copies of the contract, which shall be for a
minimum period of three years, shall be submitted to, and agreed in writing with the
Planning Authority within two months of the installation.
(c) Surface water soakaways shall be located such that the drainage from the dwelling
and paved areas of the site shall be diverted away from the location of the polishing
filter.
(d) Within two months of the first occupation of the dwelling, the developer shall submit
a report from a suitably qualified person with professional indemnity insurance
certifying that the proposed effluent treatment and disposal system has been installed
and commissioned in accordance with the approved details and is working in a
satisfactory manner and that the polishing filter is constructed in accordance with the
standards set out in the EPA document.
(e) Proposed well shall be located a minimum of 30m uphill of proposed on-site
wastewater treatment system.
Reason: In the interest of public health and environmental protection.
5. Garage shall be used solely for purposes incidental to the enjoyment of the dwelling house
and not for any industrial, business or commercial purposes.
Reason: To protect the amenity of the area and to prevent unauthorised development.
6. The development shall be carried out in accordance with the plans and documents submitted
on the 26/06/2026, except as may otherwise be required in order to comply with the above
conditions.
Reason: In the interest of proper planning and sustainable development.
BUILDING CONTROL ADVICE NOTE
Before Any Building Works Commence - Things you should check!
1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC);
In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to
commencement of a development and it must be submitted not less than 14 days and not more than 28 days
before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the
online national portal BCMS. Applicants are advised to register on this website in advance of submitting a
commencement notice via the attached link: www.localgov.ie/en/bcms
As the type of Commencement Notice required will vary depending on your proposed development, you are
advised to seek advice from your agent or architect on what type of commencement notice is relevant to your
proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice
at 047-30521 or email: bcms@monaghancoco.ie
Please be advised that works can not begin until the applicant has received a valid commencement notice from
the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the
works without a valid commencement notice and/or a valid FSC (if required for works/development).
2. Pre-Development Conditions;
If there are any Pre-Development conditions on the schedule of conditions attached to your permission you
should give your immediate attention to them prior to the commencement of your development.
N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may
result in the initiation of enforcement proceedings for compliance with same.
3. Construction Products Regulations (SI No 225 of 2013);
You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with
the requirements of the Construction Products Regulations.
For more information, please see link provided below.
https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/
4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013;
The regulations are to ensure that there is a safe working environment for all involved in the construction works,
including dwellings.
For more information;
http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html