Loading...
HomeMy WebLinkAbout2660123 - Final Grant 28/09/2026 To: Board of Management Urbleshanny National School C/O Aidan Sherlock Dawson St Monaghan Town Monaghan H18 A257 File Number - 26/60123 Planning and Development Act 2000 (as amended) NOTIFICATION OF FINAL GRANT Monaghan County Council has by order dated 25/08/2026 granted the above named, for the development of land namely for:- permission for the construction/placement of a modular classroom building to the east of the school site, the construction associated steps/ramps and all associated site works. The board of management Urbleshanny National School have submitted significant further info/revised plans, plans submitted relates to revision to the site boundaries, the addition of the retention of an Astro all weather football pitch, gas tank storage unit, covered seating area, the addition of additional parking, additional technical details and clarification information and all associated site works. Significant further information received included revised drawings, Construction and Environmental Management plan, and a Environmental protection plan checklist , at Carrowhatta Td, Scotstown, Co, Moanaghan, subject to the 4 condition(s) set out in the Schedule attached. Signed on behalf of MONAGHAN COUNTY COUNCIL. __________________________ ADMINISTRATIVE OFFICER __________________________ DATE I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities for homeowners under Safety, Health and Welfare at Work (Construction) Regulations 2013. 28/09/2026 pp 26/60123 Board of Management Urbleshanny National School Carrowhatta Td, Scotstown, Co. Monaghan 1. a) The applicant shall ensure completely separate foul and surface water drainage systems are in place. b) The site shall be managed in a manner which prevents the discharge of polluting matter to any ground or surface waters. c) The applicant shall ensure that mitigation measures outlined in the Construction and Environmental Management Plan (CEMP) are implemented and that adequate measures are put in place for any construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any watercourse. d) Any hazardous liquid waste, chemicals, greases, hydraulic fluids or oil/fuel storage containers temporary or otherwise to be bunded and located within the Compound Area. Bunds shall be designed to contain 110 % of the capacity of the largest storage container located within the bund. e) Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. f) If infilling material is required to be imported onsite the applicant shall conform to one of the following; (i) Economic operator shall utilise EPA Article 27 notification in moving soil infill material from one site to another. Official correspondence from the EPA granting approval shall be submitted to the Planning Authority prior to commencement of development, or; (ii) If using waste material as infill and prior to acceptance of material a valid permit must be issued by Monaghan County Council in accordance with the Waste Management (Facility Permit and Registration) Regulations 2007 as amended (iii) Buy topsoil material as a product for final landscaping purposes only. Documentation demonstrating purchase shall be submitted to Planning Authority. g) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act 1996 as amended. Reason: In the interest of public health environmental protection. 2. Development within the site in respect of water and sewerage services shall be to standards as required by Uisce Éireann. Reason: In the interests of orderly development, public health and securing a satisfactory standard of development. 3. No additional signs, flags, logos, other advertising material or illumination shall be erected or displayed on or adjacent to the development/property without prior permission from the Planning Authority. Reason: In the interest of visual amenity. 4. The development shall be retained and carried out in accordance with the plans and documents submitted to the Planning Authority on 01st April 2026, as amended on 05th August 2026. Reason: In the interest of proper planning and sustainable development. BUILDING CONTROL ADVICE NOTE Before Any Building Works Commence - Things you should check! 1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC); In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to commencement of a development and it must be submitted not less than 14 days and not more than 28 days before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the online national portal BCMS. Applicants are advised to register on this website in advance of submitting a commencement notice via the attached link: www.localgov.ie/en/bcms As the type of Commencement Notice required will vary depending on your proposed development, you are advised to seek advice from your agent or architect on what type of commencement notice is relevant to your proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice at 047-30521 or email: bcms@monaghancoco.ie Please be advised that works can not begin until the applicant has received a valid commencement notice from the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the works without a valid commencement notice and/or a valid FSC (if required for works/development). 2. Pre-Development Conditions; If there are any Pre-Development conditions on the schedule of conditions attached to your permission you should give your immediate attention to them prior to the commencement of your development. N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may result in the initiation of enforcement proceedings for compliance with same. 3. Construction Products Regulations (SI No 225 of 2013); You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with the requirements of the Construction Products Regulations. For more information, please see link provided below. https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/ 4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013; The regulations are to ensure that there is a safe working environment for all involved in the construction works, including dwellings. For more information; http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html