Loading...
HomeMy WebLinkAbout2660331 - F.I. Request Letter 24/09/2026 Padraig McQuaid C/O Colm McKernan Cuilmore Ballinamore Co. Leitrim Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60331 - planning permission to construct a commercial storage building and all associated site works and services at Monaghan Road, Clones Co. Monaghan. _______________________________________________________ Dear Sir/Madam, With reference to the above application, I am to inform you that the information submitted is not adequate to enable a decision to be made. In accordance with the provisions of Article 33 of the Planning and Development Regulations 2001 (as amended) you are hereby requested to submit further information as set out on the attached page. Article 33(3) states that “where a requirement under sub-article (1) or sub-article (2) (Clarification) is not complied with within the period of 6 months from the date of the requirement for further information, or such additional period, not exceeding 3 months, as may be agreed by the Planning Authority, the planning application shall be declared to be withdrawn”. It should be noted that you will be required to give notice in an approved newspaper under article 35(1)(a) and erect a site notice in accordance with Article 35 (1)(b) of the Planning and Development Regulations 2001 (as amended) if the further information received is considered to contain significant additional data. Please Note: 4 copies of Additional Information to be submitted. In the case of Significantly Different Information, 6 copies of additional information to be submitted. Yours faithfully, __________________________ ADMINISTRATIVE OFFICER pp 26/60331 Padraig McQuaid Monaghan Road, Clones, Co. Monaghan ADDITIONAL INFORMATION 1. Planning Authority considers that insufficient information has been submitted with the application to properly assess the effect of the proposed development on the existing road infrastructure in the vicinity of the application site. In this regard, the applicant is requested to submit the following; a. An independent Traffic and Transport Assessment for the proposed development, carried out by a qualified professional. The assessment must include the following information: i. The existing road network, traffic conditions and traffic count data at the location of the proposed entrance ii. The capacity of the current road network iii. The volume of trips generated from the development, calculate using TRICS or similarly approved method iv. Impact of the generated traffic presently including junction capacity calculation v. Impact of the generated traffic in the current year, +15 years including junction capacity calculations. 2. The proposed development is considered insufficient in terms of the environmental information provided. In this regard, the applicant is requested to: a. Submit a fully completed Water Protection Plan checklist. b. Submit a Confirmation of Feasibility from Uisce Éireann confirming that Clones Wastewater Treatment Plant has capacity to accept the hydraulic and organic loading arising from the proposed development. c. Submit a revised site layout plan, scale 1:500, demonstrating the following: i. All surface/storm water drainage systems (outlined in blue). ii. The directional flow of all surface water pipelines. iii. All associated discharge points and outfalls. iv. Proposed nature-based solutions for surface water. v. All foul water drainage systems (outlined in red). d. Submit a Construction and Environmental Management Plan (CEMP) for agreement. This plan shall be sufficient to demonstrate that adequate measures will be in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters. The Construction and Environmental Management Plan shall take account of best practice and the guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016” and shall include the identification of potential pathways to the groundwater aquifer and the River Shambles. The CEMP shall be prepared by a suitably qualified person and shall include the location details of the monitoring points where daily visual checks and where appropriate, weekly surface water monitoring (physical & chemical parameters) shall be carried out. 3. Taking account of the further information requested above, the Planning Authority note that the red line is around the proposed structure only. Given that the access onto the public road and any additional drainage proposed would be outside the current red line boundary of the application site, the applicant is requested to update the red line boundary of the application site to reflect the applicants land ownership. This would constitute Significant Further Information. In accordance with Article 35 of the Planning and Development Regulations 2001 (as amended), the Applicant shall: a. Revise the Site Notice indicating ‘Significant Further Information/Revised Plans, as appropriate’ b. Erect revised Site Notice on site c. Revise the Press Notice indicating ‘Significant Further Information/Revised Plans, as appropriate’ d. Submit a Copy of the Revised Site Notice and Revised Press Notice to the Planning Authority. The planner dealing with this application is Catherine Toner