Loading...
HomeMy WebLinkAbout2560400 - Submission - Gregory Sheridan1 To Whom It May Concern, I objected to this turbine before. Having read the Further Information, I still believe a turbine of this size is too close to my home and farm. My concerns about farming, nearby homes, wildlife, flooding, water quality and aviation lighting remain. I ask the Council to refuse permission. 1. Proximity to Active Agricultural Infrastructure My cattle shed is only about 383 metres from the proposed turbine. It is used every day for cattle, milking, feeding, machinery and veterinary work. On 22 April 2026, a turbine blade at Drumlins Park Wind Farm in Co. Monaghan broke apart, scattering debris across nearby farmland. Local reports stated that some pieces were up to 10 metres long. The same report referred to research indicating that blade fragments can potentially travel up to 450 metres. As my shed is within that distance, this recent local incident adds to my concerns about the safety of my family, workers and livestock. 2. Animal Welfare and Dairy Operations No proper study has been done on how this turbine could affect my dairy herd over its 35 -year life. Noise, moving blades, shadow flicker, lighting and maintenance could disturb cattle and interfere with the farm. 3. Residential Amenity The noise figure of 33.2 dBA is only a prediction, and shadow flicker depends on shutdown controls. I do not think the site is suitable if it needs constant controls to protect nearby homes. 4. Confirmed Woodland Clearance, Hedgerow Removal and Continuing Vegetation Management The works will clear conifers and about 340 metres of hedgerow, removing habitat and changing the farmland. Vegetation will need ongoing control. The reports also give two different bat buffers, 87 metres and 91 metres, which should be explained. 5. Bat Activity and Operational Curtailment The 2025 survey recorded 4,888 bat passes, including bats at high risk of collision. Five years of monitoring and possible shutdowns show that the turbine is in the wrong place. 6. Bird Monitoring, Adaptive Management and Shutdown Procedures There is still uncertainty about Whooper Swan and Greenland White -fronted Goose at Bishop's Lough. The proposal relies on more surveys, collision checks and possible shutdowns instead of dealing with the risk now. 7. Flood Risk and Watercourse Impacts The access route crosses the Legarhill Watercourse and lies partly in Flood Zones A and B. If the drainage or pollution controls fail, my land and nearby watercourses could be affected. 8. Appropriate Assessment Water runs from the site through the Legarhill Stream and Finn River to Lough Oughter and Associated Loughs SAC. If the Council cannot rule out a likely significant effect without relying on mitigation, a Stage 2 Appropriate Assessment should be required. 9. Aviation Lighting The turbine will have a fixed red aviation light of at least 2,000 candela, shining in all directions. This will affect nearby homes, birds and the dark rural countryside. 10. Community Engagement A website, newspaper notice and liaison contact are not proper consultation. Local residents, landowners and farmers should have been spoken to before the application was made. 11. Conclusion This site is too constrained. The turbine depends on habitat clearance, vegetation control, wildlife monitoring, possible shutdowns, flood works, drainage controls and permanent aviation lighting. That tells me it is not suitable. For these reasons, I ask Monaghan County Council to refuse Planning Application Ref. 25/60400. Sincerely, Gregory Sheridan Tanderagee Newbliss Co. Monaghan H 18RW72