HomeMy WebLinkAbout2660105 - Compliance�Qc opus 9(L
Con,h,lrl . Cont.. Mhuinaachfin
Monaghan County Council
Stn September 2026
Martin McElroy
C/O Ted Duffy
Horizon Group
Market Square
Castleblayney
Co. Monaghan
Rannog Pleanail
Planning Section
00353 47 30532
planning@monaghancoco.ie
Re: Compliance with Planning ref: 26/60105
Applicant: Martin McElroy
A Chara,
The Planning Authority has assessed the information submitted on the 23/08/2026 in respect of
Conditions 2 and 3 of planning permission file number 26/60105.
It is considered that the submitted details satisfactorily address the requirements of Conditions 2 and
3 and are hereby agreed.
The developer remains responsible for implementing the agreed measures in full within the
timeframes specified by the permission. Accordingly, agreement of the submitted details shall not be
taken as confirmation that the associated works have been carried out on -site.
I trust this letterto be self-explanatory, but should you have any further queries please do not hesitate
to contact this office.
Mise le meas,
Kevin Dow
Assistant Staff Officer
Planning
0
Oifigi Pleanala
Comhairle Contae Mhuineachain
1 Sraid Bhaile Atha Cliath,
Muineachan,
H18 X982, Eire.
O®
00353 47 30500
info@monaghancoco.ie
eolas@monaghancoco.ie
www.monaghan.ie
0
Planning Offices
Monaghan County Council
1 Dublin Street,
Monaghan,
H18 X982, Ireland.
Failtionn an tCdaras Aitiuil roimh chomhfhreagras i nGaeilge
PLANNING AND DEVELOPMENT
Planning file number 26/60105
To: Kevin Dowds
RE: Compliance
Assessment
Details have been submitted in respect of Conditions 2 and 3 of planning permission file
number 26/60105.
Regarding Condition 2, the applicant has submitted details of proposed surface water
management measures for the sites, including rear land drainage infrastructure, discharge
arrangements to an existing open drain, and confirmation that surface water will not
discharge onto adjoining lands or properties. The submission also includes details of
permeability testing undertaken within Site 1 and proposes corresponding permeability
standards for the reinstated garden areas within Site 2.
Regarding Condition 3, the applicant has submitted details concerning the reinstatement
and finishing of external areas, including the proposed removal of hardcore within Site 2 and
the provision of imported subsoil and topsoil to rear garden areas. Boundary treatments and
the interface with adjoining lands have also been identified.
It is considered that sufficient information has now been submitted to address the
requirements of Conditions 2 and 3. However, it is noted that the conditions require not
only the submission and agreement of details, but also the implementation of the agreed
measures within the specified timeframes set out in the permission.
Conclusions
The information submitted satisfactorily addresses the details sought under Conditions 2
and 3 of planning permission file number 26/60105.
Notwithstanding this, agreement of the submitted details should not be taken as
confirmation that the associated drainage, landscaping and garden reinstatement works
have been completed. The developer remains responsible for implementing the agreed
measures in full within the timeframes specified by Conditions 2 and 3 of the permission.
Recommendation
Issue a response in the following terms:
The Planning Authority has assessed the information submitted on the 23/08/2026 in
respect of Conditions 2 and 3 of planning permission file number 26/60105.
It is considered that the submitted details satisfactorily address the requirements of
Conditions 2 and 3 and are hereby agreed.
The developer remains responsible for implementing the agreed measures in full within the
timeframes specified by the permission. Accordingly, agreement of the submitted details
shall not be taken as confirmation that the associated works have been carried out on -site.
Ben Clerkin
Planner
08/09/2026
Kevin Dowds
From: ted.duffy@horizonsurveyors.ie
Sent: Sunday 23 August 2026 08:29
To: Planning
Subject: Formal submission for condition 2 & 3 of planning reference number 26/60105
Attachments: Cover Letter1.pdf; Drainage Drawing.pdf
*Warning from Monaghan County Council IS Department* STOP. THINK. CHECK.
This email originated from outside Monaghan County Council. Do not click links or open attachments unless you
recognise the sender and know the content is safe.
Dear Sirs,
Please see attached which is a formal submission in relation to condition 2 & 3 of planning reference number
26/60105.
Kind Regards,
Ted Duffy
Horizon Group
Market Square
Castleblayney
Co. Monaghan
A75 FP70
0876640932
042 9740671
www.horizonsurvevors.ie
HORIZON GROUP
BUILDING & LAND SURVEYING
BER ASSESSORS
1
HORIZON GROUP
BUILDING B LAND SURVEYING
BER ASSESSORS
Please find enclosed information to address condition 2 & 3 of grant
of planning permission number 26/60105.
• Lawns to surround of site 1 has had a percolation test carried out and is achieving 10
in a P -test and 18 in a T -test.
• All storm water from site 1 is drained to a 6" double wall land drainage pipe to the
rear which is connected to an open drain behind site 2.
• All storm water from site 2 is drained to a 6" double wall land drainage pipe at the
rear boundary which is connected to an existing open drain on the site.
• Garden areas to site 2 is to have hardcore removed and minimum depth of 500mm
subsoil and 300mm topsoil imported. Topsoil and subsoil to achieve similar
percolation test results as site 1.
• No surface water shall discharge to adjoining properties.
• All boundaries shall be as per photos in attached drawing.
For Horizon Group
0 www.hortzon-groupie O Info@horizon-group.le o 087 664 0932 / 0877633015OH1ce:0429740671 ® Market Square, Castleblayney, Co.Monaghan
i¢ 3F9
'C r
aB
h
\c t&
F u
s b
3� 5yya pp:
5gs
W
=} gg{{ 99pp
iRRL
F— N
9r
s'sn
$o
N j
y
$tlt
�9y5
�
•'`
3�8
4`a
�8a
�o�