Loading...
HomeMy WebLinkAbout2660400 - Submission Acknowledgment No 2Rannog Pleanail Planning Section 00353 47 30532 Stig ansen Tisiaonisite planning@monaghancoco.ie Monaghan County Council PLANNING & DEVELOPMENT REGULATIONS 2001 (as amended) Article 29(2) ACKNOWLEDGEMENT of RECEIPT of SUBMISSION or OBSERVATION ona PLANNING APPLICATION THIS IS AN IMPORTANT DOCUMENT! KEEP THIS DOCUMENT SAFELY. YOU WILL BE REQUIRED TO PRODUCE THIS ACKNOWLEDGEMENT TO AN BORD PLEANALA IF YOU WISH TO APPEAL THE DECISION OF THE PLANNING AUTHORITY. IT IS THE ONY FORM OF EVIDENCE WHICH WILL BE ACCEPTED BY AN BORD PLEANALA THAT A SUBMISSION OR OBSERVATION HAS BEEN MADE TO THE PLANNING AUTHORITY ON THE PLANNING APPLICATION.s PLANNING AUTHORITY NAME :- MONAGHAN COUNTY COUNCIL PLANNING APPLICATION REFERENCE NO. 25/60400 (10-Year planning permission for development. The development will consist of the construction of a Single Turbine Wind Farm development on a 7.64-hectare site consisting of:- a) A single 4.8-megawatt (MW) wind turbine with an overall tip height of 143.8 metres, comprising a rotor diameter of 133.2m and a hub height 78m;b) Wind turbine foundation, crane hardstanding and assembly area; c) Temporary Construction Compound; d) Upgrade of an existing field entrance to new wind farm site entrance; e) Upgrading and widening of existing access tracks; f)New access tracks; g) Anew 10.5m clear span bridge crossing an existing stream; h) Demolition of the ruinous remains of two old stone buildings; i) An on-site 20kV electrical substation; j) Electrical and communication cabling within private lands; k) Underground 20kvV grid connection within private lands and within the R183 public road connecting to the existing ESB Clones 38kV Substation; |) Tree felling, landscaping and reinstatement works; and m) All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply Significant further information received relates to submitted, Appropriate screening assessment, Bat Mitigation Monitoring Plan, Bird Mitigation Monitoring Plan, Ecological Impact assessment, Noise Impact Report, Shadow flicker report, Fl Response Report, Flood Risk Assessment, Water environmental assessment and revised plans at The site is located within the townlands of Carney's Island, Altartate Glebe, Legarhill, and Clonavilla, County Monaghan. for Art Generation Limited) A submission/observation in writing has been received from: Mr Fintan Morgan, Cladowen, Newbliss, Co. Monaghan, on: 28/09/2026 in relation to the above planning application. The appropriate fee of €0 has been paid. The submission/observation is in accordance with the appropriate provisions of the Planning & Development Regulations 2001 (as amended) and will be taken into account by the Planning Authority in its determination of the planning application. To check the status of this application, please log i Monaghan.Co ouncil’s Search (ePlan) link and type in the above mentioned olan hei eferénde) ynum ber. NNING SECTION | «2 8 SEP 2096 Planning Authority Stamp Datie: 28/09/2026 _@ SO. © Oifigi Pleanala 00353 47 30500 Planning Offices Comhairle Gantae Mhuineachain info@monaghancoco.ie Monaghan County Council 1 Sraid Bhaile Atha Cliath, eolas@monaghancoco.ie 1 Dublin Street, . Muineachan, a Monaghan, H18 X982, Eire. nega H18 X982, Ireland. Failtionn an tUdaras Aitidil roimh chomhfhreagras i nGaeilge